A kind of installation device of cold region channel side slope lining plate

By using mechanical equipment with a track and truss system to install channel slope lining slabs, the safety hazards and high costs of manual installation of channel lining slabs have been solved, achieving efficient and safe channel lining construction.

CN225014087UActive Publication Date: 2026-11-24HEILONGJIANG SONGLIAO CONSTR ENG CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202522758279.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-26
Publication Date
2026-11-24
Estimated Expiration
2035-12-26

AI Technical Summary

Technical Problem

The installation of existing channel lining panels mainly relies on manual labor, which poses safety hazards, high costs, and low construction efficiency.

Method used

The installation is carried out using mechanical equipment consisting of tracks, trusses, and precast slab installation platforms, including parallel top and bottom ramp tracks, trusses, gantry mechanisms, and lifting platforms. This mechanical equipment avoids manual operation.

Benefits of technology

It improves construction efficiency, reduces safety risks and construction costs, and is applicable to slope construction with different slopes and lengths, achieving efficient installation of channel lining panels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225014087U_ABST
    Figure CN225014087U_ABST
Patent Text Reader

Abstract

This utility model relates to the field of high-standard farmland construction technology in cold regions. A device for installing lining slabs on canal slopes in cold regions includes a track comprising parallel top and bottom tracks, installed at the top and bottom of the canal slope respectively; a truss comprising a frame and a portal mechanism, with a transmission mechanism mounted on the frame and a precast slab installation platform mounted on the transmission mechanism, the platform being movable along the truss; the portal mechanism is slidably mounted on the tracks and includes an adjustment mechanism fixedly connected to the frame; the precast slab installation platform is a lifting platform with a precast lining slab loading and unloading mechanism. This utility model employs mechanized lining installation, avoiding damage to the sand cushion layer during manual installation, and ensuring accurate control of the overall installation precision and flatness of the precast slabs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of high-standard farmland construction technology in cold regions, specifically to a channel slope lining plate device. Background Technology

[0002] In the construction of high-standard farmland in cold regions, water conservancy facilities are the core projects for ensuring food security, and their quality directly determines the region's agricultural productivity. As a key carrier for irrigation water conveyance, canals must directly face the special challenges of freeze-thaw cycles and agricultural machinery compaction in cold regions; therefore, canal lining becomes crucial.

[0003] In farmland irrigation projects in the cold regions of Northeast China, canal lining has formed a technical system dominated by precast concrete lining slabs. The advantages of concrete lining slabs are mainly reflected in their core performance adapting to the needs of cold regions: ① Strong frost resistance, able to cope with extreme low temperatures of -30℃ and freeze-thaw cycles; ② Excellent seepage prevention, reducing irrigation water leakage. Although existing technologies have shortcomings, the lining slabs themselves still significantly improve the seepage prevention effect compared to traditional processes; ③ Convenient and efficient construction: prefabricated production and rapid on-site assembly reduce the dependence on the environment for on-site pouring and meet the time requirements of farmland projects; ④ Good structural stability: the overall integrity is improved through designs such as seamless or flexible connections, which can resist loads such as agricultural machinery rolling to a certain extent. Combined with measures such as insulation layers, the adaptability to cold regions can be enhanced; ⑤ Mature technology and easy to promote: concrete lining slabs have formed a complete set of prefabrication processes and have been applied in many high-standard farmland projects.

[0004] A channel lining machine is a type of mechanical equipment used in water conservancy construction, primarily for the concrete lining construction of channels. Existing technologies have relatively mature techniques in channel slope shaping, shotcrete support, and prefabrication of channel lining panels, mainly as follows: ① "A Channel Lining Device for Water Conservancy Projects CN202411187443.6", which uses a spraying mechanism to spray a curing agent onto the channel foundation soil, reducing the amount of soil frost heave deformation and solving the problem of frost heave damage to the channel foundation soil when the channel lining machine is applied to water conveyance channels in cold regions. ② "A Channel Lining Device for Water Conservancy Projects CN202411005046.2", this invention can transport accumulated soil out of the channel and simultaneously level the channel sidewalls, making the concrete laying more uniform and improving the quality of concrete laying. However, in terms of channel lining panel installation, there are significant shortcomings in construction efficiency, safety risks, and cost control. Utility Model Content

[0005] This utility model addresses the current issue of slope lining panels still relying primarily on manual installation, avoiding the safety hazards and high costs associated with manual installation. It provides an installation device for lining panels on channel slopes in cold regions, which improves construction efficiency and reduces construction costs through mechanical equipment installation. It has significant advantages in slope installation applicability and can effectively solve technical problems in slope installation.

[0006] The technical solution adopted by this utility model to solve the above problems is: a device for installing lining slabs on channel slopes in cold regions, including a track, a truss, and a precast slab installation platform. The track includes parallel top and bottom tracks, which are installed at the top and bottom of the channel slope, respectively. The truss includes a frame and a portal mechanism. The frame is equipped with a transmission mechanism, and the transmission mechanism is equipped with a precast slab mounting platform that can move along the truss. The portal mechanism is slidably mounted on a track and is equipped with an adjustment mechanism that is fixedly connected to the frame. The precast slab installation platform is a lifting platform, and the precast slab installation platform is equipped with a precast lining slab loading and unloading mechanism.

[0007] Preferably, the truss includes two parallel frames, frame A and frame B are installed on a track and can move along the track; the length of the frame is set according to the length of the slope, and the two ends of the precast slab installation platform are installed on the two truss frames.

[0008] Preferably, the bottom of the portal mechanism is fixedly mounted on the traveling mechanism, the traveling mechanism is equipped with pulleys, the slide rail is slidably mounted on the track, and the traveling mechanism is equipped with a pulley braking mechanism.

[0009] Preferably, the precast slab installation platform is a fixed lifting platform.

[0010] Preferably, the loading and unloading mechanism uses a suction cup or a mechanical gripper.

[0011] Preferably, the adjustment mechanism is a screw or a hand-operated hoist.

[0012] Preferably, the transmission mechanism is a transmission chain.

[0013] This utility model device has a simple structure and, compared with current channel lining construction devices, represents a qualitative improvement from manual to automated construction. Specifically, it offers the following beneficial effects: (1) In this utility model, a longitudinal walking channel is set on the truss and a transverse walking channel is set on the installation platform, which avoids damage to the sand cushion layer during the installation process. At the same time, the precast lining slabs of this utility model are installed in rows, and the overall installation accuracy and flatness of the precast lining slabs are accurately controlled.

[0014] (2) In terms of risk reduction, the installation of traditional precast lining panels requires manual walking and carrying of blocks on slopes (slopes are generally 1:1 to 1:1.25). Walking on the laid sand cushion layer poses a significant safety hazard. Moreover, the installation of canal lining panels in cold regions takes place in winter, when people wear thick clothing, further increasing the safety risk of walking on slopes. This utility model, by setting up trusses and installation platforms, avoids the risks of walking on slopes and carrying precast lining panels, thus reducing construction risks.

[0015] (3) In terms of universality, this utility model can be widely applied to slope construction with different slopes and different slope lengths. The slope of the truss can be adjusted by controlling the height difference between the upper and lower ends of the truss; the length of the truss (bolted connection) can be adjusted according to the slope length, thus making it suitable for slope operations with different slope lengths.

[0016] (4) In terms of efficiency improvement, the traditional method of installing channel lining panels is manual. The installation period for channel lining panels in cold regions is all in winter, with less than 20 working days per month and an effective construction time of 8 hours per working day. The average person lays 10 panels per hour, and an average person lays 80 panels per day. According to the characteristics of channel construction in cold regions, the number of channel lining panels to be installed is huge, and the channel closure period is clear. Based on the actual situation, an average of 200,000 precast lining panels need to be laid per month, requiring 125 workers per day, which is difficult to organize. This utility model has high adaptability to the cold environment, with 28 working days per month and an effective construction time of 12 hours per working day. A single set of equipment can be configured with 8 workers and a construction efficiency of 320 panels per hour. A single set of equipment can lay 107,000 panels per month. Two sets of equipment can meet the progress requirements. This utility model improves efficiency by 4 times compared to the traditional manual method. Attached Figure Description

[0017] Figure 1 This is a schematic diagram of the construction device for channel slope lining plates according to this utility model.

[0018] Figure 2 This is a side view of the channel slope installation and construction device of this utility model.

[0019] Figure 3 This is a view from direction A of the channel slope installation and construction device of this utility model.

[0020] Figure 4 This is a schematic diagram of the channel cross-section structure of this utility model.

[0021] In the diagram: 1-1 Frame A, 1-2 Frame B, 1-3 Transmission mechanism, 2-1 Precast slab installation platform, 2-2 Lifting mechanism, 2-3 Loading and unloading mechanism, 3-1 Gantry mechanism, 3-2 Adjustment mechanism, 3-3 Traveling mechanism, 4-1 Precast lining slab for channel slope, 4-2 Precast lining slab for channel bottom, 4-3 Precast lining slab for channel top, 5-1 Slope bottom track, 5-2 Slope top track, 6 Sand cushion layer, 7 Geomembrane, 8 Concrete footing. Detailed Implementation

[0022] like Figure 1-3 The device shown is an installation device for lining slabs on channel slopes in cold regions, including a track, a truss, and a precast slab installation platform. The track includes two parallel tracks, namely the top slope track 5-2 and the bottom slope track 5-1, which are respectively installed at the top and bottom of the channel slope. The truss includes a frame and a portal mechanism 3-1, as shown in the figure. The lengths of the two parallel frames A 1-1 and B 1-2 can be connected by bolts and set according to the slope length. A chain-type transmission mechanism 3-3 is installed on frames A and B along the frame direction. The two ends of the precast slab installation platform 2-1 are fixed on the transmission mechanism, and the precast slab installation platform 2-1 can move along the truss frame. The bottom of the portal mechanism 3-1 is fixedly installed on the traveling mechanism 3-3. The traveling mechanism is equipped with pulleys, which are slidably installed with the rails. The traveling mechanism also has a pulley braking mechanism. An adjusting mechanism screw or a hand-operated hoist is installed on the portal mechanism. The adjusting mechanism 3-2 is fixedly connected to the frame. The height of frames A and B can be adjusted up and down. The precast slab installation platform 2-1 is a fixed lifting platform, including a lifting mechanism 2-2 and a loading and unloading mechanism 2-3. The bottom of the lifting mechanism 2-2 is connected to the loading and unloading mechanism 2-3. Suction cups or mechanical grippers are suitable for loading and unloading precast lining slabs.

[0023] The construction method of the precast lining slab 4-1 for channel slope using this utility model device is as follows: Step 1: After the channel slope shaping, sand cushion layer laying and concrete footing installation (if any) are completed, install one track at the top and one at the bottom of the slope. The track at the top and the track at the bottom of the slope are parallel and used for the movement of the machinery installing the channel slope lining slab. Step 2: Select the truss length based on factors such as the slope length. The truss consists of frame A and frame B, which are installed on rails. A gantry mechanism is located at the top of the truss's traveling section. Adjustments are made using screws or hand-operated hoists to control the height difference between the upper and lower ends of the truss, thereby adjusting the truss's slope to match the channel slope. Figure 2 As shown; Step 3: Install the precast slab installation platform at both ends of frame A and frame B, as follows: Figure 3 As shown, the precast slab installation platform adopts a lifting platform, and a fixed lifting platform is more suitable. A chain drive or other device is set on the truss to move the precast slab installation platform up and down. The precast slab installation platform can move along the truss. Step 4: Based on the slope of the slope to be installed, adjust the truss and precast slab installation platform to be consistent with the slope inclination by using screws or hand-operated hoists, so that the truss and precast slab installation platform are parallel to the slope and ensure that they are parallel to the precast lining slab to be installed. Step 5: Depending on the location of the precast lining slab supply, move the precast slab installation platform along the truss to the top or bottom, place the precast lining slab on the lifting precast slab installation platform, and transport the precast lining slab to the site via the top or bottom of the slope. Step 6: Move the precast slab installation platform along the truss to the intended installation position of the precast lining slab; Step 7: Lower the precast slab installation platform to make the precast lining slab contact the slope surface to be installed. Fine-tune the installation position of the precast lining slab by adjusting the left and right positions of the lifting platform, and then install the precast lining slab. Step 8: After the precast lining slab installation passes the acceptance test, raise the precast slab installation platform and move it along the truss to the initial position; Step 9: Repeat steps 5 through 8 until all precast lining slabs in this installation section are installed; Step 10: Move the truss to the next installation section and repeat steps 5 through 8 until all channel slope lining is installed.

[0024] The precast lining slabs 4-2 at the bottom of the channel and 4-3 at the top of the channel can be constructed using conventional methods. The completed channel cross-section is shown below. Figure 4 As shown, the channel mainly includes: sand cushion layer 6, geomembrane 7, concrete footing 8, precast lining slabs for channel slope 4-1, precast lining slabs for channel bottom 4-2, and precast lining slabs for channel top 4-3.

Claims

1. A device for installing lining panels on channel slopes in cold regions, characterized in that, Includes tracks, trusses, and precast slab installation platforms: The track includes parallel top and bottom tracks, which are installed at the top and bottom of the channel slope, respectively. The truss includes a frame and a portal mechanism. The frame is equipped with a transmission mechanism, and the transmission mechanism is equipped with a precast slab mounting platform that can move along the truss. The portal mechanism is slidably mounted on a track and is equipped with an adjustment mechanism that is fixedly connected to the frame. The precast slab installation platform is a lifting platform, and the precast slab installation platform is equipped with a precast lining slab loading and unloading mechanism.

2. The installation device for lining plates on channel slopes in cold regions according to claim 1, characterized in that, The truss includes two parallel frames, A and B, which are mounted on a track and can move along the track. The length of the frames is set according to the length of the slope. The two ends of the precast slab installation platform are mounted on the two truss frames.

3. The installation device for lining plates on channel slopes in cold regions according to claim 1 or 2, characterized in that, The bottom of the portal mechanism is fixedly installed on the traveling mechanism. The traveling mechanism is equipped with pulleys, and the slide rail is slidably installed on the track. The traveling mechanism also has a pulley braking mechanism.

4. The installation device for lining plates on channel slopes in cold regions according to claim 1 or 2, characterized in that, The precast slab installation platform is a fixed lifting platform.

5. A device for installing lining plates on channel slopes in cold regions according to claim 1 or 2, characterized in that, The loading and unloading mechanism uses suction cups or mechanical grippers.

6. A device for installing lining plates on channel slopes in cold regions according to claim 1 or 2, characterized in that, The adjustment mechanism is a screw or a hand-operated hoist.

7. A device for installing lining plates on channel slopes in cold regions according to claim 1 or 2, characterized in that, The transmission mechanism uses a transmission chain.