Adhesive stone pervious pavement

By using a mixed layer of polyurethane adhesive and crushed granite aggregate in the adhesive stone pavement, combined with a sealing layer, crack-resistant layer and structural layer, the problems of easy detachment, cracking, slipping and moss growth in traditional adhesive stone pavement have been solved, and the permeability and aesthetics have been improved.

CN225013906UActive Publication Date: 2026-11-24GUANGZHOU S P I DESIGN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522636757.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-12
Publication Date
2026-11-24
Estimated Expiration
2035-12-12

AI Technical Summary

Technical Problem

Traditional adhesive stone pavement suffers from problems such as easy detachment, cracking, slipperiness, and moss growth.

Method used

The adhesive stone layer is made of polyurethane adhesive and granite crushed stone aggregate, combined with a bottom sealing layer, a crack prevention layer and a structural layer. The structural layer has shrinkage joints and is filled with silicone parts. The anti-slip layer uses anti-slip steel wire mesh or nylon mesh. The structural layer has a drainage pipe connected to the sewer pipe.

Benefits of technology

It prevents the adhesive stone pavement from falling off, cracking, becoming slippery, and growing moss, while enhancing the pavement's permeability and aesthetics, and improving its stability and drainage efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225013906U_ABST
    Figure CN225013906U_ABST
Patent Text Reader

Abstract

This application provides a permeable pavement made of bonded stone, relating to the field of pavement construction. The permeable pavement made of bonded stone includes a surface layer and a structural layer; the surface layer includes a bonded stone layer, a sealing and bonding layer, and a crack-resistant layer, which are laid sequentially from top to bottom; the bonded stone layer includes a polyurethane adhesive and multiple crushed granite aggregates, the multiple crushed granite aggregates being mixed with the polyurethane adhesive; the crack-resistant layer is laid on the upper surface of the structural layer, and the upper surface of the structural layer has expansion joints extending along a first direction. The permeable pavement made of bonded stone provided in this application solves the technical problems of traditional bonded stone pavement being prone to detachment, cracking, slipping, and moss growth.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of road paving, and more specifically, to a permeable pavement made of adhesive stone. Background Technology

[0002] Traditional adhesive-bonded stone is a colored stone produced using a special process; permeable adhesive-bonded stone uses modified resin adhesive as a binder, and various natural stones, colored sand, and colored pebbles as aggregates, mixed with a variety of polymer additives. This adhesive-bonded stone is made from non-toxic, environmentally friendly raw materials, has natural and elegant colors, and is economical.

[0003] The following disadvantages exist in the road surface paved with traditional adhesive stone: (1) it is easy to fall off and crack; (2) it is easy to slip in rainy weather; (3) it is easy to grow moss. Utility Model Content

[0004] The purpose of this application is to provide a permeable pavement made of adhesive stone to alleviate the technical problems of traditional adhesive stone pavement being prone to falling off, cracking, slipping, and growing moss.

[0005] To solve the above-mentioned technical problems, the technical solution provided by this utility model is as follows: The adhesive-bonded stone permeable pavement provided by this utility model includes a surface layer and a structural layer; The surface layer includes an adhesive stone layer, a bottom sealing and bonding layer, and a crack-resistant layer, which are laid sequentially from top to bottom; The bonded stone layer includes a polyurethane adhesive and a plurality of granite crushed stone aggregates, wherein the plurality of granite crushed stone aggregates are mixed with the polyurethane adhesive; The crack-resistant layer is laid on the upper surface of the structural layer, and the upper surface of the structural layer is provided with a shrinkage joint, which extends along a first direction.

[0006] Furthermore, the contraction joints are all filled with silicone components.

[0007] Furthermore, multiple shrinkage joints are provided, and the multiple shrinkage joints are spaced apart along the second direction, which is at an angle to the first direction; Each of the aforementioned contraction joints is filled with silicone.

[0008] Furthermore, the crack-resistant layer includes a crack-resistant wire mesh, which is laid between the bottom sealing layer and the structural layer.

[0009] Furthermore, the crack-resistant layer includes a nylon mesh, which is laid between the bottom sealing layer and the structural layer.

[0010] Furthermore, the adhesive-bonded stone permeable pavement also includes a reinforcing layer, which is laid on top of the adhesive-bonded stone layer.

[0011] Furthermore, the adhesive-bonded permeable pavement also includes a protective layer, which is laid on top of the reinforcing layer.

[0012] Furthermore, the adhesive-bonded permeable pavement also includes a filter layer, which is laid between the sealing layer and the crack-resistant layer; or, the filter layer is laid between the crack-resistant layer and the structural layer.

[0013] Furthermore, a drainage pipe is pre-embedded within the structural layer, which is used for fluid communication with the sewer system.

[0014] Furthermore, multiple drain pipes are provided, and the multiple drain pipes are arranged at intervals and are all used for fluid communication with the sewer pipe.

[0015] Based on the above technical solutions, the technical effects achievable by this utility model can be analyzed as follows: The permeable pavement with adhesive-bonded stone provided by this utility model includes a surface layer and a structural layer; the surface layer includes an adhesive-bonded stone layer, a bottom sealing and bonding layer, and a crack-resistant layer, which are laid sequentially from top to bottom; the adhesive-bonded stone layer includes a polyurethane adhesive and multiple granite crushed stone aggregates, which are mixed with the polyurethane adhesive; the crack-resistant layer is laid on the upper surface of the structural layer, and the upper surface of the structural layer is provided with a shrinkage joint, which extends along a first direction.

[0016] This permeable pavement made of bonded stone comprises, from top to bottom, a layer of bonded stone, a bottom sealing layer, a crack-resistant layer, and a structural layer. The bonded stone layer is composed of a mixture of polyurethane adhesive and crushed granite aggregate. The crushed granite aggregate has a rough surface and large volume, enhancing the granular texture and achieving an anti-slip effect. The bottom sealing layer is laid beneath the bonded stone layer, enhancing the fixation of the crushed granite aggregate within the bonded stone layer and preventing detachment. The crack-resistant layer is laid between the bottom sealing layer and the structural layer, serving to prevent cracking. The upper surface of the structural layer has expansion joints, further enhancing its ability to prevent cracking due to expansion and contraction.

[0017] This adhesive-bonded permeable pavement achieves the basic functions of permeability and colored pavement. It avoids easy detachment by setting a sealing layer, avoids easy cracking by setting a crack-resistant layer, and avoids slipperiness and moss growth in rainy weather by using granite crushed stone aggregate. Attached Figure Description

[0018] To more clearly illustrate the technical solutions of the embodiments of this application, the accompanying drawings used in the embodiments of this application will be briefly introduced below. It should be understood that the following drawings only show some embodiments of this application and should not be regarded as a limitation of the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0019] Figure 1 Schematic diagram of the structure of the adhesive-bonded permeable pavement provided in the embodiments of this application. Figure 1 ; Figure 2 Schematic diagram of the structure of the adhesive-bonded permeable pavement provided in the embodiments of this application. Figure 2 .

[0020] icon: 100 - Surface layer; 110 - Protective layer; 120 - Reinforcing layer; 130 - Adhesive stone layer; 140 - Sealing and bonding layer; 150 - Crack-resistant layer; 160 - Expansion joint; 200 - Structural layer; a - First direction. Detailed Implementation

[0021] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. The components of the embodiments of this application described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.

[0022] In the description of this application, it should be noted that the terms "inner" and "outer," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship commonly used when the product is in use. They are used only for the convenience of describing this application and for simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this application. Furthermore, the terms "first," "second," etc., are used only to distinguish descriptions and should not be construed as indicating or implying relative importance.

[0023] In the description of this application, it should also be noted that, unless otherwise expressly specified and limited, the terms "setup" and "connection" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this application based on the specific circumstances.

[0024] Traditional adhesive stone uses imported special adhesives and natural colored stone, and is processed through special technology. The raw materials are non-toxic, environmentally friendly, natural in color, elegant and economical. However, the road surface paved with traditional adhesive stone has the following disadvantages: (1) it is easy to fall off and crack; (2) it is easy to slip in rainy weather; (3) it is easy to grow moss.

[0025] In view of this, see Figure 1 and Figure 2 The permeable pavement with adhesive-bonded stone provided in this embodiment of the utility model includes a surface layer 100 and a structural layer 200; the surface layer 100 includes an adhesive-bonded stone layer 130, a bottom sealing and bonding layer 140, and a crack-resistant layer 150, which are laid sequentially from top to bottom; the adhesive-bonded stone layer 130 includes a polyurethane adhesive and multiple granite crushed stone aggregates, which are mixed with the polyurethane adhesive; the crack-resistant layer 150 is laid on the upper surface of the structural layer 200, and the upper surface of the structural layer 200 is provided with a contraction joint 160, which extends along a first direction a.

[0026] Specifically, the first direction 'a' is set according to the actual road surface conditions to ensure that the structural layer 200 has a crack-resistant effect. Here, the aforementioned crushed granite aggregate refers to aggregates of varying volumes formed by crushing granite.

[0027] This permeable pavement made of bonded stone comprises, from top to bottom, a bonded stone layer 130, a sealing and bonding layer 140, a crack-resistant layer 150, and a structural layer 200. The bonded stone layer 130 is composed of a mixture of polyurethane adhesive and crushed granite aggregate. The crushed granite aggregate has a rough surface and large volume, enhancing the granular texture and achieving an anti-slip effect. The sealing and bonding layer 140 is laid beneath the bonded stone layer 130, enhancing the fixation of the crushed granite aggregate within the bonded stone layer 130 and preventing detachment. The crack-resistant layer 150 is laid between the sealing and bonding layer 140 and the structural layer 200, serving to prevent cracking. The upper surface of the structural layer 200 has expansion joints 160, further enhancing its expansion and contraction resistance and preventing cracking.

[0028] This adhesive-bonded permeable pavement achieves the basic functions of permeability and colored pavement. It avoids easy detachment by setting a sealing bonding layer 140, avoids easy cracking by setting a crack-resistant layer 150, and avoids slipperiness and moss growth in rainy weather by using granite crushed stone aggregate.

[0029] The following is a detailed description of the structure of cement-bonded permeable pavement: In an optional embodiment of this utility model, the contraction joint 160 is filled with silicone.

[0030] Specifically, the structural layer 200 is a concrete layer, and a shrinkage joint 160 is cut on the upper surface of the concrete layer. The shrinkage joint 160 is treated with silicone to fill the shrinkage joint 160 with silicone components.

[0031] The silicone component fills the shrinkage joint 160, which can effectively reduce the generation of cracks in the structural layer 200 and prevent debris from entering the shrinkage joint 160 and affecting its performance. On the other hand, the silicone component is flexible and can absorb the stress of the structural layer 200, thereby enhancing the stability of the structural layer 200.

[0032] In an optional embodiment of this utility model, multiple shrinkage joints 160 are provided, and the multiple shrinkage joints 160 are spaced apart along the second direction, with the second direction forming an angle with the first direction a; each shrinkage joint 160 is filled with a silicone component.

[0033] Specifically, the width of the shrinkage joint 160 and the spacing between two adjacent shrinkage joints 160 can be made according to actual needs.

[0034] Multiple contraction joints 160 enhance the crack resistance of the structural layer 200.

[0035] In an optional embodiment of this utility model, the crack-resistant layer 150 includes a crack-resistant wire mesh, which is laid between the bottom sealing layer 140 and the structural layer 200.

[0036] Specifically, in this embodiment, the crack-resistant layer 150 includes a crack-resistant steel wire mesh of 200×200×3mm.

[0037] Crack-resistant steel wire mesh is laid between the bottom sealing layer 140 and the structural layer 200 to prevent cracking.

[0038] As another implementation, the crack-resistant layer 150 includes a nylon mesh, which is laid between the bottom sealing bonding layer 140 and the structural layer 200.

[0039] In an optional embodiment of this utility model, the adhesive-bonded stone permeable pavement further includes a reinforcing layer 120, which is laid on top of the adhesive-bonded stone layer 130.

[0040] Specifically, the reinforcing layer 120 is configured as a polyurethane surface layer 100.

[0041] The reinforcing layer 120 reinforces the adhesive stone layer 130.

[0042] In an optional embodiment of this utility model, the adhesive-bonded permeable pavement further includes a protective layer 110, which is laid on top of the reinforcing layer 120.

[0043] Specifically, the protective layer 110 is configured as a two-component polyurethane adhesive layer 100, and the protective layer 110 is configured as a transparent layer.

[0044] The protective layer 110 protects the adhesive layer, and its main function is to protect the color.

[0045] In an optional embodiment of this utility model, the adhesive-bonded permeable pavement further includes a filter layer, which is laid between the bottom sealing layer 140 and the crack-resistant layer 150.

[0046] Specifically, the filter layer is composed of multiple layers of filter media, including fine sand, filter residue, and ceramics.

[0047] The filter layer achieves the filtering effect.

[0048] In another implementation, the filter layer is laid between the crack-resistant layer 150 and the structural layer 200.

[0049] In an optional embodiment of this utility model, a drainage pipe is pre-embedded in the structural layer 200, and the drainage pipe is used to communicate with the sewer pipe.

[0050] Specifically, in this embodiment, the adhesive stone layer 130 is set as a 40mm thick colored polyurethane adhesive stone to protect the color of the product; of course, the thickness of the adhesive stone layer 130 can be set to other values, such as 50mm, 60mm, etc., which should also be within the protection scope of this utility model embodiment; the bottom sealing layer 140 is set as a polyurethane concrete base bottom sealing layer 140, which plays the role of preventing detachment.

[0051] Drain pipes are used for drainage.

[0052] In an optional embodiment of this utility model, multiple drain pipes are provided, and the multiple drain pipes are arranged at intervals and are all used for fluid communication with the sewer pipe.

[0053] Multiple drainage pipes improve drainage efficiency and prevent water accumulation on the road surface.

[0054] The following is a detailed description of the surface layer construction method for cement-bonded permeable pavement: The surface layer 100 includes, from top to bottom, a protective layer 110, a reinforcing layer 120, an adhesive stone layer 130, a bottom sealing bonding layer 140, a crack-resistant layer 150, and a shrinkage joint 160.

[0055] Protective layer 110: Two-component polyurethane adhesive surface layer 100, its function is to protect the color.

[0056] Reinforcing layer 120: Polyurethane surface layer 100, its function is to provide reinforcement.

[0057] Adhesive Stone Layer 130: Colored polyurethane adhesive stone layer 130, used to protect the color of the product.

[0058] Sealing layer 140: The sealing layer 140 for the polyurethane concrete foundation is used to prevent detachment.

[0059] Crack-resistant layer 150: Crack-resistant steel wire mesh is laid to prevent cracking.

[0060] Expansion joint 160: Expansion joint 160 is cut and treated with silicone to prevent cracking during expansion and contraction.

[0061] It should be noted that, where there is no conflict, the features in the embodiments of this application can be combined with each other.

[0062] The above description is merely a preferred embodiment of this application and is not intended to limit this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the protection scope of this application.

Claims

1. A permeable pavement made of bonded stone, characterized in that, include: Surface layer (100) and structural layer (200); The surface layer (100) includes an adhesive stone layer (130), a bottom sealing bonding layer (140), and a crack-resistant layer (150), which are laid sequentially from top to bottom; The bonded stone layer (130) includes a polyurethane adhesive and a plurality of granite crushed stone aggregates, wherein the plurality of granite crushed stone aggregates are mixed with the polyurethane adhesive; The crack-resistant layer (150) is laid on the upper surface of the structural layer (200), and the upper surface of the structural layer (200) is provided with a shrinkage joint (160), which extends along the first direction (a).

2. The permeable pavement made of bonded stone according to claim 1, characterized in that, The contraction joints (160) are all filled with silicone.

3. The permeable pavement made of bonded stone according to claim 2, characterized in that, Multiple contraction joints (160) are provided, and the multiple contraction joints (160) are spaced apart along a second direction, which is at an angle to the first direction (a); Each of the aforementioned contraction joints (160) is filled with silicone.

4. The permeable pavement made of bonded stone according to claim 1, characterized in that, The crack-resistant layer (150) includes a crack-resistant wire mesh, which is laid between the bottom sealing layer (140) and the structural layer (200).

5. The permeable pavement made of bonded stone according to claim 1, characterized in that, The crack-resistant layer (150) includes a nylon mesh, which is laid between the bottom sealing layer (140) and the structural layer (200).

6. The permeable pavement made of bonded stone according to any one of claims 1-5, characterized in that, The permeable pavement of the adhesive stone also includes a reinforcing layer (120), which is laid on top of the adhesive stone layer (130).

7. The permeable pavement made of bonded stone according to claim 6, characterized in that, The adhesive-bonded permeable pavement also includes a protective layer (110), which is laid on top of the reinforcing layer (120).

8. The permeable pavement made of bonded stone according to claim 7, characterized in that, The adhesive-bonded permeable pavement also includes a filter layer, which is laid between the bottom sealing layer (140) and the crack-resistant layer (150); or, the filter layer is laid between the crack-resistant layer (150) and the structural layer (200).

9. The permeable pavement made of bonded stone according to claim 8, characterized in that, A drainage pipe is pre-embedded in the structural layer (200), which is used to communicate with the sewer pipe.

10. The permeable pavement made of bonded stone according to claim 9, characterized in that, The drain pipes are provided in multiple locations, and the multiple drain pipes are arranged at intervals and are all used to communicate with the sewer pipe in fluid.