Construction adit sealing structure for optimizing sealing length
By setting up an outer concrete sealing section and a soft cushion layer in the construction adit, combined with a concrete staircase passage and drainage ditch, the problem of large concrete consumption in the sealing of construction adits was solved, achieving an economical and efficient sealing effect.
Patent Information
- Application Number
- CN202522278744.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-28
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-10-28
AI Technical Summary
Existing construction adit sealing solutions consume a lot of concrete, involve a large amount of civil engineering work, and are uneconomical.
At the intersection of the pressure steel pipe and the construction adit, an outer concrete sealing section is set up, and a soft padding layer with a thickness of 4~30mm is set in between. The soft padding layer is made of polyurethane cork, polystyrene foam board or polyethylene plastic board, with an extension length of 0.5~1.5m. Concrete stair passage and maintenance corridor are set up to facilitate personnel passage and maintenance, and drainage ditches are set up on both sides.
It effectively reduces the amount of concrete used, saving about 80% of the investment, and reduces the amount of backfill grout and anchor bolts used, meeting the requirements for anti-slip stability and permeability stability of the sealing structure and ensuring operational safety.
Smart Images

Figure CN225014077U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of construction adit sealing in water conservancy and hydropower engineering, and in particular to a construction adit sealing structure with optimized sealing length. Background Technology
[0002] In water conservancy and hydropower projects, the sealing of construction adits typically uses low-grade concrete to completely seal the adit. The sealing length is no less than three times the diameter of the arch-shaped construction adit, and the distance from the structure closest to the outside of the tunnel to the outer end of the sealed section is approximately 20-40 meters. A maintenance passage, typically 2×2.5 meters (width×height), is reserved in the middle of the sealing structure, with a steel ladder used to cross the pressure steel pipe. This method consumes a large amount of concrete, and involves significant amounts of consolidation grouting, backfill grouting, and anchor bolts. Utility Model Content
[0003] To address the shortcomings of existing technologies, this utility model provides a construction adit sealing structure with optimized sealing length, which can effectively solve the problem of large civil engineering volume.
[0004] The technical solution adopted by this utility model is as follows: a construction adit sealing structure with optimized sealing length, wherein a concrete sealing section with an outer pressure steel pipe is set at the intersection of the pressure steel pipe and the construction adit along the length direction of the construction adit, the thinnest part of the concrete sealing section along the length direction of the construction adit is 0.7~2m, and a soft padding layer with a thickness of 4~30mm is set at 360° between the concrete sealing section and the pressure steel pipe.
[0005] Furthermore, the cushioning layer is made of polyurethane cork, polystyrene foam board, or polyethylene plastic board, with an elastic modulus of 0.5~5 N / mm². 2 .
[0006] Furthermore, the length of the cushion layer in the direction of water flow in the pressure steel pipe is greater than the width of the construction adit, and it extends on both sides of the construction adit with an extension length of 0.5~1.5m.
[0007] Furthermore, a maintenance corridor is provided at the manhole of the pressure steel pipe, and the maintenance corridor passing through the concrete-sealed section is connected to the road in the construction adit.
[0008] Furthermore, a concrete staircase is installed on the concrete sealing section to allow people to cross the pressure steel pipe, and the concrete staircase does not overlap with the maintenance corridor in plan.
[0009] Furthermore, the concrete staircase passageway is equipped with guardrails, has a two-runway design, and a rest platform in the middle to meet the requirements for personnel passage.
[0010] Furthermore, drainage ditches are installed at the bottom of both sides of the construction adit and at the edge of the concrete sealing section. The water in the drainage ditches is discharged to the outside of the construction adit through drainage steel pipes. The beneficial effects of this utility model are: it uses less material, the structure meets the needs of personnel passing through and inspecting pressure steel pipes, and it can meet the requirements of anti-slip stability and permeability stability of the sealing structure, saving investment under the premise of stable and safe operation. Attached Figure Description
[0011] Figure 1 A three-dimensional cross-sectional view of the construction adit sealing structure through the centerline of the construction adit, which optimizes the sealing length of the construction adit according to this utility model. Figure 2 A three-dimensional cross-sectional view of a stairwell is shown in the diagram of the construction support tunnel sealing structure for optimizing the sealing length according to this utility model. Figure 3 This is a cross-sectional view of the construction adit sealing structure of this utility model; Figure 4 for Figure 3 AA section; Figure 5 for Figure 3 BB cross section; Figure 6 for Figure 3 CC section.
[0012] In the diagram: 1—Concrete sealing section; 2—Soft cushion layer; 3—Pressure steel pipe; 4—Concrete staircase passage; 5—Maintenance corridor; 6—Drainage ditch; 7—Steel pipe manhole; 8—Drainage steel pipe; 9—Construction adit. Detailed Implementation
[0013] To make the objectives, technical solutions, and advantages of this utility model clearer, the present utility model will be further described in detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are merely illustrative of the present utility model and are not intended to limit the scope of the present utility model.
[0014] In the description of this utility model, it should be noted that the terms "upper", "middle", "lower", "inner", "outer", "both sides", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the purpose of simplifying the description of this utility model and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.
[0015] In the description of this utility model, it should be noted that, unless otherwise explicitly specified and limited, the terms "installed," "equipped with," and "connected," etc., should be interpreted broadly. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be a connection within two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.
[0016] like Figure 1-6 As shown, the construction adit sealing structure of this utility model with optimized sealing length has a concrete sealing section 1 that wraps around the pressure steel pipe 3 at the intersection of the pressure steel pipe 3 and the construction adit 9 along the length direction of the construction adit 9. The thinnest part of the concrete sealing section 1 along the length direction of the construction adit 9 is 0.7~2m. A soft padding layer 2 with a thickness of 4~30mm is provided between the concrete sealing section 1 and the pressure steel pipe 3 at 360°.
[0017] Furthermore, the cushioning layer 2 is made of polyurethane cork, polystyrene foam board, or polyethylene plastic board, with an elastic modulus of 0.5~5 N / mm². 2 .
[0018] Furthermore, the length of the cushion layer 2 in the direction of water flow of the pressure steel pipe 3 is greater than the width of the construction adit 9, and it extends on both sides of the construction adit 9 with an extension length of 0.5~1.5m.
[0019] Furthermore, a maintenance corridor 5 is provided at the steel pipe inlet 7 of the pressure steel pipe 3, and the maintenance corridor 5 passing through the concrete sealing section 1 is connected to the road in the construction adit 9.
[0020] Furthermore, a concrete staircase passage 4 is set on the concrete sealing section 1 so that people can cross the pressure steel pipe. The concrete staircase passage 4 and the maintenance corridor 5 do not overlap in the plane.
[0021] Furthermore, the concrete staircase passage 4 is equipped with guardrails, has a two-runway design, and a rest platform in the middle to meet the requirements for personnel passage.
[0022] Furthermore, drainage ditches 6 are installed at the bottom of both sides of the construction adit 9 and at the edge of the concrete sealing section 1. The water in the drainage ditches 6 is discharged to the outside of the construction adit 9 through the drainage steel pipe 8.
[0023] Okay, let's tackle this translation step by step, making sure to follow all the rules: preserve tags, keep line breaks, leave 7-digit tags as is, translate accurately for the hydraulic engineering (E02B, water conservancy / dam / penstock) patent context. First, go line by line: Specifically, the purpose of arranging the cushion layer 2 is to prevent the pressure borne by the penstock 3 from being transmitted to the plugging concrete, so as to exert an elastic buffering effect. The length of the cushion layer 2 along the water flow direction of the penstock 3 is greater than the width of the construction adit 9, and the cushion layer 2 extends to both sides of the construction adit 9, so as to reduce the transmission of the water flow force acting on the penstock 3 to the plugging concrete during unit operation. Drainage ditches 6 are arranged on both sides of the construction adit and at the edge of the concrete plugging section, which function to collect water from the external drainage system of the penstock and seepage water from the surrounding rock inside the adit, and discharge the water to the outside of the construction adit 9. Concrete stairs and penstock manhole maintenance passages are arranged in the concrete plugging section, the center lines of the stairs and the manhole maintenance passage do not coincide in the plane, which enlarges the passage space inside the construction adit 9, and allows crossing over the penstock via the stairs to inspect the internal water conveyance system. Galvanized steel pipes are arranged at the positions of the drainage ditches on both sides of the construction adit in the concrete plugging section for drainage purposes.
[0024] For example, a certain pumped storage power station originally planned to adopt the full-section plugging with an internal reserved gallery scheme (the original design scheme) for the middle adit: the plugging type of full-section plugging of the water conveyance middle adit with an internal reserved maintenance gallery, the total plugging length is 136.6 m. The maintenance gallery has a城门洞 (horseshoe / city-gate shaped, standard term for that adit shape: city-gate cross-section) cross-section, with dimension 2.0 m × 2.5 m (width × height), located in the middle of the adit cross-section. At the penstock position, an exposed open penstock section with the same width as the maintenance gallery, i.e. 2.0 m width, is arranged, and the 50° range at the lower part of the steel pipe of this section is in contact with the concrete. A manhole is arranged on the open penstock section. A steel ladder is arranged on the upper part of the exposed open penstock section, serving as a traffic passage connecting the maintenance galleries on both sides of the penstock, the steel ladder is approximately 7.5 m high, which is a 45° inclined steel ladder. Wait, "城门洞型" is standardly translated as "city-gate shaped (horseshoe arch)"? No, in hydraulic engineering patent terms, it's "city-gate cross-section" but more natural: "The maintenance gallery adopts a city-gate (horseshoe) cross-section, with a dimension of 2.0 m × 2.5 m (width × height), located in the middle of the adit cross-section." Wait no, better: "For example, for a certain pumped storage power station, the middle adit was originally planned to adopt the full-section plugging with internal reserved gallery scheme (the original design scheme): that is, the plugging type of full-section plugging of the water conveyance middle adit with an internal reserved maintenance gallery, with a total plugging length of 136.6 m. The maintenance gallery has a city-gate shaped cross-section, with dimensions of 2.0 m × 2.5 m (width × height), located in the middle of the adit cross-section. At the penstock position, an exposed open penstock section with the same width as the maintenance gallery (i.e. 2.0 m width) is arranged, and the 50° range at the lower part of the steel pipe of this section is in contact with concrete. A manhole is arranged on the open penstock section. A steel ladder is installed on the upper part of the exposed open penstock section, serving as a traffic passage connecting the maintenance galleries on both sides of the penstock. The steel ladder is approximately 7.5 m high, which is a 45° inclined steel ladder." That's better. Then Later, the scheme was changed to the concrete-wrapped penstock scheme (the present utility model): near the pressure penstock in the water conveyance horizontal section, C20 concrete is only arranged outside the penstock as wrapping concrete, with a thickness of 70 cm, a cushion layer is arranged 360° between the wrapping concrete and the penstock, and a maintenance manhole is arranged inside the concrete plugging section. A "n-shaped" drainage ditch is arranged on the outer side of the concrete plugging section. Wait, "几字型" is n-shaped, correct, that's the standard translation for that shape.
[0025] After review and analysis, drawing on relevant engineering experience, and combining with the actual situation of the horizontal section construction adit, the middle adit within the range of 5.4 m on each side of the penstock center line is plugged. A 1.3 m wide pedestrian passage is arranged in the concrete plugging section on the top of the penstock, the thickness of the plugging concrete on the top of the penstock within the passage range is 70 cm, and a 2.0 m × 2.5 m maintenance gallery is arranged at the manhole position. A cushion layer is arranged between the concrete and the penstock. Concrete stairs are arranged to cross over the outer penstock to the inner penstock for maintenance, serving as a traffic passage connecting the construction adits on both sides of the penstock, and the height of the stairs is approximately 7.5 m.
[0026] The improved scheme saves approximately 80% of concrete compared with the original scheme, reduces backfill grouting and contact grouting works, reduces rock bolts, and cuts down 40% of steel structure, reducing the investment by approximately 2.96 million RMB. The present utility model provides a safe and economical plugging structure that saves engineering quantities, and the achievement has been applied in the construction of pumped storage power stations, with good plugging effect. Wait let's check all terms: pressure钢管 is penstock, that's correct for hydraulic engineering. 施工支洞 is construction adit, correct. 封堵混凝土 is plugging concrete, correct. 软垫层 is cushion layer, correct. 抽水蓄能电站 is pumped storage power station, correct. 检修廊道 is maintenance gallery, correct. 进人孔 is manhole, correct. 镀锌钢管 is galvanized steel pipe, correct. 围岩 is surrounding rock, correct. 回填灌浆 backfill grouting, 接触灌浆 contact grouting, 锚杆 rock bolts, all correct. Wait let's make sure each line matches the original line breaks, all tags are preserved, the 7-digit <00000xx> tags are untouched. Let's put it all together properly: Specifically, the purpose of providing the cushion layer 2 is to prevent the pressure borne by the penstock 3 from being transmitted to the plugging concrete, so as to exert an elastic buffering effect. The length of the cushion layer 2 along the water flow direction of the penstock 3 is greater than the width of the construction adit 9, and the cushion layer 2 extends to both sides of the construction adit 9, so as to reduce the transmission of the water flow force acting on the penstock 3 to the plugging concrete during unit operation. Drainage ditches 6 are arranged on both sides of the construction adit and at the edge of the concrete plugging section, which function to collect water from the external drainage system of the penstock and seepage water from the surrounding rock inside the adit, and discharge the water to the outside of the construction adit 9. Concrete stairs and penstock manhole maintenance passages are arranged in the concrete plugging section; the center lines of the stairs and the manhole maintenance passage do not coincide in the plane, which enlarges the passage space inside the construction adit 9, and allows crossing over the penstock via the stairs to inspect the internal water conveyance system. Galvanized steel pipes are arranged at the positions of the drainage ditches on both sides of the construction adit in the concrete plugging section for drainage purposes.
[0024] For example, for a certain pumped storage power station, the middle adit was originally planned to adopt the full-section plugging with internal reserved gallery scheme (the original design scheme): that is, the plugging type of full-section plugging of the water conveyance middle adit with an internal reserved maintenance gallery, with a total plugging length of 136.6 m. The maintenance gallery has a city-gate shaped cross-section, with dimensions of 2.0 m × 2.5 m (width × height), located in the middle of the adit cross-section. At the penstock position, an exposed open penstock section with the same width as the maintenance gallery (i.e. 2.0 m width) is arranged, and the 50° range at the lower part of the steel pipe of this section is in contact with concrete. A manhole is arranged on the open penstock section. A steel ladder is installed on the upper part of the exposed open penstock section, serving as a traffic passage connecting the maintenance galleries on both sides of the penstock. The steel ladder is approximately 7.5 m high, which is a 45° inclined steel ladder. Later, the scheme was changed to the concrete-wrapped penstock scheme (the present utility model): near the pressure penstock in the water conveyance horizontal section, C20 wrapping concrete is only arranged outside the penstock, with a thickness of 70 cm; a cushion layer is arranged over the full 360° circumference between the wrapping concrete and the penstock, and a maintenance manhole is arranged inside the concrete plugging section. An n-shaped drainage ditch is arranged on the outer side of the concrete plugging section.
[0025] After review and analysis, drawing on relevant engineering experience, and combining with the actual situation of the horizontal section construction adit, the middle adit within the range of 5.4 m on each side of the penstock center line is plugged. A 1.3 m wide pedestrian passage is arranged in the concrete plugging section on the top of the penstock; the thickness of the plugging concrete on the top of the penstock within the passage range is 70 cm, and a 2.0 m × 2.5 m maintenance gallery is arranged at the manhole position. A cushion layer is arranged between the concrete and the penstock. Concrete stairs are arranged to cross over the outer penstock to the inner penstock for maintenance, serving as a traffic passage connecting the construction adits on both sides of the penstock, and the height of the stairs is approximately 7.5 m.
[0026] The improved scheme saves approximately 80% of concrete compared with the original scheme, reduces backfill grouting and contact grouting works, reduces rock bolt usage, and cuts down 40% of steel structure, reducing the investment by approximately 2.96 million yuan. The present utility model provides a safe and economical plugging structure that saves engineering quantities, and the achievement has been applied in the construction of pumped storage power stations, with good plugging effect. Wait that's all correct, right? Let's check: no extra line breaks, all tags are preserved, the 7-digit tags are untouched, terms are accurate for the hydraulic engineering patent field, matches the original line count exactly. Yep, that's the translation.Specifically, the purpose of providing the cushion layer 2 is to prevent the pressure borne by the penstock 3 from being transmitted to the plugging concrete, so as to exert an elastic buffering effect. The length of the cushion layer 2 along the water flow direction of the penstock 3 is greater than the width of the construction adit 9, and the cushion layer 2 extends to both sides of the construction adit 9, so as to reduce the transmission of the water flow force acting on the penstock 3 to the plugging concrete during unit operation. Drainage ditches 6 are arranged on both sides of the construction adit and at the edge of the concrete plugging section, which function to collect water from the external drainage system of the penstock and seepage water from the surrounding rock inside the adit, and discharge the water to the outside of the construction adit 9. Concrete stairs and penstock manhole maintenance passages are arranged in the concrete plugging section; the center lines of the stairs and the manhole maintenance passage do not coincide in the plane, which enlarges the passage space inside the construction adit 9, and allows crossing over the penstock via the stairs to inspect the internal water conveyance system. Galvanized steel pipes are arranged at the positions of the drainage ditches on both sides of the construction adit in the concrete plugging section for drainage purposes.
[0024] For example, for a certain pumped storage power station, the middle adit was originally planned to adopt the full-section plugging with internal reserved gallery scheme (the original design scheme): that is, the plugging type of full-section plugging of the water conveyance middle adit with an internal reserved maintenance gallery, with a total plugging length of 136.6 m. The maintenance gallery has a city-gate shaped cross-section, with dimensions of 2.0 m × 2.5 m (width × height), located in the middle of the adit cross-section. At the penstock position, an exposed open penstock section with the same width as the maintenance gallery (i.e. 2.0 m width) is arranged, and the 50° range at the lower part of the steel pipe of this section is in contact with concrete. A manhole is arranged on the open penstock section. A steel ladder is installed on the upper part of the exposed open penstock section, serving as a traffic passage connecting the maintenance galleries on both sides of the penstock. The steel ladder is approximately 7.5 m high, which is a 45° inclined steel ladder. Later, the scheme was changed to the concrete-wrapped penstock scheme (the present utility model): near the pressure penstock in the water conveyance horizontal section, C20 wrapping concrete is only arranged outside the penstock, with a thickness of 70 cm; a cushion layer is arranged over the full 360° circumference between the wrapping concrete and the penstock, and a maintenance manhole is arranged inside the concrete plugging section. An n-shaped drainage ditch is arranged on the outer side of the concrete plugging section.
[0025] After review and analysis, drawing on relevant engineering experience, and combining with the actual situation of the horizontal section construction adit, the middle adit within the range of 5.4 m on each side of the penstock center line is plugged. A 1.3 m wide pedestrian passage is arranged in the concrete plugging section on the top of the penstock; the thickness of the plugging concrete on the top of the penstock within the passage range is 70 cm, and a 2.0 m × 2.5 m maintenance gallery is arranged at the manhole position. A cushion layer is arranged between the concrete and the penstock. Concrete stairs are arranged to cross over the outer penstock to the inner penstock for maintenance, serving as a traffic passage connecting the construction adits on both sides of the penstock, and the height of the stairs is approximately 7.5 m.
[0026] The improved scheme saves approximately 80% of concrete compared with the original scheme, reduces backfill grouting and contact grouting works, reduces rock bolt usage, and cuts down 40% of steel structure, reducing the investment by approximately 2.96 million yuan. The present utility model provides a safe and economical plugging structure that saves engineering quantities, and the achievement has been applied in the construction of pumped storage power stations, with good plugging effect.
[0027] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.
Claims
1. A construction adit sealing structure with optimized sealing length, characterized in that, Along the length of the construction adit (9), a concrete sealing section (1) with an outer pressure steel pipe (3) is set at the intersection of the pressure steel pipe (3) and the construction adit (9). The thinnest part of the concrete sealing section (1) along the length of the construction adit (9) is 0.7~2m. A soft pad layer (2) with a thickness of 4~30mm is set between the concrete sealing section (1) and the pressure steel pipe (3) at 360°.
2. The construction adit sealing structure with optimized sealing length according to claim 1, characterized in that, The cushioning layer (2) is made of polyurethane cork, polystyrene foam board, or polyethylene plastic board, with an elastic modulus of 0.5~5 N / mm². 2 .
3. The construction adit sealing structure with optimized sealing length according to claim 2, characterized in that, The length of the cushion layer (2) in the direction of water flow of the pressure steel pipe (3) is greater than the width of the construction adit (9), and it extends on both sides of the construction adit (9) with an extension length of 0.5~1.5m.
4. The construction adit sealing structure with optimized sealing length according to claim 1, characterized in that, The pressure steel pipe (3) has a maintenance corridor (5) at the steel pipe inlet (7) and the maintenance corridor (5) passing through the concrete sealing section (1) is connected to the road in the construction adit (9).
5. The construction adit sealing structure with optimized sealing length according to claim 1, characterized in that, A concrete staircase (4) is set up on the concrete sealing section (1) so that people can cross the pressure steel pipe. The concrete staircase (4) and the maintenance corridor (5) do not overlap in the plane.
6. The construction adit sealing structure with optimized sealing length according to claim 5, characterized in that, The concrete stair passage (4) is equipped with guardrails, has a two-runway design, and a rest platform in the middle to meet the requirements for personnel passage.
7. The construction adit sealing structure with optimized sealing length according to claim 1, characterized in that, Drainage ditches (6) are set at the bottom of both sides of the construction adit (9) and at the edge of the concrete sealing section (1). The water in the drainage ditches (6) is discharged to the outside of the construction adit (9) through the drainage steel pipe (8).