A sewage treatment process system

By designing a multi-stage annular reaction tank and optimizing the AAO process, combined with magnetic coagulation sedimentation and filter cloth filters, the problems of low purification level and large footprint in traditional sewage treatment have been solved. This has achieved efficient and energy-saving sewage treatment, reached high standards of effluent quality, and avoided sludge accumulation and waste.

CN225013264UActive Publication Date: 2026-11-24HAIKOU KAIYUAN WATER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202521967877.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-09-12
Publication Date
2026-11-24
Estimated Expiration
2035-09-12

AI Technical Summary

Technical Problem

Traditional urban wastewater treatment processes suffer from low purification levels, small treatment capacity, low efficiency, large land area requirements, and problems such as sludge accumulation in sedimentation tanks leading to sludge turning over and deterioration of indicators.

Method used

The system adopts a multi-stage annular reaction tank design, combined with the AAO process, to achieve anoxic denitrification by controlling the reflux and aeration rate. It uses magnetic coagulation sedimentation and filter cloth filter for deep treatment, and a three-phase separator to achieve effective separation of water, air and sludge. The positions of the anoxic tank and anaerobic tank are optimized to enhance the phosphorus removal effect. It is equipped with a carrier addition device and backwashing components to control the amount of carrier used.

Benefits of technology

It improves purification level and treatment efficiency, reduces land occupation, prevents anaerobic sludge accumulation, achieves high standard of effluent quality, saves energy consumption, and avoids waste and pollution through resource reuse and quantitative addition.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225013264U_ABST
    Figure CN225013264U_ABST
Patent Text Reader

Abstract

This utility model discloses a wastewater treatment process system, including a coarse screen, an equalization tank, a fine screen, a vortex grit chamber, a reaction tank, a magnetic coagulation sedimentation tank, a cloth filter, and a disinfection tank. The coarse screen is located before the equalization tank, the fine screen is located after the equalization tank, and the fine screen is located before the vortex grit chamber. The vortex grit chamber is connected to the reaction tank, and the reaction tank is connected to the magnetic coagulation sedimentation tank. The reaction tank includes an anaerobic tank, an anoxic tank, an aerobic tank, and a sedimentation zone. The reaction tank is arranged in a ring shape, with the aerobic tank in the inner ring, the anaerobic tank and the anoxic tank in the outer ring, and the sedimentation zone located above the aerobic tank. The magnetic coagulation sedimentation tank is connected to the cloth filter, and the cloth filter is connected to the disinfection tank. The disinfection tank is equipped with an effluent discharge pipe. The main function is to improve the purification level, increase the wastewater treatment capacity and efficiency through multi-stage treatment, and the ring-shaped stacked arrangement reduces the footprint.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of wastewater treatment technology, and in particular to a wastewater treatment process system. Background Technology

[0002] With rapid urbanization, the discharge of large amounts of untreated domestic sewage can severely pollute the environment. Treating domestic sewage can not only alleviate water pollution but also enable reuse, thus easing water scarcity. Traditional urban sewage treatment suffers from low purification levels, small treatment volumes, poor water quality, and low efficiency. Generally, the process includes pretreatment, primary treatment, secondary biological treatment, and sludge treatment, with relatively low standards. To meet Class IV surface water standards and ensure compliant discharge, further advanced treatment is required after secondary biological treatment. In practice, traditional AAO (Anaerobic-Anaerobic-Sludge) processes require large equipment footprints, and anaerobic sludge accumulation at the bottom of sedimentation tanks can cause sludge backflow and deterioration of indicators, hindering use and maintenance. Utility Model Content

[0003] In view of the above-mentioned prior art, the present invention provides a wastewater treatment process system, which mainly solves the above-mentioned technical problems.

[0004] To achieve the above objectives, the technical solution of this utility model embodiment is implemented as follows: A wastewater treatment process system includes a coarse screen, an equalization tank, a fine screen, a vortex grit chamber, a reaction tank, a magnetic coagulation sedimentation tank, a cloth filter, and a disinfection tank. The coarse screen is located before the equalization tank, the fine screen is located after the equalization tank, and the fine screen is located before the vortex grit chamber. The vortex grit chamber is pipe-connected to the reaction tank, and the reaction tank is connected to the magnetic coagulation sedimentation tank. The reaction tank includes an anaerobic tank, an anoxic tank, an aerobic tank, and a sedimentation zone. The reaction tank is arranged in a ring shape, with the aerobic tank in the inner ring and the anaerobic and anoxic tanks in the outer ring. The sedimentation zone is located above the aerobic tank. The magnetic coagulation sedimentation tank is connected to the cloth filter, and the cloth filter is connected to the disinfection tank. The disinfection tank is equipped with an effluent discharge pipe. Furthermore, the anoxic tank is located in front of the anaerobic tank, the aerobic tank is located behind the anaerobic tank, the anoxic tank is connected to the inlet pipe, and the aerobic tank is provided with a mixed liquid gas lift return channel that connects to the anoxic tank.

[0005] Furthermore, a three-phase separator is provided between the aerobic tank and the sedimentation zone.

[0006] Furthermore, it also includes a chemical dosing room, an intercepting well, a sludge storage tank, and a sludge thickening and dewatering room. The intercepting well is connected to the coarse bar screen, the sludge storage tank is connected to the magnetic coagulation sedimentation tank, and the sludge thickening and dewatering room is connected to the sludge storage tank.

[0007] Furthermore, a powdered biological carrier dosing device is provided above the aerobic tank. The powdered biological carrier dosing device includes a material tank, which is equipped with a liquid outlet pipe and a water inlet pipe. A weighing assembly is provided on the upper left side of the material tank. The weighing assembly includes a housing, a weighing sensor, a weighing plate, a discharge cylinder, a pusher plate, a baffle plate, a hopper, and a screw feed shaft. The housing is fixed to the material tank and has a discharge port communicating with the material tank. The weighing sensor is mounted on the housing, and the weighing plate is mounted on the weighing sensor. The discharge cylinder is connected to the housing, and the pusher plate is connected to the output end of the discharge cylinder. The baffle plate is rotatably connected to the housing, and the hopper is fixed to the upper part of the housing. The screw feed shaft is rotatably connected to the lower end of the hopper.

[0008] Furthermore, the material barrel is equipped with a first motor, which is connected to a stirring shaft, and the stirring shaft is located inside the material barrel.

[0009] Furthermore, the hopper is connected to a second motor and a rotary cylinder, the output end of the second motor is connected to the screw feed shaft, and the output end of the rotary cylinder is connected to the baffle plate.

[0010] Furthermore, a backwashing assembly is provided on the right side of the material tank. The backwashing assembly includes a backwashing inlet pipe, a backwashing pipe, a bearing seat, a retaining ring, a connecting sleeve, a first gear, a second gear, and a third motor. The connecting sleeve is fixed to the material tank, the bearing seat is connected to the material tank, the backwashing pipe is rotatably connected to the bearing seat, the retaining ring is fixed to the backwashing pipe, one end of the backwashing pipe is connected to the connecting sleeve, the connecting sleeve is provided with a sealing ring, the third motor is fixed to the material tank, the first gear is connected to the output end of the third motor, the backwashing pipe is provided with a second gear that meshes with the first gear, and the backwashing inlet pipe is connected above the connecting sleeve.

[0011] Furthermore, the bottom of the material bucket is provided with a base, the base is provided with supporting feet, and the bottom of the material bucket is provided with a drain pipe.

[0012] Furthermore, the sedimentation zone is connected to a recycling device, which is equipped with a composite powder carrier recycling pipe connected to the aerobic tank, and a sludge discharge pipe.

[0013] The beneficial effects of this utility model are as follows: (1) By using "coarse / fine screen and vortex grit chamber" for pretreatment, sand particles of a certain diameter in the sewage are removed in advance to ensure that the subsequent secondary treatment can operate normally. It can also remove some scum and grease in the sewage, and ensure the normal growth of microorganisms in the secondary treatment. The secondary biological treatment adopts the AAO process. The downstream deep treatment adopts the "magnetic coagulation sedimentation + filter cloth filter" process. The disinfection tank adopts "ultraviolet + sodium hypochlorite combined disinfection" to improve the purification level and efficiency, achieve higher emission standards, and reduce pollution. The reaction tank is arranged in a multi-stage ring shape, and anoxic denitrification is achieved by controlling the internal reflux and aeration. The inner ring integrates the aerobic tank and the sedimentation zone. The superposition of the sedimentation zone and the aerobic tank significantly reduces the footprint. The sedimented sludge is directly separated and returned to the aerobic tank through the three-phase separator in the sedimentation zone, which prevents the sludge turning and index deterioration caused by anaerobic sludge accumulation at the bottom of the traditional sedimentation tank. The three-phase separator achieves effective separation of water, air and sludge, and the separated gas is collected to form a large flow of air lift, realizing the non-powered reflux of the sludge-water mixture in the system and saving energy. (2) By absorbing the advantages of the improved A / A / O process, the anoxic tank is placed in front of the anaerobic tank. The return sludge and recycled carrier from the carrier separator, as well as 30-50% of the influent and 50-150% of the mixed liquor return, all enter the anoxic zone, with a residence time of 1-3 hours. The return sludge and mixed liquor undergo denitrification in the anoxic tank to remove nitrate oxygen before entering the anaerobic zone, ensuring the anaerobic state of the anaerobic tank and enhancing the phosphorus removal effect. (3) By setting up a carrier addition device, the carrier is quantitatively added through the weighing component, avoiding waste and pollution, and also avoiding insufficient quantity that affects the reaction efficiency. The material tank is cleaned by the backwashing component to avoid carrier residue causing an impact. Attached Figure Description

[0014] Figure 1 This is a schematic diagram of the structure of a wastewater treatment process system according to an embodiment of this application; Figure 2 This is a schematic diagram of the structure of the reaction tank in an embodiment of this application; Figure 3 This is a partial cross-sectional view of the carrier dispensing device in the embodiments of this application; Figure 4 This is a cross-sectional view of the carrier dispensing device in an embodiment of this application; Figure 5 This is an enlarged view of point A in an embodiment of this application; Explanation of icon numbers: 1. Interception well; 2. Coarse bar screen; 3. Equalization tank; 4. Fine bar screen; 5. Cyclone grit chamber; 6. Reaction tank; 7. Magnetic coagulation sedimentation tank; 8. Cloth filter; 9. Disinfection tank; 10. Chemical dosing room; 11. Sludge storage tank; 12. Sludge thickening and dewatering room; 13. Anaerobic tank; 14. Anoxic tank; 15. Aerobic tank; 16. Sedimentation zone; 17. Blower; 18. Pressure relief and exhaust pipe; 19. Material tank; 20. Discharge pipe; 21. Housing; 22. Weighing sensor; 23. Weighing plate; 4. Discharge cylinder; 25. Push plate; 26. Baffle plate; 27. Hopper; 28. Spiral feed shaft; 29. ​​Discharge port; 30. First motor; 31. Stirring shaft; 32. Second motor; 33. Rotary cylinder; 34. Backwash inlet pipe; 35. Backwash pipe; 36. Bearing seat; 37. Snap ring; 38. Connecting sleeve; 39. First gear; 40. Second gear; 41. Third motor; 42. Base; 43. Support foot; 44. Drain pipe; 45. Sealing ring; 46. Nozzle. Detailed Implementation

[0015] The technical solution of this utility model will be further described in detail below with reference to the accompanying drawings and specific embodiments. Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this utility model belongs. The terminology used in this specification of this utility model is for the purpose of describing particular embodiments only and is not intended to limit the utility model. In the following description, the expression "some embodiments" refers to a subset of all possible embodiments; however, it should be understood that "some embodiments" can be the same subset or different subsets of all possible embodiments and can be combined with each other without conflict.

[0016] It should also be noted that when an element is referred to as being "fixed to" another element, it can be directly attached to the other element or there may be an intervening element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or there may be an intervening element. The terms "vertical," "horizontal," "inner," "outer," "left," "right," and similar expressions used herein are for illustrative purposes only and do not represent the only possible implementation.

[0017] Example 1 See attached document Figure 1-2This application provides a wastewater treatment process system, including a coarse screen 2, an equalization tank 3, a fine screen 4, a vortex grit chamber 5, a reaction tank 6, a sedimentation zone 16, a magnetic coagulation sedimentation tank 7, a filter cloth filter 8, and a disinfection tank 9. Municipal wastewater is connected to the coarse screen 2 via a pipeline. The coarse screen 2 is connected to the equalization tank 3 via a pipeline. The equalization tank 3 is used to regulate the water quality and quantity. The equalization tank 3 is connected to the fine screen 4 via a pump well. The fine screen 4 is connected to the vortex grit chamber 5 via a pipeline. It is mainly used to remove sand particles of a certain diameter from the wastewater to ensure the normal operation of subsequent primary and secondary treatment. It can also remove some scum and grease from the wastewater to ensure the normal growth of microorganisms in the secondary treatment. The water in the vortex grit chamber 5 enters the chamber tangentially and is then slowly stirred by an impeller located at the center of the chamber, forming a planar vortex. Due to the difference in specific gravity between the sand particles and water, they are separated under the vortex condition. The vortex grit chamber 5 is connected to the reaction tank 6 via a pipeline. The reaction tank 6 is connected to a blower room, which is equipped with a blower 17, which is an air suspension blower with the following specifications: Q=26.04m³ / min, ΔP=0.08MPa, N=37.5kW. The blower room mainly provides air volume for the biological treatment system. The reaction tank 6 includes an anaerobic tank 13, an anoxic tank 14, an aerobic tank 15, and a sedimentation zone 16. Composite powder carriers can be added. The anaerobic tank 13 and the anoxic tank are connected, and the anoxic tank 14 and the aerobic tank 15 are connected, circulating through gravity. The three sections of anaerobic, anoxic, and aerobic are clearly defined and have distinct boundaries. The spatial and temporal ratios and operating conditions of the three sections can be artificially created and controlled according to the influent conditions and effluent requirements. As long as the carbon source is sufficient (TKN / COD≤0.08 or BOD / TKN≥4), a relatively high denitrification rate can be achieved as needed. The aerobic tank 15 is connected to the sedimentation zone 16. Figure 2As shown, the reaction tank 6 is arranged in a ring shape, with the aerobic tank 15 in the inner ring, and the anaerobic tank 13 and anoxic tank 14 in the outer ring. The sedimentation zone 16 is located above the aerobic tank 15. The anaerobic tank 13 and anoxic tank 14 are connected to the aerobic tank 15 by gravity. The aerobic tank 15 is connected to the sedimentation zone 16, and water enters the sedimentation zone as the water level rises. The blower 17 is connected to the lower part of the aerobic tank 15 through a duct to provide airflow. The aerobic tank 15 is equipped with a pressure relief and exhaust pipe 18 for pressure relief. A three-phase separator is provided between the aerobic tank 15 and the sedimentation zone 16 to achieve effective separation of water, air, and sludge. The reaction equipment is arranged in a multi-stage ring, achieving anoxic denitrification by controlling internal reflux and aeration. The inner ring integrates the aerobic section and sedimentation tank, effectively separating water, gas, and sludge through a three-phase separator. The separated gas is collected to form a high-flow-rate airlift, enabling non-powered reflux of the sludge-water mixture within the system. The superposition of the sedimentation zone and aerobic tank significantly reduces the floor space required. The three-phase separator separates gas, water, and sludge, and collects the aeration tail gas from the aerobic tank as the power source for airlift, achieving reflux of the mixed liquor and significantly reducing energy consumption. The settled sludge is directly returned to the aerobic tank by gravity, preventing sludge backflow and index deterioration caused by anaerobic sludge accumulation at the bottom of traditional sedimentation tanks. Water distribution through the aerobic three-phase separator creates laminar flow in the sedimentation zone, significantly improving sedimentation efficiency. The unique flow pattern and advanced process design enable the system to achieve stable aerobic denitrification. The sedimentation zone 16 is connected to the magnetic coagulation sedimentation tank 7, which can... The magnetic flocculation separation technology, which connects the filter cloth filter 8 via gravity flow or a screw conveyor, uses flocculation, adsorption, and bridging to efficiently combine tiny suspended solids or insoluble pollutants in the water with extremely small magnetic particles. This increases the volume and density of the flocs, thereby accelerating their settling speed, effectively reducing the hydraulic retention time of the clarifier, and increasing its surface load. Simultaneously, the loaded magnetic particles are recovered through the magnetic separation system for recycling, achieving the goal of treating waste with waste and reusing resources. Polyaluminum chloride (PAC) and polyacrylamide (PAM) can be used as coagulants. The magnetic flocculation sedimentation tank 7 is connected to the filter cloth filter 8, and can be connected via gravity flow or a screw conveyor. The fiber filter disc (filter cloth filter 8) consists of filter discs, a filter tank (filter), a hollow rotating shaft, a drive device, and a backwash pump. The filter discs are connected in series, with the rotating shaft running through the center, immersed in the filter tank, and driven by the drive device to rotate around the shaft.Its function is to remove various impurities in the sewage in a suspended state, improve the effluent quality of the sewage treatment plant, and make the treated water SS reach the Class A standard or above. The filter cloth filter 8 is connected to the disinfection tank 9. The disinfection tank 9 uses ultraviolet + sodium hypochlorite combined disinfection to kill pathogenic microorganisms in the water, prevent the harm of waterborne infectious diseases, and at the same time control the reproduction of bacteria and algae in the treatment structure to ensure unobstructed water flow. The disinfection tank 9 is equipped with an effluent discharge pipe for drainage. Optionally, to avoid the impact of nitrate recirculation from the traditional A / A / O process on phosphorus release from the anaerobic tank, the anoxic tank 14 is located before the anaerobic tank 13, and the aerobic tank 15 is located after the anaerobic tank 13. The anoxic tank 14 is connected to the inlet pipe 16, and the aerobic tank 15 is equipped with a mixed liquor recirculation pipe connected to the anoxic tank 14. The sedimentation zone 16 is equipped with a sludge recirculation pipe connected to the anoxic tank 14. By absorbing the advantages of the improved A / A / O process, the anoxic tank 14 is placed before the anaerobic tank 13. The recirculated sludge from the sedimentation zone 16 and 30-50% of the inlet water, as well as 50-150% of the mixed liquor recirculation from the aerobic tank 15, all enter the anoxic zone, with a residence time of 1-3 hours. The returned sludge and mixed liquor undergo denitrification in the anoxic tank 14 to remove nitrate oxygen before entering the anaerobic zone. This ensures the anaerobic state of the anaerobic tank 13, enhancing phosphorus removal. The sludge is returned to the anoxic zone, where the sludge concentration can be 50% higher than in the anoxic zone. The denitrification rate per unit tank volume is significantly increased, effectively guaranteeing denitrification. The proportion of influent allocated to the anoxic and anaerobic zones is adjusted according to different influent water qualities and seasonal conditions, as well as variations in the carbon source required for biological nitrogen and phosphorus removal. This ensures effective denitrification and consistent phosphorus removal within the system.

[0018] Optionally, the system also includes an intercepting well 1, which is connected to the coarse screen machine 2 to control the flow rate of combined sewage entering the treatment station during the dry and rainy seasons. Optionally, it also includes a sludge storage tank 11, which is located underground and is an underground reinforced concrete structure. The magnetic coagulation sedimentation tank 7 is connected to the sludge storage tank 11 and is mainly used to store sludge generated from biochemical treatment, magnetic coagulation sedimentation, etc., for convenient unified treatment and to avoid direct discharge pollution. Optionally, it also includes a sludge thickening and dewatering room 12, which is connected to the sludge storage tank 11. The sludge thickening and dewatering room 12 uses a centrifugal dewatering machine with specifications: LW500L-2100, N=30kw for dewatering. The sludge is pumped to the centrifugal dewatering machine and dewatered to a moisture content of less than 80% for off-site disposal.

[0019] Optionally, it also includes a dosing room 10, which is equipped with a dosing and dissolving device to pump chemicals to each system reaction via metering pumps. Specifically, the dosing room 10 is equipped with a PAC dosing device, specifications: complete set, metering pump: Q=530L / h, 0.37kw, stirring motor: 4kw, with matching SS304 impeller and stirring rod; dosing tank; an alkali dosing device, specifications: complete set, metering pump: Q=750L / h, 0.55kw, stirring motor: 4kw, with matching SS304 impeller and stirring rod; dosing tank; an emergency carbon source dosing device, specifications: complete set, metering pump: Q=450L / h, 0.37kw, stirring motor: 4kw, with matching SS304 impeller and stirring rod; dosing tank; and a PAM (cation) dosing device, specifications: The system adopts a complete set of equipment, including a dosing screw pump with a capacity of Q=0.7m³ / h and a power of 0.55 kW; an integrated PAM dosing machine with a capacity of 2000L / h and a power of 3.67 kW; and a PAM (anion) dosing device. Specifications: The system adopts a complete set of equipment, including a dosing screw pump with a capacity of Q=0.7m³ / h and a power of 0.55 kW; and an integrated PAM dosing machine.

[0020] Example 2 See attached document Figure 3-5The difference between this embodiment and Embodiment 1 is that a powdered biological carrier dosing device is provided above the aerobic tank. This device includes an electrical control box with a control board for connecting and controlling electrical components. The device also includes a material tank 19, which has an outlet pipe 20 with a valve and a water inlet pipe. The water inlet pipe is connected to a water tank pump for adding water and mixing the composite powdered carrier. The outlet pipe 20 is connected to the reaction tank via a pump for adding the carrier mixture to the reaction tank. A pressure relief valve is provided on the material tank 19, and a weighing device is located on the upper left side of the material tank 19. The weighing assembly includes a housing 21, a weighing sensor 22, a weighing plate 23, a discharge cylinder 24, a pusher plate 25, a baffle plate 26, a hopper 27, and a screw feed shaft 28. The housing 21 is fixedly connected to the top of the hopper 19. The housing 21 has a discharge port 29 communicating with the hopper 19. The weighing sensor 22 is mounted on the housing 21, and the weighing plate 23 is mounted on the weighing sensor 22. The discharge cylinder 24 is fixedly connected to the housing 21, and the pusher plate 25 is connected to the output end of the discharge cylinder 24. The bottom of the pusher plate 25 and the... The weighing plate 23 is in contact with the top surface of the housing 21. The baffle plate 26 is rotatably connected to the housing 21 to block the composite powder carrier during weighing. The hopper 27 is fixed to the top of the housing 21. The lower end of the hopper 27 includes a Y-shaped tube. The screw feeding shaft 28 is rotatably connected to the Y-shaped tube at the lower end of the hopper 27. The hopper 27 is connected to a second motor 32 and a rotary cylinder 33. The cylinder is connected to an air pump. The output end of the second motor 32 is connected to the screw feeding shaft 28. The output end of the rotary cylinder 33 is connected to the baffle plate 26. The hopper 27 is equipped with a top cover. During operation, the technician will... The composite powder carrier is placed in the hopper 27, and the second motor 32 is driven to rotate the screw feed shaft 28 to transport the powder to the weighing plate 23. The weighing sensor 22 feeds back the weight to the control board. After the set value is reached, the second motor 32 stops, and the rotary cylinder 33 rotates counterclockwise to drive the baffle plate 26 to flip upward and open. The discharge cylinder 24 extends and drives the pusher plate 25 to push the powder to the discharge port 29 and into the material bucket 19, so as to realize the quantitative addition of the composite powder carrier, avoiding waste and pollution caused by adding too much, and the reaction effect being affected by insufficient amount.

[0021] Specifically, the material tank 19 is equipped with a first motor 30, which is connected to a stirring shaft 31. The stirring shaft 31 is located inside the material tank 19. The stirring shaft 31 is used to stir the mixture evenly and improve the reaction efficiency.

[0022] Specifically, a backwashing assembly is provided on the right side of the material tank 19. The backwashing assembly includes a backwashing inlet pipe 34, a backwashing pipe 35, a bearing seat 36, a retaining ring 37, a connecting sleeve 38, a first gear 39, a second gear 40, and a third motor 41. The connecting sleeve 38 is fixed to the material tank 19, the bearing seat 36 is connected to the material tank 19, the backwashing pipe 35 is rotatably connected to the bearing seat 36, the retaining ring 37 is fixed to the backwashing pipe 35, and the retaining ring 37 is used to connect with the inner ring of the bearing in the bearing seat 36. The bottom end of the backwashing pipe 35 is sealed, and the backwashing pipe 35 is provided with several nozzles 46. The top end of the backwashing pipe 35 is connected to the connecting sleeve 38, and the connecting sleeve 38 is provided with a sealing ring 45. The connecting sleeve 38 and the backwashing pipe 35 are provided with sealing rings 45. The third motor 41 is fixed to the material tank 19, and the first gear 39 is connected to the third motor 41. At the output end, the backwash pipe 35 is provided with a second gear 40 that meshes with the first gear 39. The backwash water inlet pipe 34 is connected above the connecting sleeve 38. The backwash water inlet pipe 34 is pumped to the clean water tank. Specifically, the bottom of the material tank 19 is provided with a base 42, the base 42 is provided with a support foot 43, and the bottom of the material tank 19 is provided with a drain pipe 44 with a valve for discharging the cleaning liquid. During operation, a high-pressure pump pumps clean water from the backwash water inlet pipe 34 into the backwash pipe 35, and sprays it out from the nozzle 46 of the backwash pipe 35 to rinse the stirring shaft 31 and the inner wall of the material tank 19. The rotation of the third motor 41 drives the first gear 39 to rotate. Through the meshing transmission of the first gear 39 and the second gear 40, the backwash pipe 35 is driven to rotate to clean the inside of the material tank 19, making the cleaning more thorough and avoiding the impact of residual composite powder carrier.

[0023] Optionally, a recycling device is provided below the sedimentation zone 16. The sludge outlet end of the sedimentation zone 16 is connected to the recycling device for recycling the composite powder carrier flowing out of the sedimentation zone 16. The recycling device is provided with a composite powder carrier recycling pipe connected to the aerobic tank 15 for sending the recycled composite powder carrier back to the aerobic tank 15 for recycling, thereby improving efficiency and avoiding waste and pollution. The recycling device is also provided with a sludge discharge pipe.

[0024] The above are merely specific embodiments of this utility model, but the protection scope of this utility model is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in this utility model should be included within the protection scope of this utility model. The protection scope of this utility model should be determined by the protection scope of the stated claims.

Claims

1. A wastewater treatment process system, characterized in that, The system includes a coarse bar screen, an equalization tank, a fine bar screen, a vortex grit chamber, a reaction tank, a magnetic coagulation sedimentation tank, a filter cloth filter, and a disinfection tank. The coarse bar screen is located before the equalization tank, the fine bar screen is located after the equalization tank, and the fine bar screen is located before the vortex grit chamber. The vortex grit chamber is pipe-connected to the reaction tank, and the reaction tank is connected to the magnetic coagulation sedimentation tank. The reaction tank includes an anaerobic tank, an anoxic tank, an aerobic tank, and a sedimentation zone. The reaction tank is arranged in a ring shape, with the aerobic tank in the inner ring and the anaerobic and anoxic tanks in the outer ring. The sedimentation zone is located above the aerobic tank. The magnetic coagulation sedimentation tank is connected to the filter cloth filter, and the filter cloth filter is connected to the disinfection tank. The disinfection tank is equipped with an effluent discharge pipe.

2. The wastewater treatment process system according to claim 1, characterized in that, The anoxic tank is located in front of the anaerobic tank, and the aerobic tank is located behind the anaerobic tank. The anoxic tank is connected to the inlet pipe, and the aerobic tank is equipped with a mixed liquor return pipe that connects to the anoxic tank. The sedimentation zone is equipped with a mixed liquor gas lift return channel that connects to the anoxic tank.

3. The wastewater treatment process system according to claim 1, characterized in that, A three-phase separator is provided between the aerobic tank and the sedimentation zone.

4. The wastewater treatment process system according to claim 1, characterized in that, It also includes a chemical dosing room, an intercepting well, a sludge storage tank, and a sludge thickening and dewatering room. The intercepting well is connected to the coarse bar screen, the sludge storage tank is connected to the magnetic coagulation sedimentation tank, and the sludge thickening and dewatering room is connected to the sludge storage tank.

5. The wastewater treatment process system according to claim 1, characterized in that, A powdered biological carrier dosing device is provided above the aerobic tank. The powdered biological carrier dosing device includes a material tank, which is equipped with a liquid outlet pipe and a water inlet pipe. A weighing assembly is provided on the upper left side of the material tank. The weighing assembly includes a shell, a weighing sensor, a weighing plate, a discharge cylinder, a pusher plate, a baffle plate, a hopper, and a screw feed shaft. The shell is fixed to the material tank and has a discharge port communicating with the material tank. The weighing sensor is mounted on the shell, and the weighing plate is mounted on the weighing sensor. The discharge cylinder is connected to the shell, and the pusher plate is connected to the output end of the discharge cylinder. The baffle plate is rotatably connected to the shell, and the hopper is fixed to the upper part of the shell. The screw feed shaft is rotatably connected to the lower end of the hopper.

6. The wastewater treatment process system according to claim 5, characterized in that, The material barrel is equipped with a first motor, which is connected to a stirring shaft, which is located inside the material barrel.

7. The wastewater treatment process system according to claim 5, characterized in that, The hopper is equipped with a second motor and a rotary cylinder. The output end of the second motor is connected to the screw feed shaft, and the output end of the rotary cylinder is connected to the baffle plate.

8. A wastewater treatment process system according to claim 5, characterized in that, A backwashing assembly is provided on the right side of the material tank. The backwashing assembly includes a backwashing inlet pipe, a backwashing pipe, a bearing seat, a retaining ring, a connecting sleeve, a first gear, a second gear, and a third motor. The connecting sleeve is fixed to the material tank, the bearing seat is connected to the material tank, the backwashing pipe is rotatably connected to the bearing seat, the retaining ring is fixed to the backwashing pipe, one end of the backwashing pipe is connected to the connecting sleeve, the connecting sleeve is provided with a sealing ring, the third motor is fixed to the material tank, the first gear is connected to the output end of the third motor, the backwashing pipe is provided with a second gear that meshes with the first gear, and the backwashing inlet pipe is connected above the connecting sleeve.

9. A wastewater treatment process system according to claim 8, characterized in that, The bottom of the material bucket is provided with a base, the base is provided with supporting feet, and the bottom of the material bucket is provided with a drain pipe.

10. A wastewater treatment process system according to claim 5, characterized in that, The sedimentation zone is connected to a recycling device, which is equipped with a composite powder carrier recycling pipe connected to the aerobic tank and a sludge discharge pipe.