Cofferdam impermeable structure
By setting up a three-layer composite structure of anti-seepage, protection and reinforcement on the cofferdam, the problem of easy damage to a single geomembrane was solved, and the stability and durability of the cofferdam's anti-seepage performance were improved.
Patent Information
- Application Number
- CN202522496905.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-25
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-11-25
AI Technical Summary
Traditional single geomembrane cofferdam seepage prevention structures are easily damaged under water pressure, environmental erosion and mechanical damage, resulting in unstable seepage prevention effect and difficulty in meeting the reliability and durability requirements of important engineering projects.
The system employs a three-layer composite structure, comprising an anti-seepage layer, a protective layer, and a reinforcement layer. The anti-seepage layer consists of a geotextile layer and a high-density polyethylene geomembrane layer. The protective layer consists of an epoxy resin coating and a polyurethane waterproof coating. The reinforcement layer consists of a steel mesh layer, a gravel layer, and a crack-resistant mortar layer. Each layer works together to improve the anti-seepage performance.
It significantly improves the strength, durability, and reliability of the cofferdam seepage prevention structure, enabling it to maintain its seepage prevention effect under the influence of various factors and avoid system failure caused by single-layer damage.
Smart Images

Figure CN225014078U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of water conservancy engineering technology, and in particular to a cofferdam seepage prevention structure. Background Technology
[0002] Cofferdams are temporary or permanent water-retaining structures widely used in water conservancy projects. They are mainly used to create dry land in rivers, lakes, and other bodies of water, providing waterless conditions for construction. The seepage prevention performance of cofferdams directly affects the safety and economy of the project. Poor seepage prevention can lead to increased leakage, affecting the construction progress, increasing construction costs, and in severe cases, potentially causing safety accidents.
[0003] Currently, cofferdam seepage prevention technologies mainly employ methods such as geomembrane laying, high-pressure jet grouting, and curtain grouting. Among these, geomembrane seepage prevention is widely used due to its simple construction and low cost. Traditional geomembrane seepage prevention structures typically use a single geomembrane to directly cover the cofferdam, that is, the geomembrane is laid directly on the surface of the cofferdam, blocking water seepage through the impermeability of the geomembrane.
[0004] However, this single-layer geomembrane seepage control structure has revealed numerous problems in practical engineering applications. First, the geomembrane material itself has limited strength and is prone to deformation and damage under long-term water pressure, especially under conditions of frequent water level changes, where repeated pressure fluctuations accelerate the fatigue aging of the geomembrane. Second, the geomembrane is directly exposed to the external environment, making it susceptible to ultraviolet radiation, temperature changes, and chemical corrosion, leading to material performance degradation and a shortened service life. Third, collisions with machinery, trampling by personnel, and punctures from sharp objects during construction can all damage the geomembrane, and once damaged, the reliability of the entire seepage control system decreases significantly. Furthermore, the single-layer geomembrane structure lacks effective protective measures and cannot resist external impacts and environmental erosion, making it difficult to guarantee seepage control performance in complex engineering environments.
[0005] Especially in some important engineering projects, the reliability and durability requirements of cofferdam seepage prevention are high, and traditional single geomembrane seepage prevention structures are no longer sufficient to meet the technical requirements. Engineering practice shows that cofferdam seepage prevention failure is often the result of multiple factors working together, and relying solely on a single layer of geomembrane for seepage prevention carries significant technical risks. Utility Model Content
[0006] This utility model provides a cofferdam seepage prevention structure, which solves the problems of easy damage and unstable seepage prevention effect of traditional seepage prevention structures, and improves the strength, durability and reliability of the cofferdam seepage prevention system.
[0007] This utility model provides a cofferdam seepage prevention structure, including an anti-seepage functional layer, a protective functional layer, and a reinforcing functional layer laid on the surface of the cofferdam body and arranged sequentially in the direction away from the cofferdam body; the anti-seepage functional layer includes a geotextile layer attached to the surface of the cofferdam body and a high-density polyethylene geomembrane layer disposed on the outside of the geotextile layer; the protective functional layer includes an epoxy resin coating and a polyurethane waterproof coating coated on the outer surface of the anti-seepage functional layer, the epoxy resin coating and the polyurethane waterproof coating forming a composite protective coating that combines rigid sealing and flexible toughness; the reinforcing functional layer is used to provide overall structural reinforcement and impact protection for the anti-seepage functional layer and the protective functional layer.
[0008] In one possible implementation, an epoxy resin coating penetrates to the surface of a high-density polyethylene geomembrane layer and forms an integrated bond with it, while a polyurethane waterproof coating covers the outer surface of the epoxy resin coating.
[0009] In one possible implementation, the epoxy resin coating and the polyurethane waterproof coating have the same thickness.
[0010] In one possible implementation, the high-density polyethylene geomembrane layer is fixed to the outer surface of the geotextile layer by hot-melt welding.
[0011] In one possible implementation, the thickness of the geotextile layer is the same as the thickness of the high-density polyethylene geomembrane layer.
[0012] In one possible implementation, the overall thickness of the reinforcing functional layer is 2-4 times the overall thickness of the impermeable functional layer.
[0013] In one possible implementation, the reinforcement functional layer includes: a steel mesh layer laid on the outer surface of the protective functional layer; a gravel layer embedded in the mesh of the steel mesh layer; and a crack-resistant mortar layer poured into the gaps of the gravel layer and covering the entire outer surface of the steel mesh layer and the gravel layer.
[0014] In one possible implementation, the gravel layer is graded gravel.
[0015] In one possible implementation, the geotextile layer is a non-woven geotextile.
[0016] In one possible implementation, the cofferdam seepage prevention structure is laid on the top surface, the water-facing surface, or the back surface of the cofferdam body.
[0017] The cofferdam seepage prevention structure provided by this utility model adopts a three-layer structure consisting of an anti-seepage functional layer, a protective functional layer, and a reinforcement functional layer arranged sequentially, achieving synergistic protection through functional division. The anti-seepage functional layer consists of a geotextile layer and a high-density polyethylene geomembrane layer, forming a double-layer seepage prevention system. The geotextile layer adheres to the cofferdam body to provide isolation and protection, while the high-density polyethylene geomembrane layer is located on the outside to form the main seepage barrier. The double-layer configuration ensures that the seepage prevention function can still be maintained even if a single layer is damaged. The epoxy resin coating of the protective functional layer provides rigid sealing, while the polyurethane waterproof coating provides flexibility and toughness. The two coatings combined resist chemical erosion, ultraviolet radiation, and temperature changes that could damage the anti-seepage functional layer. The reinforcement functional layer consists of a steel mesh layer, a gravel layer, and a crack-resistant mortar layer. The steel mesh layer forms a load-bearing skeleton, the gravel layer with embedded mesh provides aggregate support, and the crack-resistant mortar layer is poured in to form an integrated rigid protection, providing mechanical and impact protection for the inner layer. Existing cofferdam seepage prevention methods mostly use a single geomembrane for direct coverage. The geomembrane is directly exposed to the external environment without protective measures, making it prone to aging and damage under water pressure and environmental erosion. Moreover, once the geomembrane is damaged, the entire seepage prevention system fails. In contrast, this utility model uses a three-layer composite structure. The outer reinforcing functional layer provides mechanical protection and disperses and absorbs external impact loads, the middle protective functional layer prevents harmful factors from eroding, and the inner anti-seepage functional layer focuses on seepage prevention. Working under dual protection, the three-layer composite structure significantly improves the overall strength and stiffness compared to a single geomembrane, enhances the impact and deformation resistance, and greatly improves the durability of the seepage prevention system through multiple protections. Even if a certain layer is damaged locally, it will not cause the entire system to fail, fundamentally improving the seepage prevention performance of the cofferdam. Attached Figure Description
[0018] To more clearly illustrate the technical solutions in this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this utility model. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0019] Figure 1 This is an exploded structural diagram of a cofferdam seepage prevention structure provided by this utility model.
[0020] Figure 2 This is an exploded structural diagram of an anti-permeability functional layer provided by this utility model.
[0021] Figure 3 This is an exploded structural diagram of a protective functional layer provided by this utility model.
[0022] Figure 4 This is an exploded structural diagram of a reinforced functional layer provided by this utility model.
[0023] Figure 5 This is a schematic diagram of a cofferdam seepage prevention structure provided by this utility model.
[0024] Figure 6 This is a schematic diagram of a cofferdam seepage prevention structure and a cofferdam body provided by this utility model.
[0025] Figure label: a. The cofferdam itself; 1. Impermeable functional layer; 11. Geotextile layer; 12. Polyethylene geomembrane layer; 2. Protective functional layer; 21. Epoxy resin coating; 22. Polyurethane waterproof coating; 3. Reinforced functional layer; 31. Steel mesh layer; 32. Gravel layer; 33. Crack-resistant mortar layer. Detailed Implementation
[0026] To make the objectives, technical solutions, and advantages of this utility model clearer, the technical solutions of this utility model will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this utility model, not all embodiments. Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this utility model.
[0027] The following is combined with Figure 1-6 This invention describes a cofferdam seepage prevention structure, comprising an anti-seepage functional layer 1, a protective functional layer 2, and a reinforcing functional layer 3 sequentially arranged on the surface of the cofferdam body a and in a direction away from the cofferdam body a; the anti-seepage functional layer 1 includes a geotextile layer 11 adhered to the surface of the cofferdam body a and a high-density polyethylene geomembrane layer 12 disposed on the outside of the geotextile layer 11; the protective functional layer 2 includes an epoxy resin coating 21 and a polyurethane waterproof coating 22 coated on the outer surface of the anti-seepage functional layer 1, the epoxy resin coating 21 and the polyurethane waterproof coating 22 forming a composite protective coating that combines rigid sealing and flexible toughness; the reinforcing functional layer 3 provides overall structural reinforcement and impact protection for the anti-seepage functional layer 1 and the protective functional layer 2.
[0028] In this invention, the cofferdam seepage prevention structure adopts a three-layer composite structure consisting of an anti-seepage functional layer 1, a protective functional layer 2, and a reinforcing functional layer 3 arranged sequentially in the direction away from the cofferdam body a. Each layer has a clear division of labor and works in concert. The anti-seepage functional layer 1 consists of a geotextile layer 11 and a high-density polyethylene geomembrane layer 12, forming a basic seepage prevention system. The protective functional layer 2 forms a composite protective coating with both rigid sealing and flexible toughness through an epoxy resin coating 21 and a polyurethane waterproof coating 22. The reinforcing functional layer 3 provides overall structural reinforcement and impact protection for the anti-seepage functional layer 1 and the protective functional layer 2, thereby solving the technical problems of insufficient strength and poor durability of single seepage prevention measures.
[0029] Specifically, the geotextile layer 11 adheres to the surface of the cofferdam body a, serving as an isolation and protection layer. The high-density polyethylene geomembrane layer 12 is placed on the outside of the geotextile layer 11, forming the main seepage barrier. Epoxy resin coating 21 and polyurethane waterproof coating 22 are applied to the outer surface of the anti-seepage functional layer 1. The epoxy resin coating 21 provides rigid sealing protection, while the polyurethane waterproof coating 22 provides flexible and tough protection; the two combine to form a composite protective coating. The reinforcement functional layer 3 is located on the outermost layer, providing mechanical protection for the internal layers.
[0030] In a specific embodiment, when the cofferdam is subjected to water pressure and soil pressure, the reinforcement functional layer 3 first bears the external load and distributes it evenly. The double-layer structure of the protective functional layer 2 can resist chemical erosion and buffer mechanical impact. The double-layer design of the anti-seepage functional layer 1 ensures that even if a single layer is damaged, the basic anti-seepage function can be maintained. The three-layer structure forms multiple insurances, which greatly improves the reliability of the cofferdam's anti-seepage.
[0031] In related technologies, existing cofferdam seepage prevention structures mostly use a single geomembrane to directly cover the cofferdam, lacking effective protective measures. Under long-term water pressure and environmental erosion, the geomembrane is prone to aging and damage, leading to the failure of its seepage prevention function. In this embodiment of the utility model, through a three-layer composite structure design with clearly defined functions, the outer reinforcing functional layer 3 undertakes the main mechanical protection function, the middle protective functional layer 2 provides chemical protection and buffer protection, and the inner anti-seepage functional layer 1 focuses on the seepage prevention function. The layers work together, which significantly improves the overall strength, durability and seepage prevention reliability of the structure compared to a single geomembrane seepage prevention structure.
[0032] like Figure 3 As shown, in some embodiments, the epoxy resin coating 21 penetrates to the surface of the high-density polyethylene geomembrane layer 12 and forms an integrated bond structure therewith, and the polyurethane waterproof coating 22 covers the outer surface of the epoxy resin coating 21.
[0033] In this invention, the epoxy resin coating 21 penetrates into the surface of the high-density polyethylene geomembrane layer 12 and forms an integrated bonding structure. The polyurethane waterproof coating 22 covers the outer surface of the epoxy resin coating 21. Through different bonding methods of penetration bonding and surface covering, the organic unity of rigid sealing and flexible protection is achieved, thereby improving the overall performance of the protective functional layer 2.
[0034] Specifically, the epoxy resin coating 21, due to its molecular structure, can penetrate into the micropores on the surface of the high-density polyethylene geomembrane layer 12, forming a molecular-level bond with the geomembrane layer. This integrated bonding structure avoids the interface peeling phenomenon that easily occurs with traditional surface adhesion methods. The polyurethane waterproof coating 22 covers the outer surface of the epoxy resin coating 21, forming a continuous flexible protective film. The two coatings complement each other, together constituting a composite protective coating.
[0035] In one specific embodiment, when the cofferdam seepage prevention structure is subjected to temperature changes and mechanical stress, the permeation bonding structure of the epoxy resin coating 21 can maintain a stable connection with the seepage prevention membrane layer and will not peel off due to thermal expansion and contraction. The flexible characteristics of the polyurethane waterproof coating 22 can adapt to the slight deformation of the structure. The two coatings work together to ensure that the protective functional layer 2 can maintain good sealing performance under various working conditions.
[0036] In this embodiment of the present invention, the epoxy resin coating 21 forms an integrated structure with the high-density polyethylene geomembrane layer 12 through a permeation method. The bonding strength is far greater than that of traditional physical adhesion methods. The coverage of the polyurethane waterproof coating 22 further enhances the overall protective performance. The different bonding mechanisms of the two coatings work together to significantly improve the reliability and durability of the protective functional layer 2.
[0037] In some embodiments, the epoxy resin coating 21 and the polyurethane waterproof coating 22 have the same thickness.
[0038] In this invention, the epoxy resin coating 21 and the polyurethane waterproof coating 22 are configured with equal thickness. This equal thickness design allows the two coatings with different properties to deform in a coordinated manner when subjected to external loads, avoiding stress concentration caused by thickness differences and ensuring the overall stability of the composite protective coating.
[0039] Specifically, the epoxy resin coating 21, as a rigid layer, mainly provides chemical protection and sealing, while the polyurethane waterproof coating 22, as a flexible layer, mainly provides elastic cushioning and adaptive protection. When the two layers are of equal thickness, under external stress, the strain of the rigid and flexible layers can remain consistent, avoiding stress gradient changes caused by uneven thickness and reducing the generation of interfacial shear stress.
[0040] In a specific embodiment, when the cofferdam seepage prevention structure is subjected to periodic loads caused by water level changes, the epoxy resin coating 21 and polyurethane waterproof coating 22 of equal thickness can respond synchronously to load changes. The rigid layer provides structural support, and the flexible layer provides deformation compensation. The two work in coordination to avoid performance defects that may be caused by excessively thick or thin single layers, and ensure the long-term stability of the composite protective coating.
[0041] In this embodiment of the present invention, the equal thickness design of the epoxy resin coating 21 and the polyurethane waterproof coating 22 fully considers the balance between rigid sealing and flexible toughness. Compared with the traditional single thickness consideration method, the equal thickness configuration makes the composite protective coating have better coordination and integrity, and improves the comprehensive performance of the protective functional layer 2.
[0042] like Figure 2 As shown, in some embodiments, the high-density polyethylene geomembrane layer 12 is fixed to the outer surface of the geotextile layer 11 by hot-melt welding.
[0043] In this invention, the high-density polyethylene geomembrane layer 12 is fixed to the outer surface of the geotextile layer 11 by hot-melt welding. The hot-melt welding process causes the geomembrane layer and the geotextile layer 11 to bond at the molecular level under heating conditions, forming a connection structure that is more robust than mechanical fixing or adhesive bonding, thus ensuring the integrity and reliability of the anti-seepage functional layer 1.
[0044] Specifically, during the hot-melt welding process, the high-density polyethylene geomembrane layer 12 softens under high temperature, physically interlocking and chemically bonding with the fiber structure of the geotextile layer 11, forming an integrated composite structure after cooling. This connection method avoids the problem of adhesive aging and failure, and also eliminates stress concentration points that may be generated by mechanical connections, making the geomembrane layer and the geotextile layer 11 a whole load-bearing unit.
[0045] In one specific embodiment, when the cofferdam seepage prevention structure is used for a long period of time while submerged in water, the hot-melt welded connection will not fail due to water erosion, nor will it cause thermal stress cracking due to temperature changes. The seepage prevention membrane layer and the geotextile layer 11 maintain a stable connection. Even under greater water pressure, the two layers of materials can work together to bear the load, preventing the connection from becoming a weak link in the seepage prevention.
[0046] In this embodiment of the invention, the hot-melt welding connection eliminates the problems of adhesive aging and stress concentration at mechanical fixing points. It forms an integrated structure through molecular-level bonding. Compared with traditional connection methods, hot-melt welding connection has higher bonding strength, better durability and stronger environmental adaptability.
[0047] In some embodiments, the thickness of the geotextile layer 11 is the same as the thickness of the high-density polyethylene geomembrane layer 12.
[0048] In this invention, the thickness of the geotextile layer 11 is set to be the same as the thickness of the high-density polyethylene geomembrane layer 12. This equal thickness configuration ensures that the two sub-layers inside the anti-seepage functional layer 1 have similar deformation resistance when subjected to external loads, avoids uneven stress distribution caused by thickness differences, and ensures the overall coordination of the anti-seepage functional layer 1.
[0049] Specifically, the geotextile layer 11 serves as a protective and transitional layer, primarily functioning as a buffer and stress-dispersing layer, while the high-density polyethylene geomembrane layer 12 acts as the main geomembrane layer, undertaking the primary seepage prevention function. When the two layers are of equal thickness, under the same external pressure, the compression deformation of the geotextile layer 11 and the geomembrane layer is similar, reducing interlayer relative slippage and shear deformation, and lowering the risk of interface failure.
[0050] In a specific embodiment, when the bottom of the cofferdam is subjected to a large earth pressure, the geotextile layer 11 of equal thickness can provide sufficient buffer protection for the geomembrane layer. The two layers of materials deform synchronously, and the geotextile layer 11 effectively disperses the concentrated load. The geomembrane layer works under uniform stress, avoiding the problem of the geomembrane being damaged due to the protective layer being too thin, or the overall stiffness being too large due to the protective layer being too thick.
[0051] In this embodiment of the utility model, the equal thickness design of the geotextile layer 11 and the high-density polyethylene geomembrane layer 12 fully considers the needs of stress balance and protection coordination. Compared with the traditional independent thickness design, the equal thickness configuration achieves the best balance between protection function and seepage prevention function, and improves the overall performance and reliability of the seepage prevention functional layer 1.
[0052] In some embodiments, the overall thickness of the reinforcing functional layer 3 is 2-4 times the overall thickness of the impermeable functional layer 1.
[0053] In this invention, the overall thickness of the reinforcing functional layer 3 is set to be 2-4 times the overall thickness of the anti-seepage functional layer 1. This thickness ratio ensures that the reinforcing functional layer 3 has sufficient rigidity and impact resistance to protect the flexible anti-seepage system below. A balance between structural protection and material economy is achieved through a reasonable thickness ratio.
[0054] Specifically, the reinforced functional layer 3, as the outermost protective structure, needs to withstand various mechanical impacts, soil pressures, and construction loads from the outside. The relatively thick design provides sufficient buffer depth and load-bearing capacity. A thickness ratio of 2-4 times ensures effective protection of the underlying flexible structure while avoiding material waste and increased self-weight caused by excessive thickening. This ratio range represents the optimal balance between protective effectiveness and economy.
[0055] In one specific embodiment, when construction machinery operates on the surface of the cofferdam, the sufficiently thick reinforcement functional layer 3 can effectively disperse and absorb mechanical loads, preventing concentrated loads from being directly transmitted to the lower anti-seepage functional layer 1 and protective functional layer 2. Even under large impact, the reinforcement functional layer 3 can maintain structural integrity and provide reliable mechanical protection for the inner layer.
[0056] In this embodiment of the present invention, the thickness ratio of the reinforcing functional layer 3 to the impermeable functional layer 12-4 times is based on a comprehensive consideration of structural mechanics and protection requirements. Compared with the traditional empirical thickness configuration, this ratio design not only ensures sufficient protection effect, but also achieves economical use of materials and improves the overall cost-effectiveness of the structure.
[0057] like Figure 4 As shown, in some embodiments, the reinforcing functional layer 3 includes: a steel mesh layer 31, laid on the outer surface of the protective functional layer 2; a gravel layer 32, embedded in the mesh of the steel mesh layer 31; and a crack-resistant mortar layer 33, poured into the gaps of the gravel layer 32 and covering the entire outer surface of the steel mesh layer 31 and the gravel layer 32.
[0058] In this utility model, the reinforcing functional layer 3 includes a ternary combination structure of a steel mesh layer 31, a gravel layer 32, and a crack-resistant mortar layer 33. The steel mesh layer 31 is laid on the outer surface of the protective functional layer 2 to provide tensile strength. The gravel layer 32 is embedded in the mesh of the steel mesh layer 31 to form aggregate support. The crack-resistant mortar layer 33 is poured into the gaps of the gravel layer 32 and covers the entire outer surface. The three are interlocked and form an integrated rigid protective structure through pouring and binding.
[0059] Specifically, the steel mesh layer 31 forms an integral load-bearing skeleton, transferring and dispersing external loads through the steel bars. The gravel layer 32, as granular aggregate, is embedded in the mesh openings and forms a composite load-bearing system with the steel bars, providing both good permeability and enhanced overall rigidity. The crack-resistant mortar layer 33 is poured into the gravel gaps, binding the discrete gravel particles into a whole, while simultaneously covering the outer surfaces of the steel mesh layer 31 and the gravel layer 32, forming a continuous protective surface layer.
[0060] In a specific embodiment, when the cofferdam is subjected to water scouring and soil lateral pressure, the steel mesh layer 31 first bears the tensile stress and transfers the load to the gravel layer 32 embedded in the mesh. The gravel layer 32 bears the compressive stress through the mutual compression and friction between the particles. The crack-resistant mortar layer 33 binds the entire system together. The three work together to form a protective shell that is both strong and tough, effectively protecting the internal protective functional layer 2 and the anti-seepage functional layer 1.
[0061] In this embodiment of the invention, the ternary interlocking combination of the steel mesh layer 31, the gravel layer 32, and the crack-resistant mortar layer 33 fully utilizes the advantages of each material. The steel bars provide tensile strength, the gravel provides compressive strength and permeability, and the mortar provides integrity and surface protection. Compared with traditional single or simple combination structures, the ternary interlocking structure has superior comprehensive performance and stronger environmental adaptability.
[0062] In some embodiments, the gravel layer 32 is graded gravel.
[0063] In this invention, the gravel layer 32 uses graded gravel. By rationally combining gravel of different particle sizes, the best balance between density and permeability is achieved. The graded design enables the gravel layer 32 to have both good load-bearing capacity and sufficient drainage function, thus optimizing the overall performance of the reinforced functional layer 3.
[0064] Specifically, graded gravel is prepared according to a certain particle size distribution ratio. Large-diameter gravel forms the main load-bearing skeleton, providing structural strength; medium-diameter gravel fills the gaps between large particles, increasing density; and small-diameter gravel further fills the fine gaps, forming a stable granular structure. This gradation combination ensures sufficient porosity for drainage while maintaining sufficient density to bear the load.
[0065] In one specific embodiment, when rainwater or infiltrated water enters the reinforced functional layer 3, the continuous porous network of the graded gravel can quickly drain the water, preventing water pressure accumulation from damaging the underlying structure. Simultaneously, the dense structure of the graded gravel can effectively bear and disperse the upper load, transforming concentrated stress into a uniformly distributed surface load, thus reducing the impact on the lower protective functional layer 2.
[0066] In this embodiment of the utility model, the graded gravel achieves complementary advantages of multiple gravel sizes through a scientific particle size distribution design. Compared with gravel of a single particle size or simple proportion, the graded gravel maintains good permeability while having higher load-bearing capacity and better structural stability, thus improving the overall performance of the gravel layer 32.
[0067] In some embodiments, the geotextile layer 11 is a non-woven geotextile.
[0068] In this invention, the geotextile layer 11 is made of non-woven geotextile. The fiber structure and manufacturing process of non-woven geotextile give it excellent permeability and filtration performance, while maintaining good tensile strength and durability, providing ideal basic protection for the high-density polyethylene geomembrane layer 12.
[0069] Specifically, nonwoven geotextiles are made of fibers bonded together by mechanical, thermal, or chemical methods to form a three-dimensional porous structure. This structure allows water to pass through while preventing soil particle loss, thus providing excellent filtration. The fibers in nonwoven geotextiles are evenly distributed and have isotropic tensile strength, unlike woven geotextiles which exhibit differences in warp and weft strength, providing uniform support and protection for the geomembrane layer.
[0070] In one specific embodiment, when the foundation of the cofferdam is uneven or has sharp particles, the thickness and flexibility of the nonwoven geotextile can effectively buffer the impact of these adverse factors on the geomembrane. Its porous structure allows water from the foundation to pass through without forming water pockets under the geotextile, thus avoiding damage to the geomembrane from local water pressure. At the same time, its good puncture resistance prevents sharp objects from piercing the geomembrane.
[0071] In this embodiment of the invention, the three-dimensional porous structure and isotropic characteristics of the nonwoven geotextile have better permeability, filtration and protection than woven geotextile. The uniform fiber distribution of the nonwoven geotextile provides a more stable and reliable foundation protection for the impermeable membrane layer, thereby improving the overall performance of the impermeable functional layer 1.
[0072] like Figure 6 As shown, in some embodiments, the cofferdam seepage prevention structure is laid on the top surface, the water-facing surface, or the back surface of the cofferdam body a.
[0073] In this invention, the cofferdam seepage prevention structure can be laid on the top surface, the water-facing side surface, or the back surface of the cofferdam body a. This multi-site applicable design greatly improves the adaptability and reliability of the cofferdam seepage prevention system and can provide targeted protection measures for different leakage risk points.
[0074] Specifically, the top surface paving primarily prevents rainwater and surface runoff from seeping into the cofferdam. The water-facing surface paving directly blocks water seepage from the reservoir or river. The backwater surface paving serves as the final seepage barrier, preventing further diffusion of seepage water through the cofferdam body. The paving of different parts can be flexibly selected according to specific engineering needs and geological conditions; they can be used individually or in combination.
[0075] In a specific embodiment, for cofferdam projects with high water levels and long-term water storage, a cofferdam seepage prevention structure can be laid on the water-facing side to directly block water seepage. In areas with more rainfall, a structure can be laid on the top surface to prevent rainwater from seeping in. In areas with complex geological conditions, multiple sections can be laid simultaneously to form multiple seepage prevention protections and ensure the overall seepage prevention effect of the cofferdam.
[0076] In this embodiment of the utility model, the multi-part applicable design of the cofferdam seepage prevention structure provides a flexible application scheme. Compared with the traditional single-part seepage prevention measures, the multi-part laying can form a three-dimensional seepage prevention network, which significantly improves the reliability and safety of the cofferdam seepage prevention system and provides better adaptability to different engineering conditions.
[0077] In some embodiments, the diameter of the reinforcing bars in the reinforcing mesh layer 31 is 6-12mm, and the mesh spacing is 100-200mm.
[0078] In this invention, the diameter of the steel bars in the steel mesh layer 31 is set to 6-12mm, and the mesh spacing is set to 100-200mm. This geometric parameter configuration achieves the best balance between material usage and construction convenience while ensuring structural strength, and ensures that the reinforced functional layer 3 has sufficient load-bearing capacity.
[0079] Specifically, the 6-12mm diameter of the reinforcing bars provides sufficient tensile strength to withstand external loads while avoiding material waste and construction difficulties caused by excessively thick bars. The 100-200mm mesh spacing ensures that the gravel can be effectively embedded in the mesh to form a composite structure, while maintaining the overall stiffness and load transfer capacity of the reinforcing mesh. This combination of parameters enables the reinforcing mesh layer 31 to effectively perform its structural reinforcement function.
[0080] In some embodiments, the thickness of the crack-resistant mortar layer 33 is 30-80 mm.
[0081] In this invention, the thickness of the crack-resistant mortar layer 33 is set to 30-80mm. This thickness range ensures sufficient coverage and protection for the steel mesh layer 31 and the gravel layer 32, while avoiding material waste and increased weight caused by excessive thickness, thus achieving the best balance between protective function and economy.
[0082] Specifically, the minimum thickness of 30mm ensures that the mortar can completely cover the largest particles of the gravel layer 32 and form a continuous protective surface layer, while the maximum thickness limit of 80mm avoids unnecessary material consumption and increased structural weight. Within this thickness range, the crack-resistant mortar layer 33 can effectively resist the erosion of the external environment, providing long-term protection for the internal steel mesh layer 31 and gravel layer 32.
[0083] In some embodiments, the particle size of the graded gravel is 5-50 mm.
[0084] In this invention, the particle size of the graded gravel is set to 5-50mm. This particle size range achieves the optimal combination of density and permeability of the gravel layer 32. Through the reasonable combination of large and small particles, a stable and permeable aggregate structure is formed, which optimizes the drainage and bearing performance of the reinforced functional layer 3.
[0085] Specifically, gravel with a minimum diameter of 5mm fills the small gaps between larger particles, improving the density and load-bearing capacity of the gravel layer 32. Gravel with a maximum diameter of 50mm forms the main load-bearing skeleton, providing structural strength. After proper gradation, gravel within this size range maintains a continuous porous network to facilitate drainage and forms a stable granular structure to bear the load.
[0086] In some embodiments, the density of the high-density polyethylene geomembrane layer 12 is 0.94-0.97 g / cm³. 3 .
[0087] In this invention, the density of the high-density polyethylene geomembrane layer 12 is set to 0.94-0.97 g / cm³. 3 This density range ensures that the geomembrane possesses excellent seepage prevention and mechanical properties, maintaining good flexibility and construction adaptability while guaranteeing seepage prevention effectiveness.
[0088] Specifically, 0.94-0.97 g / cm³ 3 The density range allows the high-density polyethylene geomembrane layer 12 to have a dense molecular structure, effectively preventing the penetration of water molecules while maintaining appropriate flexibility to adapt to unevenness of the substrate and minor deformation of the structure. Within this density range, the geomembrane exhibits good tensile strength, tear resistance, and aging resistance, enabling it to operate stably for extended periods under various environmental conditions.
[0089] The device embodiments described above are merely illustrative. The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the modules can be selected to achieve the purpose of this embodiment according to actual needs. Those skilled in the art can understand and implement this without any creative effort.
[0090] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this utility model, and not to limit it. Although this utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this utility model.
Claims
1. A cofferdam seepage prevention structure, characterized in that, It includes an anti-seepage functional layer (1), a protective functional layer (2), and a reinforcement functional layer (3) laid on the surface of the cofferdam body and arranged sequentially in the direction away from the cofferdam body. The impermeable functional layer (1) includes a geotextile layer (11) that adheres to the surface of the cofferdam body and a high-density polyethylene impermeable membrane layer (12) disposed on the outside of the geotextile layer (11). The protective functional layer (2) includes an epoxy resin coating (21) and a polyurethane waterproof coating (22) coated on the outer surface of the impermeable functional layer (1). The epoxy resin coating (21) and the polyurethane waterproof coating (22) form a composite protective coating that combines rigid sealing with flexible toughness. The reinforcement functional layer (3) is used to provide overall structural reinforcement and impact protection for the impermeable functional layer (1) and the protective functional layer (2).
2. The cofferdam seepage prevention structure according to claim 1, characterized in that, The epoxy resin coating (21) penetrates to the surface of the high-density polyethylene geomembrane layer (12) and forms an integrated structure therewith, and the polyurethane waterproof coating (22) covers the outer surface of the epoxy resin coating (21).
3. The cofferdam seepage prevention structure according to claim 1, characterized in that, The epoxy resin coating (21) and the polyurethane waterproof coating (22) have the same thickness.
4. The cofferdam seepage prevention structure according to claim 1, characterized in that, The high-density polyethylene geomembrane layer (12) is fixed to the outer surface of the geotextile layer (11) by hot-melt welding.
5. The cofferdam seepage prevention structure according to claim 1, characterized in that, The thickness of the geotextile layer (11) is the same as the thickness of the high-density polyethylene geomembrane layer (12).
6. The cofferdam seepage prevention structure according to claim 1, characterized in that, The overall thickness of the reinforced functional layer (3) is 2-4 times the overall thickness of the impermeable functional layer (1).
7. The cofferdam seepage prevention structure according to claim 1, characterized in that, The reinforced functional layer (3) includes: A steel mesh layer (31) is laid on the outer surface of the protective functional layer (2); The gravel layer (32) is embedded in the mesh of the steel mesh layer (31); A crack-resistant mortar layer (33) is poured into the gaps of the gravel layer (32) and covers the entire outer surface of the steel mesh layer (31) and the gravel layer (32).
8. The cofferdam seepage prevention structure according to claim 7, characterized in that, The gravel layer (32) is graded gravel.
9. The cofferdam seepage prevention structure according to claim 1, characterized in that, The geotextile layer (11) is a non-woven geotextile.
10. The cofferdam seepage prevention structure according to any one of claims 1-9, characterized in that, The seepage prevention structure of the cofferdam is laid on the top surface, the water-facing side surface, or the back surface of the cofferdam body.