A municipal roadbed waterproof and drainage device for rainy season construction
By erecting rain shelters and temporary side ditches on the roadbed, and using support components and geomembranes to form drainage channels, the problem of lack of effective drainage during the rainy season of municipal roadbed construction was solved, achieving rapid drainage and rain protection, and ensuring construction quality and progress.
Patent Information
- Application Number
- CN202522671122.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-17
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-17
AI Technical Summary
During rainy season construction, the lack of effective temporary drainage measures for municipal roadbeds makes it difficult to control construction quality and progress, especially in the rainy environment of southern China, where roadbeds are easily flooded by rainwater.
Rain shelters and temporary side ditches are erected above the roadbed. The rain shelters are supported by supporting components, and the rainwater is quickly drained into the temporary side ditches. A simple drainage channel is formed by laying a geomembrane, which is connected to the rainwater pipe network system to prevent the roadbed from being soaked by rainwater.
It enables rapid drainage of rainwater during rainy season construction, protecting the roadbed from immersion, ensuring construction quality and progress, and is suitable for municipal roadbed construction during the rainy season.
Smart Images

Figure CN225013947U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of roadbed construction technology, and in particular to a drainage and waterproofing device for municipal roadbed construction during the rainy season. Background Technology
[0002] Roadbed engineering mainly involves roadbed filling, roadbed compaction, and roadbed drainage. During the rainy season, adequate temporary drainage measures are crucial for ensuring the progress and quality of roadbed construction. This is especially true in southern China, a region characterized by frequent, heavy, and prolonged rainy seasons, which presents significant quality risks and uncontrollable factors in roadbed construction.
[0003] Therefore, it is necessary to innovate the current municipal road construction technology to prevent rainwater from seeping into the roadbed and to ensure high-quality roadbed construction during the rainy season. Utility Model Content
[0004] The purpose of this utility model is to provide a rain-season drainage device for municipal roadbed construction, so as to realize the functions of rain protection and drainage of the roadbed, and effectively solve the problem of lack of good temporary drainage measures for roadbed construction during the rainy season in the existing technology.
[0005] To achieve the above objectives, the present invention adopts the following technical solution:
[0006] A rainproof and drainage device for municipal roadbed construction during the rainy season includes a rainproof canopy arranged above the roadbed. Temporary side ditches extending along the road direction are excavated on both sides of the roadbed between the road edge line and the sidewalk edge line, and the temporary side ditches are covered with geomembrane. Support components for supporting the rainproof canopy are fixedly installed on the upper surface of the roadbed. The rainproof canopy is inclinedly distributed from the center line of the road towards the road edge lines on both sides, and the edge of the rainproof canopy extends into the temporary side ditch on the same side and is partially covered with geomembrane.
[0007] Furthermore, the geomembrane is spliced by overlapping along the slope, with an overlap length greater than or equal to 0.5m, and the geomembrane is sealed at the joints.
[0008] Furthermore, the rainproof canopy is made of several rainproof colored tarpaulins that extend along the road direction and are spliced together in a slope-overlapping manner, with an overlap length of 1m or more, and the rainproof colored tarpaulins are sealed at the seams.
[0009] Furthermore, the tilt angle of the rainproof canopy on one side is 10°~15°.
[0010] Furthermore, the support assembly includes a plurality of first support members distributed along the road centerline and a plurality of second support members distributed between the road centerline and the road edge line. The plurality of second support members are divided into several rows and are distributed at intervals, and each row of second support members extends along the road direction.
[0011] Furthermore, the spacing between two adjacent rows of second support members and the spacing between the first support member and the adjacent row of second support members are all set according to the lane width.
[0012] Furthermore, ropes are connected between two adjacent second support members and between a second support member and an adjacent first support member.
[0013] Furthermore, the first support component is a metal barricade, and the second support component is a cross-headed steel rod.
[0014] Furthermore, several counterweights for pressing and fixing are provided along the two sides of the temporary ditch in the direction of the road.
[0015] Furthermore, the counterweight is a woven bag filled with soil.
[0016] Compared with the prior art, this utility model provides a drainage and waterproofing device for municipal roadbed construction during the rainy season, which has the following beneficial effects:
[0017] This invention involves erecting simple rainproof and drainage facilities above unfinished or completed roadbeds. By using support components to prop up the rainproof canopy on the roadbed, rainwater can be quickly drained into temporary side ditches on both sides, protecting the soil roadbed from rainwater infiltration. At the same time, by opening temporary side ditches and laying geomembrane in the temporary side ditches to form simple drainage channels, rainwater can be discharged into the nearest rainwater pipe network system in a timely manner, avoiding the formation of waterlogging and back erosion of the roadbed in the side ditches.
[0018] This invention has good rainproof and drainage effects, and is suitable for municipal roadbed construction during the rainy season. Attached Figure Description
[0019] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0020] Figure 1 This is a schematic diagram of the structure of this utility model;
[0021] Figure 2 for Figure 1 Enlarged view of point A in the middle;
[0022] Figure 3 for Figure 1 Enlarged view of point B in the middle;
[0023] Figure 4 This is a schematic diagram showing the layout of lines on the roadbed.
[0024] Figure 5 This is a schematic diagram showing the planar distribution of the supporting components on the roadbed.
[0025] Attached reference numerals: 1. Roadbed; 11. Road edge line; 12. Sidewalk edge line; 13. Temporary side ditch; 14. Road center line; 2. Rain shelter; 3. Geomembrane; 4. Support component; 41. First support component; 42. Second support component; 5. Rope; 6. Counterweight. Detailed Implementation
[0026] The technical solution of this utility model will be clearly and completely described below through detailed embodiments and in conjunction with the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this utility model, and not all of them. Based on the embodiments of this utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of this utility model.
[0027] Please refer to Figures 1-5 This embodiment provides a rainproof and drainage device for municipal roadbed construction during the rainy season, including a rainproof canopy 2 arranged above the roadbed 1. Temporary side ditches 13 extending along the road direction are excavated on both sides of the roadbed 1 between the road edge line 11 and the sidewalk edge line 12, and the temporary side ditches 13 are covered with geomembrane 3. A support component 4 for supporting the rainproof canopy 2 is fixedly installed on the upper surface of the roadbed 1. The rainproof canopy 2 is inclinedly distributed from the road center line 14 towards the road edge lines 11 on both sides. The edge of the rainproof canopy 2 extends into the temporary side ditches 13 on the same side and covers part of the geomembrane 3. By constructing simple rainproof and drainage facilities above the unfinished or completed roadbed 1, and using support components 4 to support the rainproof canopy 2 on the roadbed 1, rainfall can be quickly drained to both sides into temporary side ditches 13, protecting the soil of the roadbed 1 from rainwater infiltration. Simultaneously, by creating temporary side ditches 13 and laying a geomembrane 3 to cover them, simple drainage channels are formed, allowing rainwater to be promptly discharged into the nearest stormwater drainage system, preventing waterlogging and back-erosion of the roadbed 1 within the side ditches. This method provides good rainproof and drainage effects, making it suitable for municipal roadbed construction during the rainy season.
[0028] In some specific implementations, the geomembrane 3 is spliced by overlapping along the slope, with an overlap length greater than or equal to 0.5m. The geomembrane 3 is preferably welded and sealed at the joint using a geomembrane welding machine.
[0029] In some specific implementations, the rainproof canopy 2 is constructed by splicing together several rainproof tarpaulins extending along the road direction in a slope-adjustable manner, with an overlap length greater than or equal to 1m. The seams of the rainproof tarpaulins are sealed. When purchasing rainproof tarpaulins, it is advisable to purchase appropriate sizes based on the width of the roadbed to facilitate installation.
[0030] In some specific implementation methods, such as Figure 1 As shown, the tilt angle of the rain shelter 2 on one side is 10°~15°. As an example, the tilt angle of the rain shelter 2 on one side can be set to 12°. This allows rainwater to drain quickly to both sides.
[0031] In some specific implementation methods, refer to Figure 1 , Figure 2 , Figure 4 and Figure 5 The support component 4 includes several first support members 41 distributed along the road centerline 14 and several second support members 42 distributed between the road centerline 14 and the road edge line 11. The second support members 42 are arranged in several rows at intervals, and each row of second support members 42 extends along the road direction. As an example, the first support member 41 is a metal barricade, and the second support member 42 is a cross-shaped steel rod. The bottom of the metal barricade and the bottom of the cross-shaped steel rod are fixed by being driven into the roadbed 1. The metal barricade is a conventional metal guardrail frame structure; the cross-shaped steel rod is composed of a straight steel bar and a cross-shaped metal frame welded and fixed to the top of the straight steel bar. The four ends of the cross-shaped metal frame are bent downwards for binding ropes 5.
[0032] Preferred, such as Figure 4 and Figure 5 As shown, the spacing between two adjacent rows of second support members 42 and the spacing between the first support member 41 and the adjacent row of second support members 42 are all set according to the lane width. The net height of the second support member 42 should be reasonably designed based on the lateral width of the roadbed 1 to ensure that the lateral slope of the rainproof canopy 2 is within the preset tilt angle range.
[0033] refer to Figure 1 , Figure 2 and Figure 5 As an improved implementation, in order to enhance the support effect of the rain shelter 2 and allow rainwater to flow down quickly to prevent water accumulation, ropes 5 are connected between adjacent second support members 42 and between a second support member 42 and an adjacent first support member 41. For example, nylon ropes are used for the ropes 5. By tying the ropes together, the first support members 41, second support members 42, and ropes 5 together construct a simple overall support frame for the rain shelter 2, ensuring good support and rainproof / drainage performance.
[0034] In some specific implementation methods, such as Figure 1 , Figure 3 , Figure 4 and Figure 5 As shown, several counterweights 6 are provided along both sides of the temporary side ditch 13, following the road direction, for pressing and fixing. By placing the counterweights 6, the rainproof canopy 2 and the geomembrane 3 can be pressed down to prevent them from being blown away by wind and rain. As an example, the counterweights 6 are woven bags filled with soil. When excavating the temporary side ditches 13 on both sides of the roadbed 1, woven bags are simultaneously filled with soil as counterweights 6 for later use. Before using the counterweights 6 to press down, the rainproof canopy 2 should be kept taut.
[0035] In a specific application example, refer to Figures 1-5 The construction layout of this utility model is described as follows: During construction, according to the plan layout diagram, the road centerline 14, road edge line 11, excavation edge line of temporary side ditch 13, insertion point of second support member 42, and placement point of counterweight 6 are laid out on the roadbed 1. Then, the temporary side ditches 13 on both sides are excavated along the longitudinal slope of the roadbed 1, according to the design specifications of the side ditches. Attention should be paid to controlling the excavation depth, and over-excavation should not be carried out. Attention should be paid to leveling the bottom of the ditch. After the excavation of the temporary side ditch 13 is completed, the geomembrane 3 is laid as the bottom. The geomembrane 3 is spliced by overlapping along the slope, with an overlap length of 0.5m. It is preferable to use a geomembrane 3 welding machine to weld and seal the joints of the geomembrane 3. When excavating the temporary side ditch 13, woven bags are filled with soil as counterweight 6 for backup. Next, based on the layout, the first support component 41 (iron horse guardrail) and the second support component 42 (crosshead steel rod) are installed. According to the positions of the installed first support component 41 and the installed second support component 42, ropes 5 are used to create a rope-connected framework according to the design scheme. This rope-connected framework, together with the ropes 5, forms an overall support frame to support the rain shelter 2. When installing the second support component 42, its net height should be designed reasonably based on the lateral width of the roadbed 1 to ensure that the lateral slope of the rain shelter 2 is approximately 12°. Afterwards, several rainproof tarpaulins extending along the road direction are spliced together in a slope-adjusted overlapping manner to form the rain shelter 2, with an overlap length of 1m. The seams of the rainproof tarpaulins are sealed. Finally, the rain shelter 2 is kept taut and supported above the roadbed 1, with its edge extending into the temporary ditch 13 on the same side and partially covering the geomembrane 3. Counterweights 6 are placed according to the layout points to weigh down the rain shelter 2 and the geomembrane 3, preventing them from being blown away by wind and rain. In this way, rainwater can be quickly drained into the temporary ditch 13 through the rain shelter 2, protecting the roadbed 1 from rainwater infiltration.
[0036] The above embodiments are merely illustrative of the concept and technical solution of this utility model, and are not intended to limit this utility model. Any person skilled in the art can modify or alter the above embodiments without departing from the spirit and scope of this utility model. Therefore, all equivalent modifications or alterations made by those skilled in the art without departing from the spirit and technical concept disclosed in this utility model should still be covered by the claims of this utility model.
[0037] Furthermore, it should be understood that although this specification describes embodiments, not every embodiment contains only one independent technical solution. This narrative style is merely for clarity. Those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can also be appropriately combined to form other embodiments that can be understood by those skilled in the art.
Claims
1. A drainage and waterproofing device for municipal roadbed construction during the rainy season, comprising a rainproof canopy arranged above the roadbed, characterized in that, On both sides of the roadbed, temporary side ditches extending along the road direction are excavated between the road edge line and the sidewalk edge line, and the temporary side ditches are covered with geomembrane; a support assembly for supporting the rain shelter is fixedly installed on the upper surface of the roadbed, and the rain shelter is inclined from the center line of the road towards the road edge lines on both sides, and the edge of the rain shelter extends into the temporary side ditch on the same side and is partially covered with geomembrane.
2. The municipal roadbed rainwater drainage device according to claim 1, characterized in that, The geomembrane is spliced by overlapping along the slope, with an overlap length greater than or equal to 0.5m, and the geomembrane is sealed at the joints.
3. The municipal roadbed rainwater drainage device according to claim 1, characterized in that, The rainproof canopy is made of several rainproof tarpaulins that extend along the road and are spliced together in a slope-overlapping manner, with an overlap length of 1m or more. The seams of the rainproof tarpaulins are sealed.
4. The municipal roadbed rainwater drainage device according to claim 1, characterized in that, The awning has a single-sided tilt angle of 10° to 15°.
5. The municipal roadbed rainwater drainage device according to claim 1, characterized in that, The support assembly includes several first support members distributed along the road centerline and several second support members distributed between the road centerline and the road edge line. The several second support members are divided into several rows and are distributed at intervals, and each row of second support members extends along the road direction.
6. The municipal roadbed rainwater drainage device according to claim 5, characterized in that, The spacing between two adjacent rows of second support members and the spacing between the first support member and the adjacent row of second support members are all set according to the lane width.
7. The municipal roadbed rainwater drainage device according to claim 5, characterized in that, Ropes are connected between two adjacent second support members and between a second support member and an adjacent first support member.
8. The municipal roadbed rainwater drainage device according to claim 5, characterized in that, The first support component is a metal horse guardrail, and the second support component is a cross-head steel rod.
9. The municipal roadbed rainwater drainage device according to any one of claims 1 to 8, characterized in that, The temporary ditch has several counterweights along its two sides, which are used for pressing and fixing.
10. The municipal roadbed rainwater drainage device according to claim 9, characterized in that, The counterweight is a woven bag filled with soil.