Slurry recycling system for dykes

By designing a mud reuse system, the environmental pollution problem of mud treatment in the construction of bored pile foundations was solved. The system enables on-site sedimentation, filtration and solidification of mud to form mud cakes for use in dike construction, thereby improving construction efficiency and environmental protection.

CN225013308UActive Publication Date: 2026-11-24CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522499003.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-25
Publication Date
2026-11-24
Estimated Expiration
2035-11-25

AI Technical Summary

Technical Problem

In existing technologies, the treatment of waste mud generated during the construction of bored pile foundations is costly and pollutes the environment. Traditional methods of transportation result in dripping and spillage, failing to effectively solve the environmental pollution problem.

Method used

Design a mud reuse system including multiple mud pits, storage tanks and solidification devices. Through sedimentation, filtration and solidification of mud, mud cakes are formed for use in dike construction, avoiding transportation and pollution. The system is equipped with a grid-like transmission network to optimize the mud treatment process.

Benefits of technology

This enabled on-site treatment and resource utilization of the mud, improving construction efficiency, reducing environmental pollution, and lowering transportation costs and energy consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225013308U_ABST
    Figure CN225013308U_ABST
Patent Text Reader

Abstract

This utility model discloses a mud reuse system for dikes. A row of cast-in-place piles is constructed below the dike. The mud reuse system includes: multiple mud pits located on the outside of the dike and spaced apart along the length of the dike, used to settle the mud discharged from the row of cast-in-place piles. Each mud pit is connected to multiple nearby cast-in-place piles; multiple storage tanks located on the inside of the dike and spaced apart along the length of the dike, used to store the mud after sedimentation in the mud pits, with each storage tank connected to one of the mud pits; and a solidification device located on the inside of the dike, used to filter and solidify the mud in the storage tanks to form mud cakes. The solidification device is connected to the multiple storage tanks. This mud reuse system reduces environmental pollution.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building construction technology, and in particular to a mud reuse system for dikes. Background Technology

[0002] As the construction of seawalls across the country accelerates, many seawalls utilize bored pile foundations, inevitably encountering the challenge of mud disposal. The pile foundation construction process generates a large amount of waste mud. Traditional mud disposal methods involve constructing mud pits and transporting it off-site in tanker trucks. However, this method is costly, and spillage and leakage are unavoidable during transport. Simply storing the mud at another location is a stopgap measure, causing pollution to the surrounding environment. Summary of the Invention

[0003] The purpose of this invention is to overcome the shortcomings of the prior art and provide a mud reuse system for dikes, which allows the mud discharged from the cast-in-place piles to be precipitated, filtered and solidified into mud cakes for use in dike construction, avoiding transportation and improving construction efficiency.

[0004] To achieve the above objectives, the technical solution adopted by this utility model is a mud reuse system for dikes, wherein a row of cast-in-place piles is constructed below the dike, and the mud reuse system includes: Multiple mud pits are located outside the dike and spaced apart along the length of the dike, for settling the mud discharged from a row of cast-in-place piles. Each mud pit is connected to multiple nearby cast-in-place piles. Multiple storage pools are located inside the dike and spaced apart along the length of the dike, for storing mud after sedimentation in the mud pools, and the multiple storage pools are connected to the multiple mud pools in a one-to-one correspondence. A solidification device, located on the inner side of the dike, is used to filter and solidify the mud in the storage pool and form mud cakes. The solidification device is connected to multiple storage pools.

[0005] A further improvement of this utility model's mud reuse system for dikes is that the plurality of mud pits include: Multiple primary sedimentation tanks are used for preliminary sedimentation of the mud discharged from the cast-in-place piles, and each primary sedimentation tank is connected to multiple nearby cast-in-place piles. Multiple secondary sedimentation tanks are used for secondary sedimentation of the sludge after preliminary sedimentation in the primary sedimentation tanks. The multiple secondary sedimentation tanks are arranged alternately with the multiple primary sedimentation tanks, and adjacent primary sedimentation tanks are connected to the secondary sedimentation tanks. The multiple secondary sedimentation tanks are also connected to the multiple storage tanks in a corresponding manner.

[0006] A further improvement of the mud reuse system for dikes of this utility model is that mud pipes are connected between adjacent primary sedimentation tanks and secondary sedimentation tanks, between the primary sedimentation tank and the corresponding cast-in-place pile, between the secondary sedimentation tank and the corresponding storage tank, and between the storage tank and the solidification device, forming a grid-like transmission network.

[0007] A further improvement of the mud reuse system for dikes of this invention is that the top elevation of each mud pit is 0.8m to 1.0m higher than the site elevation.

[0008] A further improvement of the mud reuse system for dikes of this invention is that each mud pit is lined with multiple impermeable geomembranes, and the overlap length of adjacent impermeable geomembranes is not less than 1 m.

[0009] A further improvement of this utility model's mud reuse system for dikes is that the solidification device includes: A reaction vessel, connected to multiple storage tanks, is filled with a curing agent to react with the mud to form flocculent mud clumps. A filter press is used to squeeze the flocculent mud clumps to filter out excess water and form the mud cake.

[0010] Compared with the prior art, the advantages of this utility model are: The mud discharged from the cast-in-place piles is settled, filtered, and solidified into mud cakes for use in dike construction, avoiding transportation, reducing environmental pollution, and improving construction efficiency. Attached Figure Description

[0011] To more clearly illustrate the technical solutions in the embodiments of this utility model, the drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0012] Figure 1 This is a schematic diagram of the transmission network of the mud reuse system for dikes according to this utility model.

[0013] Figure 2 This is a schematic diagram of the process of the mud reuse system for dikes according to this utility model.

[0014] Figure 3 This is a detailed drawing of the mud pit for the mud recycling system used in dikes according to this utility model.

[0015] In the diagram: 1. Embankment; 2. Secondary sedimentation tank; 3. Primary sedimentation tank; 4. Storage tank; 5. Reaction tank; 6. Mud pipe; 7. Cast-in-place pile; 8. Filter press; 9. Impermeable geomembrane; 10. Clay. Detailed Implementation

[0016] The following specific examples illustrate the implementation of this utility model. Those skilled in the art can easily understand other advantages and effects of this utility model from the content disclosed in this specification. This utility model can also be implemented or applied through other different specific embodiments, and various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of this utility model.

[0017] The mud reuse system for dikes according to this utility model will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0018] Please see Figures 1-3 A mud recycling system for dikes, wherein a row of cast-in-place piles 7 is constructed beneath dike 1, and the mud recycling system includes: Multiple mud pits are located outside the dike 1 and spaced apart along the length of the dike 1, for settling the mud discharged from a row of cast-in-place piles 7. Each mud pit is connected to multiple nearby cast-in-place piles 7. Multiple storage tanks 4 are located inside the dike 1 and are spaced apart along the length of the dike 1. They are used to store mud after sedimentation in the mud tanks. The multiple storage tanks 4 are connected to the multiple mud tanks one by one. A solidification device is installed on the inner side of the dike 1 to filter and solidify the mud in the storage tank 4 and make mud cakes. The solidification device is connected to multiple storage tanks 4.

[0019] By setting multiple mud pits outside the dike 1, the construction site is avoided from being occupied, the site pressure is reduced, and the construction site is also avoided from being polluted.

[0020] By setting up the storage tank 4 as a "buffer" for mud treatment, the difference in processing capacity between the mud tank and the solidification device is balanced. When the drilling and grouting pile 7 generates mud at a high rate, the mud tank cannot immediately process all the mud. In this case, the storage tank can temporarily store excess mud to prevent mud overflow or overload of the processing equipment. Conversely, when the solidification equipment has a strong processing capacity, the storage tank can provide a stable mud supply to ensure continuous operation of the equipment.

[0021] By setting up multiple mud pits and multiple storage tanks 4, the long-distance transmission of mud is avoided, thus optimizing the mud delivery efficiency.

[0022] Preferably, the plurality of such mud pits include: Multiple primary sedimentation tanks 3 are used for preliminary sedimentation of the mud discharged from the cast-in-place pile 7. Each primary sedimentation tank 3 is connected to multiple nearby cast-in-place piles 7. Multiple secondary sedimentation tanks 2 are used for secondary sedimentation of the sludge after preliminary sedimentation in the primary sedimentation tank 3. The multiple secondary sedimentation tanks 2 are arranged at intervals with the multiple primary sedimentation tanks 3, and adjacent primary sedimentation tanks 3 are connected to the secondary sedimentation tanks 2. The multiple secondary sedimentation tanks 2 are connected to the multiple storage tanks 4 in a corresponding manner.

[0023] By setting up the primary sedimentation tank 3 and the secondary sedimentation tank 2, the sedimentation effect of the mud was improved.

[0024] Preferably, mud pipes 6 are connected between the adjacent primary sedimentation tank 3 and the secondary sedimentation tank 2, between the primary sedimentation tank 3 and the corresponding cast-in-place pile 7, between the secondary sedimentation tank 2 and the corresponding storage tank 4, and between the storage tank 4 and the solidification device, forming a grid-like transmission network.

[0025] By constructing this grid-like transmission network, the transmission distance of the mud was reduced, the transmission efficiency was improved, and energy consumption was reduced.

[0026] Specifically, the mud pipe 6 is also connected between adjacent storage pools 4.

[0027] By installing the mud pipe 6 between adjacent storage tanks 4, it is easy for mud to flow between adjacent storage tanks 4, thus avoiding the situation of too much or too little mud in a single storage tank 4.

[0028] Specifically, each of the mud pits and the storage tank 4 is equipped with a float, and a delivery pump is connected to the bottom of the float.

[0029] By setting up this pontoon, the pump is kept afloat, preventing it from sinking and affecting the quality of the pumped slurry.

[0030] Preferably, the top elevation of each mud pit is 0.8m to 1.0m higher than the site elevation.

[0031] By ensuring that the top of the mud pit is 0.8m to 1.0m higher than the site elevation during excavation, rainwater and river water can be prevented from automatically flowing into the mud pit.

[0032] Specifically, when excavating the mud pit, the size and location of the mud pit are determined according to the project conditions. Mechanical excavation is carried out to the design elevation and then compacted and leveled. The slope of the mud pit is leveled manually in accordance with the 1:1 slope ratio.

[0033] Preferably, each of the mud pits is lined with multiple impermeable geomembranes 9, and the overlap length of adjacent impermeable geomembranes 9 is not less than 1 m.

[0034] By laying the impermeable geomembrane 9 in the mud pit, the mud is prevented from directly contacting the soil in the mud pit, thus avoiding affecting the mud sedimentation.

[0035] Specifically, before laying the impermeable geomembrane 9, the bottom of the mud pit is compacted and leveled, and the impermeable geomembrane 9 is laid smoothly from top to bottom along the pit wall.

[0036] Specifically, clay 10 is also provided at the joints of the adjacent impermeable geomembrane 9 for compaction and leakage prevention.

[0037] By setting the clay 10, the integrity of the laying of multiple impermeable geomembranes 9 is ensured, and leakage is avoided.

[0038] Preferably, the curing apparatus includes: The reaction tank 5 is connected to multiple storage pools 4. A solidifying agent is added to the reaction tank 5 to react with the mud to form flocculent mud clumps. Filter press 8 is used to squeeze the flocculent mud mass to filter out the remaining water and form the mud cake.

[0039] Specifically, the curing agent is pre-mixed according to the on-site mud parameters, with a mixing ratio of 4.5 kg of quicklime, 0.25 kg of PAM, and 0.3 kg of PAC per 1 m³ of mud.

[0040] The above ratio ensures effective dehydration while also saving on the amount of quicklime used.

[0041] Specifically, the mud cake can be used in the construction of embankment 1, and the filtered water is transported through pipes to a reservoir for vehicle and site cleaning.

[0042] It should be noted that the structures, proportions, sizes, etc., illustrated in the accompanying drawings are merely for illustrative purposes to aid those skilled in the art and are not intended to limit the scope of this invention. Therefore, they have no substantial technical significance. Any modifications to the structure, changes in proportions, or adjustments to size, without affecting the effectiveness and purpose of this invention, should still fall within the scope of the disclosed technical content. Furthermore, the terms "upper," "lower," "left," "right," "middle," and "one" used in this specification are merely for clarity and not intended to limit the scope of this invention. Changes or adjustments to their relative relationships, without substantially altering the technical content, should also be considered within the scope of this invention.

[0043] The above description is merely a preferred embodiment of the present utility model and is not intended to limit the present utility model in any way. Although the present utility model has been disclosed above with reference to a preferred embodiment, it is not intended to limit the present utility model. Any person skilled in the art can make some modifications or alterations to the above-disclosed technical content to create equivalent embodiments without departing from the scope of the present utility model's technical solution. Any simple modifications, equivalent changes, and alterations made to the above embodiments based on the technical essence of the present utility model without departing from the content of the present utility model's technical solution shall still fall within the scope of the present utility model's technical solution.

Claims

1. A mud recycling system for dikes, wherein a row of cast-in-place piles is constructed beneath the dike, characterized in that, The mud reuse system includes: Multiple mud pits are located outside the dike and spaced apart along the length of the dike, for settling the mud discharged from a row of cast-in-place piles. Each mud pit is connected to multiple nearby cast-in-place piles. Multiple storage pools are located inside the dike and spaced apart along the length of the dike, for storing mud after sedimentation in the mud pools, and the multiple storage pools are connected to the multiple mud pools in a one-to-one correspondence. A solidification device, located on the inner side of the dike, is used to filter and solidify the mud in the storage pool and form mud cakes. The solidification device is connected to multiple storage pools.

2. The mud reuse system for dikes as described in claim 1, characterized in that, The plurality of said mud pits include: Multiple primary sedimentation tanks are used for preliminary sedimentation of the mud discharged from the cast-in-place piles, and each primary sedimentation tank is connected to multiple nearby cast-in-place piles. Multiple secondary sedimentation tanks are used for secondary sedimentation of the sludge after preliminary sedimentation in the primary sedimentation tanks. The multiple secondary sedimentation tanks are arranged alternately with the multiple primary sedimentation tanks, and adjacent primary sedimentation tanks are connected to the secondary sedimentation tanks. The multiple secondary sedimentation tanks are also connected to the multiple storage tanks in a corresponding manner.

3. The mud reuse system for dikes as described in claim 2, characterized in that, Mud pipes are connected between adjacent primary sedimentation tanks and secondary sedimentation tanks, between primary sedimentation tanks and corresponding cast-in-place piles, between secondary sedimentation tanks and corresponding storage tanks, and between storage tanks and solidification devices, forming a grid-like transmission network.

4. The mud reuse system for dikes as described in claim 1, characterized in that, The top elevation of each mud pit is 0.8m to 1.0m higher than the site elevation.

5. The mud reuse system for dikes as described in claim 1, characterized in that, Each of the mud pits is lined with multiple impermeable geomembranes, and the overlap length of adjacent impermeable geomembranes is not less than 1 m.

6. The mud reuse system for dikes as described in claim 1, characterized in that, The curing device includes: A reaction vessel, connected to multiple storage tanks, is filled with a curing agent to react with the mud to form flocculent mud clumps. A filter press is used to squeeze the flocculent mud clumps to filter out excess water and form the mud cake.