A desulfurization wastewater treatment system
By introducing a multi-box agitator and electromagnetic flowmeter into the desulfurization wastewater treatment system of iron and steel smelting, combined with a parallel pump group design, the stability and equipment failure problems of the lime slurry preparation unit were solved, achieving stability of heavy metal removal effect and production continuity, and reducing water consumption and sludge disposal costs.
Patent Information
- Application Number
- CN202522559818.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-02
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-02
AI Technical Summary
In existing desulfurization wastewater treatment systems for iron and steel smelting, the feeding and mixing stability of the lime slurry preparation unit is insufficient, the pH value is easily out of control, the heavy metal removal effect is unstable, and equipment failure can easily lead to system shutdown, affecting the continuity of production.
A desulfurization wastewater treatment system was designed, comprising a lime slurry preparation module, an organic sulfur dosing device, a flocculant dosing device, a coagulant aid dosing device, a hydrochloric acid dosing device, a safety shower, a lime slurry metering module, a mixing module, a reuse module, a clarification module, a sludge circulation module, and a filter press module. The system uses multiple tanks with independent mixers, electromagnetic flow meters for precise flow control, a drainage ditch design to prevent secondary pollution, and parallel pump sets to improve equipment redundancy and stability.
It achieves full reaction between the reagent and wastewater, significantly improves the removal efficiency of heavy metals and suspended solids, reduces fresh water consumption, optimizes the sludge dewatering process, reduces off-site disposal costs, and ensures the continuous production needs of steel smelting.
Smart Images

Figure CN225013280U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of iron and steel smelting technology, specifically to a desulfurization wastewater treatment system. Background Technology
[0002] In the steel smelting industry, core processes such as sintering and blast furnace gas purification require the use of wet desulfurization processes to remove sulfides from sulfur-containing flue gas in order to meet the environmental emission requirements for flue gas. If the flue gas is discharged directly without compliant treatment, it will not only pollute the water and soil environment of the plant area, but may also interfere with the stable operation of the steel production circulating water system. Therefore, the compliant treatment of desulfurization wastewater is one of the key links in the environmental governance of steel smelting.
[0003] Currently, desulfurization wastewater treatment in the iron and steel smelting industry typically integrates a lime slurry preparation unit, a multi-agent dosing unit, a mixing and reaction unit, a clarification and separation unit, and a sludge treatment unit. The lime slurry preparation unit prepares an alkaline slurry to adjust the pH of the wastewater. With the help of agents such as organic sulfur and flocculants, heavy metal chelation and suspended solids flocculation are achieved. The wastewater is then purified through clarification and separation and sludge dewatering to adapt to the production conditions of iron and steel smelting.
[0004] However, existing desulfurization wastewater treatment systems used in steel smelting still have significant drawbacks: the feeding and mixing stability of the lime slurry preparation unit is insufficient, the steel smelting operating conditions fluctuate greatly, which can easily lead to pH loss in the reaction unit and make it difficult to ensure the stable removal effect of heavy metals; the core power redundancy configuration is lacking, the steel production has high requirements for continuity, and the failure of a single piece of equipment can easily cause system shutdown and disrupt the normal production rhythm. Utility Model Content
[0005] The purpose of this invention is to provide a desulfurization wastewater treatment system to solve the problems mentioned in the background art.
[0006] To achieve the above objectives, this utility model provides the following technical solution:
[0007] A desulfurization wastewater treatment system includes a lime slurry preparation module, an organic sulfur dosing device, a flocculant dosing device, a coagulant aid dosing device, a hydrochloric acid dosing device, a safety shower, a lime slurry metering module, a stirring module, a reuse module, a clarification module, a sludge recycling module, and a filter press module.
[0008] The lime slurry preparation module includes a slaked lime storage tank. The input end of the lime slurry preparation module is connected to the process water system, and the output end is connected to the lime slurry metering module for preparing lime slurry.
[0009] The organic sulfur dosing device, flocculant dosing device, and coagulant aid dosing device include a metering tank, a stirrer, a magnetic level gauge, a first metering pump, and a second metering pump. The hydrochloric acid dosing device includes a hydrochloric acid tank, an acid mist absorber, an acid unloading pump, a first hydrochloric acid metering pump, and a second hydrochloric acid metering pump. The input ends of the organic sulfur dosing device, flocculant dosing device, coagulant aid dosing device, and hydrochloric acid dosing device are connected to the process water system and are used to add organic sulfur, flocculant, coagulant aid, and hydrochloric acid, respectively.
[0010] The safety shower is connected to the process water system and is used for emergency rinsing operations;
[0011] The lime slurry metering module includes a first lime slurry metering pump, a second lime slurry metering pump, and a flow sight glass. The input end of the lime slurry metering module is connected to the output end of the lime slurry preparation module, and is used to receive the lime slurry prepared by the lime slurry preparation module and to quantitatively measure the lime slurry. The output end of the lime slurry metering module is divided into two paths: one path is used to transport the metered lime slurry to the stirring module, and the other path is connected to the input end of the lime slurry preparation module to form a circulation loop.
[0012] The stirring module includes a neutralization tank, a settling tank, and a flocculation tank. The neutralization tank is connected to the output of the lime slurry metering module to receive the wastewater to be treated and the metered lime slurry. The settling tank is connected to the output of the organic sulfur dosing device to receive organic sulfur. The flocculation tank is connected to the outputs of the flocculant dosing device and the coagulant aid dosing device to receive flocculant and coagulant aid, respectively.
[0013] The reuse module includes a clean water tank, a first clean water pump, and a second clean water pump. The input end of the reuse module is divided into three paths: the first path is connected to the clean water outlet of the clarification module to receive the qualified clean water separated by the clarification module; the second path is connected to the process water system to supplement the process water shortage in the system; and the third path is connected to the hydrochloric acid dosing device to realize water resource recycling.
[0014] The input end of the clarification module is connected to the output end of the stirring module, and is used to separate mud and water in the treated wastewater;
[0015] The sludge circulation module includes a first sludge circulation pump, a second sludge circulation pump, a third sludge circulation pump, and a fourth sludge circulation pump. The input end of the sludge circulation module is connected to the sludge outlet of the clarification module, and the output end is divided into two paths: one path is connected to the settling tank, and the other path is connected to the filter press module. It is used to return part of the sludge separated by the clarification module to the settling tank to enhance the removal of heavy metals, and to transport part of it to the filter press module for dewatering.
[0016] The filter press module includes a rinsing and pressing water tank, a rinsing water pump, a pressing water pump, and a dewatering machine. The filter press module is connected to the process water system and is used to obtain the process water required for rinsing and pressing. The filter press module is used to dewater the residual sludge separated from the clarification module. The dewatered sludge is then transported to the sludge off-site transportation point.
[0017] Preferably, the slaked lime storage silo is connected to the lime feed point via a nitrate lime inlet pipe; a dust collector is fixedly installed on the top of the slaked lime storage silo, and a level gauge and a low level alarm switch are fixedly installed inside, while a vibrator is fixedly installed on the outer wall; the discharge end of the slaked lime storage silo is connected to the lime hopper via a motor-driven star feeder and a screw conveyor in sequence; the lime hopper is connected to the limestone slurry tank, which is connected to the process water system via a water inlet solenoid valve, and is equipped with a motor-driven agitator inside and an ultrasonic level gauge outside, to ensure the continuity and concentration stability of lime slurry preparation and avoid raw material waste and pipeline blockage.
[0018] Preferably, a stirrer is installed inside the metering tank, a magnetic float level gauge is installed on the outer wall of the metering tank and connected to the inside of the metering tank, and both the first metering pump and the second metering pump are equipped with motors. The first metering pump and the second metering pump are installed in parallel on the discharge pipeline of the metering tank to achieve precise control of the quantitative addition of the agent. The parallel design of the two pumps improves the reliability of the device operation and avoids the interruption of the dosing caused by the failure of a single pump.
[0019] Preferably, the acid mist absorber is connected to the pipeline of the hydrochloric acid tank, and the output end of the acid unloading pump is connected to the hydrochloric acid tank through a pipeline. The first hydrochloric acid metering pump and the second hydrochloric acid metering pump are both equipped with motors and installed in parallel on the discharge pipeline of the hydrochloric acid tank. The input ends of the first hydrochloric acid metering pump and the second hydrochloric acid metering pump are both connected to the bottom of the hydrochloric acid tank through pipelines, which effectively absorbs the acid mist generated by the volatilization of hydrochloric acid. The dual metering pump design ensures the continuity of hydrochloric acid dosing and improves the corrosion resistance and operational stability of the system.
[0020] Preferably, the first lime slurry metering pump and the second lime slurry metering pump are installed in parallel on the pipeline of the lime slurry metering module, and the flow sight is connected to the discharge pipe section of the lime slurry metering module. The parallel connection of the two pumps ensures the stability of the quantitative delivery of lime slurry, and the flow sight facilitates real-time observation of the delivery status and improves the dosing accuracy.
[0021] Preferably, the neutralization tank is connected to the wastewater inlet via a pipeline to an electromagnetic flow meter, and the discharge end of the flocculation tank is connected to the wastewater collection pit. The neutralization tank, settling tank, and flocculation tank are all equipped with motor-driven agitators, and the tops of the neutralization tank, settling tank, and flocculation tank are all connected to the water inlet to ensure that the wastewater to be treated enters the reaction system stably. The multi-tank agitator ensures that the reagent and wastewater are fully mixed, thereby improving the pollutant removal efficiency.
[0022] Preferably, the clean water tank is equipped with a motor-driven agitator, and a first clean water pump and a second clean water pump are connected in parallel on the discharge pipe of the clean water tank and connected to the recycling point; the clarification module includes a clarifier, and the clarifier is equipped with a motor-driven sludge scraper. The agitator avoids uneven water quality in the clean water tank, the dual clean water pumps ensure stable delivery of recycled water, and the sludge scraper improves the sludge-water separation efficiency of the clarifier and enhances the water resource recycling effect.
[0023] Preferably, the first sludge circulation pump and the second sludge circulation pump are connected in parallel to form a pump group, and the third sludge circulation pump and the fourth sludge circulation pump are connected in parallel to form another pump group. Both pump groups are installed on the pipeline of the sludge circulation module. The parallel design of the two pump groups improves the redundancy of sludge transportation, avoids system downtime caused by the failure of a single pump group, and ensures the continuity of sludge circulation and discharge.
[0024] Preferably, the rinsing and pressing water tank is connected to the process water system via a pipeline. The rinsing and pressing water tank is connected to the input end of the rinsing water pump and the pressing water pump via a pipeline. The output end of the rinsing water pump and the pressing water pump is connected to the filter press via a pipeline. The dewatering equipment includes a filter press, a hydraulic sludge hopper, and a sludge discharge valve. A hydraulic sludge hopper is correspondingly installed below the filter press. A sludge discharge valve is fixedly installed at the bottom of the hydraulic sludge hopper. The output end of the sludge discharge valve is connected to the sludge transport point via a pipeline, ensuring a stable supply of water for rinsing and pressing the filter press. The cooperation between the hydraulic sludge hopper and the discharge valve improves the efficiency of sludge collection and transport, and reduces the moisture content of the sludge.
[0025] Preferably, a trench is provided beside the quicklime storage silo, metering tank, acid mist absorber, hydrochloric acid tank, first lime slurry metering pump, clean water tank, first sludge circulation pump, third sludge circulation pump, and rinsing and pressing water tank; pressure gauges are installed on the adjacent pipelines of the first metering pump, second metering pump, first hydrochloric acid metering pump, second hydrochloric acid metering pump, acid unloading pump, first lime slurry metering pump, second lime slurry metering pump, first clean water pump, second clean water pump, first sludge circulation pump, second sludge circulation pump, third sludge circulation pump, fourth sludge circulation pump, rinsing water pump, and pressing water pump. The trench enables centralized collection of leaked media to avoid secondary pollution, and the pressure gauges facilitate real-time monitoring of pipeline pressure to promptly detect equipment failures and pipeline abnormalities.
[0026] Compared with the prior art, the beneficial effects of this utility model are:
[0027] This invention features multiple chambers equipped with independent stirrers, precise flow control via electromagnetic flowmeters, and thorough reaction between reagents and wastewater. The drainage ditch design prevents secondary pollution and significantly reduces the removal of heavy metals and suspended solids.
[0028] This invention features a recycling module that enables clean water circulation, reducing fresh water consumption; and a filter press module that optimizes the sludge dewatering process, reduces sludge moisture content, decreases transportation and disposal costs, and improves the overall economic efficiency of the system.
[0029] This utility model features a lime slurry metering module with a circulating loop, equipped with a vibrator, stirrer, etc., to avoid downtime due to single equipment failure, ensure stable reagent addition and pH value, and meet the needs of continuous production in steel smelting. Attached Figure Description
[0030] Figure 1 This is a schematic diagram of the overall structure of this utility model.
[0031] Figure 2 This is a schematic diagram of the overall structure of the lime milk preparation module of this utility model.
[0032] Figure 3 This is a schematic diagram of the overall structure of the organic sulfur dosing device and flocculant dosing device of this utility model.
[0033] Figure 4 This is a schematic diagram of the overall structure of the coagulant dosing device of this utility model.
[0034] Figure 5 This is a schematic diagram of the overall structure of the hydrochloric acid dosing device of this utility model.
[0035] Figure 6 This is a schematic diagram of the overall structure of the safety shower device of this utility model.
[0036] Figure 7 This is a schematic diagram of the overall structure of the lime milk metering module of this utility model.
[0037] Figure 8 This is a schematic diagram of the overall structure of the stirring module of this utility model.
[0038] Figure 9 This is a schematic diagram of the overall structure of the recycling module of this utility model.
[0039] Figure 10 This is a schematic diagram of the overall structure of the clarification module of this utility model.
[0040] Figure 11 This is a schematic diagram of the overall structure of the sludge recycling module of this utility model.
[0041] Figure 12 This is a schematic diagram of the overall structure of the filter press module of this utility model.
[0042] In the diagram: 1. Lime slurry preparation module; 101. Silo top dust collector; 102. Hydrated lime storage silo; 103. Level gauge; 104. Low level alarm switch; 105. Vibrator; 106. Rotary feeder; 107. Screw conveyor; 108. Lime hopper; 109. Limestone slurry tank; 110. Water inlet solenoid valve; 111. Ultrasonic level gauge; 112. Inlet pipe for quicklime; 2. Organic sulfur dosing device; 201. First metering pump; 202. Second metering pump ; 203, Magnetic float level gauge; 204, Metering tank; 205, Agitator; 3, Flocculant dosing device; 4, Coagulant aid dosing device; 5, Hydrochloric acid dosing device; 501, Hydrochloric acid tank; 502, Acid mist absorber; 503, First hydrochloric acid metering pump; 504, Second hydrochloric acid metering pump; 505, Acid unloading pump; 6, Safety shower; 7, Lime slurry metering module; 701, First lime slurry metering pump; 702, Second lime slurry metering pump; 703, Flow sight glass; 8 801. Mixing Module; 802. Neutralization Tank; 803. Settling Tank; 804. Flocculation Tank; 805. Electromagnetic Flowmeter; 9. Reuse Module; 901. Clear Water Tank; 902. First Clear Water Pump; 903. Second Clear Water Pump; 10. Clarification Module; 1001. Clarifier; 1002. Sludge Scraper; 11. Sludge Circulation Module; 1101. First Sludge Circulation Pump; 1102. Second Sludge Circulation Pump; 1103. Third Sludge Circulation Pump; 1104. Fourth Sludge Circulation Pump 12. Pump; 1201. Filter press module; 1202. Rinse water pump; 1203. Press water pump; 1204. Filter press; 1205. Hydraulic sludge hopper; 1206. Sludge hopper discharge valve; 1207. Dewatering equipment; 1208. Rinse and press water tank; 13. Pressure gauge; 14. Motor; 15. Ditch; 16. Water inlet; 17. Process water system; 18. Lime feed inlet; 19. Wastewater inlet; 20. Wastewater collection pit; 21. Reuse area; 22. Sludge transport area. Detailed Implementation
[0043] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0044] Example:
[0045] Please see Figures 1 to 12 This utility model provides a technical solution:
[0046] A desulfurization wastewater treatment system includes a lime slurry preparation module 1, an organic sulfur dosing device 2, a flocculant dosing device 3, a coagulant aid dosing device 4, a hydrochloric acid dosing device 5, a safety shower 6, a lime slurry metering module 7, a stirring module 8, a reuse module 9, a clarification module 10, a sludge recycling module 11, and a filter press module 12.
[0047] The lime slurry preparation module 1 is located at the front end of the system. The input end of the lime slurry preparation module 1 is connected to the process water system 17, and the output end is connected to the lime slurry metering module 7. Its main function is to mix and stir solid hydrated lime and process water in a preset ratio to prepare lime slurry with stable concentration. This provides a continuous and qualified alkaline reaction medium for the neutralization reaction of the subsequent stirring module 8, which is a fundamental step to ensure the pH adjustment and heavy metal removal effect of wastewater.
[0048] The lime slurry preparation module 1 includes a dust collector 101 on the top of the silo, a hydrated lime storage silo 102, a level gauge 103, a low level alarm switch 104, a vibrator 105, a star feeder 106, a screw conveyor 107, a lime hopper 108, a limestone slurry tank 109, a water inlet solenoid valve 110, an ultrasonic level gauge 111, and a lime feed pipe 112. The hydrated lime storage silo 102 is directly connected to the external lime feed port 18 through the lime feed pipe 112 and is used to centrally store solid hydrated lime raw materials. The dust collector 101 is fixedly installed on the top of the silo to effectively adsorb dust generated during the raw material transportation process and avoid air pollution. The level gauge 103 and the low level alarm switch 104 are embedded inside the silo to monitor the remaining raw material in the silo in real time and automatically alarm to remind replenishment when the material level is low. The vibrator 105 is fixedly installed on the outer wall of the silo to prevent the hydrated lime from caking and clogging through vibration, ensuring smooth material discharge. A star feeder 106 driven by motor 14 and a screw conveyor 107 are connected to the discharge end of the hydrated lime storage silo 102 along the raw material conveying direction. The star feeder 106 is responsible for precisely controlling the amount of hydrated lime fed, while the screw conveyor 107 smoothly conveys the fed hydrated lime to the lime hopper 108 below. The two work together to achieve quantitative and continuous transfer of raw materials, avoiding raw material accumulation or conveying interruption. The lime hopper 108 is arranged below the screw conveyor 107 and above the limestone slurry tank 109, serving as a buffer and transition for raw materials. It concentrates the hydrated lime conveyed by the screw conveyor 107 into the limestone slurry tank 109, ensuring smooth connection between raw material conveying and subsequent slurry preparation processes. The limestone slurry tank 109 is directly connected to the lime hopper 108 and connected to the process water system 17 through the water inlet solenoid valve 110, allowing for the supply of a fixed amount of process water as needed. Inside the tank, there is a stirrer 205 driven by a motor 14, which can fully mix the hydrated lime and process water to form a uniform lime slurry. An ultrasonic level gauge 111 is installed on the outside of the tank to monitor the liquid level of the lime slurry in real time. Together with the water inlet solenoid valve 110 and the feeding equipment, the slurry concentration is precisely controlled, ultimately ensuring the continuity and concentration stability of lime slurry preparation and avoiding raw material waste and pipeline blockage.
[0049] The organic sulfur dosing device 2, flocculant dosing device 3, and coagulant aid dosing device 4 include a metering tank 204, a stirrer 205, a magnetic level gauge 203, a first metering pump 201, and a second metering pump 202. The hydrochloric acid dosing device 5 includes a hydrochloric acid tank 501, an acid mist absorber 502, an acid unloading pump 505, a first hydrochloric acid metering pump 503, and a second hydrochloric acid metering pump 504. The input ends of the organic sulfur dosing device 2, flocculant dosing device 3, coagulant aid dosing device 4, and hydrochloric acid dosing device 5 are connected to the process water system 17 and are used to add organic sulfur, flocculant, coagulant aid, and hydrochloric acid, respectively.
[0050] A stirrer 205 is fixedly installed inside the metering tank 204 to continuously stir the reagents inside, preventing uneven concentration caused by reagent sedimentation and stratification. A magnetic level gauge 203 is fitted to the outer wall of the metering tank 204 and is directly connected to the inside of the tank, which can reflect the remaining reagent level in real time, facilitating timely replenishment by operators. A first metering pump 201 and a second metering pump 202 are connected in parallel on the discharge pipe of the metering tank 204. Both metering pumps are equipped with independent drive motors 14, which can accurately adjust the reagent delivery rate according to system requirements to achieve quantitative dosing control. The parallel design of the two pumps not only improves the stability and accuracy of reagent dosing but also provides operational redundancy. When one metering pump fails, the other can be immediately put into operation or maintained, effectively avoiding dosing interruptions caused by single pump failure and ensuring the continuity of the desulfurization wastewater treatment reaction.
[0051] The acid mist absorber 502 is installed in series on the pipeline of the hydrochloric acid tank 501. It can adsorb the acidic gas generated during the storage and transportation of hydrochloric acid in real time, avoid acid mist leakage that corrodes equipment and pollutes the environment, and ensure the safety of the operating area. The output end of the acid unloading pump 505 is connected to the hydrochloric acid tank 501 through a dedicated pipeline. It is mainly used to replenish the hydrochloric acid raw material to the hydrochloric acid tank 501, realizing the convenience and efficiency of the acid unloading process. The discharge pipeline of the hydrochloric acid tank 501 is equipped with a first hydrochloric acid metering pump 503 and a second hydrochloric acid metering pump 504 in parallel. Both metering pumps are equipped with independent motors 14, and their input ends are directly connected to the bottom of the hydrochloric acid tank 501 through pipelines to ensure that the hydrochloric acid in the tank can be fully extracted and to avoid residual waste. The parallel design of dual metering pumps allows for precise adjustment of hydrochloric acid dosage according to system reaction requirements, achieving quantitative dosing control. It also provides operational redundancy, ensuring continuous hydrochloric acid dosing when one metering pump fails, as the other can immediately switch or maintain operation. The synergistic design of the acid mist absorber 502 and the dual metering pumps not only enhances the system's corrosion resistance but also significantly improves overall operational stability, providing reliable support for acid-base balance adjustment in desulfurization wastewater treatment.
[0052] The safety shower 6 is connected to the process water system 17 for emergency rinsing operations. It is equipped with an independent and easy-to-operate control valve that can be quickly opened in an emergency. When operators accidentally come into contact with corrosive agents, they can immediately use process water for whole-body or local emergency rinsing, quickly diluting and removing the adhering corrosive substances, avoiding personal injury such as burns to the skin and mucous membranes, significantly improving the safety protection level during system operation, and providing reliable protection for the personal safety of operators.
[0053] The lime slurry metering module 7 is located between the lime slurry preparation module 1 and the stirring module 8. The input end of the lime slurry metering module 7 is connected to the output end of the lime slurry preparation module 1 through a pipeline. It is used to receive the prepared uniform lime slurry and accurately measure the lime slurry, and then deliver it to the subsequent reaction unit as needed. The output end of the module is divided into two paths. One path stably delivers the metered lime slurry to the neutralization tank 801 of the stirring module 8, and the other path flows back to the input end of the lime slurry preparation module 1 through a pipeline, forming a circulation loop to avoid lime slurry retention and deposition, which would cause waste or pipeline blockage.
[0054] The lime slurry metering module 7 includes a first lime slurry metering pump 701, a second lime slurry metering pump 702, and a flow sight glass 703. The first lime slurry metering pump 701 and the second lime slurry metering pump 702 are installed in parallel on the pipeline. They can work together or independently according to the system reaction requirements. The parallel design of the two pumps not only improves the stability of the quantitative delivery of lime slurry, but also has operational redundancy, effectively avoiding delivery interruption caused by single pump failure. The flow sight glass 703 is fixedly connected to the discharge pipe section of the module and communicates with the inside of the pipeline. Operators can observe the delivery speed, status, and whether there are impurities blocking the lime slurry in real time through the flow sight glass 703, which facilitates timely adjustment of operating parameters, further improves the accuracy of lime slurry addition, and provides a reliable guarantee for the stable control of pH value in the subsequent neutralization reaction.
[0055] The stirring module 8 is arranged between the lime slurry metering module 7, the organic sulfur dosing device 2, the flocculant dosing device 3, the coagulant aid dosing device 4, and the clarification module 10. The stirring module 8 is composed of a neutralization tank 801, a settling tank 802, and a flocculation tank 803 connected in series according to the wastewater treatment flow direction. One side of the neutralization tank 801 is connected to the external wastewater inlet 19 via a pipeline to the electromagnetic flowmeter 804, and the other side is connected to the output of the lime slurry metering module 7 to simultaneously receive the wastewater to be treated and a quantitative amount of lime slurry. The settling tank 802 is connected to the output of the organic sulfur dosing device 2 to receive organic sulfur agents. The flocculation tank 803 is connected to the outputs of the flocculant dosing device 3 and the coagulant aid dosing device 4 to receive two types of coagulants. The discharge end of the flocculation tank 803 is connected to the wastewater collection pit 20 via a pipeline to ensure stable delivery of wastewater after the reaction.
[0056] The neutralization tank 801, settling tank 802, and flocculation tank 803 are all equipped with water inlets 16 on their tops, allowing for the addition of process water or emergency water replenishment as needed. Each tank is internally equipped with a motor-driven agitator 205, which thoroughly mixes the wastewater with the corresponding reagents. An electromagnetic flowmeter 804 precisely controls the wastewater inflow, ensuring a stable reaction ratio. The multi-tank independent stirring design avoids uneven mixing of reagents and wastewater, significantly improving the reaction efficiency of heavy metal chelation and suspended solids coagulation, laying a solid foundation for the subsequent sludge-water separation in the clarification module 10.
[0057] The reuse module 9 is located beside the clarification module 10 and connects to the process water system 17 and the hydrochloric acid dosing device 5. It is responsible for the recovery, storage and reuse of qualified clean water. The input end of the reuse module 9 is divided into three paths: the first path is connected to the clean water outlet of the clarification module 10 through a pipeline to receive qualified clean water after mud-water separation; the second path is connected to the system process water system 17 to supplement the system process water shortage; the third path is connected to the hydrochloric acid dosing device 5 to provide it with suitable water; the output end of the module is connected to the reuse point 21 through the discharge pipeline of the clean water tank 901 to realize the recycling and reuse of water resources.
[0058] The reuse module 9 includes a clean water tank 901, a stirrer 205 driven by a motor 14, a first clean water pump 902, and a second clean water pump 903. The stirrer 205 driven by the motor 14 is fixedly installed inside the clean water tank 901, which can continuously stir the qualified clean water stored in the tank, effectively avoiding water quality stratification or the accumulation of a small amount of sediment during the water settling process, and ensuring that the quality of the reused water is uniform. The discharge pipe of the clean water tank 901 adopts a design in which the first clean water pump 902 and the second clean water pump 903 are installed in parallel, and are connected to the external reuse point 21 through a pipeline to form a redundant conveying structure.
[0059] The clarification module 10 is arranged after the mixing module 8 and before the reuse module 9 and the sludge circulation module 11. The input end of the clarification module 10 is connected to the discharge end of the flocculation box 803 of the mixing module 8 through a pipeline to receive wastewater containing flocculants. The output end is divided into two paths: the top clear water outlet is connected to the clear water tank 901 of the reuse module 9 through a pipeline, and the bottom sludge outlet is connected to the input end of the sludge circulation module 11 through a pipeline to realize the separate treatment of clear water and sludge.
[0060] The clarifier 1001 is internally equipped with a sludge scraper 1002 driven by a motor 14. The scraper 1002 rotates slowly along the bottom of the clarifier 1001, efficiently scraping away the sludge sediment that settles to the bottom, preventing sludge accumulation from affecting the separation effect. Through the synergistic effect of gravity settling and the scraper 1002, wastewater achieves thorough sludge-water separation within the clarifier 1001: the resulting purified water at the top is of high quality, providing a high-quality water source for the reuse module 9; the sludge at the bottom is promptly transported to the sludge circulation module 11, improving sludge-water separation efficiency and ensuring the long-term stable operation of the clarifier 1001. This design not only lays a water quality foundation for subsequent water resource recycling and reuse but also indirectly improves the overall operating efficiency and economy of the treatment system by quickly removing sludge and preventing system blockage.
[0061] The sludge recycling module 11 is arranged between the clarification module 10, the settling tank 802, and the filter press module 12. It receives the sludge separated by the clarification module 10. The input end of the sludge recycling module 11 is connected to the sludge outlet of the clarification module 10 through a main pipeline to receive the sludge after settling and separation. The output end is divided into two paths: one path is connected to the settling tank 802 of the stirring module 8 through a pipeline, and the other path is connected to the input end of the filter press module 12 to realize the diversion and disposal of sludge.
[0062] The sludge circulation module 11 consists of four sludge circulation pumps. The first sludge circulation pump 1101 and the second sludge circulation pump 1102 are connected in parallel to form one pump group, and the third sludge circulation pump 1103 and the fourth sludge circulation pump 1104 are connected in parallel to form another pump group. Both pump groups are installed on the core pipeline of the module. This parallel pump group design provides high redundancy for sludge transport. When one pump group fails for maintenance, the other pump group can immediately switch or maintain operation, effectively avoiding system downtime caused by a single pump group failure. A portion of the sludge is stably returned to the settling tank 802, where residual chemicals and adsorption activity enhance the secondary removal of heavy metals. The remaining sludge is continuously transported to the filter press module 12 for dewatering, providing reliable support for stable system operation and treatment effectiveness.
[0063] The filter press module 12 is arranged after the sludge recycling module 11 and before the sludge transport station 22. It is also connected to the process water system 17 through pipelines. Its core function is to receive the remaining sludge separated by the clarification module 10, and after dewatering, transport the sludge cake to the sludge transport station 22, which greatly reduces the sludge moisture content and reduces the cost and difficulty of subsequent disposal. The system includes a rinsing and pressing water tank 1207, a rinsing water pump 1201, a pressing water pump 1202, and a dewatering machine 1206 (including a filter press 1203, a hydraulic mud storage hopper 1204, and a mud hopper discharge valve 1205). The rinsing and pressing water tank 1207 is directly connected to the process water system 17 via pipelines to stably store the process water required for rinsing and pressing. The rinsing and pressing water tank 1207 is connected to the input ends of the rinsing water pump 1201 and the pressing water pump 1202 via pipelines. The output ends of the two pumps are then connected to the filter press 1203 via pipelines to provide a continuous rinsing water source and pressing power for the filter press 1203. In the dewatering equipment 1206, the filter press 1203 is the core component for sludge dewatering. A hydraulic sludge storage hopper 1204 is arranged below it to collect the sludge cake formed after dewatering by the filter press 1203. A sludge discharge valve 1205 is fixedly installed at the bottom of the hydraulic sludge storage hopper 1204. The output end of the discharge valve is directly connected to the sludge transport outlet 22 through a pipeline.
[0064] The flushing and pressing water tank 1207 ensures a stable supply of water for rinsing and pressing the filter press 1203. The flushing water pump 1201 and the pressing water pump 1202 work together to improve dewatering efficiency. The precise coordination between the hydraulic sludge storage hopper 1204 and the sludge discharge valve 1205 enables the orderly collection and smooth discharge of sludge cake, which not only improves the efficiency of sludge collection and transportation, but also effectively reduces the moisture content of the sludge after dewatering, providing a reliable guarantee for the compliant disposal of sludge.
[0065] The trench 15 is arranged in a strip shape beside the quicklime storage silo 102, metering box 204, acid mist absorber 502, hydrochloric acid tank 501, first lime slurry metering pump 701, clean water tank 901, first sludge circulation pump 1101, third sludge circulation pump 1103, and flushing and pressing water tank 1207. The trench 15 is tightly fitted to the bottom area of each piece of equipment, forming a fully enclosed leakage collection space. This design can centrally collect lime slurry, hydrochloric acid, various reagents, and wastewater that may leak during equipment operation, preventing the leaked media from spreading to the plant area and causing secondary pollution to soil and water bodies. At the same time, it facilitates subsequent unified recycling and treatment, meeting the high standards of environmental protection.
[0066] Pressure gauges 13 are fixedly installed on adjacent pipelines of the first metering pump 201, the second metering pump 202, the first hydrochloric acid metering pump 503, the second hydrochloric acid metering pump 504, the acid unloading pump 505, the first lime slurry metering pump 701, the second lime slurry metering pump 702, the first clean water pump 902, the second clean water pump 903, the first sludge circulation pump 1101, the second sludge circulation pump 1102, the third sludge circulation pump 1103, the fourth sludge circulation pump 1104, the flushing water pump 1201, and the pressing water pump 1202, and are directly connected to the inside of the pipelines. Pressure gauges 13 allow for real-time monitoring of pressure changes in the media within each pipeline. When abnormal conditions such as pump malfunction, pipeline blockage, or valve leakage occur, the pressure value will fluctuate synchronously. Operators can quickly identify problems and troubleshoot potential hazards, effectively reducing maintenance difficulty, avoiding system downtime or equipment damage due to pipeline abnormalities, and ensuring continuous and stable system operation.
[0067] All other parts of this utility model not described herein are the same as existing technologies, or are known technologies, or can be implemented using existing technologies, and will not be described in detail here.
[0068] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A desulfurization wastewater treatment system characterized by comprising: It includes a lime milk preparation module (1), an organic sulfur dosing device (2), a flocculant dosing device (3), a coagulant aid dosing device (4), a hydrochloric acid dosing device (5), a safety shower (6), a lime milk metering module (7), a stirring module (8), a reuse module (9), a clarification module (10), a sludge recycling module (11), and a filter press module (12). The lime milk preparation module (1) includes a slaked lime storage tank (102), the lime milk preparation module (1) is connected to the process water system (17) at its input end and to the lime milk metering module (7) at its output end, and is used to prepare lime milk; The organic sulfur dosing device (2), flocculant dosing device (3), and coagulant aid dosing device (4) include a metering tank (204), a stirrer (205), a magnetic level gauge (203), a first metering pump (201), and a second metering pump (202). The hydrochloric acid dosing device (5) includes a hydrochloric acid tank (501), an acid mist absorber (502), an acid unloading pump (505), a first hydrochloric acid metering pump (503), and a second hydrochloric acid metering pump (504). The input ends of the organic sulfur dosing device (2), flocculant dosing device (3), coagulant aid dosing device (4), and hydrochloric acid dosing device (5) are connected to the process water system (17) and are used to add organic sulfur, flocculant, coagulant aid, and hydrochloric acid, respectively. The safety shower (6) is connected to the process water system (17) and is used for emergency flushing operations; The lime milk metering module (7) is located between the lime milk preparation module (1) and the stirring module (8). The lime milk metering module (7) includes a first lime milk metering pump (701), a second lime milk metering pump (702), and a flow sight glass (703). The input end of the lime milk metering module (7) is connected to the output end of the lime milk preparation module (1) and is used to receive the lime milk prepared by the lime milk preparation module (1) and to quantitatively meter the lime milk. The output end of the lime milk metering module (7) is divided into two paths. One path is used to transport the metered lime milk to the stirring module (8), and the other path is connected to the input end of the lime milk preparation module (1) to form a circulation loop. The stirring module (8) is arranged between the lime slurry metering module (7), the organic sulfur dosing device (2), the flocculant dosing device (3), the coagulant aid dosing device (4), and the clarification module (10). The stirring module (8) includes a neutralization tank (801), a settling tank (802), and a flocculation tank (803). The inlet of the neutralization tank (801) is connected to the output of the lime slurry metering module (7) and is used to receive the wastewater to be treated and the metered lime slurry. The inlet of the settling tank (802) is connected to the output of the organic sulfur dosing device (2) and is used to receive organic sulfur. The inlet of the flocculation tank (803) is connected to the output of the flocculant dosing device (3) and the output of the coagulant aid dosing device (4) and is used to receive flocculant and coagulant aid. The reuse module (9) is arranged next to the clarification module (10). The reuse module (9) includes a clear water tank (901), a first clear water pump (902) and a second clear water pump (903). The input end of the reuse module (9) is divided into three paths. The first path is connected to the clear water outlet of the clarification module (10) and is used to receive the qualified clear water separated by the clarification module (10). The second path is connected to the process water system (17) and is used to supplement the process water shortage in the system. The third path is connected to the hydrochloric acid dosing device (5) to realize water resource recycling. The clarification module (10) is arranged after the stirring module (8) and before the reuse module (9) and the sludge recycling module (11). The input end of the clarification module (10) is connected to the output end of the stirring module (8) and is used to separate the mud and water in the treated wastewater. The sludge recycling module (11) is arranged between the clarification module (10), the settling tank (802), and the filter press module (12). The sludge recycling module (11) includes a first sludge recycling pump (1101), a second sludge recycling pump (1102), a third sludge recycling pump (1103), and a fourth sludge recycling pump (1104). The input end of the sludge recycling module (11) is connected to the sludge outlet of the clarification module (10), and the output end is divided into two paths: one path is connected to the settling tank (802), and the other path is connected to the filter press module (12). It is used to return part of the sludge separated by the clarification module (10) to the settling tank (802) to enhance the removal of heavy metals, and part of it is transported to the filter press module (12) for dewatering. The filter press module (12) is arranged after the sludge circulation module (11). The filter press module (12) includes a rinsing and pressing water tank (1207), a rinsing water pump (1201), a pressing water pump (1202), and a dewatering machine (1206). The filter press module (12) is connected to the process water system (17) and is used to obtain the process water required for rinsing and pressing. The filter press module (12) is used to dewater the remaining sludge separated by the clarification module (10). The dewatered sludge is transported to the sludge off-site (22).
2. A desulfurization wastewater treatment system according to claim 1, characterized by The hydrated lime storage silo (102) is connected to the lime feeder (18) through the nitrate lime inlet pipe (112); a dust collector (101) is fixedly installed on the top of the hydrated lime storage silo (102), a material level gauge (103) and a low material level alarm switch (104) are fixedly installed inside, and a vibrator (105) is fixedly installed on the outer wall; the discharge end of the hydrated lime storage silo (102) is connected to the lime hopper (108) in sequence through a star feeder (106) driven by a motor (14) and a screw conveyor (107); the lime hopper (108) is connected to the limestone slurry tank (109), and the limestone slurry tank (109) is connected to the process water system (17) through a water inlet solenoid valve (110), and is equipped with a stirrer (205) driven by a motor (14) inside and an ultrasonic level gauge (111) outside.
3. The desulfurization wastewater treatment system according to claim 1, characterized by A stirrer (205) is installed inside the metering tank (204). A magnetic float level gauge (203) is installed on the outer wall of the metering tank (204) and connected to the inside of the metering tank (204). The first metering pump (201) and the second metering pump (202) are both equipped with motors (14). The first metering pump (201) and the second metering pump (202) are installed in parallel on the discharge pipe of the metering tank (204).
4. The desulfurization wastewater treatment system according to claim 1, characterized by The acid mist absorber (502) is connected to the pipeline of the hydrochloric acid tank (501). The output end of the acid unloading pump (505) is connected to the hydrochloric acid tank (501) through the pipeline. The first hydrochloric acid metering pump (503) and the second hydrochloric acid metering pump (504) are both equipped with motors (14) and are installed in parallel on the discharge pipeline of the hydrochloric acid tank (501). The input ends of the first hydrochloric acid metering pump (503) and the second hydrochloric acid metering pump (504) are both connected to the bottom of the hydrochloric acid tank (501) through the pipeline.
5. The desulfurization wastewater treatment system according to claim 1, wherein The first lime slurry metering pump (701) and the second lime slurry metering pump (702) are installed in parallel on the pipeline of the lime slurry metering module (7), and the flow sight glass (703) is connected to the discharge pipe section of the lime slurry metering module (7).
6. The desulfurization wastewater treatment system according to claim 1, wherein The neutralization tank (801) is connected to the wastewater inlet (19) via a pipeline to the electromagnetic flow meter (804). The discharge end of the flocculation tank (803) is connected to the wastewater collection pit (20). The neutralization tank (801), the settling tank (802) and the flocculation tank (803) are all equipped with a stirrer (205) driven by a motor (14). The tops of the neutralization tank (801), the settling tank (802) and the flocculation tank (803) are all connected to the water inlet (16).
7. The desulfurization wastewater treatment system according to claim 1, wherein The clean water tank (901) is equipped with a stirrer (205) driven by a motor (14). A first clean water pump (902) and a second clean water pump (903) are connected in parallel on the discharge pipe of the clean water tank (901) and are connected to the recycling station (21). The clarification module (10) includes a clarifier (1001), and a sludge scraper (1002) driven by a motor (14) is installed inside the clarifier (1001).
8. The desulfurization wastewater treatment system according to claim 1, wherein The first sludge circulation pump (1101) and the second sludge circulation pump (1102) are connected in parallel to form a pump group, and the third sludge circulation pump (1103) and the fourth sludge circulation pump (1104) are connected in parallel to form another pump group. Both pump groups are installed on the pipeline of the sludge circulation module (11).
9. The desulfurization wastewater treatment system according to claim 1, wherein The flushing and pressing water tank (1207) is connected to the process water system (17) through a pipeline. The flushing and pressing water tank (1207) is connected to the input end of the flushing water pump (1201) and the pressing water pump (1202) through a pipeline. The output end of the flushing water pump (1201) and the pressing water pump (1202) is connected to the filter press (1203) through a pipeline. The dewatering equipment (1206) includes a filter press (1203), a hydraulic sludge hopper (1204) and a sludge discharge valve (1205). A hydraulic sludge hopper (1204) is correspondingly provided below the filter press (1203). A sludge discharge valve (1205) is fixedly installed at the bottom of the hydraulic sludge hopper (1204). The output end of the sludge discharge valve (1205) is connected to the sludge transport point (22) through a pipeline.
10. The desulfurization wastewater treatment system according to claim 1, characterized by, A drainage ditch (15) is provided beside the slaked lime storage silo (102), metering tank (204), acid mist absorber (502), hydrochloric acid tank (501), first lime slurry metering pump (701), clean water tank (901), first sludge circulation pump (1101), third sludge circulation pump (1103), and rinsing and pressing water tank (1207); the first metering pump (201), second metering pump (202), first hydrochloric acid metering pump (503), and second hydrochloric acid metering pump (504) are all equipped with drainage ditches (15); Pressure gauges (13) are installed on the adjacent pipelines of the metering pump (504), acid unloading pump (505), first lime milk metering pump (701), second lime milk metering pump (702), first clean water pump (902), second clean water pump (903), first sludge circulation pump (1101), second sludge circulation pump (1102), third sludge circulation pump (1103), fourth sludge circulation pump (1104), flushing water pump (1201) and pressing water pump (1202).
