A structure of a spoil ground suitable for a large flood narrow channel

By adopting an upstream composite water-retaining structure and a graded drainage system in narrow and steep ditch spoil disposal sites, the problem of large-volume spoil stockpiling and flood control and drainage has been solved, the stability and safety of the spoil disposal sites have been improved, the engineering cost has been reduced, and it is suitable for large flood environments.

CN225014064UActive Publication Date: 2026-11-24POWERCHINA BEIJING ENG CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522420437.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-14
Publication Date
2026-11-24
Estimated Expiration
2035-11-14

AI Technical Summary

Technical Problem

In water conservancy projects in high mountain and canyon areas, spoil heaps in narrow and steep gullies face the dual challenges of large-volume spoil heaps and flood control and drainage. Existing technologies are unable to effectively solve the problem of large-volume spoil heaps while saving investment costs. At the same time, it is difficult to construct an efficient water-blocking and drainage system to resist the impact of large floods and improve the overall stability and safety of the spoil heap.

Method used

The system employs an upstream composite water-retaining structure, a slag heap, and a tiered drainage structure, including an upstream water-retaining dam, upper and lower slag heaps, bottom drainage culverts, and top intercepting drainage ditches. This combined dam intercepts floodwaters and safely guides them out through the tiered drainage structure. Downstream, a slag heap is installed to prevent slag from sliding down, and outlet energy dissipation facilities reduce downstream scouring.

Benefits of technology

It enables the effective stacking of large amounts of waste in narrow and steep ditches, enhances the stability of the waste disposal site, reduces flood risk, reduces project investment costs, ensures the safety and efficient drainage of the waste disposal site, and has a simple structure that is easy to construct.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225014064U_ABST
    Figure CN225014064U_ABST
Patent Text Reader

Abstract

This utility model discloses a spoil disposal site structure suitable for narrow channels during major floods, including an upstream composite water-retaining structure, a spoil heap, a tiered drainage structure, a downstream spoil retaining dam, and an outlet energy dissipation facility. The upstream composite water-retaining structure consists of an upstream water-retaining dam and an upper spoil heap to block floodwaters during the flood season; the spoil heap lies between the upstream water-retaining dam and the downstream spoil retaining dam. The tiered drainage structure consists of a bottom drainage culvert and a top intercepting drainage ditch. The drainage culvert is buried at the bottom of the spoil heap to discharge floodwaters during the flood season, while the intercepting drainage ditch at the top intercepts water flow from both sides of the slope. The downstream spoil retaining dam prevents the spoil heap from sliding down. The outlet energy dissipation facility eliminates the energy of the downstream floodwaters, reducing downstream scouring. This design solves the problem of storing large quantities of spoil in short, narrow channels, reducing land occupation; it also solves the problem of intercepting and storing rapidly rising floodwaters in the channel, allowing the floodwaters to flow smoothly through interception and regulation, saving costs and ensuring the safety of the spoil disposal site. This utility model has a simple structure and is easy to construct.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model patent belongs to the field of water conservancy engineering technology, specifically relating to a spoil disposal site structure suitable for narrow channels during major floods. Background Technology

[0002] In water conservancy projects in high mountain and canyon areas, spoil disposal is a crucial aspect of project implementation. Due to its ability to utilize the terrain surrounded by mountains on three sides, and the use of retaining dams at the bottom of the gully to create a relatively enclosed storage space without encroaching on basic farmland, gully-type spoil disposal sites have gradually become a common choice in development projects.

[0003] In practical applications, especially in areas prone to flooding, with narrow channels and steep slopes, such spoil disposal sites face the dual challenges of large-scale spoil storage and flood control and drainage. Therefore, how to effectively solve the problem of storing large volumes of spoil in narrow, steep channels while saving investment costs, constructing efficient water-blocking and drainage systems to withstand the impact of major floods, and simultaneously improving the overall stability and safety of the spoil disposal site has become a critical technical issue that urgently needs to be addressed. Utility Model Content

[0004] To address the shortcomings of existing technologies, a spoil disposal site structure suitable for narrow channels during major floods is proposed. This structure aims to solve the problem of storing large amounts of spoil in narrow and steep channels, improve the overall stability of the spoil disposal site, reduce flood risk, and lower engineering investment costs.

[0005] This utility model is implemented as follows: a spoil disposal site structure suitable for narrow channels during large floods, including an upstream composite water-retaining structure, a spoil pile, a graded drainage structure, and a downstream spoil retaining dam. The upstream composite water-retaining structure is located upstream of the slag yard and consists of an upstream water-retaining dam and an upper slag pile. The upstream water-retaining dam and the upper slag pile together form a combined dam to intercept floods during the flood season and improve the water-retaining capacity. The slag heap consists of an upper slag heap and a lower slag heap. The slag heap is stacked in two layers. The upper slag heap is located downstream of the upstream dam and above the lower slag heap, covering the top surface of the lower slag heap. The lower slag heap is located between the upstream dam and the downstream slag heap. The graded drainage structure includes a bottom drainage culvert and a top intercepting drainage ditch. The bottom drainage culvert is pre-buried below the lower layer of slag heap, with its inlet extending to the upstream side of the upstream dam and its outlet extending to the downstream side of the downstream slag heap. The top intercepting drainage ditch is located at the junction of the upper and lower layers of slag heap and intersects with the slopes on both sides.

[0006] Furthermore, the upstream slope ratio of the upstream dam is between 1:0 and 1:0.2, and the downstream slope ratio is between 1:0.4 and 1:0.7; the upstream slope ratio of the upper slag heap is between 1:2 and 1:3, and the downstream slope ratio is between 1:1.5 and 1:2.5.

[0007] Furthermore, upstream water-retaining dams can be made of concrete, cementitious materials, or masonry.

[0008] Furthermore, the lower layer of slag heap is provided with a gentle slope with a downstream slope ratio between 1% and 5%, and the slope ratio of the lower layer of slag heap at the connection section with the downstream slag retaining dam is between 1:1.5 and 1:2.5.

[0009] Furthermore, the bottom drainage culvert is a pressurized drainage structure, using reinforced concrete pipe, prestressed steel cylinder concrete pipe, or ductile iron pipe.

[0010] Furthermore, the length of the first end of the bottom drainage culvert extending out of the upstream water-retaining dam is between 0.3 and 1.0 meters, and the length of the last end extending out of the downstream slag-retaining dam is between 2.0 and 5.0 meters.

[0011] Furthermore, the top drainage ditch has a trapezoidal or rectangular cross-section.

[0012] Furthermore, an outlet energy dissipation facility is installed downstream of the downstream slag retaining dam to eliminate the energy of floodwater discharged from the bottom drainage culvert and reduce downstream scouring.

[0013] Furthermore, the bottom drainage culvert is connected to the outlet energy dissipation facility. The beneficial effects of this utility model are as follows: This utility model can solve the problem of storing large amounts of waste in short and narrow channels, reducing the land area occupied; the composite water-retaining structure of the upstream dam and the waste pile can also solve the problem of intercepting and storing floods during rapid rises in the channel, allowing the floodwaters to flow smoothly through interception and regulation, saving costs and ensuring the safety of the waste disposal site. In addition, this utility model has a simple structure and is easy to construct. Attached Figure Description

[0014] Figure 1 This is a plan view of the spoil disposal site structure applicable to narrow channels during major floods.

[0015] Figure 2 This is a cross-sectional schematic diagram of the spoil disposal site structure applicable to narrow channels during major floods.

[0016] Among them: 1-upstream water-retaining dam, 2-upper layer of slag heap, 3-lower layer of slag heap, 4-bottom drainage culvert, 5-top intercepting drainage ditch, 6-downstream slag-retaining dam, 7-outlet energy dissipation facility. Detailed Implementation

[0017] To make the objectives, technical solutions, and advantages of this utility model clearer, the present utility model will be further described in detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are merely illustrative of the present utility model and are not intended to limit the scope of the present utility model.

[0018] In the description of this utility model, it should be noted that the terms "upper", "middle", "lower", "inner", "outer", "both sides", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the purpose of simplifying the description of this utility model and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.

[0019] In the description of this utility model, it should be noted that, unless otherwise explicitly specified and limited, the terms "installed," "equipped with," and "connected," etc., should be interpreted broadly. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be a connection within two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.

[0020] like Figure 1-2 As shown, the waste disposal site structure applicable to narrow channels during major floods, as described in this utility model patent, includes an upstream dam 1, an upper waste stockpile 2, a lower waste stockpile 3, a bottom drainage culvert 4, a top intercepting drainage ditch 5, a downstream waste dam 6, and an outlet energy dissipation facility 7.

[0021] The upstream composite water-retaining structure consists of an upstream water-retaining dam 1 and an upper-layer slag heap 2 to block floodwaters during the flood season. The slag heap is located between the upstream water-retaining dam 1 and the downstream slag heap 6. The upper-layer slag heap 2 is located downstream of the upstream water-retaining dam 1 and above the lower-layer slag heap 3, covering the top surface of the lower-layer slag heap. The lower-layer slag heap 3 is located between the upstream water-retaining dam 1 and the downstream slag heap 6. The graded drainage structure consists of a bottom drainage culvert 4 and a top intercepting drainage ditch 5. The bottom drainage culvert 4 is buried under the slag heap to discharge floodwaters during the flood season, while the top intercepting drainage ditch 5 intercepts and drains water from the slopes on both sides. The downstream slag heap 6 prevents the slag heap from sliding down. The outlet energy dissipation facility 7 eliminates the energy released by the floodwaters from the top intercepting drainage ditch 5, reducing downstream scouring.

[0022] The upstream slope ratio of the upstream dam 1 is between 1:0 and 1:0.2, and the downstream slope ratio is between 1:0.4 and 1:0.7.

[0023] When the upper layer of slag 2 is piled up, it should be based on the top elevation of the upstream dam 1 and piled up reasonably from the backwater side of the dam body to ensure the safety of the dam body and prevent the upstream dam 1 from overflowing.

[0024] The upstream slope ratio of the upper slag heap 2 is between 1:2 and 1:3, and the downstream slope ratio is between 1:1.5 and 1:2.5.

[0025] The lower layer of slag heap is provided with a gentle slope with a downstream slope ratio between 1% and 5%, and the slope ratio of the lower layer of slag heap at the connection section with the downstream slag retaining dam is between 1:1.5 and 1:2.5.

[0026] The bottom drainage culvert 4 can be made of reinforced concrete, prestressed steel cylinder concrete or ductile iron.

[0027] The length of the first end of the bottom drainage culvert 4 extending out of the upstream water-retaining dam 1 is between 0.3 and 1.0 meters, and the length of the last end extending out of the downstream slag-retaining dam is between 2 and 5 meters.

[0028] The top drainage ditch 5 has a trapezoidal or rectangular cross section, and in steep areas of the mountain, anti-slip toothed walls need to be added to the bottom plate at intervals of 3m to 5m.

[0029] This invention utilizes the slag heap to increase the dam height, forming a combined dam with the upstream water-retaining dam to improve water retention capacity. The downstream slag-retaining dam is located at the toe of the lower slag heap to prevent slag from sliding down. When stacking the upper slag heap, the elevation of the top of the upstream water-retaining dam should be used as a reference, and the slag should be stacked reasonably from the backwater side of the dam upwards to ensure the safety of the dam and prevent upstream flooding from overflowing the upstream water-retaining dam.

[0030] A large reservoir project involves a significant amount of spoil disposal. The site is located in a narrow, elongated valley with steep slopes on both sides, limiting its storage capacity. Furthermore, the upstream catchment area for the spoil disposal site is large, with a 10-year flood peak flow of 18.0 m³ / h. 3 / s, the peak flow rate for a 20-year flood event is 31.6m³ / s. 3 / s, the total flood volume reached 104,100 m³. 3 To meet design requirements and prevent flooding from the slag heap during rapid channel rises, the height of the upstream dam needs to be significantly increased, leading to higher investment. The slag heap structure provided by this patent combines the upper slag heap with the dam to form a composite water-retaining structure, effectively solving the problem of rapid channel rises while increasing the slag heap capacity. Furthermore, the tiered drainage structure designed in this patent not only safely guides pressurized flow through the slag heap but also effectively drains water from the slopes on both sides, ensuring the stability and safety of the slag heap. The downstream dam prevents slag from sliding down, and the energy dissipation facilities at the outlet effectively eliminate the energy of the downstream floodwaters, reducing the risk of downstream scouring.

[0031] The above description is only a preferred embodiment of the present utility model. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the principle of the present utility model, and these improvements and modifications should also be considered within the protection scope of the present utility model.

Claims

1. A spoil disposal site structure suitable for narrow channels during major floods, characterized in that, This includes the upstream composite water-retaining structure, the slag heap, the graded drainage structure, and the downstream slag-retaining dam; The upstream composite water-retaining structure is located upstream of the slag yard and consists of an upstream water-retaining dam (1) and an upper slag pile (2). The upstream water-retaining dam (1) and the upper slag pile (2) together form a combined dam to intercept floods during the flood season and improve the water-retaining capacity. The slag heap includes an upper slag heap (2) and a lower slag heap (3). The slag heap is stacked in two layers. The upper slag heap (2) is located downstream of the upstream dam (1) and above the lower slag heap (3). The upper slag heap (2) covers the top surface of the lower slag heap (3). The lower slag heap (3) is located between the upstream dam (1) and the downstream slag heap (6). The graded drainage structure includes a bottom drainage culvert (4) and a top intercepting drainage ditch (5). The bottom drainage culvert (4) is pre-buried below the lower layer of slag heap (3), with its inlet end extending to the upstream side of the upstream dam (1) and its outlet end extending to the downstream side of the downstream slag heap (6). The top intercepting drainage ditch (5) is located at the junction of the upper layer of slag heap (2) and the lower layer of slag heap (3), and intersects with the slopes on both sides.

2. The spoil disposal site structure suitable for narrow channels during major floods according to claim 1, characterized in that, The upstream slope ratio of the upstream dam (1) is between 1:0 and 1:0.2, and the downstream slope ratio is between 1:0.4 and 1:0.7; the upstream slope ratio of the upper slag heap (2) is between 1:2 and 1:3, and the downstream slope ratio is between 1:1.5 and 1:2.

5.

3. The spoil disposal site structure suitable for narrow channels during major floods, as described in claim 1, is characterized in that... Upstream water-retaining dams can be made of concrete, cementitious materials, or masonry.

4. The spoil disposal site structure suitable for narrow channels during major floods according to claim 1, characterized in that, The lower layer of slag heap (3) is provided with a gentle slope with a slope ratio between 1% and 5% towards the downstream, and the slope ratio of the lower layer of slag heap (3) at the connection section with the downstream slag retaining dam (6) is between 1:1.5 and 1:2.

5.

5. The spoil disposal site structure suitable for narrow channels during major floods according to claim 1, characterized in that, The bottom drainage culvert (4) is a pressurized drainage structure, using reinforced concrete pipe, prestressed steel cylinder concrete pipe or ductile iron pipe.

6. The spoil disposal site structure suitable for narrow channels during major floods according to claim 1, characterized in that, The length of the bottom drainage culvert (4) extending from the upstream water-retaining dam (1) is between 0.3 and 1.0 meters, and the length of the tail end extending from the downstream slag-retaining dam (6) is between 2.0 and 5.0 meters.

7. The spoil disposal site structure suitable for narrow channels during major floods according to claim 1, characterized in that, The top intercepting drainage ditch (5) has a trapezoidal or rectangular cross-section.

8. The spoil disposal site structure suitable for narrow channels during major floods according to claim 1, characterized in that, The downstream slag retaining dam (6) is equipped with an outlet energy dissipation facility (7) to eliminate the energy of flood discharge from the bottom drainage culvert (4) and reduce downstream scouring.

9. The spoil disposal site structure suitable for narrow channels during major floods, as described in claim 8, is characterized in that... The bottom drainage culvert (4) is connected to the outlet energy dissipation facility (7).