A blocking auxiliary device for dam breach
By combining piles and grids with excavator operation, rapid and stable sealing of breaches in earthen embankments was achieved, solving the problem of sealing materials being easily washed away in traditional methods and improving sealing efficiency and stability.
Patent Information
- Application Number
- CN202522769097.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-26
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-26
AI Technical Summary
Existing dam breach sealing technologies mostly rely on large machinery, making it difficult to quickly and effectively form stable seals on earthen dams. Especially in large-scale dam failure accidents, traditional methods are prone to the sealing materials being washed away due to their light weight, difficulty in positioning, and poor erosion resistance, which can easily lead to dam failure again.
A sealing auxiliary device including piles, grids, and pile drivers was designed. The piles are inserted into the bottom mud of the dam, the grids block and allow water to pass through, and the piles are supported on the back side. When used with an excavator, the grids and piles are quickly installed by the pile drivers, and a stable seal is formed with the water-blocking material.
It improves the efficiency and stability of dam breach sealing, reduces the amount of water-blocking materials used, has a simple structure, low cost, and is easy to promote on a large scale.
Smart Images

Figure CN225014082U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of dam breach sealing technology, and in particular to an auxiliary device for sealing dam breaches. Background Technology
[0002] Existing dam breach sealing technologies mostly utilize specialized equipment and heavy machinery, making them unsuitable for large-scale earthen dam structures prone to frequent collapses. Earthen dams, subjected to long-term scouring by water flow, wave erosion, and seepage, are susceptible to localized collapse and breaches. Once a breach occurs, the significant difference in water level and rapid flow velocity mean that traditional sealing methods, such as throwing sandbags, stones, or even mechanically bulldozing, are often ineffective. These methods are hampered by the light weight, difficulty in positioning, and lack of erosion resistance of the materials, causing them to be quickly dispersed by the rushing water. Furthermore, sand-based seals, due to their soft foundation, are highly susceptible to further dam failures.
[0003] Therefore, there is an urgent need for a quick-closing auxiliary device that is simple in structure, easy to install, and can be used with common engineering machinery (such as excavators) to efficiently and safely complete the breach sealing task in conjunction with water-blocking materials. Utility Model Content
[0004] The purpose of this invention is to provide an auxiliary device for sealing breaches in dikes, which solves the problems existing in the prior art. It has a simple structure, is easy to install, and can improve the efficiency and stability of sealing breaches in dikes.
[0005] This utility model provides an auxiliary device for sealing breaches in dams, comprising a pile, a grid, and a pile driver. The pile is inserted into the bottom mud at the breach, and the top sidewall of the pile has two radially opposite first pin holes through which pins are inserted. The top of the grid has a connecting part for connecting to excavator bucket teeth, and the bottom end of the grid is inserted into the bottom mud at the breach. The grid has mesh openings that can block water-retaining materials while allowing water to pass through. The front side of the grid is the water-facing side, and the back side of the grid abuts against the pile. The pile driver includes a fixed base and a connecting base. The fixed base has a through hole for inserting the pile, and the through hole can engage with the pin to prevent the pile from falling out of the fixed base. The connecting base is fixedly connected to the fixed base and is used to fit onto the excavator bucket teeth.
[0006] As one embodiment, the bottom end of the pile has a first tip for insertion into the bottom mud.
[0007] In one embodiment, the grid includes a frame and a mesh, the bottom end of the frame being inserted into the bottom mud, the mesh being fixed to the frame, and the mesh having the mesh openings.
[0008] In one embodiment, the frame includes multiple horizontal bars and vertical bars, which are welded and fixed together. The mesh is fixedly connected to the horizontal bars and / or the vertical bars, and the bottom end of the vertical bars has a second tip for insertion into the bottom mud.
[0009] As one embodiment, the mesh is welded and fixed to the horizontal bar and / or the vertical bar.
[0010] In one embodiment, the height of the pile is greater than the height of the grid.
[0011] In one embodiment, the fixing base is a plate-shaped structure, and the connecting surfaces of the fixing base and the connecting base are perpendicular to each other.
[0012] As one embodiment, the fixing base and the connecting base are welded together.
[0013] As one embodiment, the side wall of the connecting seat has a second pin hole for inserting the bucket tooth pin.
[0014] As one embodiment, a pull ring is provided at one end of the pin.
[0015] Compared with the prior art, this utility model has the following technical advantages: In this invention, the mesh openings on the grating allow water to pass through. When installed at a dam breach, the grating reduces the impact of the water flow, preventing it from being washed away. Furthermore, the mesh openings also block water-retaining materials, preventing them from being washed away, thus improving the efficiency of sealing the dam breach and appropriately reducing the amount of water-retaining material needed. The piles in this invention are located on the backwater side of the grating, providing support for the grating and the initial water-retaining material, further enhancing the grating's stability. The pile driver in this invention, combined with a pin, allows for quick installation of the piles onto the bucket, improving installation efficiency. Moreover, the sealing auxiliary device in this invention has a simple structure, low manufacturing cost, and is easy to widely implement. Attached Figure Description
[0016] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0017] Figure 1 This is a schematic diagram of a sealing auxiliary device installed at a breach in a dam, according to one embodiment of the present invention. Figure 2 This is a schematic diagram of the fit between the pile body and the pin shaft in one embodiment of the present invention; Figure 3 This is a schematic diagram of the structure of the grille in one embodiment of the present invention; Figure 4 This is a schematic diagram of the pile driver in one embodiment of the present invention; Figure 5 for Figure 4 Side view; Figure 6 This is a schematic diagram of the cooperation structure between the pile driver, the pin, and the pile body in one embodiment of this utility model; Figure 7 This is a schematic diagram illustrating the cooperation between the column and the excavator bucket through a pile driver in one embodiment of this utility model.
[0018] 1. Pile body; 2. Grating; 21. Horizontal bar; 22. Vertical bar; 23. Mesh sheet; 3. Pile driver; 31. Fixing seat; 311. Through hole; 32. Connecting seat; 321. Second pin hole; 4. Pin shaft; 41. Pull ring; 5. Bucket. Detailed Implementation
[0019] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0020] The purpose of this invention is to provide an auxiliary device for sealing breaches in dikes, which solves the problems existing in the prior art. It has a simple structure, is easy to install, and can improve the efficiency and stability of sealing breaches in dikes.
[0021] To make the above-mentioned objectives, features and advantages of this utility model more apparent and understandable, the utility model will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0022] like Figures 1-7As shown, this embodiment provides an auxiliary device for sealing a dam breach, including a pile body 1, a grid 2, and a pile driver 3. In this embodiment, the pile body 1 is a steel pile, specifically, the pile body 1 is a steel section with an I-shaped, circular, or channel-shaped cross-section. The pile body 1 is inserted into the bottom mud at the dam breach, with its top protruding from the bottom mud to abut against the grid 2. The top side wall of the pile body 1 has two first pin holes arranged radially opposite each other, and a pin 4 is inserted into the first pin holes. The top of the grid 2 is provided with a connecting part for connecting to the bucket teeth of an excavator, and the bottom end is inserted into the bottom mud at the dam breach. The part protruding from the bottom mud is used to block water-retaining materials. The grid 2 has mesh holes that can block water-retaining materials and allow water to pass through. When the grid 2 is inserted into the dam, it is placed close to the pile body 1, with the front side of the grid 2 being the water-facing side and the back side of the grid 2 abutting against the pile body 1. The pile driver 3 includes a fixed base 31 and a connecting base 32. The fixed base 31 is provided with a through hole 311 for inserting the pile body 1. The diameter of the through hole 311 is slightly larger than that of the pile body 1, so that the pile driver 3 can move along the pile body 1, but the pile body 1 will not shake violently in the through hole 311. The through hole 311 can be engaged with the pin 4 to prevent the pile body 1 from falling out of the fixed base 31. The connecting base 32 is fixedly connected to the fixed base 31 and is used to fit onto the excavator bucket teeth.
[0023] In use, firstly, the connecting seat 32 is fitted onto the bucket teeth of the excavator to fix the pile driver 3 onto the bucket 5; then, the top of the pile 1 passes through the through hole 311 on the fixing seat 31. When the first pin hole (not shown in the figure) is above the through hole 311, the pin 4 is inserted into the first pin hole. The pin 4 can be engaged at the through hole 311 to prevent the pile 1 from coming out of the through hole 311 when the excavator bucket 5 lifts it; then, the excavator lifts and transfers the pile 1 through the bucket 5 until the pile 1 reaches the designated location. After positioning, the pile body 1 is repeatedly pressed down using the shovel head (usually by repeatedly hammering the pile body 1 downwards using the inner surface of the bucket 5) to insert the pile body 1 into the bottom mud. Then, the pin 4 is removed, allowing the bucket 5, along with the pile hammer 3, to detach from the top of the pile body 1. The bucket teeth of the bucket 5 connect to the connecting part at the top of the grid 2. The connecting part can be a connecting plate with insertion holes for the bucket teeth to insert. The bucket 5 places the grid 2 on the water-facing side of the pile body 1. After the bucket 5 is disconnected from the connecting part, the bucket 5 presses down on the grid 2, inserting the bottom of the grid 2 into the bottom mud. Finally, earth, stones, sandbags, and other retaining materials are gradually piled up on the water-facing surface of the grid 2 to complete the sealing of the dam breach.
[0024] In this embodiment, the mesh openings on the grid 2 allow water to pass through. When the grid 2 is installed at a breach in the dam, it reduces the impact of the water flow at the breach, preventing the grid 2 from being washed away. Furthermore, the mesh openings on the grid 2 can block the water-retaining material, preventing it from being washed away by the water flow, thus improving the efficiency of sealing the dam breach and appropriately reducing the amount of water-retaining material used. In this embodiment, the pile body 1 is located on the backwater side of the grid 2, providing support for the grid 2 and the initial water-retaining material, further improving the stability of the grid 2. In this embodiment, the pile driver 3, in conjunction with the pin 4, can quickly install the pile body 1 onto the bucket 5, improving installation efficiency. Moreover, the sealing auxiliary device in this embodiment has a simple structure, low manufacturing cost, and is easy to widely promote.
[0025] Figure 7 In the illustration, the connecting seat 32 is not fully fitted onto the bucket teeth, but this is only for illustrative purposes. In actual operation, the connecting seat 32 can be fully fitted onto the bucket teeth.
[0026] In this embodiment, the diameter of the pin 4 is matched with that of the first pin hole, and there is a certain friction, which reduces the possibility of the pin 4 coming out of the first pin hole when the pile body 1 is tilted; in this embodiment, a pull ring 41 is provided at one end of the pin 4; in use, the pull ring 41 is connected to the pull rope, and during the fixing process of the pile body 1, the worker can always pull one end of the pull rope, but will not exert a pulling force on the pin 4; after the pile body 1 is fixed, the worker can pull the pull rope to pull the pin 4 out of the first pin hole, and the fixing seat 31 can move upward along the pile body 1 without being restricted by the pin 4, the bucket 5 is lifted, and the fixing seat 31 comes out from the top of the pile body 1.
[0027] To facilitate the insertion of the pile body 1 into the bottom mud, in this embodiment, the bottom end of the pile body 1 has a conical first tip. In this embodiment, the pile body 1 is longer than the grid 2, and the length of the pile body 1 inserted into the bottom mud is greater than that of the grid 2, to ensure that the pile body 1 is sufficiently firm and can provide sufficient support for the grid 2. In this embodiment, even after the pile body 1 has been inserted into the bottom mud to a certain length, the portion exposed in the bottom mud is still longer than the portion of the grid 2 exposed in the bottom mud. Figure 1 As shown.
[0028] like Figure 3 As shown, in this embodiment, the grid 2 includes a frame and a mesh 23. The bottom end of the frame is inserted into the bottom mud, and the mesh 23 is fixed to the frame, having mesh openings. In this embodiment, the frame is a steel structure frame to ensure sufficient impact resistance. The mesh 23 can be a metal mesh, a perforated metal plate, or a high-strength perforated plastic plate. To facilitate welding the mesh 23 to the frame, a perforated metal plate can be selected.
[0029] In this embodiment, the frame includes multiple horizontal bars 21 and vertical bars 22, which are welded and fixed together. The mesh 23 is fixedly connected to the horizontal bars 21 and / or vertical bars 22, and the bottom end of the vertical bar 22 has a conical second tip for insertion into the bottom mud.
[0030] In this embodiment, the mesh 23 is welded and fixed to the horizontal bar 21 and / or the vertical bar 22.
[0031] In this embodiment, the fixing seat 31 is a plate-shaped structure, and the connecting surfaces of the fixing seat 31 and the connecting seat 32 are welded vertically.
[0032] In this embodiment, the shape of the connecting seat 32 is adapted to the shape of the bucket teeth, and the side wall of the connecting seat 32 has a second pin hole 321 for inserting the bucket tooth pin. The bucket teeth have holes that are directly opposite the second pin hole 321. By using the bucket tooth pin to pass through the bucket teeth and the connecting seat 32, the pile driver 3 can be quickly assembled and disassembled.
[0033] Any adaptive changes made according to actual needs are within the protection scope of this utility model.
[0034] This utility model uses specific examples to illustrate its principles and implementation methods. The above description of the embodiments is only for the purpose of helping to understand the method and core idea of this utility model. At the same time, for those skilled in the art, there will be changes in the specific implementation methods and application scope based on the idea of this utility model. In summary, the content of this specification should not be construed as a limitation of this utility model.
Claims
1. A device for assisting the closure of a breach in a dam, characterized in that, include: The pile body is inserted into the bottom mud at the breach of the dam. The top side wall of the pile body has two first pin holes arranged radially opposite each other, and a pin is inserted into the first pin hole. The grid has a connecting part at the top for connecting to the bucket teeth of an excavator, and the bottom end of the grid is inserted into the bottom mud at the breach of the dam. The grid has mesh holes that can block water-retaining materials and allow water to pass through. The front side of the grid is the water-facing side, and the back side of the grid abuts against the pile body. The equipment includes a pile driver, which comprises a fixed base and a connecting base. The fixed base has a through hole for inserting the pile body, and the through hole can be engaged with the pin to prevent the pile body from falling out of the fixed base. The connecting base is fixedly connected to the fixed base and is used to be sleeved on the excavator bucket teeth.
2. A device for assisting the closure of a breach in a dam according to claim 1, characterized in that, The bottom end of the pile has a first tip for insertion into the bottom mud.
3. The auxiliary device for sealing breaches in dikes according to claim 1, characterized in that, The grid includes a frame and a mesh, the bottom end of the frame is inserted into the bottom mud, the mesh is fixed to the frame, and the mesh has the mesh holes.
4. The auxiliary device for sealing breaches in dikes according to claim 3, characterized in that, The frame includes multiple horizontal and vertical bars, which are welded and fixed together. The mesh is fixedly connected to the horizontal and / or vertical bars, and the bottom end of the vertical bar has a second tip for insertion into the bottom mud.
5. The auxiliary device for sealing breaches in dikes according to claim 4, characterized in that, The mesh is welded and fixed to the horizontal bar and / or the vertical bar.
6. The auxiliary device for sealing breaches in dikes according to claim 1, characterized in that, The height of the pile is greater than the height of the grid.
7. The auxiliary device for sealing breaches in dikes according to claim 1, characterized in that, The fixing base has a plate-like structure, and the connecting surfaces of the fixing base and the connecting base are perpendicular to each other.
8. The auxiliary device for sealing breaches in dikes according to claim 7, characterized in that, The fixed base and the connecting base are welded together.
9. The auxiliary device for sealing breaches in dikes according to claim 1, characterized in that, The side wall of the connecting seat has a second pin hole for inserting the bucket tooth pin.
10. The auxiliary device for sealing breaches in dikes according to claim 1, characterized in that, A pull ring is provided at one end of the pin.
