An integrated drill backfill device for osmometer embedding
The mechanization and standardization of piezometer installation are achieved through an integrated drilling and backfilling device, which solves the problems of cumbersome installation process and inaccurate data, and improves the installation quality and the reliability of monitoring data.
Patent Information
- Application Number
- CN202522532875.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-28
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-11-28
AI Technical Summary
The existing piezometer installation process is cumbersome and relies on manual labor, resulting in low efficiency, poor data accuracy and stability, and manual backfilling affects the seepage path and the representativeness of the medium.
An integrated drilling and backfilling device is adopted, which integrates drilling, soil sampling, instrument positioning and backfilling functions. It uses a spiral blade drill bit and backfilling mechanism to achieve integrated mechanical operation, ensuring accurate positioning of the piezometer and in-situ soil backfilling.
To achieve mechanization and standardization of the piezometer installation process, reduce manual intervention, improve data reliability and monitoring stability, and maintain the original soil structure and permeability characteristics.
Smart Images

Figure CN225014115U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of hydrological monitoring technology, specifically relating to an integrated borehole backfilling device for piezometer installation. This device is mainly used in seepage monitoring in civil engineering and water conservancy projects, enabling integrated operation of the entire installation process, including borehole construction, piezometer installation, borehole backfilling, and sealing, significantly improving the technological level of piezometer installation and the quality of monitoring data. Background Technology
[0002] A piezometer is a widely used instrument for monitoring pore water pressure in geotechnical and hydraulic engineering, commonly found in dams, slopes, foundations, and underground projects. By sensing changes in pore water pressure within the soil, it reflects fluctuations in groundwater levels and the distribution of seepage fields, thus providing crucial data support for project safety assessment and early warning. The measurement accuracy and long-term reliability of a piezometer, besides the instrument's inherent performance, largely depend on the quality of its installation process.
[0003] Currently, the traditional drilling method is widely used for installing piezometers in engineering practice. This process mainly includes the following steps: First, a drilling rig is used to drill a hole to the designed depth at the predetermined measuring point location; then, sediment and residual soil debris at the bottom of the hole are manually cleaned to avoid affecting sensor contact; next, the piezometer probe is manually lowered to the bottom of the hole via a cable and adjusted to the designed elevation; finally, filter material (such as fine sand, medium sand, etc.) is backfilled in layers around the probe, and the top is sealed with clay to prevent surface water from flowing in and interfering. Although this method is widely used, it has several significant drawbacks. The process is cumbersome and reliant on manual labor. Drilling, cleaning the hole, lowering the instrument, and backfilling are performed separately, requiring multiple equipment entry and exit points and manual transfers, resulting in low efficiency and high labor intensity. Manually lowering the piezometer is easily affected by the operator, leading to problems such as the instrument not being at the designed elevation, tilting, or colliding with the hole wall, affecting data accuracy. Manual backfilling makes it difficult to ensure uniform layering and consistent density of the filter material, which can easily lead to short circuits or poor contact, altering the original seepage path and causing monitoring errors. In addition, the filter material is often transported from elsewhere for backfilling, but the soil properties differ from the original strata, which undermines the representativeness of the medium surrounding the piezometer and affects the accuracy and long-term stability of the data. Summary of the Invention
[0004] To overcome the shortcomings of existing technologies, this utility model provides an integrated drilling and backfilling device for burying piezometers, which integrates drilling, soil sampling, instrument positioning and backfilling functions into one unit. It can obtain and backfill soil material in situ to avoid interference from external materials, and can achieve precise positioning of the piezometer and uniform backfilling of surrounding filter material through mechanical control.
[0005] The technical solution adopted by this utility model to solve its technical problem is: An integrated borehole backfilling device for piercing gauge installation includes a drilling mechanism, a soil collection and storage unit, a slide rail conveying assembly, and a backfilling mechanism. The drilling mechanism is located at the lower end of the device and uses a spiral blade drill bit. A circular through hole is provided at the top of the drilling mechanism. The soil collection and storage unit is connected to the hollow part of the spiral blade drill bit. The slide rail conveying assembly is located on the inner wall of the device and is used to push out the soil after drilling and accurately lower the piercing gauge to the designated position in the borehole along the guide rail. The backfilling mechanism is connected to a soil bag outside the device and uses a mechanical pushing method to backfill the in-situ soil temporarily stored in the soil bag into the borehole in layers, ensuring that the soil environment around the piercing gauge is restored to its original state.
[0006] Furthermore, the spiral blade drill bit can efficiently cut the soil layer during rotation, and the generated soil chips are continuously transported upward with the help of the spiral structure. The soil generated during the drilling process is pushed through the circular through hole and temporarily stored in the internal cavity of the device.
[0007] Furthermore, the spiral blade drill bit includes a hollow drill rod and spiral blades, the spiral blades being disposed on the outer wall of the hollow drill rod, and a circular through hole being provided at the top of the hollow drill rod.
[0008] The backfilling mechanism includes a soil sump, a soil sump sliding platform, and a soil sump rail. The soil sump and the soil sump rail are located in the outer area of the soil sump sliding platform. The soil in the soil sump is pushed into the inner cavity layer by layer by vertical sliding. The soil sump rail is installed on the outer wall structure of the soil sump sliding platform. The soil in the soil sump is backfilled into the borehole layer by layer by vertical sliding, ensuring that the soil environment around the piezometer is restored to its original state.
[0009] The moving end of the slide rail conveying component is connected to the tray. After drilling stops, the tray rises and pushes the soil out of the inner cavity of the drilling mechanism.
[0010] The monitoring data is connected to the piezometer. After the tray is removed, a telescopic robotic arm is installed on the moving end. The piezometer clamps onto the telescopic robotic arm. After the piezometer is lowered to the bottom of the drilling mechanism cavity through the slide rail transmission assembly, the telescopic robotic arm releases the piezometer and rises to reset.
[0011] The beneficial effects of this utility model are mainly reflected in: (1) To realize integrated mechanical operation of drilling, soil extraction, instrument installation and backfilling, reduce the types and quantities of equipment, and effectively reduce construction costs.
[0012] (2) The burial process is highly mechanized and standardized, easy to operate, greatly reduces manual intervention and reduces labor intensity.
[0013] (3) The piezometer is accurately positioned and its attitude is controlled by mechanical guidance, which ensures the quality of installation and improves the reliability of test data.
[0014] (4) Backfilling with in-situ soil is used to preserve the original structure and permeability of the soil around the instrument to the greatest extent possible, thereby enhancing the authenticity and long-term stability of the monitoring data. Attached Figure Description
[0015] Figure 1 This is a three-dimensional diagram of the overall structure of the device of the present invention.
[0016] Figure 2 This is a front view of the present invention.
[0017] Figure 3 This is a cross-sectional view of the present invention.
[0018] Figure 4 This is a top view of the present invention.
[0019] Figure 5 This is a schematic diagram of the operation process of the present invention.
[0020] Figure 6 This is a schematic diagram of the operation process of the present invention.
[0021] Figure 7 This is a schematic diagram of the operation process of the present invention.
[0022] The attached diagram is labeled as follows: 1 is the inner cavity of the device, 2 is the soil sump slide rail, 3 is the soil sump, 4 is the soil sump sliding platform, 5 is the circular through hole, 6 is the spiral drill bit, 7 is the hollow drill rod, 8 is the slide rail conveying assembly, 9 is the soil, 10 is the bottom tray, 11 is the piezometer, 12 is the telescopic robotic arm, and 13 is the monitoring data wiring. Detailed Implementation
[0023] The present invention will now be further described with reference to the accompanying drawings.
[0024] Reference Figures 1-7 An integrated borehole backfilling device for burying piezometers, comprising: Drilling mechanism: Located at the lower end of the device, it uses a spiral blade drill bit to perform the drilling function. During rotation, the drill bit efficiently cuts through the soil layer and, through its spiral structure, continuously transports the resulting soil cuttings upwards.
[0025] Soil collection and storage unit: A circular through-hole is provided at the top of the device, which is connected to the hollow part of the auger bit. Soil generated during drilling is pushed through this through-hole and temporarily stored in the internal cavity of the device.
[0026] The slide rail conveyor assembly, located on the inner wall of the device, is used to push out the soil after drilling and precisely lower the piezometer along the guide rail to the designated position inside the hole. This system ensures directional and depth control during the instrument installation process.
[0027] Backfilling mechanism: Soil sump 3 and soil sump slide rail 2 are located in the outer area of soil sump sliding platform 4. The soil in soil sump 3 is pushed into the inner cavity layer by layer by vertical sliding. Soil sump slide rail 2 is installed on the outer wall structure of soil sump sliding platform 4. The soil in situ of the soil temporarily stored in soil sump 3 is backfilled into the borehole layer by layer by vertical sliding to ensure that the soil environment around the piezometer is restored to its original state.
[0028] The implementation process of this utility model is as follows: 1) Drilling for soil extraction Position the device precisely at the preset measuring point, start the power system, and the spiral blade 6 rotates downwards to drill until the designed depth is reached. During the process, the cut soil is transported upwards through the inside of the drill rod and finally enters the device's inner cavity 1 through the circular through-hole 5 at the top for temporary storage.
[0029] 2) Pallet lifting and soil removal After drilling is completed, drilling is stopped and the slide rail conveyor assembly 8 is started. The tray 10 slowly rises along the guide rail, pushing the soil 9 accumulated in the device upwards and guiding it into the soil bag 3 connected to the outside for temporary storage, making room for the subsequent placement of the piezometer 11.
[0030] 3) Install piezometers Install the monitoring data cable 13 onto the piezometer 11, remove the tray 10, replace it with the telescopic robotic arm 12, use the telescopic robotic arm 12 to clamp the piezometer 11, and control it to be smoothly and vertically lowered to the target depth at the bottom of the borehole through the slide rail transmission assembly 8. Then control the telescopic robotic arm 12 to lower the piezometer to ensure that the instrument is accurately positioned and in the correct posture.
[0031] 4) Soil backfilling After the piezometer 11 is in place, operate the backfilling mechanism to push the soil bag 3 through the soil bag slide rail 2, and gradually and evenly push the soil 9 temporarily stored in the soil bag 3 into the inner cavity 1 of the device. During the backfilling process, the speed and layers need to be controlled to ensure that the compaction is consistent with the soil condition.
[0032] 5) Equipment evacuation After backfilling is completed, the soil bag 3 is restored to its initial position, the entire device is removed from the backfilled hole, the site is restored to cleanliness, and the piezometer installation process is completed.
[0033] The embodiments described in this specification are merely examples of implementations of the inventive concept and are for illustrative purposes only. The scope of protection of this utility model should not be considered limited to the specific forms described in these embodiments; rather, it extends to equivalent technical means that can be conceived by those skilled in the art based on the inventive concept.
Claims
1. An integrated borehole backfilling device for burying piezometers, characterized in that, The device includes a drilling mechanism, a soil collection and storage unit, a slide rail conveying assembly, and a backfilling mechanism. The drilling mechanism is located at the lower end of the device and uses a spiral blade drill bit. A circular through hole is provided at the top of the drilling mechanism. The soil collection and storage unit is connected to the hollow part of the spiral blade drill bit. The slide rail conveying assembly is located on the inner wall of the device and is used to push out the soil after drilling is completed and to accurately lower the piezometer to a designated position in the hole along the guide rail. The backfilling mechanism is connected to a soil bag outside the device and uses a mechanical pushing method to backfill the in-situ soil temporarily stored in the soil bag into the borehole in layers, ensuring that the soil environment around the piezometer is restored to its original state.
2. The integrated borehole backfilling device for burying piezometers as described in claim 1, characterized in that, The spiral blade drill bit can efficiently cut the soil layer during rotation, and the generated soil cuttings are continuously transported upward with the help of the spiral structure. The soil generated during the drilling process is pushed through the circular through hole and temporarily stored in the internal cavity of the device.
3. The integrated borehole backfilling device for burying piezometers as described in claim 1, characterized in that, The spiral blade drill bit includes a hollow drill rod and spiral blades. The spiral blades are disposed on the outer wall of the hollow drill rod, and a circular through hole is provided at the top of the hollow drill rod.
4. The integrated borehole backfilling device for burying piezometers as described in claim 1, characterized in that, The backfilling mechanism includes a soil sump, a soil sump sliding platform, and a soil sump rail. The soil sump and the soil sump rail are located in the outer area of the soil sump sliding platform. The soil in the soil sump is pushed into the inner cavity layer by layer by vertical sliding. The soil sump rail is installed on the outer wall structure of the soil sump sliding platform. The soil in the soil sump is backfilled into the borehole layer by layer by vertical sliding, ensuring that the soil environment around the piezometer is restored to its original state.
5. The integrated borehole backfilling device for burying piezometers as described in claim 1, characterized in that, The moving end of the slide rail conveying component is connected to the tray. After drilling stops, the tray rises and pushes the soil out of the inner cavity of the drilling mechanism.
6. The integrated borehole backfilling device for burying piezometers as described in claim 5, characterized in that, The monitoring data is connected to the piezometer. After the tray is removed, a telescopic robotic arm is installed on the moving end. The piezometer clamps onto the telescopic robotic arm. After the piezometer is lowered to the bottom of the drilling mechanism cavity through the slide rail transmission assembly, the telescopic robotic arm releases the piezometer and rises to reset.