A fully enclosed construction protection system for crossing high frequency traffic highways at high speed
By designing a fully enclosed construction protection system, using a roof structure and standardized modular components, the risks of vehicles laterally entering and objects falling from heights during highway construction have been resolved, achieving safety protection and smooth traffic flow in the construction area.
Patent Information
- Application Number
- CN202522474026.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-21
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-11-21
AI Technical Summary
Existing highway construction safety measures are ineffective in preventing vehicles from veering sideways and objects from falling from heights, and they also impact traffic flow.
Design a fully enclosed construction protection system, including a roof structure, support components, top protection components, and side protection components, forming a three-dimensional rigid channel, and using standardized modular components for rapid assembly and disassembly.
It achieves inherent safety protection for the construction area, reduces the impact on traffic, and is particularly suitable for high-frequency traffic sections, ensuring smooth traffic during construction.
Smart Images

Figure CN225014017U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of highway construction safety technology, and in particular to a fully enclosed construction protection system for highways crossing high-frequency traffic flow. Background Technology
[0002] With the rapid increase in highway traffic volume, cross-road construction activities such as maintenance and repair are becoming increasingly frequent. These constructions face two major contradictions: first, the contradiction between the safety of construction workers and the risks posed by high-speed traffic; and second, the contradiction between road closures for construction and the need for smooth social traffic flow.
[0003] Currently, common protective measures have significant limitations: 1) Isolation barriers and cones: These only provide warning and soft isolation functions, offering weak protection and failing to stop out-of-control vehicles. 2) Mobile steel crash barriers: While possessing some crash protection capabilities, their linear open structure has two major drawbacks: firstly, they cannot prevent vehicles from overturning or small vehicles from crawling under them; secondly, they cannot create a closed space at the top, thus failing to protect against the risk of falling objects from above (such as during bridge construction).
[0004] Therefore, there is an urgent need in this field for a systematic solution that can provide comprehensive and high-intensity safety protection for construction areas with minimal impact on traffic. Summary of the Invention
[0005] The main purpose of this utility model is to provide a fully enclosed construction protection system for highways with high-frequency traffic flow, aiming to solve the two major problems of construction safety and smooth traffic flow at the same time.
[0006] Therefore, this utility model provides a fully enclosed construction protection system for highways with high-frequency traffic flow, including two canopy structures respectively set on both sides of the central median of the highway. Each canopy structure includes support components set on both sides of the corresponding driving lane of the highway, a top protection component erected on the top of the support components, and a side protection component set on the side of each set of support components. The support components, the top protection component and the side protection component together constitute a fully enclosed protective passage that spans the corresponding driving lane of the highway and allows vehicles to pass underneath it.
[0007] Specifically, the support components include multiple concrete foundations arranged along the extension direction of the highway and steel pipe supports arranged on each of the concrete foundations; the top protection components include crossbeams assembled from Bailey panels and bamboo plywood fully laid on the crossbeams; and the side protection components are corrugated steel sheet fences.
[0008] Specifically, the concrete foundation contains embedded reinforcing bars and embedded plates for fixing the steel pipe support.
[0009] Specifically, the steel pipe support includes two steel pipe columns arranged side by side in the horizontal direction. The lower end of each steel pipe column is welded and fixed to the concrete foundation through a pre-embedded plate, and trapezoidal reinforcing plates are welded around the connection. The two steel pipe columns are horizontally connected by a scissor brace made of steel pipes.
[0010] Specifically, the crossbeam is connected to the top of the steel pipe support via a sliding block.
[0011] Specifically, the fully enclosed protective passage is equipped with an outer guardrail on the side near the road shoulder and a cement protective block on the side near the central divider.
[0012] Compared with the prior art, the present invention has the following beneficial effects: 1. Three-dimensional fully enclosed protection, inherently enhanced safety: By constructing a rigid passage covering the top and sides, the risk of vehicles entering from the side and objects falling from heights is fundamentally eliminated, providing "three-dimensional" inherent safety protection for the construction area.
[0013] 2. Ensuring smooth traffic flow and significant socio-economic benefits: The innovative "channel-style" design allows vehicles to pass safely under the protection system, realizing parallel "construction-traffic" space, greatly reducing the impact on highway traffic capacity, and is particularly suitable for high-frequency traffic sections.
[0014] 3. Modularization and speed: The system adopts standardized modular components (such as standard steel pipe columns, Bailey beams, etc.), realizing factory production, rapid on-site assembly and disassembly, which greatly shortens the construction preparation cycle and reduces the time that construction occupies traffic. Attached Figure Description
[0015] To more clearly illustrate the technical solutions in the embodiments of this utility model, the drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0016] Figure 1 This is a horizontal schematic diagram of the protection system of this utility model; Figure 2 This is a longitudinal schematic diagram of the protection system of this utility model; Figure 3 This is a schematic diagram of the concrete foundation of this utility model. Figure 4 This is a schematic diagram showing the connection between the crossbeam and the steel pipe support of this utility model.
[0017] The components include: 1. Roof structure; 2. Support components; 201. Concrete foundation; 202. Steel pipe support; 2021. Steel pipe column; 2022. Scissor bracing; 203. Embedded plate; 204. Embedded steel bar; 3. Top protection components; 301. Horizontal beam; 302. Bamboo plywood; 303. Longitudinal sliding beam; 304. Sliding seat; 4. Fully enclosed protective passage; 5. Outer guardrail; 6. Cement protective pier. Detailed Implementation
[0018] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0019] In the description of this utility model, it should be understood that the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this utility model and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model.
[0020] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this utility model, "a plurality of" means two or more, unless otherwise explicitly specified.
[0021] See Figures 1-4The protective system of this embodiment spans an eight-lane highway and requires a bridge to be built above it. The protective system is installed at the location where the bridge needs to be built above the highway, and its specific structure is as follows: It includes two canopy structures 1 respectively set on both sides of the central median of the highway. The canopy structure 1 is located directly below the bridge to be built above. Each canopy structure 1 includes support components 2 set on both sides of the corresponding lane of the highway, a top protective component 3 erected on the top of the support component 2, and a side protective component set on the side of each set of support components 2. The support components 2, the top protective component 3 and the side protective component together form a fully enclosed protective passage 4 that spans the corresponding lane of the highway and allows vehicles to pass underneath it.
[0022] This embodiment fundamentally eliminates the risk of vehicles intruding from the side and objects falling from heights by constructing a rigid passage covering the top and sides, providing "three-dimensional" intrinsic safety protection for the construction area.
[0023] The innovative "channel-style" design allows vehicles to pass safely under the protection system, realizing parallel "construction-traffic" space, greatly reducing the impact on highway traffic capacity, and is particularly suitable for high-frequency traffic sections.
[0024] In some embodiments, the support component 2 includes a plurality of concrete foundations 201 arranged along the extension direction of the highway and steel pipe supports 202 arranged on each concrete foundation 201. The concrete foundations 201 are independent foundations made of C30 strength concrete, with dimensions of 0.8m × 1.2m × 3.0m. The foundations are set adjacent to the highway subgrade and have pre-embedded reinforcing bars 204 and pre-embedded plates 203 for fixing the steel pipe supports 202. The steel pipe supports 202 include two Φ600mm steel pipe columns 2021 arranged side by side in the transverse direction. The bottom of the columns is firmly welded to the pre-embedded plates 203 in the foundation. Around the welded joints, trapezoidal reinforcing plates with a height of 400mm, a bottom width of 200mm, and a top width of 100mm are welded to greatly enhance the impact resistance and overturning resistance.
[0025] See Figures 1-4 Specifically, the top protective component 3 includes a crossbeam 301 and bamboo plywood 302 fully covering the crossbeam 301. The crossbeam 301 is assembled from 321-type Bailey panels. The top of the steel pipe column 2021 is equipped with a longitudinal sliding beam 303, and a sliding seat 304 is slidably provided on the sliding beam. The two ends of the crossbeam 301 are placed in the sliding seat 304 and locked by a fixing device. The bamboo plywood 302 is 14mm thick and is fully covered on the load-bearing beam structure and fixed with self-tapping screws to form a reliable fall protection barrier.
[0026] Specifically, the side protection components utilize 750mm high corrugated steel sheet fences, reliably connected to the edges of the support components 2 and the top protection components 3 via angle steel to form side protection. The concrete foundation 201 contains pre-embedded reinforcing bars 204 and pre-embedded plates 203 for fixing the steel pipe supports 202. A Z-shaped scissor brace 2022 is welded between the two steel pipe columns 2021 using Φ273mm and Φ180mm steel pipes to effectively resist wind loads and vibrations caused by vehicle traffic, ensuring overall stability.
[0027] In this embodiment, the system adopts standardized modular components (such as standard steel pipe columns 2021, Bailey beams, etc.), realizing factory production, rapid on-site assembly and disassembly, which greatly shortens the construction preparation cycle and reduces the time that construction occupies traffic.
[0028] To ensure that vehicles traveling on the highway do not collide with the steel pipe column 2021 and the concrete foundation 201 of the column, an outer guardrail 5 is installed on the side of the fully enclosed protective passage 4 near the shoulder, and a cement protective block 6 is installed on the side near the central divider.
[0029] See Figures 1-4 The construction process of the above-mentioned protection system is as follows: (1) Foundation construction The foundation is located on both sides of the shoulder and the central median. Before construction, the shoulder and curb stones were removed. The bottom of the foundation is located on the top of the original highway pavement. Part of the foundation is located on the shoulder of the highway embankment. The foundation uses cast-in-place concrete, and the concrete is poured using a concrete mixer truck chute.
[0030] (2) Construction of steel pipe columns in 2021 The columns are fabricated on-site according to the design dimensions and then transported to the construction site for hoisting. A 25T crane is used for lifting, with manual assistance for installation. The connection between the column and the base is made of welded steel plates, and reinforcing plates are welded to all four sides of the column. The verticality of the column must be ensured during installation. After the column is installed, a horizontal steel pipe connection system is welded. During the column hoisting process, a designated person must direct the operation, and unauthorized personnel are strictly prohibited from entering the construction site.
[0031] Before erecting the columns, the construction supervisor must ensure that all safety personnel and construction workers are in place before issuing the construction order. Before installation, check the position, elevation, and flatness of the embedded parts, and check the length of the columns, adjusting as needed. Immediately after the columns are securely welded, install two temporary limiting guy ropes. It is strictly forbidden to loosen the traction ropes and slings before the columns are securely welded or the limiting guy ropes are tightened, to prevent the columns from falling onto the highway.
[0032] After the columns are securely welded, the traction ropes must not be released immediately. Once each steel pipe column 2021 is roughly in place, it should be manually straightened, aligned with the pre-laid design position, and its verticality corrected. The bottom of the column should be welded promptly, and column feet should be welded according to the design drawings. This process should be repeated for each steel pipe support 202. Lateral scissor bracing 2022 should be installed between the steel pipe supports 202 to enhance lateral stability.
[0033] (3) Construction of beams and fences The Bailey bridge beams were pre-assembled and installed using a combination of manual labor and crane. Lifting rings were installed at both ends of the main Bailey bridge beam. The main Bailey bridge beam was slowly lifted up, and when the lifting height exceeded the crossbeam 301, it was slowly turned and gently lowered into the sliding seat 304. After it was in place, the fixing device was installed. A dedicated safety officer was assigned to the site to direct the lifting process.
[0034] The roof of the protective canopy is fully covered with 302 bamboo plywood and fixed with self-tapping screws. The perimeter is surrounded by a 750mm high color steel sheet fence, which is reliably welded to the roof with angle iron. After the canopy is installed, on-site construction personnel, quality inspectors, and supervisors will conduct an on-site inspection and acceptance. Only after the inspection and acceptance are passed can the construction of the overpass bridge begin.
[0035] (4) Dismantling of protective scaffolding The dismantling of the protective canopy is a challenge. Due to the limitations imposed by the precast small box girders that have already been erected, the crane dismantling is somewhat restricted. The canopy dismantling must also be carried out under the temporary closure of the highway. The canopy must be dismantled in the order from top to bottom, that is, first the guardrails, then the panels, then the crossbeams 301, and finally the columns. The dismantled structural materials are placed nearby outside the roadbed area on both sides of the Shenzhen-Shantou West Expressway.
[0036] Unless otherwise stated, if any of the technical solutions disclosed in this utility model discloses a numerical range, then the disclosed numerical range is a preferred numerical range. Anyone skilled in the art should understand that the preferred numerical range is merely one among many feasible numerical values that has a more obvious or representative technical effect. Because there are many numerical values, it is impossible to list them all. Therefore, this utility model discloses only some numerical values to illustrate the technical solutions of the invention. Furthermore, the numerical values listed above should not constitute a limitation on the scope of protection of this invention.
[0037] Meanwhile, if the present invention discloses or relates to mutually fixedly connected parts or structural components, then unless otherwise stated, the fixed connection can be understood as: a detachable fixed connection (e.g., using bolts or screws), or a non-detachable fixed connection (e.g., riveting, welding). Of course, mutually fixed connections can also be replaced by an integral structure (e.g., manufactured by casting) (except where it is obviously impossible to use an integral forming process).
[0038] Furthermore, unless otherwise stated, the terms used to indicate positional relationships or shapes in any of the technical solutions disclosed in this utility model include states or shapes that are similar to, analogous to, or close to those states or shapes. Any component provided by this utility model can be assembled from multiple individual components or can be a single component manufactured using a one-piece molding process.
[0039] The above embodiments are merely illustrative examples to clearly illustrate the present invention, and are not intended to limit the implementation. Those skilled in the art can make other variations or modifications based on the above description. It is neither necessary nor possible to exhaustively list all embodiments here. However, obvious variations or modifications derived therefrom are still within the protection scope of this invention.
Claims
1. A fully enclosed construction protection system for highways with high-frequency traffic flow, comprising two canopy structures (1) respectively installed on both sides of the central median strip of the highway, characterized in that: Each of the canopy structures (1) includes support components (2) set on both sides of the corresponding driving lane of the highway, a top protection component (3) erected on the top of the support components (2) and a side protection component set on the side of each set of support components (2). The support components (2), the top protection component (3) and the side protection component together form a fully enclosed protective passage (4) that spans the corresponding driving lane of the highway and allows vehicles to pass under it.
2. The fully enclosed construction protection system according to claim 1, characterized in that: The support assembly (2) includes a plurality of concrete foundations (201) arranged along the extension direction of the highway and steel pipe supports (202) arranged on each of the concrete foundations (201). The top protection assembly (3) includes a crossbeam (301) assembled from Bailey panels and bamboo plywood (302) fully covered on the crossbeam (301). The side protection assembly is a corrugated steel sheet fence.
3. The fully enclosed construction protection system according to claim 2, characterized in that: The concrete foundation (201) is pre-embedded with pre-embedded reinforcing bars (204) and pre-embedded plates (203) for fixing the steel pipe support (202).
4. The fully enclosed construction protection system according to claim 3, characterized in that: The steel pipe support (202) includes two steel pipe columns (2021) arranged side by side in the horizontal direction. The lower end of each steel pipe column (2021) is welded and fixed to the concrete foundation (201) through a pre-embedded plate (203), and trapezoidal reinforcing plates are welded around the connection. The two steel pipe columns (2021) are connected laterally by a scissor brace (2022) made of steel pipes.
5. The fully enclosed construction protection system according to claim 2, characterized in that, The crossbeam (301) is connected to the top of the steel pipe support (202) via a slide (304).
6. The fully enclosed construction protection system according to any one of claims 1-5, characterized in that: The fully enclosed protective passage (4) has an outer guardrail (5) on the side near the road shoulder and a cement protective block (6) on the side near the central divider.