A tunnel cable hoisting device

By designing a tunnel cable hoisting device, the problems of low efficiency, significant safety hazards, and severe damage in traditional cable installation were solved, achieving efficient and safe cable installation.

CN225012935UActive Publication Date: 2026-11-24ZHONG STEEL ERSHISI BUREAU GRP SHANGHAI DIANWUDIANHUA CO LT +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522513734.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-27
Publication Date
2026-11-24
Estimated Expiration
2035-11-27

AI Technical Summary

Technical Problem

Traditional cables are inefficient to install in subway tunnels, require a lot of labor for construction workers, pose safety hazards, and are easily damaged during pulling, making it difficult to move the supports.

Method used

A tunnel cable hoisting device was designed, including a tunnel moving vehicle, a fixed frame, a lifting mechanism, a hoisting mechanism, a sliding mechanism, and a tensioning mechanism. Through the coordinated work of these components, the cable can be hoisted and moved stably, reducing cable damage and improving installation efficiency.

Benefits of technology

It improves the efficiency and safety of cable installation, reduces cable damage, lowers the labor intensity of construction workers, and avoids safety accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225012935U_ABST
    Figure CN225012935U_ABST
Patent Text Reader

Abstract

This utility model discloses a tunnel cable hoisting device, including a tunnel mobile vehicle. A fixed frame is mounted on the upper end of the tunnel mobile vehicle, and a lifting mechanism is installed on the fixed frame. The lifting mechanism includes a lifting seat, a lifting column is mounted on the lifting seat, and a hoisting mechanism is mounted on the lifting column. The hoisting mechanism includes a hoisting frame, which is mounted on a hoisting tower. The hoisting tower is mounted on the lifting column. A sliding mechanism is provided on one side of the hoisting tower, and the hoisting frame is mounted on the sliding mechanism. A tensioning mechanism is connected to the hoisting frame, which is mounted on the hoisting tower. Guide pulley groups are respectively provided on the upper and lower sides of the hoisting frame. The hoisting device can quickly hoist and install cables onto the inner wall support of the tunnel cable, while reducing cable damage caused by forceful pulling, improving installation efficiency while minimizing cable damage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of cable hoisting technology, and in particular to a tunnel cable hoisting device. Background Technology

[0002] With the rapid development of urban construction and road transportation, subway expansion is booming, and more and more subway lines are spreading underground, forming a vast subway network. The power cables used to transmit electricity in subway tunnels are a crucial part of subway construction. Traditionally, cable installation relies on workers standing on scaffolding or trolleys to hang the cables on hooks. Because subway tunnels use 35-square-millimeter industrial-grade cables, which are thick and heavy, it is extremely strenuous for workers to manually carry, lift, and hang them. This method is not only inefficient but also poses safety hazards to construction workers.

[0003] Meanwhile, it is difficult to continuously mount cables onto supports during installation, and the cable surface is easily damaged during the pulling process, which is not conducive to the safe installation of cables. Furthermore, it is difficult to move the cables on the supports. Using a hoisting device to move the cables and suspend them on the inner wall of the support is more convenient and the laying efficiency is higher. Utility Model Content

[0004] The purpose of this utility model is to provide a tunnel cable hoisting device to solve the problems mentioned in the background art. The hoisting device can quickly hoist and install the cable on the inner wall support of the tunnel cable, while reducing cable damage caused by hard pulling, improving installation efficiency and reducing damage to the cable.

[0005] To achieve the above objectives, this utility model provides the following technical solution: a tunnel cable hoisting device, comprising a tunnel mobile vehicle, a fixed frame at the upper end of the tunnel mobile vehicle, a lifting mechanism mounted on the fixed frame, the lifting mechanism comprising a lifting seat, a lifting column mounted on the lifting seat, a hoisting mechanism mounted on the lifting column, the hoisting mechanism comprising a hoisting frame, the hoisting frame mounted on a hoisting tower, the hoisting tower mounted on the lifting column, a sliding mechanism on one side of the hoisting tower, the hoisting frame mounted on the sliding mechanism, the sliding mechanism comprising a sliding seat, the sliding seat being located on one side of the hoisting tower, a tensioning mechanism connected to the hoisting frame, the tensioning mechanism being mounted on the hoisting tower, the tensioning mechanism comprising a tension rope, one end of the tension rope being located on the hoisting tower, the other end of the tension rope being located on the hoisting frame, and guide pulley groups being respectively provided at the upper and lower ends of the hoisting frame, the guide pulley groups comprising a first guide pulley, a second guide pulley, a third guide pulley, and a fourth guide pulley.

[0006] The hoisting frame is rotatably connected to the hoisting tower.

[0007] The sliding seat is provided with a sliding rail, and a lifting frame is slidably connected to the sliding rail. The sliding rail is installed at an angle on the sliding seat, and a drive motor is provided on the lifting frame. The drive motor is installed on a motor base on one side of the lifting frame.

[0008] The first and second guide pulleys are installed on the right side of the hoisting frame, and the third and fourth guide pulleys are installed on the left side of the hoisting frame. The first guide pulley is located to the right of the second guide pulley, and the third guide pulley is located to the left of the fourth guide pulley.

[0009] The first guide pulley is fixedly installed on the hoisting frame, the second guide pulley is slidably connected to the hoisting frame, the third guide pulley is slidably connected to the hoisting frame, and the fourth guide pulley is fixedly installed on the hoisting frame.

[0010] The other end of the tension rope is connected to an electric roller, which is mounted on the hoisting tower.

[0011] Compared with the prior art, the beneficial effects of this utility model are: The lifting mechanism can be adjusted at any time according to different tunnel heights, increasing the scope of use of the hoisting device. It can also be adjusted at any time when laying cables at different heights, allowing for flexible control according to different construction conditions. The hoisting tower can improve the stability of the hoisting process, addressing overall issues at higher heights and preventing safety accidents caused by tilting due to cable length and weight during the pulling process. It also improves the stability of the chassis due to height and supports the movement stability of the hoisting frame during the hoisting process.

[0012] The sliding rails on the sliding seat allow the lifting frame to tilt and slide during hoisting, facilitating cable pulling and slightly raising the cable height to stabilize it. This also prevents the lifting tower from tilting or falling over due to large height adjustments, thus avoiding accidents. It also facilitates the movement of the tunnel mobile vehicle and drives the lifting frame to move using the drive motor.

[0013] The first and second guide pulleys can pull the cable a certain distance during the cable hoisting process, which facilitates the movement of the cable during hoisting. The third and fourth guide pulleys facilitate the upward guidance when the sliding rail moves at an inclined angle, while improving the flexibility of control in the tunnel and facilitating the handling of curves during tunnel cable laying.

[0014] The first guide wheel is fixed on the hoisting frame for stable cable transport. The second guide pulley is slidably connected to facilitate the adjustment of its height. Fine-tuning of the cable height during the laying process can be done through the second guide wheel, which facilitates cable laying. The third guide pulley can be adjusted up and down to increase the guiding angle at the front end during cable guiding, thereby improving laying efficiency. Attached Figure Description

[0015] Figure 1 This is a schematic diagram of the overall structure of the tunnel cable hoisting device of this utility model.

[0016] Figure 2 This is a schematic diagram of the structural principle of the hoisting mechanism of this utility model.

[0017] Figure 3 This is a schematic diagram of the tensioning mechanism of this utility model.

[0018] In the diagram: 1. Tunnel mobile vehicle, 2. Fixed frame, 3. Lifting mechanism, 4. Lifting seat, 5. Lifting column, 6. Hoisting mechanism, 7. Hoisting frame, 8. Hoisting tower, 9. Sliding mechanism, 10. Sliding seat, 11. Tensioning mechanism, 12. Tensioning rope, 13. Guide pulley block, 14. First guide pulley, 15. Second guide pulley, 16. Third guide pulley, 17. Fourth guide pulley, 18. Sliding rail, 19. Drive motor, 20. Motor base, 21. Electric roller. Detailed Implementation

[0019] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0020] Example 1: A tunnel cable hoisting device includes a tunnel mobile vehicle 1. A fixed frame 2 is mounted on the upper end of the tunnel mobile vehicle 1. A lifting mechanism 3 is mounted on the fixed frame 2. The lifting mechanism 3 includes a lifting seat 4, and a lifting column 5 is mounted on the lifting seat 4. A hoisting mechanism 6 is mounted on the lifting column 5. The hoisting mechanism 6 includes a hoisting frame 7, which is mounted on a hoisting tower 8. The hoisting tower 8 is mounted on the lifting column 5. A sliding mechanism 9 is provided on one side of the hoisting tower 8, and the hoisting frame 7 is mounted on the sliding mechanism 9. The sliding mechanism 9 includes a sliding seat 10, which is located on one side of the hoisting tower 8. A tensioning mechanism 11 is connected to the hoisting frame 7 and is mounted on the hoisting tower 8. The tensioning mechanism 11 includes a tension rope 12, one end of which is located on... On the hoisting tower 8, the other end of the tension rope 12 is set on the hoisting frame 7. The upper and lower ends of the hoisting frame 7 are respectively equipped with guide pulley groups 13, which include a first guide pulley 14, a second guide pulley 15, a third guide pulley 16, and a fourth guide pulley 17. The lifting mechanism can be adjusted at any time according to different tunnel heights, improving the application range of the hoisting device. At the same time, it can be adjusted at any time when laying cables at different heights, allowing for flexible control according to different construction conditions. The hoisting tower can improve the stability of the hoisting process, addressing overall issues at higher heights, preventing safety accidents caused by tilting due to cable length and weight during the pulling process, improving the stability of the chassis due to height, and supporting the movement stability of the hoisting frame during the hoisting process.

[0021] The hoisting frame 7 and the hoisting tower 8 are rotatably connected, which facilitates the hoisting frame 7 to increase the vertical height of the cable during the cable hoisting process, and makes it easier to adjust and lay the cable.

[0022] The sliding seat 10 is provided with a sliding rail 18, and a lifting frame 7 is slidably connected to the sliding rail 18. The sliding rail 18 is installed at an angle on the sliding seat 10. The lifting frame 7 is provided with a drive motor 19, which is installed on a motor base 20 on one side of the lifting frame 7. The sliding rail 18 on the sliding seat 10 can tilt and slide the lifting frame during the lifting process, which is convenient for pulling the cable. At the same time, it can slightly raise the height of the cable to stabilize the cable and prevent the lifting tower from tilting or falling over due to large height adjustments, thus preventing accidents. It also facilitates the movement and operation of the tunnel moving vehicle, and the drive motor drives the lifting frame to move.

[0023] The first guide pulley 14 and the second guide pulley 15 are installed on the right side of the hoisting frame 7, and the third guide pulley 16 and the fourth guide pulley 17 are installed on the left side of the hoisting frame 7. The first guide pulley 14 is located to the right of the second guide pulley 15, and the third guide pulley 16 is located to the left of the fourth guide pulley 17. The first guide pulley 14 and the second guide pulley 15 can pull the cable a certain distance in advance during cable hoisting, which facilitates the hoisting and movement of the cable. When the sliding rail moves at an inclined angle, the third guide pulley 16 and the fourth guide pulley 17 can continue to guide upwards, while improving the flexibility of control in the tunnel and facilitating the handling of bends in the cable laying in the tunnel.

[0024] The first guide pulley 14 is fixedly installed on the hoisting frame, the second guide pulley 15 is slidably connected to the hoisting frame 7, the third guide pulley 16 is slidably connected to the hoisting frame 7, and the fourth guide pulley 17 is fixedly installed on the hoisting frame 7. The first guide pulley 14 is fixed on the hoisting frame for stable cable transport. The slidable connection of the second guide pulley facilitates the adjustment of its height. During the laying process, the height of the cable can be finely adjusted using the second guide pulley, which facilitates the cable laying process. The third guide pulley can be adjusted up and down to increase the guiding angle at the front end during cable laying, thereby improving laying efficiency.

[0025] The other end of the tension rope 12 is connected to an electric roller 21, which is mounted on the hoisting tower 8. The tension rope 12 can tighten the hoisting frame 7 during cable hoisting to prevent the cable from being dragged and tilted due to its length during movement, thus achieving overall cable force balance.

[0026] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A tunnel cable hoisting device, comprising a tunnel mobile vehicle, characterized in that, The tunnel mobile vehicle is equipped with a fixed frame at its upper end, and a lifting mechanism is installed on the fixed frame. The lifting mechanism includes a lifting seat, a lifting column is installed on the lifting seat, and a hoisting mechanism is installed on the lifting column. The hoisting mechanism includes a hoisting frame, which is installed on a hoisting tower. The hoisting tower is installed on the lifting column. A sliding mechanism is provided on one side of the hoisting tower, and a hoisting frame is installed on the sliding mechanism. The sliding mechanism includes a sliding seat, which is located on one side of the hoisting tower. A tensioning mechanism is connected to the hoisting frame and is installed on the hoisting tower. The tensioning mechanism includes a tension rope, one end of which is located on the hoisting tower, and the other end of which is located on the hoisting frame. Guide pulley groups are respectively provided at the upper and lower ends of the hoisting frame. The guide pulley groups include a first guide pulley, a second guide pulley, a third guide pulley, and a fourth guide pulley.

2. The tunnel cable hoisting device according to claim 1, characterized in that, The hoisting frame is rotatably connected to the hoisting tower.

3. The tunnel cable hoisting device according to claim 1, characterized in that, The sliding seat is provided with a sliding rail, and a lifting frame is slidably connected to the sliding rail. The sliding rail is installed at an angle on the sliding seat, and a drive motor is provided on the lifting frame. The drive motor is installed on a motor base on one side of the lifting frame.

4. The tunnel cable hoisting device according to claim 1, characterized in that, The first and second guide pulleys are installed on the right side of the hoisting frame, and the third and fourth guide pulleys are installed on the left side of the hoisting frame. The first guide pulley is located to the right of the second guide pulley, and the third guide pulley is located to the left of the fourth guide pulley.

5. A tunnel cable hoisting device according to claim 1, characterized in that, The first guide pulley is fixedly installed on the hoisting frame, the second guide pulley is slidably connected to the hoisting frame, the third guide pulley is slidably connected to the hoisting frame, and the fourth guide pulley is fixedly installed on the hoisting frame.

6. A tunnel cable hoisting device according to claim 1, characterized in that, The other end of the tension rope is connected to an electric roller, which is mounted on the hoisting tower.