Bridge structure joint ice melting device
The integrated bridge structure joint de-icing device enables efficient collection and intelligent de-icing of bridge seepage, solving the problem of bridge seepage and icing, and improving safety and ease of installation.
Patent Information
- Application Number
- CN202522561084.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-02
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-02
AI Technical Summary
The existing drainage system of bridge structural joints lacks de-icing function, causing seepage water to freeze in low-temperature environments, affecting the safety of pedestrians and vehicles. In addition, the existing heat tracing system is complicated to install or wastes heat.
Design an integrated bridge structure seam de-icing device, including a water collection pipe, a fixing frame, a de-icing mechanism, and a de-icing mechanism. Intelligent temperature control is achieved through induction cables and monitoring and control devices, and heat pipes are used for heating and de-icing. Rapid installation and positioning are achieved through structures such as clamps, slots, and positioning blocks.
It enables efficient collection and guidance of water seepage from bridge structural joints, ensuring automatic de-icing in cold weather, improving the safety of the area under the bridge and the convenience of installation and maintenance, and avoiding safety hazards caused by icing.
Smart Images

Figure CN225013969U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of bridge facility technology, and in particular to a bridge structure joint de-icing device. Background Technology
[0002] Bridges are important transportation infrastructure. During the construction of bridges, structural joints are an essential component to cope with thermal expansion and contraction and structural displacement. However, structural joints are also weak points in bridges where water can seep in, especially during rainy or snowy weather, when water can seep down along the structural joints.
[0003] If these leaking water streams cannot be effectively collected and guided, they will drip directly onto the road below the bridge, interfering with and affecting the safety of vehicles and pedestrians. In winter, the leaking water will freeze into ice in the low temperature environment and adhere to the local structure of the bridge. This will not only cause freeze-thaw damage to the bridge structure itself, but more importantly, the icy areas will pose a direct safety hazard to passing pedestrians or vehicles.
[0004] While some bridge drainage or heating systems exist in the current technology, existing drainage systems often only focus on water collection and guidance, have relatively simple structures, lack targeted anti-icing and de-icing functions, and are difficult to adapt to the special needs of cold regions. Existing heating systems may be complex to install or lack intelligent temperature control mechanisms, resulting in heat waste and failing to efficiently and reliably solve the dual problems of structural joint seepage and winter icing.
[0005] Therefore, this utility model proposes a bridge structure joint de-icing device to address the shortcomings of existing technologies. Utility Model Content
[0006] In view of the problems existing in bridge structure joint de-icing devices, such as low integration of drainage structure and de-icing function, inconvenience of drainage pipeline installation and maintenance, and lack of intelligent control of de-icing mechanism in low temperature environment leading to heat waste or untimely de-icing, this utility model aims to provide a bridge structure joint de-icing device with improved structure that can effectively solve the above problems.
[0007] This utility model provides a bridge structure seam de-icing device, including a water collection pipe, a fixing frame, a connecting plate, a de-icing mechanism, and a bridge.
[0008] The water collection pipe has a locking block fixed on the front side and a locking groove on the rear side for quick insertion and splicing between water collection pipes. The bottom surface of the connecting plate is fixedly connected to the water collection pipe. The connecting plate is slidably installed on the fixing frame. The front side of the connecting plate is fixed with a positioning block. The rear side of the fixing frame has a positioning groove. The positioning block slides and fits into the inner wall of the positioning groove.
[0009] Furthermore, the de-icing mechanism includes a temperature regulating device, a monitoring and control device, an induction cable, a heat pipe, a fixing ring, and a fixing nail. The monitoring and control device is fixedly connected to the right side of the temperature regulating device. The monitoring and control device is electrically connected to the induction cable and the heat pipe to receive temperature signals and control the start and stop of the heat pipe. The fixing ring binds the induction cable and the heat pipe together. A fixing groove is opened on the top of the fixing ring, and the fixing nail passes through the fixing groove to fix the fixing ring to the bridge.
[0010] Through the cooperation of the card block and the card slot, the cooperation of the positioning block and the positioning slot, and the fastening and locking of the ice-melting mechanism by the fixing nail, a bridge structure integrating water flow collection, water pipe splicing, rapid installation and positioning, and intelligent temperature control ice melting functions is formed.
[0011] Preferably, the water collection pipe adopts a splicing structure, where adjacent water collection pipes are connected by a locking block of one water collection pipe into the locking groove of another water collection pipe. This connection method allows the water collection pipes to be flexibly adjusted and extended according to the actual length of the bridge structure joint.
[0012] Preferably, the induction cable in the de-icing mechanism is used to transmit the detected ambient temperature signal to the monitoring and control device. The monitoring and control device is used to compare the temperature with the preset icing threshold inside the system, and issue a command based on the comparison result to control the temperature regulation device to open or close the heat pipe, thereby realizing the intelligent management of the system.
[0013] Preferably, when the ambient temperature detected by the induction cable in real time is lower than the set value, the monitoring and control device automatically controls the temperature regulation device to turn on the heat pipe for heating, so as to ensure that the water flow or ice in the water collection pipe can melt in time in cold weather and avoid ice accumulation.
[0014] Preferably, the connecting plate and the fixing frame are pre-positioned in the installation position through the sliding cooperation of the positioning block and the positioning groove, which greatly simplifies the installation process and improves construction efficiency.
[0015] Preferably, the front and rear sides of the connecting plate and the front and rear sides of the fixing frame are provided with matching limiting grooves. Limiting pins are inserted into the limiting grooves. The limiting pins are used to pass through the limiting grooves to finally lock and fix the already positioned connecting plate and fixing frame, effectively preventing the connecting plate from detaching under bridge vibration or external force.
[0016] Preferably, the induction cable and heat pipe are bound together by a fixing ring to form an integrated ice-melting assembly. This integrated design facilitates the overall installation and layout, and ensures that heat can be effectively transferred to the area where ice melting is needed.
[0017] Preferably, the fixing pins secure the fixing ring to the inner wall of the bridge structure joint. This fastening method ensures that the de-icing component can work stably and reliably and will not fall off due to environmental factors.
[0018] This utility model has the following beneficial effects: 1. This utility model achieves efficient collection and guidance of water seepage from bridge structural joints by setting up interlockable water collection pipes, blocks and slots. At the same time, the combination of positioning blocks, positioning slots and limiting nails enables the rapid positioning and secure installation of the water collection pipes and fixing frames, solving the problem of water seepage directly dripping and affecting traffic and pedestrians below in the prior art, thus improving the safety of the area under the bridge and the convenience of installation and maintenance. 2. This utility model, by setting up an ice-melting mechanism, including an induction cable, a heat pipe, a monitoring and control device, and a temperature regulation device, realizes real-time detection and automatic control of heating of the external temperature, which solves the problem in the prior art that bridge seepage freezes in low-temperature winter environments, thereby causing harm to pedestrians, vehicles and bridge structures, and achieves the effect of automatically eliminating safety hazards in cold weather. Attached Figure Description
[0019] Figure 1 This is a perspective view of the front side of the water collection pipe of a bridge structure joint de-icing device proposed in this utility model; Figure 2 This is a partial structural breakdown diagram of a bridge structure de-icing device for bridge structural joints proposed in this utility model. Figure 3 This is a partial structural diagram of the fixing frame of a bridge structure joint de-icing device proposed in this utility model; Figure 4 This is a partial structural diagram of the induction cable of a bridge structure seam de-icing device proposed in this utility model.
[0020] Legend: 1. Water collection pipe; 2. De-icing mechanism; 201. Bridge; 202. Fixing nail; 203. Induction cable; 204. Heat pipe; 205. Monitoring and control device; 206. Temperature regulation device; 207. Fixing ring; 208. Fixing groove; 3. Locking block; 4. Locking groove; 5. Positioning block; 6. Limiting nail; 7. Limiting groove; 8. Fixing frame; 9. Positioning groove; 10. Connecting plate. Detailed Implementation
[0021] To make the objectives, technical solutions, and advantages of this utility model clearer, the technical solutions in the embodiments of this utility model will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this utility model, not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of this utility model without creative effort are within the protection scope of this utility model.
[0022] Example: Please refer to Figures 1 to 4 This utility model provides a bridge structural joint de-icing device, which aims to solve the problems of water seepage and dripping from the bridge 201 structural joint affecting traffic and the safety hazards caused by water seepage and freezing in winter.
[0023] Please refer to Figures 1 to 4 The bridge structure joint de-icing device includes a water collection pipe 1, a fixing frame 8, a connecting plate 10, a de-icing mechanism 2, and a bridge 201. The water collection pipe 1 is fixedly connected to the bottom surface of the connecting plate 10, and the connecting plate 10 is slidably installed on the fixing frame 8. The de-icing mechanism 2 is used to heat and de-ic the water collection pipe 1 and its surrounding area. The bridge 201 is used to install and fix the entire device.
[0024] Specifically, a locking block 3 is fixed to the front side of the water collection pipe 1, and a locking groove 4 is opened on the rear side of the water collection pipe 1 to realize the splicing between multiple water collection pipes 1. A positioning block 5 is fixed to the front side of the connecting plate 10, and a positioning groove 9 is opened on the rear side of the fixing frame 8. The positioning block 5 slides and fits into the inner wall of the positioning groove 9 to realize quick positioning during installation. The front and rear sides of the connecting plate 10 and the front and rear sides of the fixing frame 8 are both provided with matching limiting grooves 7. Limiting pins 6 are inserted into the limiting grooves 7 to perform final locking and fixing after positioning.
[0025] The de-icing mechanism 2 includes a temperature regulating device 206, a monitoring and control device 205, an induction cable 203, and a heat pipe 204. The monitoring and control device 205 is fixedly connected to the right side of the temperature regulating device 206. The monitoring and control device 205 is electrically connected to the induction cable 203 and the heat pipe 204. The de-icing mechanism 2 also includes a fixing ring 207 and a fixing nail 202. The fixing ring 207 binds the induction cable 203 and the heat pipe 204 together. A fixing groove 208 is opened on the top of the fixing ring 207. The fixing ring 207 is fixedly connected to the bridge 201 through the fixing nail 202 passing through the fixing groove 208.
[0026] Please refer to Figure 1 , Figure 2 and Figure 4 The de-icing mechanism 2 is used to solve the problem of freezing at low temperatures in winter and realizes automatic temperature detection and control. The de-icing mechanism 2 includes a temperature regulating device 206, a monitoring and control device 205, an induction cable 203 and a heat pipe 204. The monitoring and control device 205 is fixedly connected to the right side of the temperature regulating device 206. The monitoring and control device 205 is electrically connected to the induction cable 203 and the heat pipe 204, and is used to receive the temperature signal transmitted by the induction cable 203 and control the start and stop of the heat pipe 204.
[0027] The de-icing mechanism 2 also includes a fixing ring 207 and a fixing nail 202. The fixing ring 207 binds the induction cable 203 and the heat pipe 204 together. The induction cable 203 and the heat pipe 204 are wrapped together to form an integrated de-icing assembly to improve installation efficiency. The top of the fixing ring 207 has a fixing groove 208. The fixing nail 202 passes through the fixing groove 208 to fix the fixing ring 207 to the bridge 201. The fixing nail 202 is used to fasten and lock the fixing ring 207.
[0028] In the assembled state, the sensing cable 203 transmits the detected external temperature to the monitoring and control device 205 in real time. When the external temperature is lower than the preset set value, the monitoring and control device 205 automatically controls the temperature regulating device 206 to turn on the heat pipe 204. The heat pipe 204 starts heating, and the heat is conducted to the water collection pipe 1 and its surroundings, realizing the heating and melting of the water flow or ice in the water collection pipe 1 in cold weather.
[0029] Please refer to Figure 1 and Figure 2 To achieve the extension of the length of the water collection pipe 1 and the seamless guidance of the water flow, the water collection pipe 1 adopts a splicing structure. A locking block 3 is fixed on the front side of the water collection pipe 1, and a locking groove 4 is opened on the rear side of the water collection pipe 1. Two adjacent water collection pipes 1 are connected by the locking block 3 of one water collection pipe 1 into the locking groove 4 of the other water collection pipe 1. This locking and connecting structure ensures the quick connection and reliable sealing of the water collection pipe 1.
[0030] In a preferred embodiment, in order to achieve automatic heating and ice melting in a low-temperature environment, the induction cable 203 is used to transmit the detected temperature signal to the monitoring and control device 205. The monitoring and control device 205 is used to compare the temperature with a preset set value and control the opening and closing of the temperature regulating device 206 according to the comparison result.
[0031] As another preferred embodiment, when the ambient temperature detected by the induction cable 203 in real time is lower than the set threshold, the monitoring and control device 205 automatically sends a command to the temperature regulation device 206, which controls the temperature regulation device 206 to automatically turn on the connected heat pipe 204 for heating, thereby achieving the purpose of melting ice.
[0032] In another preferred embodiment, in order to achieve rapid installation and final locking of the water collection pipe 1 and the fixing frame 8, the connecting plate 10 and the fixing frame 8 are pre-positioned in the installation position by the sliding cooperation of the positioning block 5 and the positioning groove 9. After the positioning block 5 slides into the positioning groove 9, the limiting pin 6 can pass through the limiting groove 7 to finally lock and fix the connecting plate 10 and the fixing frame 8, preventing the connecting plate 10 from shifting under the vibration of the bridge 201 or the action of external force.
[0033] In another preferred embodiment, the fixing ring 207 is used to physically integrate and fix the induction cable 203 and the heat pipe 204. The fixing ring 207 has a fixing groove 208 at the top. After the fixing nail 202 passes through the fixing groove 208, it firmly fixes the fixing ring 207 to the inner wall of the structural joint of the bridge 201. The fixing nail 202 plays a role in fastening the ice melting component.
[0034] As another preferred embodiment, a locking block 3 is fixedly connected to the front side of the water collection pipe 1, and a locking groove 4 is opened on the rear side of the water collection pipe 1. Two adjacent water collection pipes 1 can be quickly connected by the cooperation of the locking block 3 and the locking groove 4, ensuring that the length of the water collection pipe 1 can be flexibly extended and reliably sealed according to the actual length of the structural joint of the bridge 201.
[0035] Working principle: During installation, multiple water collection pipes 1 are first spliced together. The locking block 3 on the front side of one water collection pipe 1 is inserted into the locking groove 4 on the rear side of the adjacent water collection pipe 1 to form a continuous water guiding channel. The water collection pipe 1 is fixedly connected to the bottom surface of the connecting plate 10. Then the connecting plate 10 is installed. The positioning block 5 on the front side of the connecting plate 10 is slidably engaged with the inner wall of the positioning groove 9 on the rear side of the fixing frame 8 to achieve pre-positioning of the installation position. After positioning is completed, the limiting nail 6 is inserted into the limiting groove 7 opened on the connecting plate 10 and the fixing frame 8 to achieve final locking and fixing. The installed water collection pipe 1 can collect the water flowing out of the structural joint of the bridge 201 and guide the water flow to the designated position. In low-temperature winter conditions, the de-icing mechanism 2 begins to operate. The fixing ring 207 binds the induction cable 203 and the heat pipe 204 together to form an integrated de-icing component. The integrated de-icing component is fixedly connected to the inner wall of the bridge 201 by passing the fixing nail 202 through the fixing groove 208 at the top of the fixing ring 207. The induction cable 203 detects the ambient temperature in real time and transmits the temperature signal to the monitoring and control device 205. When the monitoring and control device 205 determines that the temperature is lower than the set threshold, it controls the temperature regulating device 206 to automatically turn on the heat pipe 204. The heat pipe 204 begins to heat and melt the water flow or the ice block that has formed in the water collection pipe 1, preventing the ice from freezing and causing harm. Through the coordinated work of the induction cable 203 and the heat pipe 204, the safety hazard of water seepage and ice formation in the bridge 201 in the prior art is solved.
Claims
1. A bridge structure joint de-icing device, comprising: Water collection pipe (1); Fixture (8); The connecting plate (10) is fixedly connected to the bottom surface of the water collection pipe (1), and the connecting plate (10) is slidably installed on the fixing frame (8). The de-icing mechanism (2) includes a temperature regulating device (206), a monitoring and control device (205), an induction cable (203), and a heat pipe (204). And bridges (201); Its features are: A locking block (3) is fixed on the front side of the water collection pipe (1), and a locking groove (4) is opened on the rear side of the water collection pipe (1). A positioning block (5) is fixed on the front side of the connecting plate (10), and a positioning groove (9) is provided on the rear side of the fixing frame (8). The positioning block (5) is slidably fitted on the inner wall of the positioning groove (9). The front and rear sides of the connecting plate (10) and the front and rear sides of the fixing frame (8) are provided with matching limiting grooves (7), and limiting pins (6) are inserted in the limiting grooves (7). The monitoring and control device (205) is fixedly connected to the right side of the temperature regulating device (206), and the monitoring and control device (205) is electrically connected to the induction cable (203) and the heat pipe (204). The de-icing mechanism (2) also includes a fixing ring (207), which binds the induction cable (203) and the heat pipe (204) together. The top of the fixing ring (207) is provided with a fixing groove (208), and the fixing ring (207) is fixedly connected to the bridge (201) by a fixing nail (202) passing through the fixing groove (208).
2. The bridge structure joint de-icing device according to claim 1, characterized in that, The water collection pipe (1) adopts a splicing structure, and the adjacent water collection pipes (1) are connected to each other in the slot (4) by a card block (3).
3. The bridge structure joint de-icing device according to claim 1, characterized in that, The induction cable (203) is used to transmit the detected temperature to the monitoring and control device (205), which is used to compare the temperature with a preset value and control the temperature regulation device (206) to start and stop.
4. The bridge structure joint de-icing device according to claim 3, characterized in that, When the ambient temperature detected by the induction cable (203) is lower than the set value, the monitoring and control device (205) controls the temperature regulating device (206) to automatically turn on the heat pipe (204) for heating.
5. The bridge structure joint de-icing device according to claim 1, characterized in that, The connecting plate (10) and the fixing frame (8) are pre-positioned in terms of installation position through the sliding cooperation between the positioning block (5) and the positioning groove (9).
6. The bridge structure joint de-icing device according to claim 1, characterized in that, The limiting pin (6) is used to pass through the limiting groove (7) to finally lock and fix the connecting plate (10) and the fixing frame (8).
7. The bridge structure joint de-icing device according to claim 1, characterized in that, The induction cable (203) and the heat pipe (204) are bound together by the fixing ring (207) to form an integrated ice melting assembly.
8. The bridge structure joint de-icing device according to claim 1, characterized in that, The fixing nail (202) fixes the fixing ring (207) to the inner wall of the structural joint of the bridge (201).