Old highway renovation base reinforcing device

By combining base reinforcement fillers, lateral anchors, and stress diffusion components, the problems of low construction efficiency and poor interface bonding in the repair of old highway base layers are solved, achieving a fast, economical, and durable repair effect.

CN225013901UActive Publication Date: 2026-11-24杨浩军
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202620004376.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2026-01-05
Publication Date
2026-11-24
Estimated Expiration
2036-01-05

AI Technical Summary

Technical Problem

Existing technologies for repairing old highway base courses suffer from problems such as low construction efficiency, poor interface bonding, and susceptibility to reflective defects, making it difficult to simultaneously meet the requirements of rapid construction, economic and environmental protection, and long-term durability.

Method used

The system employs a combination of prefabricated base reinforcement fillers, lateral anchors, and stress diffusers. Through the design of grouting anchors and stress diffusers, it achieves mechanical interlocking and chemical bonding between the old and new base layers, forming an overall synergistic stress-bearing structure.

Benefits of technology

It enables rapid and green construction, enhances the bonding strength between new and old base layers, reduces the incidence of reflective cracks, and improves the long-term stability and durability of the repaired area.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225013901U_ABST
    Figure CN225013901U_ABST
Patent Text Reader

Abstract

This utility model discloses a base course reinforcement device for old highway renovation, including a base course reinforcement filler, lateral anchors, and stress diffusers. The base course reinforcement filler is a prefabricated rigid body whose cross-sectional profile is adapted to fit into the pothole. The lateral anchors are vertically connected along the side of the base course reinforcement filler and have anchoring flanges extending towards the sidewall of the pothole. Grouting holes are provided on the flanges, allowing for shear anchoring with the sidewall of the pothole through grouting. The stress diffusers are laid flat on the top surface of the base course reinforcement filler to distribute and transfer the upper load to the surrounding intact base course. The base course reinforcement filler can be provided with keyways for fitting and connecting with the lateral anchors. It can be a hollow shell filled with a strong filler material after curing. This device is quick to construct, environmentally friendly, and can achieve a firm bond and synergistic stress distribution between the old and new base courses, effectively suppressing reflective cracks and improving the long-term stability and durability of the repaired area.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of road maintenance and repair engineering technology, specifically to a device for reinforcing the base layer of old highways. Background Technology

[0002] In highway maintenance and reconstruction projects, it is common to encounter situations where the original pavement base layer (such as cement-stabilized crushed stone layer, secondary crushed stone layer, etc.) becomes locally loose, broken, or has reduced load-bearing capacity due to long-term loads, water damage, etc. The traditional mainstream process for dealing with such defects is the "excavation-replacement" method, which involves excavating the damaged old base layer, filling it with new material, and compacting it. In addition, there is also a rapid repair method that uses precast concrete blocks for pothole filling.

[0003] However, existing technologies have the following obvious drawbacks, making it difficult to simultaneously meet the requirements of rapid construction, economic and environmental protection, and long-term durability: 1. Problems with the traditional "excavation-replacement" process: The construction process is complicated (excavation, removal, backfilling, and compaction), requiring long-term traffic closures, resulting in low efficiency; it generates a large amount of construction waste, which is not environmentally friendly; the interface between the new and old materials is a vertical cold joint, with weak interfacial bonding, which easily becomes a stress concentration point and a channel for moisture intrusion, leading to interlayer voids or reflective cracks, and a short repair life.

[0004] 2. Shortcomings of the simple precast block filling process: Although using precast blocks can shorten on-site construction time, there is usually a gap between the precast blocks and the sidewalls of the old pit. Relying solely on self-weight or simple interlocking, there is a lack of effective lateral anchoring and connection. Under repeated traffic loads, the blocks are prone to loosening, settlement, or horizontal displacement, and the repair area and the old base layer cannot form an integral and coordinated stress distribution. At the same time, this method usually does not consider how to effectively disperse the concentrated stress at the top of the repair area, leading to fatigue failure at the interface between the new and old layers.

[0005] Therefore, there is an urgent need for a reinforcement device that can overcome the above-mentioned defects. It can not only achieve rapid assembly construction, but also ensure a strong mechanical and chemical bond between the reinforced body and the old base layer through effective structural design, so as to achieve effective load transfer and diffusion, thereby significantly improving the long-term stability and durability of the repaired area. Utility Model Content

[0006] In view of the shortcomings of the existing technology, the purpose of this utility model is to provide a base reinforcement device for old highway renovation, so as to solve the problems mentioned in the background art.

[0007] To achieve the above objectives, a specific embodiment of this utility model provides a base course reinforcement device for old highway renovation, suitable for filling and reinforcing potholes exposed after excavation of the old pavement layer. The device includes a base course reinforcement filler, at least one lateral anchor, and a stress diffuser. The base course reinforcement filler is a prefabricated rigid body whose cross-sectional profile matches the cross-sectional profile of the pothole to embed into it. At least one lateral anchor is vertically arranged along and connected to the side of the base course reinforcement filler, and has an anchoring wing extending toward the sidewall of the pothole. The anchoring wing has grouting holes for forming shear anchorage with the sidewall of the pothole through grouting material. The stress diffuser is laid flat on the top surface of the base course reinforcement filler to distribute and transfer the upper load to the intact base course surrounding the pothole.

[0008] This utility model provides a road surface renovation and base reinforcement device that addresses the problems of low construction efficiency, poor bonding between the old and new surfaces, and susceptibility to reflective defects in existing road surface repair technologies. It offers a device with a reasonable structural design, fast and efficient construction, and ensures a firm bond and coordinated stress distribution between the old and new base surfaces.

[0009] In addition, the old highway renovation base reinforcement device proposed in the application may also have the following additional technical features: Specifically, the side of the base reinforcement filler is provided with a vertical keyway, and the lateral anchor has a protrusion that matches the shape of the keyway, and the connection is achieved by the engagement of the protrusion with the keyway.

[0010] Specifically, the anchoring flange of the lateral anchor is inclined outward on the horizontal plane to form an upward anchoring force after anchoring.

[0011] Specifically, the base reinforcement filler is a hollow shell, the internal cavity of which is filled with a filler that has strength after curing.

[0012] Specifically, the edge of the stress diffuser extends to the top surface of the intact old base layer beyond the edge of the pit and is fixed by anchors.

[0013] Specifically, it also includes at least one vertical force transmission rod, the lower end of which is pre-embedded in the base reinforcement filler, and the upper end extends vertically upward to connect with and transmit force to the upper new surface layer.

[0014] Specifically, the stress diffusion element is selected from at least one of geogrid, wire mesh and composite geotextile.

[0015] Specifically, the base reinforcement filler is a precast component made of at least one selected from concrete, engineering plastics and fiber-reinforced composite materials.

[0016] The advantages of this invention compared to existing technologies are as follows: (1) Using prefabricated components, only the pits need to be cleaned, hoisted into place, grouted and anchored, and stress diffusion components need to be laid on site. The process is simple, greatly shortens the maintenance time, reduces construction waste, and realizes rapid and green construction.

[0017] (2) High-strength grout can be injected into the gap between the precast component and the old pit sidewall through the grouting holes on the lateral anchor and its anchor wing plate; after the grout has solidified, it will tightly wrap the anchor wing plate and bond it to the old base layer, forming a strong mechanical interlocking and chemical bonding force, realizing shear anchoring between the new and old interfaces, effectively resisting vertical and horizontal loads, and preventing the solidified body from loosening and displacing.

[0018] (3) The stress diffuser laid flat on the top surface of the filler can effectively disperse and transfer the concentrated load of the wheel acting on the repair area to the surrounding intact old base layer, greatly reduce the stress level inside the repair area, and suppress the generation of reflective cracks.

[0019] (4) By pre-embedded vertical force transmission rods, the reinforced base layer and the upper new pavement layer can be further connected into a whole, realizing the effective vertical transmission of load and improving the overall integrity of the pavement structure.

[0020] (5) The reinforcing filler is prefabricated in the factory, and its quality is stable and reliable. Its size and strength can be customized according to the design requirements. The number and arrangement of the lateral anchors can be adjusted, which can adapt to the reinforcement of pits with different sizes, depths and bearing capacity requirements, and has good versatility.

[0021] Additional aspects and advantages of this invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. Attached Figure Description

[0022] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0023] Figure 1 This is a schematic diagram of the internal structure of the old highway renovation base reinforcement device in one embodiment of the present invention; Figure 2 This is a schematic diagram of the installation scenario of the old highway renovation base reinforcement device in one embodiment of this utility model. Figure 1 ; Figure 3This is a schematic diagram of the installation scenario of the old highway renovation base reinforcement device in one embodiment of this utility model. Figure 2 ; Figure 4 This is a partial structural schematic diagram of the old highway renovation base reinforcement device in one embodiment of the present invention; Figure 5 This is a structural diagram of the components of a road renovation and base reinforcement device according to one embodiment of the present invention. Figure 6 This is a diagram showing the installation sequence of the old highway renovation and base reinforcement device in one embodiment of the present invention.

[0024] Explanation of reference numerals in the attached figures: 1. Base reinforcement filler; 2. Lateral anchor; 3. Stress diffuser; 11. Keyway; 21. Anchor wing plate; 22. Grouting hole; 4. Anchor nail; 5. Vertical force transmission bar. Detailed Implementation

[0025] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0026] like Figures 1 to 6 As shown, the old highway renovation base reinforcement device in one embodiment of this utility model is mainly used to fill and reinforce the base pits exposed after the old pavement layer is excavated. Specifically, it includes a base reinforcement filler 1, a lateral anchor 2, a stress diffusion component 3, and optional anchor nails 4 and vertical force transmission rods 5.

[0027] (a) Base reinforcement filling component 1 The base reinforcement filler 1 is the core load-bearing component of the device. It is a rigid body prefabricated in the factory. Its core design requirement is to be completely compatible with the cross-sectional profile of the pit to be repaired, so as to ensure that it can fit snugly with the inner wall of the pit after being embedded in the pit, and avoid excessive gaps that would lead to uneven stress.

[0028] 1. Material Selection: The base reinforcement filler 1 is made of one or more of the following: concrete, engineering plastics, or fiber-reinforced composite materials. In practical applications, the choice can be made flexibly based on the load-bearing capacity requirements of the pothole, the construction environment, and the cost budget: For deep pothole repairs on heavy-load highways, fiber-reinforced concrete (such as carbon fiber reinforced concrete and glass fiber reinforced concrete) is preferred, as its compressive strength, flexural strength, and durability are superior to ordinary concrete; for light-load highways or temporary repair scenarios, high-strength engineering plastics (such as polyamide and polycarbonate) can be used, as they are lightweight, easy to transport and hoist, and have a certain degree of impact resistance; for medium-load scenarios, a composite structure of fiber-reinforced composite materials and concrete can be used, with an outer layer of fiber-reinforced composite material shell and an inner layer of poured concrete, balancing strength and lightness.

[0029] 2. Structural Design: The base reinforcement filler 1 is a hollow shell structure, with its internal cavity filled with a strong filler material after curing. The wall thickness of the hollow shell needs to be designed according to the load-bearing requirements to ensure sufficient rigidity to support hoisting and initial load-bearing. Generally, it is designed to withstand its own weight and the impact force during hoisting to avoid deformation. The internal filler material can be high-strength grout, polymer-modified concrete, or cement-based composite material. The filler material needs to have good fluidity, fast curing speed, and high bonding strength. After curing, it forms an integral whole with the hollow shell to jointly bear the upper load.

[0030] 3. Connection Structure: The side of the base reinforcement filler 1 is provided with vertical keyways 11. The keyways 11 are dovetail-shaped. The number of keyways 11 is determined according to the size of the base reinforcement filler 1 and the lateral anchoring requirements. Usually, 2-4 keyways are evenly arranged on each side. The depth and width of the keyways 11 must be completely matched with the protrusions of the lateral anchors 2 to ensure a tight fit without any loose gaps after the protrusions are embedded. The length of the keyways 11 is consistent with the height of the base reinforcement filler 1, extending from the top surface to the bottom surface of the filler, which facilitates the complete vertical fitting of the lateral anchors 2.

[0031] (ii) Lateral anchors 2 Lateral anchors 2 are key components for achieving a firm connection between the base reinforcement filler 1 and the sidewall of the pit. At least one is provided (in practical applications, to ensure uniform anchoring, one is usually provided on each side of the base reinforcement filler 1, adjusted according to the size of the filler). They are vertically installed along the side of the base reinforcement filler 1 and connected to that side.

[0032] 1. Structural Design: The lateral anchor 2 includes a vertical connecting part connected to the base reinforcement filler 1 and an anchoring wing plate 21 extending toward the sidewall of the pit. The inner side of the vertical connecting part has a protrusion matching the shape of the keyway 11, the length of the protrusion being the same as the length of the keyway 11. The surface of the protrusion can be provided with anti-slip textures (such as serrated or striped patterns) to further enhance the friction after engagement and prevent vertical displacement.

[0033] 2. Anchor wing plate 21 design: The anchor wing plate 21 is set outward on the horizontal plane, and the tilting direction is upward on the side away from the base reinforcement filler 1. The tilting angle is 10°-30° (this angle range can ensure that an effective upward anchoring force is formed after anchoring, while avoiding the difficulty of grouting due to excessive tilting angle).

[0034] 3. Grouting Hole 22 Design: Grouting holes 22 are provided on the anchoring wing plate 21. 3-5 grouting holes 22 are evenly distributed on each anchoring wing plate 21. The diameter of the grouting holes 22 is 8-12mm, and the hole size must be compatible with the grouting nozzle of conventional grouting equipment to ensure smooth grouting. The distribution of the grouting holes 22 must cover the entire area of ​​the anchoring wing plate 21, including the ends, middle, and side near the vertical connection, to avoid grouting dead zones and ensure that the grout can completely coat the anchoring wing plate 21 and fill all gaps between the pit sidewall and the base reinforcement filler 1.

[0035] 4. Material Selection: The lateral anchor 2 must possess high strength, corrosion resistance, and good bonding performance. High-strength steel (such as Q355 steel), stainless steel, or fiber-reinforced composite materials (such as carbon fiber reinforced polymer) are preferred. If steel is used, the surface must undergo anti-corrosion treatment (such as hot-dip galvanizing or coating with anti-corrosion paint) to prevent rusting in a humid environment over a long period, which would affect the anchoring effect and service life.

[0036] (iii) Stress diffusion component 3 The stress diffuser 3 is used to distribute and transfer the upper load to the intact base layer around the pit, so as to avoid the formation of reflective cracks in the repair area due to stress concentration. It is laid flat on the top surface of the base reinforcement filler 1.

[0037] 1. Material Selection: Stress diffusion component 3 can be at least one of geogrid, wire mesh, and composite geotextile. A single material or combination of materials can be selected based on actual needs: For heavy-load highways or scenarios with large potholes, wire mesh (such as high-carbon steel wire woven mesh with a diameter of 3-5mm and a mesh size of 10-20mm) is preferred due to its high tensile strength and good stress diffusion effect; for light-load highways or scenarios requiring enhanced waterproofing, composite geotextile (such as a composite structure of polyester filament geotextile and polyethylene film) can be used; for medium-load scenarios, geogrid (such as fiberglass geogrid or plastic geogrid) can be used, as it possesses good tensile strength and stability, and is lightweight and easy to lay. If further enhancement of stress diffusion is required, a composite structure of "wire mesh + geotextile" can be used, i.e., a wire mesh layer on top and a geotextile layer on top, balancing tensile strength with waterproofing and protection against debris intrusion.

[0038] 2. Dimensions and Fixing Method: The edge of the stress diffuser 3 must extend to the top surface of the intact old base layer beyond the edge of the pit, with an extension length of 15-30cm (this length ensures that the load can be effectively transferred to the surrounding intact base layer, avoiding stress concentration due to insufficient diffusion range). The stress diffuser 3 is fixed by anchors 4, which can be high-strength steel nails, plastic anchors, or expansion anchors, selected according to the base layer material: if the base layer is a cement-stabilized crushed stone layer, expansion anchors can be used; if the base layer is a soil base layer, barbed plastic anchors can be used. The anchors 4 are evenly distributed along the edge and center of the stress diffuser 3, with an edge anchor spacing of 20-30cm and a center anchor spacing of 30-40cm, ensuring that the stress diffuser 3 is tightly fitted to the top surface of the base reinforcement filler 1 and the surrounding intact base layer, without wrinkles or looseness, to prevent slippage under load.

[0039] (iv) Vertical force transmission rod 5 The device may also include at least one vertical force transmission rod 5, which is used to connect and transmit force between the base reinforcement filler 1 and the upper new pavement layer, thereby improving the overall integrity of the road structure.

[0040] 1. Structure and Materials: The vertical dowel bar 5 is made of threaded steel bars, glass fiber reinforced concrete, or carbon fiber reinforced concrete, with threaded steel bars (such as HRB400 grade threaded steel bars) being the preferred choice due to their strong bond with concrete and good force transmission effect. The diameter of the vertical dowel bar 5 is 12-20mm, and the length is determined according to the thickness of the new pavement layer above. It is ensured that the lower end is pre-embedded in the base reinforcement filling part 1, and the upper end extends vertically upward through the top surface of the base reinforcement filling part 1, with the protruding length being 2 / 3-3 / 4 of the thickness of the new pavement layer, to ensure full bonding with the new pavement layer.

[0041] 2. Pre-embedding method: The vertical dowel bars 5 are pre-embedded during the prefabrication of the base reinforcement filler 1. The pre-embedded positions are evenly distributed on the top surface of the base reinforcement filler 1, usually 4-6 bars per square meter, to ensure uniform force transmission. During pre-embedding, hooks or welding positioning plates can be installed at the lower end of the vertical dowel bars 5 to prevent displacement during the pouring of the filler, ensuring that the upper end is vertically upward, with a verticality deviation not exceeding 3°. An interface agent can be applied to the surface of the vertical dowel bars 5 to enhance the adhesion to the base reinforcement filler 1 and the newly laid surface layer above.

[0042] (v) Anchor bolts 4 Anchor pins 4 are used to fix the stress diffuser 3. Their material must be compatible with both the stress diffuser 3 and the base material to ensure a secure fixation. Anchor pins 4 are 5-10cm long, with a head diameter larger than the shank diameter to prevent them from slipping out of the mesh or pores of the stress diffuser 3. If the stress diffuser 3 is a wire mesh, anti-slip washers can be installed on the heads of the anchor pins 4 to further enhance the fixing effect.

[0043] Example 1: Assembly and Construction Process of the Device The construction process of this utility model device follows the sequence of "prefabrication-pretreatment-assembly-anchoring-filling-diffusion layer laying-surface layer construction", and the specific steps are as follows: Step 1: Pre-treatment of pits and grooves First, the damaged area of ​​the old highway is surveyed to determine the scope, depth and shape of the potholes in the base layer. Based on the actual size of the potholes, the dimensions (including length, width and height) of the base layer reinforcement filler 1 are designed to ensure that the cross-sectional profile of the filler is completely compatible with the potholes.

[0044] The old road surface layer and damaged base layer are excavated using equipment such as road cutting machines and picks. The shape of the excavated pit is preferably rectangular or trapezoidal (the side walls of the trapezoidal pit are slightly inclined, which is more conducive to grouting and anchoring). The side walls of the pit must be flat and free of loose materials, and the bottom surface must be compacted and leveled to ensure that the base reinforcement filling part 1 can be placed stably after being placed.

[0045] Clean the inside of the pit, removing loose particles, dust, water, and debris. Use a high-pressure blower to blow away dust and use a sponge or absorbent cloth to dry any water, ensuring the pit's sides and bottom are dry and clean. If there is a loose layer on the pit's sides, remove it completely until the solid base layer is exposed. If the pit's bottom has insufficient load-bearing capacity, a 1-2cm thick layer of dry-hardened cement mortar can be laid for leveling and reinforcement.

[0046] (Optional) Apply a layer of interface treatment agent (such as epoxy interface agent or cement-based interface agent) to the sidewalls and bottom of the pit to enhance the adhesion between the subsequent grout and the old base layer. This is especially suitable for scenarios where the old base layer surface is relatively smooth or has a slightly high moisture content.

[0047] Step 2: Prefabrication of base reinforcement filler 1 and assembly of lateral anchors 2 According to the design dimensions, prefabricate the base reinforcement filler 1 in the factory: Make a mold according to the selected material (such as fiber-reinforced concrete), pre-set a protruding structure corresponding to the keyway 11 on the inner wall of the mold, then pour the material and vibrate it to compact, forming a hollow shell structure with the vertical keyway 11. If vertical force transmission rods 5 are required, pre-embed and fix the vertical force transmission rods 5 in the preset position during the pouring of the filler, ensuring that their verticality and embedment depth meet the requirements.

[0048] Assemble the lateral anchor 2: Align the protrusion of the vertical connection portion of the lateral anchor 2 with the keyway 11 on the side of the base reinforcement filler 1, and insert it downwards from the top surface of the filler along the keyway 11 until the protrusion is completely fitted into the keyway 11. After fitting, the vertical connection portion of the lateral anchor 2 should fit tightly against the side of the base reinforcement filler 1 without any looseness. If there are slight gaps after fitting, a small amount of structural adhesive can be applied to the contact surface between the protrusion and the keyway 11 to further enhance the connection strength. Assemble one lateral anchor 2 on each side of the base reinforcement filler 1 according to the depth and width of the pit, ensuring uniform anchoring.

[0049] Step 3: Hoisting and positioning of base reinforcement filler 1 Using small hoisting equipment (such as manual hoists or small cranes), the base reinforcement filler 1 with the lateral anchor 2 assembled is hoisted to the top of the pit and slowly lowered. The position of the filler is adjusted to ensure that the bottom surface of the filler is completely in contact with the bottom surface of the pit and that the gap between the side surface and the side wall of the pit is uniform (the gap width is usually 2-5cm to facilitate subsequent grouting).

[0050] After placement, use a spirit level to check whether the top surface of the base reinforcement filler 1 is level. If it is tilted, a small amount of dry hard cement mortar can be laid on the bottom surface of the filler to level it, ensuring that the top surface of the filler is level and avoiding uneven laying of the stress diffusion component 3 later.

[0051] Step 4: Grouting and anchoring (fixing of lateral anchor 2) Prepare high-strength grouting material (such as cement-based high-strength grouting material or epoxy grouting material), add water according to the proportions specified in the product instructions and stir evenly to ensure that the grouting material has good fluidity and adhesion. After stirring, let it stand for 5-10 minutes to release air and avoid the formation of air bubbles after grouting.

[0052] Grouting is performed using a grouting gun or grouting pump. The grouting nozzle is aligned with the grouting hole 22 on the anchoring wing plate 21. Grouting begins from the lowest grouting hole 22. When the grout overflows from the upper grouting hole 22, it indicates that the area is filled with grout. Then, the grouting hole 22 is sealed, and grouting continues to other grouting holes 22 until grout overflows from all grouting holes 22, and the gap between the base reinforcement filler 1 and the pit sidewall is completely filled with grout.

[0053] During grouting, control the grouting pressure (usually 0.3-0.5MPa) to avoid excessive pressure causing the pit sidewalls to loosen or the grout to leak out. If the pit is deep, grouting can be done in multiple stages, with a 30-minute interval between each grouting to ensure that the grout is fully filled.

[0054] After grouting is completed, the grouting material is left to cure until it is completely solidified, forming a strong shear anchoring structure.

[0055] Step 5: Filling the interior of the base reinforcement filler 1 (hollow shell structure) with filler material. After the grout from the lateral injection has initially set, the pre-mixed filler (such as high-strength grout or polymer concrete) is filled into the internal cavity of the base reinforcement filler 1.

[0056] When filling, use a vibrator or vibrator to compact the filler material to ensure that it is dense, without gaps or air bubbles. If the height of the filler is high, it can be filled in layers, with each layer not exceeding 30cm in height. Vibrate each layer to avoid segregation of the filler material.

[0057] The top surface of the filler is flush with the top surface of the base reinforcement filler 1. After filling, curing is carried out. The curing time is consistent with the curing cycle of the filler until the filler reaches the design strength and forms an integral load-bearing structure with the hollow shell.

[0058] Step 6: Laying and fixing stress diffusion component 3 After the filler material inside the base reinforcement filler 1 has completely cured, clean the top surface of the filler and the surface of the intact base layer around the pit, remove dust and debris, and ensure that the surface is flat and dry.

[0059] The cut stress diffusion component 3 (the size is determined according to the size of the pit and the extension length) is laid flat on the top surface and the surrounding intact base layer of the base reinforcement filler 1, ensuring that the edge of the stress diffusion component 3 extends 15-30cm beyond the edge of the pit and that the covered area is free of wrinkles and damage.

[0060] Anchor nails 4 are used to fix the stress diffuser 3 along its edge and center. The spacing between edge anchor nails is 20-30cm, and the spacing between center anchor nails is 30-40cm. When driving in the anchor nails 4, ensure that the anchor nails 4 are perpendicular to the base surface and that the nail heads are pressed tightly against the stress diffuser 3 to prevent it from loosening. If the stress diffuser 3 is made of composite materials (such as wire mesh + geotextile), lay the lower layer of material first, fix it, and then lay the upper layer of material. Align the two layers of material and fix them together with anchor nails 4.

[0061] Step 7: Construction of the new upper surface layer After the stress diffusion component 3 is fixed, clean the base reinforcement area and surrounding road surface to ensure that there is no debris or dust.

[0062] When laying the new upper pavement layer (such as asphalt concrete or cement concrete), ensure that the new pavement layer is tightly bonded to the vertical dowel bar 5. If it is an asphalt concrete pavement layer, a paver can be used to pave it and a roller can be used to compact it. If it is a cement concrete pavement layer, it should be vibrated and compacted during pouring to ensure that it covers the upper end of the vertical dowel bar 5.

[0063] The thickness of the new pavement is determined according to the original pavement design thickness. The surface smoothness must meet the requirements of highway maintenance specifications. After the pavement is completed, maintenance is carried out. During the maintenance period, vehicles are prohibited from passing through until the surface layer reaches the design strength.

[0064] Example 2: Working principle of the device 1. The base reinforcement filling component 1 serves as the core load-bearing component. Its prefabricated rigid structure and the internally cured filling material form a high-strength whole, directly bearing the load transmitted by the upper new surface layer. The vertical force transmission rod 5 vertically transmits the upper load to the base reinforcement filling component 1, preventing the load from slipping between the surface layer and the base layer, and realizing the integrated force transmission of "surface layer-base reinforcement device-old base layer".

[0065] 2. The anchoring wing plate 21 of the lateral anchor 2 is firmly bonded to the side wall of the pit by the grout injected through the grouting hole 22. After the grout has cured, it forms a mechanical interlocking structure (the anchoring wing plate 21 is embedded in the grout, and the grout is bonded to the old base layer). At the same time, the anchoring wing plate 21 is set outward, and under the action of load, it generates an upward anchoring component force, which resists both the vertical settlement of the base layer reinforcement filler 1 and the horizontal displacement, ensuring that the filler and the old base layer are stressed together, and avoiding loosening and slippage.

[0066] 3. The stress diffuser 3 covers the repair area and the surrounding intact base layer. When the upper wheel load is applied to the repair area, the stress diffuser 3, with its high tensile strength, disperses the concentrated load laterally to a larger area of ​​intact base layer, reducing the stress concentration coefficient at the interface between the repair area and the old base layer, and effectively inhibiting the generation and propagation of reflective cracks.

[0067] 4. The grouting material injected laterally not only achieves anchoring, but also fills the gap between the base reinforcement filler 1 and the sidewall of the pit, forming a sealed structure to prevent rainwater, groundwater and other moisture from invading the interface between the new and old base layers, avoid water damage (such as loosening and peeling) at the interface, and improve the durability of the repair area.

[0068] The technical solutions in the above embodiments of this application have the following technical effects: 1. Using prefabricated components, only simple procedures such as hoisting, grouting, and laying are required on site, eliminating the need for complex excavation, transportation, backfilling, and compaction processes, which greatly shortens construction time and reduces traffic closure time.

[0069] 2. Through the mechanical interlocking of the lateral anchor 2 and the chemical bonding of the grout, a strong connection between the new and old base layers is achieved, and the shear strength of the interface is significantly improved; the vertical force transmission bar 5 enhances the integrity of the base layer and the surface layer, and avoids the separation between layers.

[0070] 3. The stress diffusion element 3 disperses and transfers the load, reduces the stress level in the repair area, significantly reduces the incidence of reflective cracks, and significantly extends the repair life.

[0071] 4. No need for extensive excavation of the old base layer, reducing construction waste; prefabricated components can be factory-produced, with stable quality, high material utilization, and compliance with green construction requirements.

[0072] 5. The dimensions of the base reinforcement filler 1, the number of lateral anchors 2, and the material of the stress diffusion component 3 can all be flexibly adjusted according to the pothole size and bearing capacity requirements, making it suitable for pothole repair on different grades of highways and different types of base layers (cement-stabilized crushed stone layer, secondary crushed stone layer, etc.).

[0073] Obviously, the above-described embodiments are only used to illustrate the technical solutions of this utility model, and not to limit it. Although this utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features therein; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of this utility model. Thus, if these modifications and variations of this utility model fall within the scope of the claims of this utility model and their equivalents, then this utility model also intends to include these modifications and variations.

Claims

1. A base course reinforcement device for old highway renovation, suitable for filling and reinforcing potholes exposed after excavation of the old pavement layer, characterized in that, It includes a base reinforcement filler (1), at least one lateral anchor (2), and a stress diffuser (3), wherein, The base reinforcement filler (1) is a prefabricated rigid body whose cross-sectional profile matches the cross-sectional profile of the pit so as to be embedded in the pit. At least one of the lateral anchors (2) is vertically disposed along and connected to the side of the base reinforcement filler (1), the lateral anchor (2) having an anchor wing (21) extending toward the sidewall of the pit, the anchor wing (21) having a grouting hole (22) for forming a shear anchor with the sidewall of the pit by grouting body. The stress diffuser (3) is laid flat on the top surface of the base reinforcement filler (1) to distribute the upper load to the intact base layer around the pit.

2. The old highway renovation base reinforcement device according to claim 1, characterized in that, The side of the base reinforcement filler (1) is provided with a vertical keyway (11), and the side anchor (2) has a protrusion that matches the shape of the keyway (11). The connection is achieved by the engagement of the protrusion with the keyway (11).

3. The old highway renovation base reinforcement device according to claim 1 or 2, characterized in that, The anchoring wing plate (21) of the lateral anchor (2) is inclined outward on the horizontal plane to form an upward anchoring component force after anchoring.

4. The old highway renovation base reinforcement device according to claim 1, characterized in that, The base reinforcement filler (1) is a hollow shell, and its internal cavity is filled with a filler material that has strength after curing.

5. The old highway renovation base reinforcement device according to claim 1, characterized in that, The edge of the stress diffuser (3) extends to the top surface of the intact old base layer outside the edge of the pit and is fixed by anchors (4).

6. The old highway renovation base reinforcement device according to claim 1, characterized in that, It also includes at least one vertical force transmission rod (5), the lower end of which is pre-embedded in the base reinforcement filler (1), and the upper end extends vertically upward to connect with the upper new pavement layer and transmit force.

7. The old highway renovation base reinforcement device according to claim 1, characterized in that, The stress diffusion element (3) is selected from at least one of geogrid, wire mesh and composite geotextile.

8. The old highway renovation base reinforcement device according to claim 1, characterized in that, The base reinforcement filler (1) is a precast component made of at least one selected from concrete, engineering plastics and fiber-reinforced composite materials.