Bridge high stress area concrete pouring device
By introducing multiple discharge ports and guide fork structures into the concrete pouring device for high-stress areas of bridges, combined with electric butterfly valves and sliding rod brush devices, the problems of small pouring area, low efficiency, and segregation of concrete in high-stress areas of bridges have been solved. This has enabled flexible pouring and efficient cleaning, reduced the labor intensity of workers, and improved construction efficiency.
Patent Information
- Application Number
- CN202522798658.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-30
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-30
AI Technical Summary
In the process of pouring concrete in the high-stress zone of bridges, existing technologies have problems such as small pouring area, low efficiency, concrete segregation, and high labor intensity.
A concrete pouring device for high-stress areas of bridges was designed. It employs multiple discharge ports and a guide fork structure to control the concrete drop. Combined with an electric butterfly valve and a sliding rod brush device, it achieves flexible pouring and efficient cleaning.
It enables flexible pouring of large or small areas, suppresses concrete segregation, reduces the labor intensity of workers, and improves construction efficiency.
Smart Images

Figure CN225014004U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of building construction, and in particular relates to a concrete pouring device for high stress zones of bridges. Background Technology
[0002] Concrete pouring in high-stress zones of bridges is a critical technical step in bridge construction, directly affecting the structure's load-bearing capacity, durability, and safety. Concrete pouring in high-stress zones is generally carried out using chutes. During construction, concrete is delivered into the chutes by pump trucks. Currently, chutes typically have only one discharge port, resulting in a small pouring area, low efficiency, and the direct drop of concrete from the discharge port easily leads to aggregate and mortar separation, causing segregation and affecting concrete quality. Furthermore, the chutes require flushing after each pouring period. Currently, the flushing method usually involves one worker holding a water hose to flush the chutes while another worker uses a brush to scrub them, which is labor-intensive and inefficient. Summary of the Invention
[0003] The problem to be solved by the present invention is to overcome the shortcomings of the prior art and provide a concrete pouring device for high stress areas of bridges.
[0004] This invention is achieved through the following technical solution: A concrete pouring device for high-stress areas of bridges includes a support frame with casters at the bottom. A chute is fixed on the support frame, and a discharge port is provided at the front of the chute. Multiple discharge ports are provided, and a discharge cylinder is fixedly connected downwards to each discharge port. A guide fork is fixed inside the discharge cylinder. The upper part of the left and right sides of the chute is symmetrically provided with sliding grooves. A transverse sliding rod is slidably installed in the sliding grooves on both sides. A brush is fixed on the bottom surface of the sliding rod, and the brush can contact the bottom surface of the chute. A metal pipe is fixed on the front side of the sliding rod, and several nozzles are provided on the metal pipe. One end of the metal pipe is closed, and the other end of the metal pipe is connected to a water pump through a water pipe. The water pump is connected to a water tank. Threaded holes A are provided at both ends of the sliding rod. A placement groove is provided at the rear end of the chute, and the placement groove is connected to the chute. The sliding rod can rotate in the placement groove. A fixing plate is provided on the outer side of the chute corresponding to the placement groove. The fixing plate has threaded holes B corresponding to threaded holes A. The sliding rod is fixed to the fixing plate by bolts passing through threaded holes A and B.
[0005] Preferably, an electric butterfly valve is installed at the discharge port.
[0006] Preferably, the guide fork extends downwards 5-15cm from inside the feed cylinder.
[0007] Preferably, there are three feeding ports.
[0008] Preferably, the guide fork is fishbone shaped.
[0009] The device of this invention is equipped with multiple discharge ports, each of which can be controlled independently. It can be used for both large-area and small-area pouring, offering high flexibility and allowing for the pouring of different high-stress areas as needed. In addition, the device has a guide fork fixed inside the discharge cylinder at each discharge port, which can slow down the falling speed of concrete, suppress concrete segregation, and ensure the quality of the poured concrete. The device also features a flushing device on the chute, requiring only one worker to perform the flushing operation, reducing the worker's labor intensity, increasing flushing efficiency, and accelerating construction efficiency. Attached Figure Description
[0010] Figure 1 This is a side view of the structure in this embodiment; Figure 2 This is a top view of the structure in this embodiment; Figure 3 This is a schematic diagram of the chute structure in this embodiment; Figure 4 This is a schematic diagram of the sliding rod structure in this embodiment; Figure 5 This is a schematic diagram of the guide fork structure in this embodiment; Figure 6 This is a schematic diagram of the structure after the brush is flipped up in this embodiment; Figure 7 This is a partially enlarged structural diagram of the brush after it has been flipped up in this embodiment; Figure 8 This is a schematic diagram of the structure of one side of the water pipe in this embodiment.
[0011] In the diagram, 1 is the bracket, 2 is the caster, 3 is the chute, 4 is the discharge port, 5 is the discharge cylinder, 6 is the guide fork, 7 is the chute, 8 is the sliding rod, 9 is the brush, 10 is the metal pipe, 11 is the nozzle, 12 is the water pipe, 13 is the threaded hole A, 14 is the placement groove, 15 is the fixing plate, 16 is the threaded hole B, 17 is the bolt, and 18 is the electric butterfly valve. Detailed Implementation
[0012] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are some embodiments of the present invention, but not all embodiments.
[0013] This embodiment includes a support frame 1 with casters 2 at its bottom for moving it during pouring. A chute 3 is fixed to the support frame 1, tilting downwards. A discharge port 4 is located at the front of the chute 3. Concrete is pumped into the chute 3 by a pump truck. The concrete flows down the chute 3 and through the discharge port 4 to be poured into the high-stress area. This is an existing structure and will not be described in detail here. In this embodiment, three discharge ports 4 are provided, each fixedly connected to a discharge cylinder 5. A guide fork 6 is fixed inside the discharge cylinder 5, with its bottom end higher than the designed pouring elevation. The guide fork 6 buffers the concrete flowing from the discharge port 4 into the discharge cylinder 5, preventing aggregate and mortar separation and effectively inhibiting concrete segregation. Preferably, the guide fork 6 is fishbone shaped and welded to the inner wall of the discharge cylinder 5. Preferably, the guide fork 6 extends downwards from the discharge cylinder 5 for 5-15 cm to further effectively inhibit concrete segregation. In this embodiment, an electric butterfly valve 18 is preferably installed at each discharge port 4. The electric butterfly valve 18 can be individually controlled by a remote control to close and open the discharge port 4. When large-area pouring is required, all three electric butterfly valves 18 can be opened by remote control, allowing material to be discharged from all three discharge ports 4 simultaneously. When pouring small areas, any one of the electric butterfly valves 18 can be closed individually as needed. The aforementioned electric butterfly valve 18 is a commonly used component, and its structure and working principle will not be described in detail here.
[0014] Symmetrical grooves 7 are provided on the upper part of the left and right sides of the chute 3. A transverse sliding rod 8 is slidably installed in the grooves 7 on both sides. The sliding rod 8 is along the width direction of the chute 3 and can slide back and forth along the grooves 7. The sliding rod 8 extends outward from the grooves 7 on both sides. Threaded holes A13 are provided at both ends of the sliding rod 8. A placement groove 14 is provided at the rear end of the groove 7. The placement groove 14 is connected to the groove 7. The size of the placement groove 14 is larger than that of the groove 7. The space in the placement groove 14 allows the sliding rod 8 to flip within the placement groove 14. A fixing plate 15 is welded to the outer surface of the chute 3 corresponding to the placement groove 14. The upper surface of the fixing plate 15 is flush with the bottom end of the placement groove 14. Threaded holes B16 corresponding to the threaded holes A13 are provided on the fixing plate 15. The sliding rod 8 can be fixed together with the fixing plate 15 by bolts 17 passing through the threaded holes A13 and B16.
[0015] A brush 9 is fixed to the bottom surface of the sliding rod 8, and the brush 9 can contact the inner bottom surface of the chute 3. The brush 9 is used to scrub the chute 3. A metal pipe 10 is fixed to the front side of the sliding rod 8. One end of the metal pipe 10 is closed, and the other end of the metal pipe 10 is connected to a water pump through a water pipe 12. The water pump is connected to a water tank (not shown in the attached diagram). Several nozzles 11 are provided on the metal pipe 10. Water is sent to the metal pipe 10 by the water pump, and then water is sprayed through the nozzles 11 on the metal pipe 10 to rinse the chute 3. By sliding the sliding rod 8 along the chute 7, the chute 3 can be rinsed and scrubbed by the brush 9 at the same time. This method is much more efficient than the traditional method and also reduces the labor intensity of workers.
[0016] During construction, push the chute 3 to the pouring location, align the discharge cylinder 5 with the pouring position, and control the number of butterfly valves opened as needed. Concrete is then pumped onto the chute 3 via a pump truck, positioned in front of the sliding rod 8. The concrete slides down the chute 3, enters the discharge cylinder 5, and then falls through the guide fork 6. After a period of pouring, the chute 3 needs to be cleaned. At this time, push the chute 3 away from the high-stress area, and then connect one end of the metal pipe 10 to the water pipe 12. The water pipe 12 is connected to the water pump, which is connected to the water tank. During construction, the water pump and water tank can be moved with the pouring process by pulling a trolley or placed on the pump truck. Unscrew bolt 17. Flip the sliding rod 8 in the placement groove 14 so that the side of the sliding rod 8 with the brush 9 is facing down. Then place the sliding rod 8 in the chute 7, turn on the water pump, and spray water from the nozzle 11 to flush the chute 3. Slide the sliding rod 8 forward to let the brush 9 brush the bottom surface of the chute 3. You can slide the sliding rod 8 back and forth to brush the chute 3 multiple times until it is clean. Turn off the water pump, remove the water pipe 12, slide the sliding rod 8 to the placement groove 14 at the rear end, flip the sliding rod 8 so that the brush 9 is facing up, place both ends of the sliding rod 8 on the fixing plate 15 respectively, align the threaded hole A13 with the threaded hole B16, tighten the bolt 17 to fix the sliding rod 8, and then proceed to the next section of pouring.
[0017] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; those skilled in the art should understand that modifications can still be made to the technical solutions described in the above embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the various embodiments of the present invention.
Claims
1. A concrete pouring device for high-stress areas of bridges, comprising a support (1), casters (2) at the bottom of the support (1), a chute (3) fixed on the support (1), and a discharge port (4) at the front of the chute (3), characterized in that: Multiple discharge ports (4) are provided, and the discharge ports (4) are fixedly connected downward to the discharge cylinder (5). A guide fork (6) is fixed inside the discharge cylinder (5). The upper part of the left and right sides of the chute (3) is symmetrically provided with sliding grooves (7). A transverse sliding rod (8) is slidably provided in the sliding grooves (7) on both sides. A brush (9) is fixed on the bottom surface of the sliding rod (8). The brush (9) can contact the bottom surface of the chute (3). A metal tube (10) is fixed on the front side of the sliding rod (8). Several nozzles (11) are provided on the metal tube (10). One end of the metal tube (10) is closed, and the other end of the metal tube (10) is closed. One end is connected to a water pump via a water pipe (12), and the water pump is connected to a water tank. The left and right ends of the sliding rod (8) are provided with threaded holes A (13). The rear end of the chute (7) is provided with a placement groove (14), which is connected to the chute (7). The sliding rod (8) can be flipped in the placement groove (14). A fixing plate is provided on the outer side of the chute (3) corresponding to the placement groove (14). The fixing plate is provided with a threaded hole B (16) corresponding to the threaded hole A (13). The sliding rod (8) is fixed to the fixing plate by bolts passing through the threaded hole A (13) and the threaded hole B (16).
2. The bridge high-stress zone concrete pouring device according to claim 1, characterized in that: An electric butterfly valve is installed at the discharge port (4).
3. The bridge high-stress zone concrete pouring device according to claim 1, characterized in that: The guide fork (6) extends downwards 5-15cm from inside the feed cylinder (5).
4. The bridge high-stress zone concrete pouring device according to claim 1, characterized in that: There are three feeding ports (4).
5. The bridge high-stress zone concrete pouring device according to claim 1, characterized in that: The guide fork (6) is fishbone shaped.