A hoisting device for PCCP pipeline alignment installation

By combining hangers, rails, electric hoists, ropes, and positioning components, the problem of excavating access roads during PCCP pipeline installation was solved, achieving efficient and stable alignment installation and reducing the amount of work.

CN225012983UActive Publication Date: 2026-11-24SINOHYDRO BUREAU 5
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522836689.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-31
Publication Date
2026-11-24
Estimated Expiration
2035-12-31

AI Technical Summary

Technical Problem

In the existing technology, PCCP pipeline installation requires the use of heavy lifting equipment such as crawler cranes, which leads to additional construction access road excavation, backfilling and reclamation work, increasing the workload.

Method used

The system employs a combination of hangers, rails, electric hoists, pull ropes, and positioning components. By moving the hangers on the rails and adjusting the height of the electric hoist, the PCCP pipeline can be installed in the correct position. The pull ropes and positioning components provide stability and prevent swaying.

Benefits of technology

No construction access road is required, which reduces additional earthwork excavation and reclamation work, improves installation efficiency and stability, and reduces the amount of work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225012983U_ABST
    Figure CN225012983U_ABST
Patent Text Reader

Abstract

This utility model relates to the field of PCCP pipe installation and discloses a lifting device for PCCP pipe alignment and installation, comprising: a hanger, a track, a pull rope, and a positioning component; the track is arranged along the axial direction of the installed PCCP pipe, and the hanger is movably mounted on the track; four electric hoists are provided on the top of the hanger; the bottom of the chain hoists of the two front electric hoists are connected by a first lifting belt, and the bottom of the chain hoists of the two rear electric hoists are connected by a second lifting belt; the PCCP pipe to be installed is placed on the first and second lifting belts; the pull rope is located on the rear side of the hanger; and the positioning component is located on the hanger. This utility model uses the movable hanger to insert the PCCP pipe to be installed into the installed PCCP pipe; the pull rope abuts against the rear end face of the PCCP pipe to be installed during insertion, and the positioning component abuts against the PCCP pipe to be installed from both sides during insertion, thereby ensuring the stability of the PCCP pipe to be installed during insertion, and playing the role of replacing the existing crawler crane in completing the alignment and installation of PCCP pipe.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of PCCP pipeline installation, specifically to a hoisting device for PCCP pipeline alignment and installation. Background Technology

[0002] PCCP pipe is short for prestressed concrete cylinder pipe. Due to its excellent performance in terms of sealing, pipe strength, pressure resistance, seismic resistance, and seepage resistance, it is widely used in water conservancy and hydropower projects such as long-distance water transmission.

[0003] In existing technologies, PCCP pipes are typically connected by a socket joint at the ends, requiring alignment before installation. Due to the significant weight of PCCP pipe sections, heavy lifting equipment such as crawler cranes is needed for alignment to ensure proper fit between the spigot and socket. Crawler cranes are specialized heavy construction equipment, requiring the use of access roads and additional excavation and backfilling of earth and rock. Post-construction land reclamation further complicates the project, resulting in substantial additional work. Utility Model Content

[0004] This utility model provides a hoisting device for PCCP pipeline alignment and installation, which solves the problem in the prior art that crawler cranes need to be used in conjunction with construction access roads, thus requiring additional excavation and backfilling of earth and stone, and reclamation and restoration after completion, resulting in a large amount of additional engineering work.

[0005] To solve the above-mentioned technical problems, the technical solution adopted by this utility model is: a hoisting device for PCCP pipeline alignment and installation, comprising: a hanger, a track, a rope and a positioning component; The track is arranged along the axial direction of the installed PCCP pipe, and the hanger is movably mounted on the track; Four electric hoists arranged in a square pattern are installed on the top of the frame, and the electric hoists are set vertically; the bottom of the chain hoist of the two electric hoists in front is connected by the first lifting belt, and the bottom of the chain hoist of the two electric hoists in the back is connected by the second lifting belt. The PCCP pipe to be installed is placed on the first and second lifting slings, and the height of the PCCP pipe to be installed is adjusted by an electric hoist so that the PCCP pipe to be installed is coaxial with the PCCP pipe already installed. The PCCP pipe to be installed is connected to the already installed PCCP pipe by moving the hanger on the track; The pull rope is positioned laterally on the rear side of the hanger to abut against the rear end face of the PCCP pipe to be installed during insertion. The positioning component is mounted on the hanger and is used to press against the PCCP pipe to be installed from both sides during insertion.

[0006] Specifically, the hanger includes a first gantry and a second gantry, with the first gantry located in front of and parallel to the second gantry; both the first and second gantry include two columns and a crossbeam connecting the tops of the two columns; the hanger also includes multiple longitudinal connecting beams; the crossbeams of the first and second gantry are connected by the longitudinal connecting beams, and the columns of the first and second gantry are also connected by the longitudinal connecting beams to form the hanger.

[0007] Furthermore, the pull rope is mounted on the two uprights of the second gantry.

[0008] Furthermore, each column is equipped with a caster wheel at its base; it also includes a drive motor, which drives the caster wheel to rotate, thereby moving the hanger on the track.

[0009] Furthermore, the positioning component includes two first support members and two second support members; The first top support includes a base with an adjusting screw hole; the bases of the two first top supports are respectively set on the left and right columns of the first gantry; the first top support also includes a top support cylinder, one end of which is provided with a screw and is rotatably set in the adjusting screw hole by the screw, and the other end is used to press against the PCCP pipe to be installed when plugged in. The second support member has the same structure as the first support member; the bases of the two second support members are respectively set on the left and right columns of the second gantry.

[0010] Furthermore, the base of the first support member is at the same height as the centerline of the installed PCCP pipe.

[0011] Furthermore, the two connection points between the pull rope and the two side columns are at the same height as the central axis of the installed PCCP pipe.

[0012] Compared with the prior art, this utility model has the following advantages and beneficial effects: By placing the PCCP pipe to be installed on the first and second lifting slings and adjusting its height using an electric hoist, the PCCP pipe to be installed is made coaxial with the already installed PCCP pipe. The moving hanger then connects the PCCP pipe to the already installed PCCP pipe. During connection, the pull rope is pressed against the rear end face of the PCCP pipe, and the positioning components press against the PCCP pipe from both sides, ensuring the stability of the PCCP pipe during connection. This method effectively replaces existing crawler cranes for PCCP pipe alignment and installation, eliminating the need for temporary access roads, additional excavation, backfilling, and post-installation land reclamation, thus avoiding extra workload for PCCP pipe installation. Attached Figure Description

[0013] Figure 1 This is a schematic diagram of the structure of this utility model.

[0014] Figure 2 This is a schematic diagram of the detailed structure of this utility model.

[0015] Figure 3 This is a rear view diagram of the present invention in use.

[0016] Figure 4 for Figure 2 Enlarged structural diagram at point A in the middle.

[0017] Figure 5 Layout diagram for PCCP pipeline installation.

[0018] Figure 6 Plan view for PCCP pipeline installation.

[0019] The meanings of the labels in the diagram are as follows: Hanger—1; Electric hoist—101; First lifting sling—102; Second lifting sling—103; Pull rope—104; First gantry—105; Second gantry—106; Crossbeam—107; Column—108; Longitudinal connecting beam—109; Screw rod—110; First top support component—111; Second top support component—112; Base—113; Top support cylinder—114; Distribution box—115; Orbit 2; PCCP pipes have been installed - 3; PCCP pipe to be installed - 4. Detailed Implementation

[0020] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model, so as to provide a better understanding of the concept of the present utility model, the technical problem solved, the technical features constituting the technical solution and the technical effects brought about.

[0021] like Figure 1 , Figure 5 and Figure 6 As shown, a hoisting device for PCCP pipeline alignment and installation includes: a hanger 1, a rail 2, a pull rope 104, and a positioning assembly; The track 2 is arranged along the axial direction of the installed PCCP pipe 3, and the hanger 1 is movably arranged on the track 2; The top of the hanger 1 is equipped with four electric hoists 101 arranged in a square shape, and the electric hoists 101 are set vertically; the bottom of the chain hoist of the two electric hoists 101 in front is connected by the first lifting belt 102, and the bottom of the chain hoist of the two electric hoists 101 in the rear is connected by the second lifting belt 103. The PCCP pipe 4 to be installed is placed on the first lifting belt 102 and the second lifting belt 103, and the height of the PCCP pipe 4 to be installed is adjusted by the electric hoist 101 so that the PCCP pipe 4 to be installed is coaxial with the PCCP pipe 3 already installed. By moving the hanger 1 on the track 2, the PCCP pipe 4 to be installed is connected to the PCCP pipe 3 that has already been installed; The pull rope 104 is arranged laterally on the rear side of the hanger 1 to press against the rear end face of the PCCP pipe 4 to be installed during insertion; The positioning component is mounted on the hanger 1 and is used to press against the PCCP pipe 4 to be installed from both sides during insertion.

[0022] In this utility model, the top of the hanger 1 is squarely equipped with four vertical electric hoists 101. When setting up the electric hoists 101, the midpoint of the line connecting the two front electric hoists 101 and the midpoint of the line connecting the two rear electric hoists 101 must be in the same vertical plane as the central axis of the installed PCCP pipe 3. With the help of the flexible first lifting belt 102 and second lifting belt 103, the PCCP pipe 4 to be installed is already horizontally aligned with the installed PCCP pipe 3 when placed on the first lifting belt 102 and the second lifting belt 103 (that is, the central axis of the PCCP pipe 4 to be installed and the central axis of the installed PCCP pipe 3 are in the same vertical plane). By adjusting the chain hoist length of the four electric hoists 101, the height of the PCCP pipe 4 to be installed is adjusted so that the PCCP pipe 4 to be installed is at the same height as the installed PCCP pipe 3, thereby completing the vertical alignment and thus completing the alignment work of the PCCP pipe 4 to be installed. At this point, the pull rope 104 is used to press firmly against the rear end face of the PCCP pipe 4 to be installed from behind, providing support for the rear end face of the PCCP pipe 4. This prevents the PCCP pipe 4 from swaying back and forth during the insertion process with the already installed PCCP pipe 3, avoiding changes in the height of the PCCP pipe 4 due to back and forth swaying, which would affect the alignment of the PCCP pipe 4 and the already installed PCCP pipe 3. Then, the positioning components set on the hanger 1 press firmly against the PCCP pipe 4 from both sides, providing sufficient lateral support for the PCCP pipe 4 to be installed, preventing lateral swaying of the PCCP pipe 4 during the insertion process and affecting alignment. Thus, the installation process of the PCCP pipe 4 is completed, replacing the existing crawler crane.

[0023] It should be noted that, in actual use, the construction sequence of this utility model device is as follows: First, a track 2 is set up and fixed according to the axial direction of the installed PCCP pipe 3. Then, a hanger 1 is assembled on the track 2 and an electric hoist 101 is installed. Next, the pipe transport vehicle is driven to the area below the hanger 1. The chain hoist 101 is connected to the first lifting strap 102 and the second lifting strap 103, which are laid on the pipe transport vehicle and located below the PCCP pipe 4 to be installed, so that the PCCP pipe 4 to be installed can be lifted by the hanger 1 and the electric hoist 101. Then, the height is adjusted to align the PCCP pipe 4 to be installed with the installed PCCP pipe 3 (i.e., the PCCP pipe 4 to be installed and the installed PCCP pipe 3 are coaxial). Finally, the installation of the PCCP pipe 4 to be installed and the installed PCCP pipe 3 is completed by moving the hanger 1. In the above process, since the length of the PCCP pipe 4 to be installed is usually longer than the length of the hanger 1 along the axial direction of the track 2, allowing the end of the PCCP pipe 4 to extend beyond the range of the hanger 1 for easy docking with the already installed PCCP pipe 3, the length of the pull rope 104 should also be longer than the width of the hanger 1. This ensures that when the pull rope 104 is pressed against the rear end face of the PCCP pipe 4 to be installed, the PCCP pipe 4 remains in a natural hanging state. Alternatively, the pull rope 104 can be a strip-shaped lifting strap to increase the contact area with the PCCP pipe 4 to be installed, achieving a better and more stable clamping effect.

[0024] As a preferred embodiment, such as Figure 2 As shown, the hanger 1 includes a first gantry 105 and a second gantry 106. The first gantry 105 is located in front of the second gantry 106 and is parallel to the second gantry 106. Both the first gantry 105 and the second gantry 106 include two columns 108 and a crossbeam 107 connecting the tops of the two columns 108. The hanger 1 also includes multiple longitudinal connecting beams 109. The crossbeams 107 of the first gantry 105 and the second gantry 106 are connected by the longitudinal connecting beams 109. The columns 108 of the first gantry 105 and the second gantry 106 are also connected by the longitudinal connecting beams 109 to form the hanger 1.

[0025] In this embodiment, the hanger 1 includes a first gantry 105 and a second gantry 106 that are parallel to each other. Multiple longitudinal connecting beams 109 are provided, with both ends of the longitudinal connecting beams 109 fixedly connected to the crossbeams 107 of the first gantry 105 and the second gantry 106, respectively, and fixedly connected to the columns 108 of the first gantry 105 and the second gantry 106. This makes the gantry 1 form a square frame as a whole, ensuring a robust structure and providing sufficiently stable support for the installation of the PCCP pipe 4. The four electric hoists are mounted on the crossbeams 107 of the first gantry 105 and the second gantry 106, and are stably supported by the portal structure of the first gantry 105 and the second gantry 106, preventing deformation of the hanger 1.

[0026] As a further embodiment, such as Figure 2 , Figure 3 and Figure 6 As shown, the pull rope 104 is mounted on the two uprights 108 of the second gantry 106.

[0027] In this embodiment, the two ends of the pull rope 104 are respectively tied to the two columns 108 of the second gantry 106. The second gantry 106 provides support for the pull rope 104 to press against the rear end face of the PCCP pipe 4 to be installed. This allows for easy adjustment of the height and length of the pull rope 104 according to the actual situation, ensuring that the pull rope 104 can press against the rear end face of the PCCP pipe 4 to be installed during the alignment and insertion process, thus preventing the PCCP pipe 4 to be installed from shifting or shaking in the front-to-back direction.

[0028] As a further embodiment, each column 108 is provided with a movable wheel at its bottom; it also includes a drive motor for driving the movable wheel to rotate, so as to move the hanger 1 on the track 2.

[0029] In this embodiment, the hoisting device also includes a drive motor. The bottom of the column 108 is equipped with casters, which are driven by the drive motor to rotate, thereby moving the hoist 1 on the track 2. The drive motor can be powered by setting up a mounting platform on the column 108 and placing a battery on it, or by directly connecting an external power source. Other power-consuming equipment, such as the electric hoist 101, is also powered in the same way. When using an external power source to power the drive motor, sufficient slack in the wire length must be provided to accommodate the movement of the hoist 1. Furthermore, a distribution box 115 can be installed on the column 108 to house various circuit breakers and residual current devices (RCDs) and other related electrical equipment.

[0030] As a further embodiment, such as Figures 2-4 As shown, the positioning assembly includes two first support members 111 and two second support members 112; The first top support 111 includes a base 113, which has an adjusting screw hole; the bases 113 of the two first top support 111 are respectively set on the left and right columns of the first gantry 105; the first top support 111 also includes a top support cylinder 114, one end of which is provided with a screw 110 and is rotatably set in the adjusting screw hole through the screw 110, and the other end is used to press against the PCCP pipe 4 to be installed when plugged in; The second support member 112 has the same structure as the first support member 111; the bases 113 of the two second support members 112 are respectively set on the left and right columns 108 of the second gantry 106.

[0031] In this embodiment, the positioning assembly includes two first top support members 111, which are respectively fixedly connected to the left and right side columns 108 of the first gantry 105. Each first top support member 111 includes a base 113 with an adjusting screw hole, and a top support cylinder 114. One end of the top support cylinder 114 is provided with a screw 110, which is rotatably disposed within the adjusting screw hole of the base 113. By rotating the top support cylinder 114, the screw 110 rotates within the adjusting screw hole, thereby adjusting the horizontal position of the top support cylinder 114, allowing the top support cylinder 114 to align with the P to be installed. The PCCP pipe 4 is tightly abutted; the support cylinders 114 of the two first support members 111 abut against the PCCP pipe 4 to be installed from both sides, providing lateral support for the PCCP pipe 4 to be installed, and preventing the PCCP pipe 4 to be installed from shaking in the left and right directions during the insertion process, which would affect the alignment; similarly, the bases 113 of the two second support members 112 are respectively set on the left and right columns 108 of the second gantry 106, thereby cooperating with the first support members 111 to make the PCCP pipe 4 to be installed more stable during the alignment and insertion process. The screw 110 should be a trapezoidal screw to give the screw 110 a certain self-locking ability.

[0032] The first support component 111 and the second support component 112 can also be ordinary lead screw pairs. The nut seat of the lead screw pair is fixed on the left and right columns 108 of the first gantry 105, and a similar effect can be achieved by rotating the lead screw.

[0033] As a further embodiment, such as Figure 3 As shown, the base 113 of the first top support 111 is at the same height as the centerline of the installed PCCP pipe 3.

[0034] In this embodiment, the base 113 of the two first top support members 111 is at the same height as the central axis of the installed PCCP pipe 3, which can ensure that when the two top support cylinders 114 are pressed against the PCCP pipe 4 to be installed, they are located at the horizontal radial ends of the PCCP pipe 4 to be installed, thereby better pressing against the PCCP pipe 4 to be installed and further ensuring the alignment and installation effect.

[0035] As a preferred embodiment, such as Figure 3 As shown, the two connection points between the pull rope 104 and the two side columns 108 are at the same height as the central axis of the installed PCCP pipe 3.

[0036] In this embodiment, by making the two connection points of the pull rope 104 and the two side columns 108 at the same height as the central axis of the installed PCCP pipe 3, the pull rope 104 is located in the middle of the PCCP pipe 4 when it is pressed against the rear end face of the PCCP pipe 4 to be installed. This ensures that the contact area between the pull rope 104 and the PCCP pipe 4 to be installed is large enough, and also prevents the pull rope 104 from slipping off during the installation of the PCCP pipe 4 due to slight relative sliding.

[0037] The terms "connection" and "fixing" appearing in this utility model description can refer to fixed connection, processing and forming, welding, or mechanical connection. The specific meaning of the above terms in this utility model should be understood according to the specific circumstances.

[0038] In the description of this utility model, the terms "center", "upper", "lower", "horizontal", "inner", "outer", etc., are used only to indicate the orientation or positional relationship for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or component referred to must have a specific orientation, and therefore should not be construed as a limitation of this utility model.

[0039] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this utility model, and not to limit it; although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of this utility model.

Claims

1. A hoisting device for aligning and installing PCCP pipelines, characterized in that, include: Hanger (1), track (2), pull rope (104) and positioning assembly; The track (2) is arranged along the axial direction of the installed PCCP pipe (3), and the hanger (1) is movably arranged on the track (2); The top of the hanger (1) is equipped with four square electric hoists (101), which are set vertically; the bottom of the chain hoists of the two electric hoists (101) in front is connected by the first lifting belt (102), and the bottom of the chain hoists of the two electric hoists (101) in the back is connected by the second lifting belt (103). The PCCP pipe (4) to be installed is placed on the first lifting belt (102) and the second lifting belt (103), and the height of the PCCP pipe (4) to be installed is adjusted by the electric hoist (101) so that the PCCP pipe (4) to be installed is coaxial with the PCCP pipe (3) already installed. By moving the hanger (1) on the track (2), the PCCP pipe (4) to be installed is connected to the PCCP pipe (3) that has been installed; The pull rope (104) is arranged laterally on the rear side of the hanger (1) to abut against the rear end face of the PCCP pipe (4) to be installed during insertion; The positioning component is mounted on the hanger (1) and is used to press against the PCCP pipe (4) to be installed from the left and right sides during insertion.

2. The hoisting device for PCCP pipeline alignment and installation as described in claim 1, characterized in that, The hanger (1) includes a first gantry (105) and a second gantry (106). The first gantry (105) is located in front of the second gantry (106) and is parallel to the second gantry (106). Both the first gantry (105) and the second gantry (106) include two columns (108) and a crossbeam (107) connecting the tops of the two columns (108). The hanger (1) also includes multiple longitudinal connecting beams (109). The crossbeam (107) of the first gantry (105) and the crossbeam (107) of the second gantry (106) are connected by the longitudinal connecting beams (109). The columns (108) of the first gantry (105) and the columns (108) of the second gantry (106) are also connected by the longitudinal connecting beams (109) to form the hanger (1).

3. A hoisting device for PCCP pipeline alignment and installation as described in claim 2, characterized in that, The pull rope (104) is set on the two columns (108) of the second gantry (106).

4. A hoisting device for PCCP pipeline alignment and installation as described in claim 2, characterized in that, Each column (108) is equipped with a moving wheel at its bottom; it also includes a drive motor, which drives the moving wheel to rotate so as to move the hanger (1) on the track (2).

5. A hoisting device for PCCP pipeline alignment and installation as described in claim 2, characterized in that, The positioning assembly includes two first support members (111) and two second support members (112). The first top support (111) includes a base (113) with an adjusting screw hole; the bases (113) of the two first top supports (111) are respectively set on the left and right columns of the first gantry (105); the first top support (111) also includes a top support cylinder (114), one end of the top support cylinder (114) is provided with a screw (110), and is rotatably set in the adjusting screw hole through the screw (110), and the other end is used to abut against the PCCP pipe (4) to be installed when plugged in. The second top support (112) has the same structure as the first top support (111); the bases (113) of the two second top supports (112) are respectively set on the left and right side columns (108) of the second gantry (106).

6. A hoisting device for PCCP pipeline alignment and installation as described in claim 5, characterized in that, The base (113) of the first top support (111) is at the same height as the centerline of the installed PCCP pipe (3).

7. A hoisting device for PCCP pipeline alignment and installation as described in claim 1, characterized in that, The two connection points of the pull rope (104) and the two side columns (108) are at the same height as the central axis of the installed PCCP pipe (3).