Chemical vapor deposition furnace gas preheating device
By using a combination of spiral guide tubes and heating wires in a chemical vapor deposition furnace, along with the design of temperature sensors and rubber rings, the problem of uneven gas preheating was solved, achieving uniform gas preheating and sealing, thereby improving the stability of the deposition reaction and processing efficiency.
Patent Information
- Application Number
- CN202522800220.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-30
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-30
AI Technical Summary
Existing gas preheating devices for chemical vapor deposition furnaces suffer from uneven heating and low preheating efficiency, which affect the stability and rate of the deposition reaction inside the furnace, leading to a decrease in overall processing efficiency.
The system employs a spiral guide tube in conjunction with a heating wire inside the cavity to uniformly preheat the gas. A temperature sensor monitors the temperature in real time, and a rubber ring enhances the sealing performance. The sliding plate and screw structure facilitate the disassembly and assembly of the outer pipe, while the fixing mechanism ensures a stable connection between the outer shell and the top cover.
Uniform gas preheating was achieved, improving preheating accuracy and sealing performance, simplifying the maintenance process, and ensuring smooth gas delivery and a clean deposition reaction environment.
Smart Images

Figure CN225013595U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of chemical vapor deposition technology, specifically a gas preheating device for a chemical vapor deposition furnace. Background Technology
[0002] Chemical vapor deposition (CVD) is a chemical engineering technique that uses one or more gaseous compounds or elements containing thin film elements to chemically react on a substrate surface to generate a thin film. CVD is a new technology for preparing inorganic materials that has been developed in recent decades. CVD has been widely used for purifying substances, developing new crystals, and depositing various single-crystal, polycrystalline, or glassy inorganic thin film materials.
[0003] Chemical vapor deposition furnaces require a gas preheating device to ensure that the gas reaches the required reaction temperature before entering the furnace. However, existing preheating devices generally suffer from uneven heating and low preheating efficiency, which affects the stability and rate of the deposition reaction in the furnace and leads to a decrease in overall processing efficiency. Utility Model Content
[0004] The purpose of this invention is to provide a gas preheating device for a chemical vapor deposition furnace to solve the problems mentioned in the background art.
[0005] To achieve the above objectives, the present invention provides the following technical solution: a gas preheating device for a chemical vapor deposition furnace, comprising a chemical vapor deposition furnace shell and a top cover, wherein a fixing mechanism is provided on the chemical vapor deposition furnace shell and the top cover, and an adjustment mechanism is provided on the top cover; The adjustment mechanism includes a preheating component and an assembly component, wherein the assembly component is disposed on the preheating component; The preheating component includes a cavity, which is located in the outer shell of a chemical vapor deposition furnace. A heating wire is fixedly connected inside the cavity. A spiral guide tube is fixedly connected inside the top cover. A temperature sensor is fixedly connected inside the top cover and is located on one side of the spiral guide tube. A rubber ring is fixedly connected to the bottom of the top cover. An external pipe is inserted into the upper surface of the spiral guide tube.
[0006] Preferably, the rubber ring is disposed on the outer ring of the chemical vapor deposition furnace shell, and the outer pipe is disposed on the top of the top cover.
[0007] Preferably, the top of the top cover has an elongated slot, and the upper surface of the spiral guide tube is in contact with the elongated slot on the top of the top cover.
[0008] Preferably, the assembly includes a fixing base, which is fixedly connected to the top periphery of the top cover and disposed around the surface of the spiral guide tube. A square groove is formed on the top of the fixing base. An mounting base is fixedly connected around the surface of the outer tube. Sliding grooves are formed at both ends inside the mounting base. A sliding plate is slidably connected inside the sliding groove. A pull rod is fixedly connected between the two sliding plates. A top block is fixedly connected to the top of the pull rod. The top block is disposed on the top of the mounting base. A square block is fixedly connected to the bottom of the pull rod and the sliding plate. A second screw is threadedly connected to the square block and the fixing base.
[0009] Preferably, the top of the square groove is set as an opening, the surface of the block and the inside of the square groove are inserted, the block is inserted into the square groove of the fixing seat, and the block and the fixing seat are fixed by the second screw thread, thus completing the assembly of the outer pipe and the spiral guide pipe, which can be easily disassembled for cleaning later.
[0010] Preferably, the mounting base has a through hole groove inside, the two sliding grooves communicate with the through hole groove inside the mounting base, and the surface of the pull rod is inserted through the through hole groove inside the mounting base.
[0011] Preferably, the fixing mechanism includes insert blocks, which are fixedly connected to the top periphery of the chemical vapor deposition furnace shell. Slots are provided around the bottom periphery of the top cover. Long slots are provided on the outer sides of the four insert blocks. Long blocks are inserted into the long slots. Connecting seats are fixedly connected to the outer sides of the long blocks. Placement slots are provided inside the connecting seats on the side near the top cover. Fixing rods are fixedly connected around the top periphery of the top cover. Rotating plates are rotatably connected to the surface of the fixing rods. First screws are threadedly connected to the rotating plates and connecting seats.
[0012] Preferably, the bottom of the slot is set as an opening, the surface of the insert block is inserted into the inside of the slot, the insert block is inserted into the slot, and the rubber ring fits against the outer ring of the outer shell to achieve a seal.
[0013] Preferably, a through groove is provided around the outer ring of the top cover, and the surface of the long block is inserted through the through groove provided around the outer ring of the top cover.
[0014] Preferably, the rotating plate has openings at both ends and on the side near the top cover, and the surface of the rotating plate is inserted into the placement groove.
[0015] Compared with the prior art, the present invention provides a gas preheating device for a chemical vapor deposition furnace, which has the following beneficial effects: 1. This gas preheating device for a chemical vapor deposition furnace extends the gas flow path through an adjustment mechanism and a spiral guide tube. Combined with heating wires inside the chamber, it achieves uniform gas preheating. A temperature sensor monitors the temperature in real time to ensure that the preheating accuracy meets the standards. A rubber ring enhances the sealing performance and reduces heat loss. The cooperation of the sliding plate, block, and second screw can fix the external pipe and the spiral guide tube. It is easy to disassemble and assemble, and facilitates regular cleaning of the inside of the pipe to ensure smooth gas delivery.
[0016] 2. The gas preheating device for this chemical vapor deposition furnace, through a fixing mechanism, positioning of inserts and slots, and a locking structure consisting of a long block, a rotating plate, and a first screw, ensures a stable connection between the furnace shell and the top cover, preventing gas leakage inside the furnace. The disassembly and assembly steps are simple, requiring no complex tools to separate the shell and top cover, facilitating regular cleaning of residual impurities on the inner wall of the shell, reducing maintenance difficulty, and ensuring a clean deposition reaction environment. Attached Figure Description
[0017] To more clearly illustrate the technical solutions in the embodiments of this utility model, the drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort. Figure 1 This is a perspective view of the overall structure of this utility model; Figure 2 A schematic diagram showing the disassembly of the preheating component's mechanism; Figure 3 This is a schematic cross-sectional view of the outer shell of a chemical vapor deposition furnace. Figure 4 This is a structural diagram of the assembled components; Figure 5 for Figure 4 Enlarged structural diagram at point A in the middle; Figure 6 This is a structural diagram of the fixing mechanism; Figure 7 for Figure 6 Enlarged structural diagram at point B; Figure 8 This is a bottom view of part of the fixed mechanism.
[0018] In the diagram: 1. Chemical vapor deposition furnace shell; 2. Fixing mechanism; 21. Long slot; 22. Insert block; 23. Slot; 24. Long block; 25. Connecting seat; 26. Placement slot; 27. First screw; 28. Fixing rod; 29. Rotating plate; 3. Top cover; 4. Adjusting mechanism; 41. Preheating assembly; 411. Cavity; 412. Heating wire; 413. Spiral guide tube; 414. Rubber ring; 415. Temperature sensor; 416. External pipe; 42. Assembly assembly; 421. Fixing seat; 422. Second screw; 423. Pull rod; 424. Mounting seat; 425. Top block; 426. Slide groove; 427. Slide plate; 428. Square slot; 429. Square block. Detailed Implementation
[0019] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0020] In this utility model, unless otherwise explicitly specified and limited, the terms "installation," "connection," "joining," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.
[0021] This utility model provides the following technical solution: Example 1 Combination Figures 1 to 5 A gas preheating device for a chemical vapor deposition furnace includes a chemical vapor deposition furnace shell 1 and a top cover 3. A fixing mechanism 2 is provided on the chemical vapor deposition furnace shell 1 and the top cover 3, and an adjusting mechanism 4 is provided on the top cover 3. The regulating mechanism 4 includes a preheating component 41 and an assembly component 42, with the assembly component 42 disposed on the preheating component 41; The preheating component 41 includes a cavity 411, which is located in the outer shell 1 of the chemical vapor deposition furnace. A heating wire 412 is fixedly connected inside the cavity 411. A spiral guide tube 413 is fixedly connected inside the top cover 3. A temperature sensor 415 is fixedly connected inside the top cover 3. The temperature sensor 415 is located on one side of the spiral guide tube 413. A rubber ring 414 is fixedly connected to the bottom of the top cover 3. An outer tube 416 is inserted into the upper surface of the spiral guide tube 413. A rubber ring 414 is set on the outer ring of the outer shell 1 of the chemical vapor deposition furnace, and an outer pipe 416 is set on the top of the top cover 3. The top of the top cover 3 has an elongated slot, and the upper surface of the spiral guide pipe 413 is in contact with the elongated slot on the top of the top cover 3. Assembly component 42 includes a fixing seat 421, which is fixedly connected to the top periphery of the top cover 3. The fixing seat 421 is disposed around the surface of the spiral guide tube 413. A square groove 428 is opened on the top of the fixing seat 421. An installation seat 424 is fixedly connected around the surface of the outer tube 416. A sliding groove 426 is opened at both ends inside the installation seat 424. A sliding plate 427 is slidably connected inside the sliding groove 426. A pull rod 423 is fixedly connected between the two sliding plates 427. A top block 425 is fixedly connected to the top of the pull rod 423. The top block 425 is disposed on the top of the installation seat 424. A square block 429 is fixedly connected to the bottom of the pull rod 423 and the sliding plate 427. A second screw 422 is threadedly connected to the square block 429 and the fixing seat 421. The top of the square groove 428 is set as an opening, the surface of the block 429 is inserted into the inside of the square groove 428, the mounting base 424 has a through hole slot, the two sliding grooves 426 are connected to the through hole slot opened inside the mounting base 424, and the surface of the pull rod 423 is inserted through the through hole slot opened inside the mounting base 424.
[0022] Furthermore, the spiral guide tube 413 extends the gas flow path, and together with the heating wire 412 inside the cavity 411, it achieves uniform gas preheating. The temperature sensor 415 monitors the temperature in real time to ensure that the preheating accuracy meets the standards. The rubber ring 414 enhances the sealing performance and reduces heat loss. The cooperation of the sliding plate 427, the block 429 and the second screw 422 can fix the outer pipe 416 and the spiral guide tube 413. It is easy to disassemble and assemble, and it is convenient to clean the inside of the pipe regularly to ensure smooth gas delivery.
[0023] Example 2 See Figure 1-8 Furthermore, based on Embodiment 1, the fixing mechanism 2 includes insert blocks 22, which are fixedly connected to the top periphery of the chemical vapor deposition furnace shell 1. The bottom periphery of the top cover 3 has slots 23, and the outer sides of the four insert blocks 22 have long grooves 21. Long blocks 24 are inserted into the long grooves 21. Connecting seats 25 are fixedly connected to the outer side of the long blocks 24. The connecting seats 25 have placement grooves 26 on the side near the top cover 3. Fixing rods 28 are fixedly connected to the top periphery of the top cover 3. A rotating plate 29 is rotatably connected to the surface of the fixing rods 28. The rotating plate 29 and the connecting seat 25 are threadedly connected with a first screw 27. The bottom of the slot 23 is set as an opening, the surface of the insert block 22 is inserted into the inside of the slot 23, the outer ring of the top cover 3 is provided with a through groove, the surface of the long block 24 is inserted through into the through groove provided on the outer ring of the top cover 3, the two ends of the rotating plate 29 and the side near the top cover 3 are set as openings, and the surface of the rotating plate 29 is inserted into the inside of the placement slot 26.
[0024] Furthermore, the insertion block 22 and slot 23 are positioned together, and the locking structure consisting of the elongated block 24, rotating plate 29, and first screw 27 ensures a stable connection between the outer shell 1 and top cover 3 of the chemical vapor deposition furnace, preventing gas leakage inside the furnace. The disassembly and assembly steps are simple, and the outer shell and top cover can be separated without complicated tools, facilitating regular cleaning of residual impurities on the inner wall of the outer shell, reducing maintenance difficulty, and ensuring a clean deposition reaction environment.
[0025] In actual operation, when this device is used, align the outer pipe 416 with the elongated slot on the top of the top cover 3 so that it fits against the upper surface of the spiral guide tube 413. Pull the top block 425 to drive the pull rod 423, so that the slide plate 427 slides along the slide groove 426 of the mounting base 424, and drive the block 429 to insert into the square slot 428 of the fixing base 421. Fix the block 429 and the fixing base 421 with the second screw 422 to complete the assembly of the outer pipe 416 and the spiral guide tube 413. It can be easily disassembled for cleaning later. The top cover 3 is placed on the top of the chemical vapor deposition furnace shell 1, so that the insert 22 is inserted into the slot 23. The rubber ring 414 fits against the outer ring of the shell to achieve a seal. The long block 24 is inserted through the through groove of the top cover 3 and inserted into the long slot 21 of the insert 22. The rotating plate 29 on the fixing rod 28 is rotated so that it is snapped into the placement slot 26 of the connecting seat 25 and fixed by the first screw 27 to achieve a stable connection between the shell and the top cover, which is convenient for subsequent disassembly and cleaning of the inner wall of the shell. Gas enters the spiral guide tube 413 through the external pipe 416. The heating wire 412 inside the cavity 411 of the chemical vapor deposition furnace shell 1 is energized and heats up. The spiral structure extends the gas flow path, allowing the gas to fully absorb heat and complete preheating. The temperature sensor 415 monitors the gas temperature in real time to ensure that the preheating effect meets the standard. The preheated gas then smoothly enters the furnace to participate in the deposition reaction.
[0026] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.
Claims
1. A chemical vapor deposition furnace gas preheating device, comprising a chemical vapor deposition furnace shell (1) and a top cover (3), characterized in that: The outer shell (1) and top cover (3) of the chemical vapor deposition furnace are provided with a fixing mechanism (2), and the top cover (3) is provided with an adjustment mechanism (4). The adjustment mechanism (4) includes a preheating component (41) and an assembly component (42), wherein the assembly component (42) is disposed on the preheating component (41); The preheating component (41) includes a cavity (411) which is located in the outer shell (1) of the chemical vapor deposition furnace. A heating wire (412) is fixedly connected inside the cavity (411). A spiral guide tube (413) is fixedly connected inside the top cover (3). A temperature sensor (415) is fixedly connected inside the top cover (3). The temperature sensor (415) is located on one side of the spiral guide tube (413). A rubber ring (414) is fixedly connected to the bottom of the top cover (3). An outer tube (416) is inserted into the upper surface of the spiral guide tube (413).
2. The gas preheating device for a chemical vapor deposition furnace according to claim 1, characterized in that: The rubber ring (414) is disposed on the outer ring of the chemical vapor deposition furnace shell (1), and the outer pipe (416) is disposed on the top of the top cover (3).
3. The gas preheating device for a chemical vapor deposition furnace according to claim 1, characterized in that: The top cover (3) has an elongated slot at the top, and the upper surface of the spiral guide tube (413) is in contact with the elongated slot at the top of the top cover (3).
4. The gas preheating device for a chemical vapor deposition furnace according to claim 1, characterized in that: The assembly component (42) includes a fixing seat (421), which is fixedly connected to the top of the top cover (3) around the perimeter. The fixing seat (421) is disposed around the surface of the spiral guide tube (413). A square groove (428) is provided on the top of the fixing seat (421). An installation seat (424) is fixedly connected around the surface of the outer tube (416). A sliding groove (426) is provided at both ends of the installation seat (424). A sliding plate (427) is slidably connected inside the sliding groove (426). A pull rod (423) is fixedly connected between the two sliding plates (427). A top block (425) is fixedly connected to the top of the pull rod (423). The top block (425) is disposed on the top of the installation seat (424). A square block (429) is fixedly connected to the bottom of the pull rod (423) and the sliding plate (427). A second screw (422) is threadedly connected to the square block (429) and the fixing seat (421).
5. The gas preheating device for a chemical vapor deposition furnace according to claim 4, characterized in that: The top of the square groove (428) is set as an opening, and the surface of the block (429) is inserted into the inside of the square groove (428).
6. The gas preheating device for a chemical vapor deposition furnace according to claim 4, characterized in that: The mounting base (424) has a through hole groove inside, and the two sliding grooves (426) are connected to the through hole groove inside the mounting base (424). The surface of the pull rod (423) is inserted through the through hole groove inside the mounting base (424).
7. The gas preheating device for a chemical vapor deposition furnace according to claim 1, characterized in that: The fixing mechanism (2) includes insert blocks (22), which are fixedly connected to the top periphery of the chemical vapor deposition furnace shell (1). The bottom periphery of the top cover (3) is provided with slots (23). The four insert blocks (22) are provided with long slots (21) on the outside. Long blocks (24) are inserted into the long slots (21). Connecting seats (25) are fixedly connected to the outside of the long blocks (24). The connecting seats (25) are provided with placement slots (26) on the side near the top cover (3). Fixing rods (28) are fixedly connected to the top periphery of the top cover (3). Rotating plates (29) are rotatably connected to the surface of the fixing rods (28). The rotating plates (29) and the connecting seats (25) are threadedly connected with first screws (27).
8. The gas preheating device for a chemical vapor deposition furnace according to claim 7, characterized in that: The bottom of the slot (23) is set as an opening, and the surface of the plug (22) is inserted into the slot (23).
9. A gas preheating device for a chemical vapor deposition furnace according to claim 7, characterized in that: The top cover (3) has a through groove around its outer ring, and the surface of the long block (24) is inserted through the through groove around the outer ring of the top cover (3).
10. A gas preheating device for a chemical vapor deposition furnace according to claim 7, characterized in that: The rotating plate (29) has openings at both ends and on the side near the top cover (3), and the surface of the rotating plate (29) is inserted into the placement groove (26).
