A road paving device for road construction
By designing a scraper and lubrication system on the surface of the pressure roller, the problem of uneven contact caused by asphalt adhesion on the surface of the pressure roller is solved, the uniformity of the contact pressure between the pressure roller and the road surface is achieved, and the efficiency of road leveling is improved.
Patent Information
- Application Number
- CN202620007616.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2026-01-06
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2036-01-06
AI Technical Summary
During highway construction, when the roller comes into contact with the high-temperature asphalt mixture, the asphalt tends to adhere to the surface of the roller, resulting in an uneven surface and affecting the efficiency of road leveling.
A road surface leveling device for highway construction was designed. It uses a scraper to contact the surface of the pressure roller to scrape off the adhering asphalt, and uses lubricating oil to reduce asphalt adhesion. The scraped asphalt is collected by a waste box to ensure uniform pressure between the pressure roller and the road surface.
It effectively avoids uneven distribution of asphalt on the surface of the pressure roller, ensures uniform contact pressure between the pressure roller and the road surface, and improves the efficiency of road leveling work.
Smart Images

Figure CN225013932U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of road construction technology, specifically to a road surface leveling device for highway construction. Background Technology
[0002] Highways connect different cities, towns, and villages, enabling convenient and fast transportation of goods. During highway construction, when asphalt mixture is freshly laid, its temperature is relatively high, generally around 130-170 degrees Celsius. At this time, the asphalt is in a relatively viscous state. When the roller comes into contact with the high-temperature asphalt mixture, the asphalt easily adheres to the surface of the roller. Often, when a lot of asphalt adheres to the surface of the roller, it will cause the surface of the roller to be uneven. When the roller with asphalt rolls on the road surface, the uneven distribution of asphalt will cause uneven contact pressure between the roller and the road surface, thus reducing the efficiency of road leveling work. Utility Model Content
[0003] To address the shortcomings of existing technologies, this application provides a road surface leveling device for highway construction, which has advantages such as easy disassembly. It solves the problem that when the roller comes into contact with high-temperature asphalt mixture, asphalt easily adheres to the surface of the roller. Often, when a lot of asphalt adheres to the surface of the roller, it will cause the surface of the roller to be uneven. When the roller with asphalt rolls on the road surface, the uneven distribution of asphalt will cause uneven contact pressure between the roller and the road surface, thereby reducing the efficiency of road surface leveling.
[0004] To achieve the above objectives, this application provides the following technical solution: a road surface leveling device for highway construction, comprising a mounting frame, on both sides of the mounting frame being rotatably mounted via bearings, a pressure roller being fixedly mounted between the two rotating shafts, a connecting frame being fixedly mounted on one side of the mounting frame, mounting grooves being provided on both sides of the lower end of the connecting frame, sliding blocks being slidably mounted inside the two mounting grooves, and a scraper corresponding to the pressure roller being fixedly mounted between the two sliding blocks, and a threaded rod being threaded inside the lower end of the connecting frame, one end of the threaded rod passing through the connecting frame and rotatably connected to the scraper.
[0005] A support frame is fixedly installed on the upper end of the mounting frame, an oil tank is fixedly installed on the upper end of the support frame, a flow divider box is fixedly installed on the upper side of one side of the support frame, a brush is fixedly installed on the lower end of the flow divider box, the brush is connected to the flow divider box, and the lower end of the brush is in contact with the surface of the pressure roller.
[0006] With the above solution, the scraper comes into contact with the surface of the pressure roller during use, thereby scraping off the asphalt adhering to the surface of the road surface when the pressure roller compacts the road. This avoids asphalt adhering to the surface of the pressure roller during the compaction process, which would cause unevenness of the pressure roller surface, uneven contact pressure between the pressure roller and the road surface, and reduced compaction effect, thus reducing the efficiency of road leveling work.
[0007] Furthermore, a placement frame is fixedly installed at the lower end of the connecting frame, and a waste box is slidably installed inside the placement frame. The waste box is located directly below the scraper, and a handle is fixedly installed at one end of the waste box.
[0008] With the above method, when the waste box is in use, the scraper will scrape off the asphalt adhering to the surface of the pressure roller and then it will fall into the waste box.
[0009] Furthermore, a stop block is fixedly installed on the upper side of one side of the waste box, and a chamfer is provided on one side of the stop block. A fixing frame is fixedly installed at the lower end of the connecting frame at a position corresponding to the stop block. A guide post is slidably installed inside the fixing frame. One end of the guide post extends into the fixing frame and is fixedly provided with a limit post. One end of the limit post is chamfered, and one end of the limit post passes through the connecting frame and abuts against the surface of the stop block.
[0010] With the above solution, the limit post and the stop block can be used to limit the waste box during use, thereby ensuring that the waste box remains stable during operation. When the limit post and the stop block are no longer in contact, the handle can be pulled to remove the waste box.
[0011] Furthermore, a pull block is fixedly installed at one end of the guide post extending out of the fixing frame, and a spring is sleeved on the outside of the guide post, with both ends of the spring abutting against the inner wall of the fixing frame and one end of the limiting post, respectively.
[0012] With the above solution, the pull block can limit the guide post and the limiting post, preventing the limiting post from completely entering the connecting frame. At the same time, when in use, pulling the pull block will drive the guide post and the limiting post to move, and the limiting post will squeeze the spring, which will cause the spring to deform.
[0013] Furthermore, an oil pump is fixedly installed on one side of the upper end of the support frame, a first oil pipe is fixedly installed at the inlet of the oil pump and is fixedly connected to the oil tank, and a second oil pipe is fixedly installed at the outlet of the oil pump and is fixedly connected to the distribution box.
[0014] With the above solution, when the oil pump is started during use, the oil pump will draw the lubricating oil inside the oil tank through the first oil pipe, and then deliver the lubricating oil to the distribution box through the second oil pipe.
[0015] Furthermore, a power supply bracket is fixedly installed on one side of the upper end of the support frame, and a power supply is fixedly installed inside the power supply bracket. The power supply is electrically connected to the oil pump.
[0016] The above solution allows the power source to provide electricity to the oil pump, thus ensuring its normal operation.
[0017] Furthermore, a mounting base is fixedly provided on the upper end of one side of the mounting frame, and a traction rod is rotatably provided inside the mounting base, with a traction ring fixedly provided at one end of the traction rod.
[0018] With the above solution, the equipment is connected to the work vehicle via a tow bar and tow ring during use, thereby moving the equipment to perform its work.
[0019] Furthermore, a support roller mounting frame is fixedly provided at the lower end of the mounting frame, and a support roller is rotatably arranged inside the support roller mounting frame.
[0020] By using the above method and setting support rollers, it can be ensured that the mounting frame is always parallel to the ground during use, thereby ensuring the stability of the compaction process.
[0021] Compared with the prior art, the technical solution of this application has the following beneficial effects: This road surface leveling equipment for highway construction features a connecting frame on one side of the mounting frame. Mounting grooves are provided on both sides of the lower end of the connecting frame, with sliding blocks slidably mounted inside each groove. A scraper is fixedly mounted between the two sliding blocks. A threaded rod is threaded inside the connecting frame, with one end rotatably connected to the scraper. When the device is moved, rotating the threaded rod causes the scraper to move until it moves away from and no longer contacts the pressure roller. This prevents the pressure roller from rotating during movement and causing friction between it and the scraper, thus reducing the scraper's lifespan. Meanwhile, the system is equipped with an oil tank, an oil pump, and a first oil pipe and a second oil pipe. The first and second oil pipes are connected to the oil tank and the distribution box, respectively. A brush is installed at the lower end of the distribution box. When in use, the oil pump is started, and the oil pump draws the lubricating oil from the oil tank and delivers it to the distribution box through the first and second oil pipes. The lubricating oil then flows out with the brush. Because the brush is in contact with the surface of the pressure roller, the lubricating oil flows to the surface of the pressure roller with the brush, thereby reducing the amount of asphalt adhering to the surface of the pressure roller during use and ensuring uniform pressure between the pressure roller and the road surface. Attached Figure Description
[0022] Figure 1 This is a schematic diagram of the overall structure of this application; Figure 2 This is a schematic diagram of the oil pump installation structure of this application; Figure 3This is a schematic diagram of the waste box installation structure for this application; Figure 4 for Figure 3 Enlarged view of the structure at point A in the middle; Figure 5 for Figure 3 Enlarged view of the structure at point B in the middle.
[0023] In the picture: 1. Mounting bracket; 2. Rotating shaft; 3. Pressure roller; 4. Connecting bracket; 5. Mounting groove; 6. Sliding block; 7. Scraper; 8. Threaded rod; 9. Placement bracket; 10. Waste box; 11. Handle; 12. Stop block; 13. Fixing bracket; 14. Limiting post; 15. Guide post; 16. Pull block; 17. Spring; 18. Support bracket; 19. Oil tank; 20. Diverter box; 21. Brush; 22. Oil pump; 23. First oil pipe; 24. Second oil pipe; 25. Power supply fixing bracket; 26. Power supply; 27. Mounting seat; 28. Traction rod; 29. Traction ring; 30. Support roller mounting bracket; 31. Support roller. Detailed Implementation
[0024] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.
[0025] Please see Figure 1-5 This embodiment of a road surface leveling device for highway construction includes a mounting frame 1. Two rotating shafts 2 are rotatably mounted on both sides of the mounting frame 1 via bearings. A pressure roller 3 is fixedly mounted between the two rotating shafts 2. A connecting frame 4 is fixedly mounted on one side of the mounting frame 1. Mounting grooves 5 are opened on both sides of the lower end of the connecting frame 4. Sliding blocks 6 are slidably mounted inside the two mounting grooves 5. A scraper 7 corresponding to the pressure roller 3 is fixedly mounted between the two sliding blocks 6. A threaded rod 8 is threaded inside the lower end of the connecting frame 4. One end of the threaded rod 8 passes through the connecting frame 4 and is rotatably connected to the scraper 7. A support frame 18 is fixedly mounted on the upper end of the mounting frame 1. An oil tank 19 is fixedly mounted on the upper end of the support frame 18. A diversion box 20 is fixedly mounted on the upper side of one side of the support frame 18. A brush 21 is fixedly mounted on the lower end of the diversion box 20. The brush 21 is connected to the diversion box 20, and the lower end of the brush 21 contacts the surface of the pressure roller 3. A placement frame 9 is fixedly installed at the lower end of the connecting frame 4. A waste box 10 is slidably installed inside the placement frame 9. The waste box 10 is located directly below the scraper 7. A handle 11 is fixedly installed at one end of the waste box 10. When in use, the scraper 7 scrapes off the asphalt adhering to the surface of the pressure roller 3, and the asphalt falls into the waste box 10. A stop block 12 is fixedly installed at the upper end of one side of the waste box 10. One side of the stop block 12 has a chamfer. A fixing frame 13 is fixedly installed at the lower end of the connecting frame 4 at a position corresponding to the stop block 12. A guide post 15 is slidably installed inside the fixing frame 13. One end of the guide post 15 extends into the fixing frame 13 and is fixedly installed with a limit post 14. One end of the limit post 14 has a chamfer. One end of the limit post 14 passes through the connecting frame 4 and abuts against the surface of the stop block 12. The time limit post 14 and the stop block 12 cooperate to limit the waste box 10, thereby ensuring that the waste box 10 remains stable during operation. When the limit post 14 and the stop block 12 are no longer in contact, the handle 11 can be pulled to remove the waste box 10. The guide post 15 is fixedly provided with a pull block 16 at one end of the fixed frame 13. A spring 17 is sleeved on the outside of the guide post 15. The two ends of the spring 17 abut against the inner wall of the fixed frame 13 and one end of the limit post 14, respectively. The pull block 16 can limit the guide post 15 and the limit post 14 to prevent the limit post 14 from completely entering the connecting frame 4. At the same time, when in use, pulling the pull block 16 will drive the guide post 15 and the limit post 14 to move. At the same time, the limit post 14 will squeeze the spring 17, which will cause the spring 17 to deform. An oil pump 22 is fixedly installed on one side of the upper end of the support frame 18. A first oil pipe 23 is fixedly installed at the inlet of the oil pump 22 and is fixedly connected to the oil tank 19. A second oil pipe 24 is fixedly installed at the outlet of the oil pump 22 and is fixedly connected to the distribution box 20. When in use, the oil pump 22 is started, and the oil pump 22 will draw the lubricating oil inside the oil tank 19 through the first oil pipe 23, and then deliver the lubricating oil to the distribution box 20 through the second oil pipe 24. A power supply bracket 25 is fixedly installed on one side of the upper end of the support frame 18. A power supply 26 is fixedly installed inside the power supply bracket 25. The power supply 26 is electrically connected to the oil pump 22 and can provide power to the oil pump 22 to ensure that the oil pump 22 works normally. A mounting base 27 is fixedly installed on the upper side of one side of the mounting frame 1. A traction rod 28 is rotatably installed inside the mounting base 27. A traction ring 29 is fixedly installed at one end of the traction rod 28. A support roller mounting frame 30 is fixedly installed at the lower end of the mounting frame 1. A support roller 31 is rotatably installed inside the support roller mounting frame 30. By setting the support roller 31, it can be ensured that the mounting frame 1 is always parallel to the ground during use, thereby ensuring the stability of the compaction process.
[0026] It should be noted that in actual use, the oil pump 22 and the power supply 26 are electrically connected by a wire. At the same time, a manual switch needs to be installed in the middle of the wire to control the start and stop of the oil pump 22. This is common knowledge to those skilled in the art and will not be described in detail here.
[0027] The working principle of the above embodiments is as follows: First, rotate the threaded rod 8. As the threaded rod 8 rotates, it pushes the scraper 7 and sliding block 6 along the mounting groove 5 until the scraper 7 makes slight contact with the surface of the pressure roller 3. Then, push the waste box 10 into the placement frame 9. During the movement of the waste box 10, it will cause the stop block 12 to move until it contacts the limiting post 14, which will then compress the limiting post 14, thus moving the limiting post 14 until it is fully inside the connecting frame 4. Simultaneously, the movement of the limiting post 14 will compress the spring 17. Afterwards, the stop block 12 continues to move until the stop block 12 no longer contacts the limit post 14. Then, the spring 17 will return to its original deformation, thereby driving the limit post 14 to move until the limit post 14 is pushed in front of the stop block 12, completing the limit fixation of the waste box 10 and ensuring that it is located directly below the scraper 7. Then, the hook of the tractor is connected to the traction ring 29 on the traction rod 28. Then, the tractor is started to drive the leveling equipment to move. At the same time, the pressure roller 3 rotates to compact the road surface, while the support roller 31 contacts the ground to ensure that the mounting frame 1 is horizontal. While moving, the oil pump 22 is started, and the oil pump 22 draws out the lubricating oil in the oil tank 19 and delivers it to the distribution box 20 through the first oil pipe 23 and the second oil pipe 24. Then, the lubricating oil is applied to the surface of the pressure roller 3 by the brush 21, thereby reducing the amount of asphalt adhering to the pressure roller 3. During the rotation of the pressure roller 3, the asphalt adhering is scraped off by the scraper 7, which prevents the accumulation of adhering material from causing unevenness on the surface of the pressure roller 3, thereby ensuring uniform contact pressure between the pressure roller 3 and the road surface and ensuring the leveling effect. At the same time, the asphalt scraped off by the scraper 7 will fall into the waste box 10 below, preventing waste from scattering and polluting the road surface or affecting the construction environment.
Claims
1. A road surface leveling device for highway construction, comprising a mounting frame (1), characterized in that: The mounting frame (1) has rotating shafts (2) on both sides via bearings. A pressure roller (3) is fixed between the two rotating shafts (2). A connecting frame (4) is fixed on one side of the mounting frame (1). The connecting frame (4) has mounting grooves (5) on both sides of its lower end. Sliding blocks (6) are slidably arranged inside the two mounting grooves (5). A scraper (7) corresponding to the pressure roller (3) is fixedly arranged between the two sliding blocks (6). A threaded rod (8) is threaded inside the lower end of the connecting frame (4). One end of the threaded rod (8) passes through the connecting frame (4) and is rotatably connected to the scraper (7). The mounting frame (1) is fixedly provided with a support frame (18) at the upper end, and an oil tank (19) is fixedly provided at the upper end of the support frame (18). A diversion box (20) is fixedly provided on one side of the support frame (18), and a brush (21) is fixedly provided at the lower end of the diversion box (20). The brush (21) is connected to the diversion box (20), and the lower end of the brush (21) is in contact with the surface of the pressure roller (3).
2. The road surface leveling equipment for highway construction according to claim 1, characterized in that: The lower end of the connecting frame (4) is fixedly provided with a placement frame (9), and a waste box (10) is slidably provided inside the placement frame (9). The waste box (10) is located directly below the scraper (7), and a handle (11) is fixedly provided at one end of the waste box (10).
3. The road surface leveling equipment for highway construction according to claim 2, characterized in that: A stop block (12) is fixedly installed on the upper side of one side of the waste box (10). A chamfer is provided on one side of the stop block (12). A fixing frame (13) is fixedly installed at the lower end of the connecting frame (4) at a position corresponding to the stop block (12). A guide post (15) is slidably installed inside the fixing frame (13). One end of the guide post (15) extends into the fixing frame (13) and a limiting post (14) is fixedly installed. One end of the limiting post (14) is chamfered. One end of the limiting post (14) passes through the connecting frame (4) and abuts against the surface of the stop block (12).
4. The road surface leveling equipment for highway construction according to claim 3, characterized in that: A pull block (16) is fixedly installed at one end of the guide post (15) extending out of the fixing frame (13). A spring (17) is sleeved on the outside of the guide post (15). The two ends of the spring (17) abut against the inner wall of the fixing frame (13) and one end of the limiting post (14), respectively.
5. A road surface leveling device for highway construction according to claim 1, characterized in that: An oil pump (22) is fixedly installed on one side of the upper end of the support frame (18). A first oil pipe (23) is fixedly installed at the inlet of the oil pump (22). The first oil pipe (23) is fixedly connected to the oil tank (19). A second oil pipe (24) is fixedly installed at the outlet of the oil pump (22). The second oil pipe (24) is fixedly connected to the diversion box (20).
6. A road surface leveling device for highway construction according to claim 5, characterized in that: A power supply bracket (25) is fixedly installed on one side of the upper end of the support frame (18), and a power supply (26) is fixedly installed inside the power supply bracket (25). The power supply (26) is electrically connected to the oil pump (22).
7. A road surface leveling device for highway construction according to claim 1, characterized in that: The mounting bracket (1) has a mounting base (27) fixedly installed on one side of the upper end. A traction rod (28) is rotatably installed inside the mounting base (27). A traction ring (29) is fixedly installed at one end of the traction rod (28).
8. A road surface leveling device for highway construction according to claim 1, characterized in that: The lower end of the mounting frame (1) is fixedly provided with a support roller mounting frame (30), and a support roller (31) is rotatably provided inside the support roller mounting frame (30).
