Bridge deck pavement concrete pouring finishing and leveling device

The bridge deck pavement leveling device, which uses modular standard sections and elevation control rods, solves the problems of leveling accuracy and stability after large-area concrete pouring of the bridge deck pavement, achieving efficient and precise leveling results.

CN225014007UActive Publication Date: 2026-11-24JIANGXI CONSTR ENG THIRD CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202620000683.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2026-01-04
Publication Date
2026-11-24
Estimated Expiration
2036-01-04

AI Technical Summary

Technical Problem

After a large area of ​​concrete is poured, traditional leveling methods are difficult to meet the high precision requirements of bridge deck pavement, and the stability of the support is challenged in continuous operation.

Method used

A bridge deck pavement concrete pouring finishing and leveling device is designed. It adopts modular standard sections and elevation control rods, combined with internal threaded sleeves and threaded fit, to achieve rapid adaptation and high-precision leveling. The finishing and leveling are completed simultaneously through an integrated crossbeam locking mechanism.

Benefits of technology

It achieved efficient and precise leveling of the bridge deck pavement, improved construction efficiency and quality, and ensured adaptability and stability under different working conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225014007U_ABST
    Figure CN225014007U_ABST
Patent Text Reader

Abstract

This utility model discloses a leveling device for concrete pouring and finishing of bridge deck pavement, including a support body. The support body is composed of several standard sections horizontally spliced ​​together. Each standard section includes a purlin, a support frame, a leveling beam, an internally threaded sleeve, a fastening nut, and an elevation control rod. The support frame includes a base frame, a herringbone support rod, and a reinforcing rod. Connecting plates are provided around the base frame, and standard section fixing bolts are provided on the connecting plates. Internally threaded sleeves are fixed on both sides of the purlin. The elevation control rod has external threads that mate with the internally threaded sleeves. The upper end of the internally threaded sleeve is fixed by an elastic washer and a fastening nut, and the lower end is fixed by a flat washer and a fastening nut. The lower end of the elevation control rod is fixedly connected to the leveling beam. The base frames of each standard section are connected by standard section fixing bolts. The leveling beams of each standard section are connected by beam fixing bolts. This utility model has significant advantages such as simple operation, high leveling accuracy, and simultaneous finishing and leveling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of bridge engineering construction technology, specifically to a surface leveling device for large-area concrete pouring construction of bridge deck pavement. It is suitable for large-area continuous construction of pavement concrete on straight bridges, curved bridges, and bridges with varying slopes, and can realize simultaneous leveling and surface finishing operations, thereby improving construction efficiency and pavement quality. Background Technology

[0002] In bridge construction, the smoothness of the bridge deck pavement layer (usually a cement concrete or asphalt concrete base layer) has a crucial impact on the quality of subsequent pavement paving, driving comfort, and the overall durability of the bridge. Currently, after the completion of large-area concrete pouring, the leveling operation of the bridge deck pavement layer still faces certain challenges: traditional methods are insufficient in controlling leveling accuracy, making it difficult to consistently meet high-standard smoothness requirements; and the support stability may be tested during continuous operation. To address these issues, we propose a novel construction device designed to achieve large-area continuous and efficient operation, improve leveling accuracy, simultaneously complete surface finishing and leveling, and enhance adaptability to different working conditions. Summary of the Invention

[0003] The purpose of this utility model is to overcome the shortcomings of the existing technology and provide a leveling device for the concrete pouring of bridge deck pavement.

[0004] The technical solution of this utility model: A bridge deck pavement concrete pouring finishing and leveling device includes a support body; The main body of the support frame is composed of several standard sections spliced ​​horizontally. The standard section includes purlins, support frames, leveling beams, internally threaded sleeves, fastening nuts, and elevation control rods. The support frame includes a base frame, a herringbone support rod, and a reinforcing rod. The two ends of the purlin are fixedly connected to the base frame through the herringbone support rod. The base frame is provided with connecting plates around its perimeter, and standard section fixing bolts are provided on the connecting plates. Internal threaded sleeves are vertically fixed on both sides of the purlin. The elevation control rod is provided with external threads that mate with the internal threaded sleeves. The upper end of the internal threaded sleeve is fixed by an elastic washer and a fastening nut, and the lower end is fixed by a flat washer and a fastening nut. The lower end of the elevation control rod is fixedly connected to the leveling beam; The base frames of each standard section are connected by standard section fixing bolts; The leveling beams of each standard section are connected by beam fixing bolts. The purlins on both sides of the main body of the support extend outward to form force-applying handles; The bottom frame on both sides of the main body of the support has a support plate extending outward, and the support plate is equipped with a traveling wheel via a wheel frame in the front and rear directions.

[0005] Furthermore, the purlins are round steel with a diameter of not less than Φ32mm.

[0006] Furthermore, the herringbone support rod consists of two diagonal rods.

[0007] Furthermore, the reinforcing rods include four diagonal reinforcing rods, two diagonal reinforcing rods in the middle, and one central reinforcing rod. The four sides of the bottom frame are connected to the middle of the purlins through the diagonal reinforcing rods. A central reinforcing rod is provided in the middle of the bottom frame, and diagonal reinforcing rods are provided on both sides of the rear of the bottom frame.

[0008] Furthermore, the base frame and reinforcing bars are all welded from angle steel, with the angle steel having a specification of not less than 3cm*3cm and a thickness of not less than 2.5mm.

[0009] Furthermore, the lower end of the elevation control rod is fixedly connected to the leveling beam via a crossbeam locking nut and an elastic washer.

[0010] This utility model has significant advantages such as simple operation, high leveling accuracy, and simultaneous leveling and finishing. Specifically, the device achieves rapid adaptation of bridge deck width through modular standard section design. Combined with the threaded fit between the elevation control rod and the internal threaded sleeve and the double-end fastening structure, the elevation adjustment operation is simple and intuitive, while ensuring low leveling accuracy error. The leveling and finishing processes are completed simultaneously through an integrated crossbeam locking mechanism, effectively solving the problem of difficulty in balancing efficiency and accuracy in traditional construction. Attached Figure Description

[0011] Figure 1 This is a schematic diagram of the structure of a preferred embodiment of the present utility model; Figure 2 This is another structural schematic diagram of a preferred embodiment of the present utility model; Figure 3 This is a structural diagram of a standard section; Figure 4 This is a schematic diagram of locking the upper end of the elevation adjustment rod; Figure 5 This is a schematic diagram of the installation of the lower end of the elevation adjustment rod; In the diagram: purlin 1, support frame 2, wheel frame mounting bolt 3, standard section fixing bolt 4, leveling beam 5, support plate 6, traveling wheel 7, internal threaded sleeve 8, fastening nut 9, elevation control rod 10, beam fixing bolt 11, wheel frame 12, beam locking nut 13, elastic washer 14, flat washer 15, bottom frame 21, herringbone support rod 22, reinforcing rod 23, connecting plate 211, diagonal reinforcing rod 231, diagonal reinforcing rod 232, and intermediate reinforcing rod 233. Detailed Implementation

[0012] The present invention can be further described through the following embodiments; however, the scope of the present invention is not limited to the following embodiments. It should be understood that the embodiments described herein are disclosed by way of illustration only, and the present invention is not intended to limit its scope to the details of the construction and arrangement of the components described below or illustrated in the figures. Furthermore, in describing preferred embodiments, specific terminology will be used for clarity. It should be understood that each specific term includes all technical equivalents that operate in a similar manner to achieve a similar purpose.

[0013] Example 1: Please refer to Figures 1 to 5 The diagram illustrates a bridge deck pavement concrete pouring and leveling device, comprising a support body. The support body is composed of several standard sections horizontally spliced ​​together, the number of which increases or decreases depending on the road width. Each standard section includes a purlin 1, a support frame 2, a leveling beam 5, an internally threaded sleeve 8, a fastening nut 9, and an elevation control rod 10. The support frame 2 includes a base frame 21, a herringbone support rod 22, and a reinforcing rod 23. Both ends of the purlin 1 are fixedly connected to the base frame 21 via the herringbone support rod 22. Next, connecting plates 211 are provided around the bottom frame 21, and standard section fixing bolts 4 are provided on the connecting plates 211. Internal threaded sleeves 8 are vertically fixed on both sides of the purlin 1. The elevation control rod 10 is provided with external threads that mate with the internal threaded sleeves 8. The upper end of the internal threaded sleeve 8 is fixed by an elastic washer 14 and a fastening nut 9, and the lower end is fixed by a flat washer and a fastening nut 9. Preferably, the internal threaded sleeve 8 is a hexagonal shape with long internal threads, and its outer wall is welded and fixed to the side of the purlin 1. The lower end of the elevation control rod 10 is fixedly connected to the leveling beam 5, which is a 5cm*5cm angle steel. The bottom frames 21 of each standard section are connected by standard section fixing bolts 4; The leveling beams 5 of each standard section are connected by beam fixing bolts 11. The purlins 1 on both sides of the main body of the support extend outward to form force application handles, for example, extending outward by 50 cm. The operator can hold the handles with both hands to control the direction and speed of movement during walking. The bottom frame 21 on both sides of the main body of the support is provided with a support plate 6 extending outward, and the support plate 6 is equipped with a traveling wheel 7 through the wheel frame 12 in the front and rear directions respectively.

[0014] In this embodiment, purlin 1 is a round steel bar with a diameter of not less than Φ32mm.

[0015] In this embodiment, the herringbone support rod 22 is composed of two diagonal rods.

[0016] In this embodiment, the reinforcing rod 23 includes four diagonal reinforcing rods 231, two diagonal reinforcing rods 232, and one central reinforcing rod 233. The four sides of the bottom frame 21 are connected to the middle of the purlin 1 through the diagonal reinforcing rods 231. The middle reinforcing rod 233 is provided in the middle of the bottom frame 21, and the diagonal reinforcing rods 232 are provided on both sides of the rear part of the bottom frame 21.

[0017] In this embodiment, the bottom frame 21 and the reinforcing rod are both made of angle steel welded together. The angle steel has a specification of not less than 3cm*3cm and a thickness of not less than 2.5mm.

[0018] In this embodiment, the lower end of the elevation control rod 10 is fixedly connected to the leveling beam 5 through the crossbeam locking nut 13 and the elastic washer 14.

[0019] During construction, this utility model can quickly adapt to the leveling requirements of different bridge deck widths by disassembling or adding / reducing the number of standard sections. When adjusting the leveling elevation, loosen the fastening bolt 9, rotate the externally threaded elevation control rod 10 to the target position (adjustment range 100-300mm, accuracy error ±1mm), then tighten the bolt 9 to lock it, and finally use the crossbeam locking nut 13 and elastic washer 14 to fix the leveling crossbeam 5, so that the elevation control rod 10 and the crossbeam 5 are connected as a rigid whole. Laser leveling is used to ensure accuracy during the installation of the overall frame. This design achieves precise positioning through the threaded engagement of the internally threaded sleeve 8 and the elevation control rod 10. The upper end is protected by elastic washer 14 and nut, and the lower end is reinforced by flat washer and nut, making the structure stable and reliable. During the finishing operation, the traveling wheels 7 keep moving forward synchronously on both sides, and their traveling speed can be adjusted from 0.5-1m / min to adapt to different initial setting speeds of concrete, ensuring the uniformity and quality stability of the leveling and finishing operation.

[0020] The foregoing has shown and described the basic principles, main features, and advantages of this utility model. It will be apparent to those skilled in the art that this utility model is not limited to the details of the exemplary embodiments described above, and that it can be implemented in other specific forms without departing from the spirit or basic characteristics of this utility model. Therefore, the embodiments should be considered exemplary and non-limiting in all respects. The scope of this utility model is defined by the appended claims rather than the foregoing description, and thus all variations falling within the meaning and scope of equivalents of the claims are intended to be included within this utility model. No reference numerals in the claims should be construed as limiting the scope of the claims.

[0021] Furthermore, it should be understood that although this specification describes embodiments, not every embodiment contains only one independent technical solution. This narrative style is merely for clarity. Those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can also be appropriately combined to form other embodiments that can be understood by those skilled in the art.

Claims

1. A leveling device for the concrete pouring of bridge deck pavement, characterized in that: Including the main support structure; The main body of the support frame is composed of several standard sections spliced ​​horizontally. The standard section includes purlins (1), support frame (2), leveling beam (5), internal threaded sleeve (8), fastening nut (9), and elevation control rod (10). The support frame (2) includes a base frame (21), a herringbone support rod (22) and a reinforcing rod (23). The two ends of the purlin (1) are fixedly connected to the base frame (21) through the herringbone support rod (22). The base frame (21) is provided with connecting plates (211) around its perimeter. The connecting plates (211) are provided with standard section fixing bolts (4). The two sides of the purlin (1) are respectively fixed with internal thread sleeves (8). The elevation control rod (10) is provided with external threads that cooperate with the internal thread sleeves (8). The upper end of the internal thread sleeves (8) is fixed by elastic washers (14) and fastening nuts (9), and the lower end is fixed by flat washers and fastening nuts (9). The lower end of the elevation control rod (10) is fixedly connected to the leveling beam (5); The bottom frames (21) of each standard section are connected by standard section fixing bolts (4); The leveling beams (5) of each standard section are connected by beam fixing bolts (11); The purlins (1) on both sides of the main body of the support extend outward to form force-applying handles; The bottom frame (21) on both sides of the main body of the support is provided with a support plate (6) extending outward. The support plate (6) is equipped with a traveling wheel (7) through a wheel frame (12) in the front and rear directions.

2. The bridge deck pavement concrete pouring finishing and leveling device according to claim 1, characterized in that: Purlin (1) is a round steel bar with a diameter of not less than Φ32mm.

3. The bridge deck pavement concrete pouring finishing and leveling device according to claim 1, characterized in that: The herringbone support rod (22) consists of two diagonal rods.

4. The bridge deck pavement concrete pouring finishing and leveling device according to claim 1, characterized in that: The reinforcing rod (23) includes four diagonal reinforcing rods (231), two diagonal reinforcing rods (232) and one intermediate reinforcing rod (233). The four sides of the bottom frame (21) are connected to the middle of the purlin (1) through the diagonal reinforcing rods (231). The middle reinforcing rod (233) is provided in the middle of the bottom frame (21), and the diagonal reinforcing rods (232) are provided on both sides of the rear part of the bottom frame (21).

5. The bridge deck pavement concrete pouring finishing and leveling device according to claim 1, characterized in that: The base frame (21) and the reinforcing rod are both made of angle steel welded together. The angle steel is not less than 3cm*3cm and the thickness is not less than 2.5mm.

6. The bridge deck pavement concrete pouring finishing and leveling device according to claim 1, characterized in that: The lower end of the elevation control rod (10) is fixedly connected to the leveling beam (5) through the crossbeam locking nut (13) and elastic washer (14).