A temporary screening plant for a landfill site

By constructing a layered foundation structure within the landfill area, including a compaction layer, a backfill layer, and an impermeable isolation layer, the problems of high transportation costs, severe pollution, and instability in traditional screening workshop construction have been solved. This has resulted in a stable and environmentally friendly screening workshop foundation, reducing transportation and resource waste.

CN225014121UActive Publication Date: 2026-11-24北京首创环境科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522751245.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-25
Publication Date
2026-11-24
Estimated Expiration
2035-12-25

AI Technical Summary

Technical Problem

The construction of screening workshops outside traditional landfill sites results in high transportation costs, serious environmental pollution, and waste of resources. The simple, flat foundation structure inside the landfill site is unstable and poses safety hazards and environmental risks.

Method used

A layered basic structure is constructed within the landfill area, including a foundation compaction layer, an intermediate backfill layer, and a surface compaction layer. An impermeable isolation layer and a surface layer are also installed. HDPE geomembrane and geotextile are used to form a closed impermeable barrier, and the vertical impermeable isolation layer is isolated from the surrounding waste pile.

Benefits of technology

It achieves a stable foundation for the screening workshop, reduces transportation distance, lowers costs and pollution risks, ensures structural stability and environmental safety, supports heavy equipment operation, is easy to dismantle, and meets environmental protection requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225014121U_ABST
    Figure CN225014121U_ABST
Patent Text Reader

Abstract

This utility model relates to the field of environmental engineering technology, specifically to a basic structure for a temporary screening workshop inside a landfill area. The structure includes, from bottom to top, a foundation compaction layer, an intermediate backfill layer, and a surface compaction layer laid on the original structural layer of the landfill floor. A seepage-proof isolation layer and a surface layer are sequentially covered above the surface compaction layer. The intermediate backfill layer can be composed of aggregate or construction waste. The seepage-proof isolation layer is an HDPE geomembrane, on which a protective layer can be installed. Vertical seepage-proof isolation layers can be installed on the sides of the structure, forming a closed seepage-proof system with the horizontal seepage-proof layers. The surface layer is a concrete surface layer or a steel plate layer. This utility model, through a multi-layer composite structure, directly constructs a stable and seepage-proof working platform within the landfill area. It has high load-bearing capacity, effectively isolates pollution, enables on-site screening of waste, shortens transportation distances, reduces costs and the risk of secondary pollution, and is convenient to construct, facilitating resource utilization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of environmental engineering technology, specifically to the basic structure of a temporary screening workshop inside a landfill area. Background Technology

[0002] Traditionally, when landfills need to screen existing waste, they typically construct fixed screening workshops outside the landfill area, either by finding or developing new sites. This approach has several inherent drawbacks. First, transporting waste from the landfill to the screening workshop outside significantly increases fuel consumption and transportation costs. Furthermore, the transportation process easily generates secondary pollution problems such as dust, waste spillage, and leachate leakage, negatively impacting the surrounding environment. Second, constructing permanent or semi-permanent workshops outside the landfill requires new land resources, involving additional land approvals, leveling, and infrastructure construction. The investment is high, and dismantling or repurposing the workshops after the project is completed is difficult, potentially leading to resource waste. Additionally, some attempts have been made to simply level the waste pile within the landfill area as a working surface, but the untreated foundation structure is extremely unstable. The waste pile itself is loose, has low load-bearing capacity, and uneven settlement, posing serious safety hazards to heavy screening equipment and transport vehicles operating on it, such as localized collapses and equipment overturning. Meanwhile, wastewater and leachate generated during screening operations can seep directly into the ground, polluting underlying waste and soil, and potentially damaging the existing seepage prevention system at the bottom of the landfill, posing a significant environmental risk. Therefore, the industry urgently needs a foundation structure for temporary screening workshops that can be directly constructed within the landfill area, possessing good stability, load-bearing capacity, and environmental isolation.

[0003] Therefore, the existing technology still needs further development. Utility Model Content

[0004] The purpose of this utility model is to overcome the above-mentioned technical deficiencies and provide a basic structure for a temporary screening workshop inside a landfill area, so as to solve the problems existing in the prior art.

[0005] To achieve the above technical objectives, this utility model provides a basic structure for a temporary screening workshop inside a landfill area, comprising: The structure consists of a base compaction layer, an intermediate backfill layer, and a surface compaction layer arranged sequentially from bottom to top. The base compaction layer is laid on the original structural layer at the bottom of the landfill, and an impermeable isolation layer and a surface layer are arranged sequentially above the surface compaction layer.

[0006] Specifically, both the base compacted layer and the surface compacted layer are compacted clay or loess layers, with a thickness greater than 50cm.

[0007] Specifically, the intermediate backfill layer includes one or more layers of aggregate or construction waste, with a single layer thickness of 50cm.

[0008] Specifically, the impermeable isolation layer includes an HDPE geomembrane with a thickness of not less than 1.0 mm.

[0009] Specifically, a protective layer is provided above the seepage-proof isolation layer. The protective layer is a geotextile with a density greater than 600g / m² or a composite drainage net with a thickness of not less than 5mm.

[0010] Specifically, the surface layer is a concrete surface layer or a steel plate paving layer.

[0011] Specifically, it also includes a vertical impermeable isolation layer set on the side of the foundation structure, which isolates the foundation structure from the surrounding waste pile.

[0012] Specifically, the vertical impermeable barrier layer is an HDPE geomembrane with a thickness of not less than 1.0 mm.

[0013] Specifically, below the foundation compaction layer, there are sequentially arranged the original leachate backflow layer at the bottom of the reservoir, the original seepage prevention layer at the bottom of the reservoir, the original foundation layer at the bottom of the reservoir, and the original groundwater backflow layer at the bottom of the reservoir.

[0014] Specifically, the overall compaction degree of the foundation structure shall not be less than 90%, and the bearing capacity shall meet the requirements of repeated compaction by vehicles weighing more than 40 tons.

[0015] Beneficial effects: The basic structure of a temporary screening workshop inside a landfill area provided by this utility model has the following significant advantages: First, the structure employs a layered design, comprising a foundation compaction layer, an intermediate backfill layer, and a surface compaction layer from bottom to top, with an impermeable isolation layer and a surface layer at the very top, forming a complete system from a stable foundation to a hard working surface. This structure can effectively adapt to uneven settlement of the landfill's bottom layer, distributing the loads of heavy equipment and vehicles layer by layer, ultimately transferring them to the stable original structural layer at the bottom of the landfill. This ensures the structural stability and safety of the entire foundation under dynamic loads, avoiding the risk of working surface collapse.

[0016] Secondly, the horizontal and vertical HDPE geomembranes installed within the structure together form a complete and airtight seepage barrier, completely isolating the screening operation area from the surrounding waste pile and the underlying soil. This effectively prevents pollutants generated during the operation from seeping downwards and from lateral intrusion of pollutants from the surrounding area, protecting the underground environment of the site and meeting environmental protection requirements.

[0017] Third, the intermediate backfill layer encourages the use of existing aggregates or construction waste on site, realizing the on-site utilization of waste resources, significantly reducing the cost of purchasing materials and earthwork transportation, and reflecting the concept of circular economy.

[0018] Fourth, the entire basic structure is a temporary structure, mainly using a layered paving and compaction process, which is convenient to construct, has a short cycle, and is easy to dismantle or reclaim after the project is completed, with little impact on the subsequent planning of the site.

[0019] Fifth, by building the screening workshop directly within the storage area, "on-site screening" of waste is achieved, which greatly shortens the material transfer distance and fundamentally reduces transportation costs, energy consumption, and the risk of secondary pollution, resulting in outstanding comprehensive economic and environmental benefits. Attached Figure Description

[0020] Figure 1 This is a schematic diagram of the site and excavation area planning before construction provided in a specific embodiment of this utility model; Figure 2 This is a schematic cross-sectional view of the basic structure provided in a specific embodiment of this utility model; Figure 3 This is a schematic diagram of the structural cross-section and region division provided in a specific embodiment of this utility model; Figure 4 This is a detailed layered structural diagram of the basic structure provided in a specific embodiment of this utility model. Detailed Implementation

[0021] To enable those skilled in the art to better understand the technical solution of this utility model, the technical solution of this utility model will be clearly and completely described below with reference to the accompanying drawings. Based on the embodiments in this application, other similar embodiments obtained by those skilled in the art without creative effort should all fall within the scope of protection of this application. Furthermore, the directional terms mentioned in the following embodiments, such as "up," "down," "left," and "right," are only for reference to the directions in the accompanying drawings. Therefore, the directional terms used are for illustrative purposes and not for limiting the creation of this utility model.

[0022] The present invention will be further described below with reference to the accompanying drawings and preferred embodiments.

[0023] Please see Figures 1-4 This utility model provides a basic structure for a temporary screening workshop inside a landfill area, comprising: The structure consists of a base compaction layer, an intermediate backfill layer, and a surface compaction layer arranged sequentially from bottom to top. The base compaction layer is laid on the original structural layer at the bottom of the landfill, and an impermeable isolation layer and a surface layer are arranged sequentially above the surface compaction layer.

[0024] It should be further explained that this foundation structure, through its layered design, makes full use of the slopes or flat areas within the landfill area to construct a stable foundation for the temporary screening workshop. The compacted foundation layer is laid directly on the original structural layer at the bottom of the landfill, providing the underlying support for the entire foundation; the intermediate backfill layer serves as filling and transition, effectively utilizing on-site materials; and the surface compacted layer provides a smooth working surface. The inclusion of an impermeable isolation layer and a surface layer ensures the sealing and surface hardness of the foundation structure. This layered structure allows the foundation to adapt to the uneven settlement of the landfill, and through the synergistic effect of each layer, it significantly improves the overall load-bearing capacity and stability, avoiding the risk of collapse caused by a loose landfill structure.

[0025] Understandably, this structure, which places the screening workshop directly within the storage area, greatly shortens the waste transportation distance, reduces secondary pollution and engineering investment, and ensures the long-term durability and environmental safety of the foundation through layered compaction and seepage prevention design.

[0026] For further information, please refer to [link / reference]. Figure 1 , Figure 1 The bottom horizontal solid line represents the original ground plane, which serves as the reference surface for construction. Above this ground plane, the area on the left, enclosed by a sloping boundary line and filled with light yellow circles, is the proposed selection area. This area is planned as the specific location for constructing the foundation structure of the temporary screening workshop. To the right and right rear of the proposed selection area, the area defined by an irregular polygonal boundary line and filled with white elliptical patterns represents the original landfill stockpile or specific geological distribution within the landfill area. A clear solid line extending from the upper left to the lower right clearly marks the excavation boundary line. It precisely delineates the upper edge of the proposed selection area and the upper limit of the excavation range for subsequent earthwork, visually demonstrating the spatial relationship for delineating the work area and determining the excavation range in a complex site, laying the foundation for subsequent layered construction.

[0027] For further information, please refer to [link / reference]. Figure 2 , Figure 2 The spatial layout of the structure is clearly shown from left to right: the leftmost side is the ground plane, above which is the planned construction area. Extending to the right, a clear excavation boundary line separates the planned area from the original environment on the right. Within the excavation boundary, the core structure of this invention is constructed. This structure, from top to bottom (from below the ground plane to deeper depth), includes: an uppermost backfill surface layer, an intermediate layer below that, a bottom layer below that, and an HDPE geomembrane covering the inner side of the structure (closer to the excavation face). This diagram visually presents the burial depth of the foundation structure relative to the ground plane and the excavation boundary, the approximate relative positions of each functional layer, and the orientation of the geomembrane, which helps in understanding the overall burial environment and components of the structure.

[0028] For further details, please refer to Figure 3 , Figure 3 The ground plane is clearly marked on the left side, and the area above it with regularly arranged small black triangles represents the selected area, which intuitively shows how the selected area is represented on the ground. Figure 3 The central area is filled with a green grid and clearly marked as the excavation boundary, which vividly represents the vertical or inclined interface formed by the excavation operation. Figure 3 The area on the right side is composed of a large number of irregular oval patterns, representing the original waste pile or specific backfill material of the landfill. Figure 3 The key features are clearly defined by lines and different filling patterns, which distinguish the three main parts: the "selected area", the "excavated boundary" and the "external original pile body", thus clarifying the boundary and adjacent relationship between the basic structure constructed by this utility model and the surrounding original environment.

[0029] Specifically, both the base compacted layer and the surface compacted layer are compacted clay or loess layers, with a thickness greater than 50cm.

[0030] It should be further explained that the foundation compacted layer and the surface compacted layer use compacted clay or loess materials, which have fine particle size and no sharp edges, making them easy to compact. The thickness is set greater than 50cm to ensure that each layer has sufficient thickness to distribute the load from the upper layer and prevent localized stress concentration. During the compaction process, a small bulldozer is used for layered compaction, with each layer's loose thickness controlled at approximately 50cm, and the compaction is carried out at least three times to achieve a compaction degree of over 90%. This design allows the foundation compacted layer to effectively isolate contamination from underlying waste and provide a uniform base; the surface compacted layer, as the direct load-bearing surface, has high density and compressive strength.

[0031] It is understandable that using clay or loess as the main material is inexpensive, readily available, and has a low permeability coefficient after compaction, thus providing a certain degree of seepage prevention. At the same time, the thickness ensures the integrity and durability of the foundation, effectively resisting deformation caused by repeated vehicle rolling.

[0032] Specifically, the intermediate backfill layer includes one or more layers of aggregate or construction waste, with a single layer thickness of 50cm.

[0033] It should be further explained that the intermediate backfill layer consists of aggregates (such as crushed stone and gravel) or construction waste (such as broken concrete blocks and bricks). These materials are widely available and can be recycled. Backfilling is carried out in layers, with each layer being 50cm thick and compacted using compaction machinery. The aggregate layer has good drainage performance, while the construction waste layer provides high structural strength. When multiple layers are used, they are staggered to enhance overall stability. This backfill layer not only fills the excavated space but also serves to distribute stress and drain water, preventing water accumulation inside the foundation.

[0034] Understandably, this utility model utilizes existing aggregates or construction waste on-site as backfill material, reducing the cost of purchasing soil and realizing resource utilization. At the same time, through layered compaction, it improves the bearing capacity and deformation resistance of the foundation and effectively utilizes the space after excavation.

[0035] Specifically, the impermeable isolation layer includes an HDPE geomembrane with a thickness of not less than 1.0 mm.

[0036] It should be further explained that the impermeable barrier layer uses a high-density polyethylene (HDPE) geomembrane with a thickness of not less than 1.0 mm, possessing excellent impermeability, chemical corrosion resistance, and aging resistance. During installation, the geomembrane completely covers the surface compacted layer and extends to the edge of the foundation structure, connecting with the vertical impermeable layer to form a sealed barrier. The membranes are connected using hot-melt welding or double-track welding to ensure the joint strength is consistent with the parent material. This layer directly prevents the downward infiltration of upper-layer domestic waste and its leachate, protecting the backfill soil from contamination.

[0037] Understandably, HDPE geomembranes provide reliable seepage prevention and isolation, preventing pollutants from seeping into the soil and protecting the underlying soil and groundwater. At the same time, their flexibility allows them to adapt to certain deformations of the foundation, ensuring long-term seepage prevention.

[0038] Specifically, a protective layer is provided above the seepage-proof isolation layer. The protective layer is a geotextile with a density greater than 600g / m² or a composite drainage net with a thickness of not less than 5mm.

[0039] It should be further explained that a protective layer is laid on top of the HDPE geomembrane of the impermeable isolation layer. This protective layer can be made of needle-punched geotextile with a density exceeding 600 g / m², or a composite drainage net with a thickness of not less than 5 mm. The geotextile has high puncture resistance and cushioning capacity, and is laid directly on the geomembrane to prevent sharp objects from puncturing the membrane. The composite drainage net has both protective and horizontal drainage functions, and can quickly drain any liquids that may seep in. The protective layer completely covers the geomembrane and is fixed to the perimeter.

[0040] For further details, please refer to Figure 4 , Figure 4The diagram shows a cross-section along the length of the structure, clearly illustrating the materials and sequence of each structural layer from top to bottom. The top layer is a rigid concrete surface layer, directly bearing the equipment load. Below this is a layer of compacted clay or loess, serving as the main load-bearing and stabilizing layer. Below that is the intermediate layer, which may consist of aggregate or construction waste, serving to diffuse stress and act as a transition. Below the intermediate layer is another layer of compacted clay or loess, providing the foundation's bottom support. Running through the entire cross-section is the core HDPE geomembrane, forming a continuous waterproof barrier. Specifically, a protective layer (such as geotextile or composite drainage net) is installed directly above the HDPE membrane, in the area overlapping with the intermediate and upper compacted soil layers, to prevent damage to the geomembrane from the upper materials. The diagram precisely illustrates the name, material type, and spatial relationship of each layer through different filling patterns and clear labeling.

[0041] Understandably, the protective layer effectively prevents mechanical damage to the geomembrane during surface construction or use, extending the service life of the geomembrane system. At the same time, the composite drainage net can also assist in drainage, reduce hydrostatic pressure, and improve foundation stability.

[0042] Specifically, the surface layer is a concrete surface layer or a steel plate paving layer.

[0043] It should be further explained that the surface layer, as the uppermost working surface, is constructed using either poured concrete or laid with steel plates. The concrete surface layer is generally 15-20cm thick, with a strength grade of not less than C20, and reinforced with internal steel mesh to enhance crack resistance. The steel plate layer is constructed by splicing together steel plates with a thickness of not less than 10mm, with the plates welded or bolted together. The surface layer is laid directly on the protective layer or the impermeable isolation layer, providing a flat and hard surface to meet the requirements of screening equipment installation and vehicle passage.

[0044] Understandably, concrete surfaces offer good durability and strong load-bearing capacity; steel plate paving layers are quick to construct and reusable. The surface layers ensure the flatness and load-bearing capacity of the screening workshop's working surface, facilitating equipment movement and material transportation.

[0045] Specifically, it also includes a vertical impermeable isolation layer set on the side of the foundation structure, which isolates the foundation structure from the surrounding waste pile.

[0046] It should be further explained that a vertical impermeable isolation layer is installed on all four sides of the foundation structure. This layer extends from the bottom of the foundation to near the surface layer, connecting with the horizontal impermeable isolation layer to form a closed impermeable system. The vertical layer is laid tightly against the side of the backfill of the foundation structure, completely separating the new foundation from the surrounding existing waste pile.

[0047] Understandably, the vertical impermeable isolation layer effectively prevents leachate from the surrounding waste from laterally intruding into the backfill area, avoiding cross-contamination, while also strengthening the lateral stability of the foundation structure and preventing the impact of surrounding waste sliding on the foundation.

[0048] Specifically, the vertical impermeable barrier layer is an HDPE geomembrane with a thickness of not less than 1.0 mm.

[0049] It should be further noted that the vertical impermeable isolation layer uses the same HDPE geomembrane material as the horizontal impermeable layer, with a thickness of not less than 1.0 mm, to ensure consistent impermeability. During installation, the membrane is vertically suspended and anchored to the side of the foundation, and connected to the horizontal membrane by welding to form an integral seal.

[0050] Understandably, HDPE membranes have good flexibility and tensile strength, can adapt to slight displacement between the foundation and the landfill, maintain their anti-seepage effect for a long time, and are easy to construct due to their uniform material properties.

[0051] Specifically, below the foundation compaction layer, there are sequentially arranged the original leachate backflow layer at the bottom of the reservoir, the original seepage prevention layer at the bottom of the reservoir, the original foundation layer at the bottom of the reservoir, and the original groundwater backflow layer at the bottom of the reservoir.

[0052] It should be further explained that the foundation compaction layer is directly constructed on top of the existing multi-layered structure of the landfill bottom. These original layers include: the original leachate backflow layer at the bottom of the landfill, typically composed of gravel or drainage pipe networks, used for collecting and draining leachate; the original impermeable layer at the bottom of the landfill, which is an HDPE membrane or clay layer to prevent contamination from seeping into the ground; the original foundation layer at the bottom of the landfill, which is a compacted soil base layer; and the original groundwater backflow layer at the bottom of the landfill, used to control groundwater. The foundation structure of this utility model is integrated with these original layers, making full use of existing facilities.

[0053] Understandably, this design effectively connects the new foundation with the original seepage prevention system at the bottom of the reservoir, avoiding redundant construction, ensuring the integrity of the overall seepage prevention system, and improving the project's economic efficiency.

[0054] Specifically, the overall compaction degree of the foundation structure shall not be less than 90%, and the bearing capacity shall meet the requirements of repeated compaction by vehicles weighing more than 40 tons.

[0055] It should be further explained that through layered backfilling and compaction, the compaction degree of the entire foundation structure is no less than 90%, which means that the material has low porosity and high density. The load-bearing capacity is ensured through compaction degree and layered design, enabling it to withstand repeated driving by vehicles with a total weight of over 40 tons (such as garbage trucks) without significant deformation. During construction, standard compaction equipment is used to control compaction parameters.

[0056] Understandably, high compaction and bearing capacity ensure the stability of the foundation under heavy equipment operation, prevent settlement and deformation, extend service life, and meet the stringent requirements of the screening workshop for the foundation.

[0057] Understandably, the screening workshop includes a temporary storage area for raw materials, a feeding area, an equipment layout area, and a temporary storage area for screened materials. Except for the equipment layout area, the other areas have low requirements for foundation load, only needing to meet the static load of vehicle transportation and material storage.

[0058] Furthermore, the screening and remediation project for municipal solid waste sanitary landfills clearly defined the requirements for the workshop's land area and distribution during the site selection and construction drawing design phases. Centered on the equipment layout area, temporary storage areas and temporary storage areas were arranged at both ends of the equipment's operating path, minimizing the occupation of other spaces within the landfill while ensuring the stability of the equipment foundations.

[0059] Furthermore, select areas within the landfill site that are adjacent to the ring road or level with the ground, upstream of the leachate drainage pipes, i.e., areas with low leachate levels. Alternatively, construct leachate backflow drainage ditches within the selected area to divert leachate as far as possible outside the area, lowering the leachate level in that area to below 30cm as specified in the "Pollution Control Standard for Municipal Solid Waste Sanitary Landfills," ensuring the safety and stability of the landfill within the selected area.

[0060] Furthermore, in the absence of significant rainfall, the temporary covering film on the surface of the selected area will be removed, and the garbage near the slope will be transferred to other areas for drying or storage. After completing the excavation and transfer of garbage above ground, the garbage below ground will be excavated. The ratio between the excavation depth and the width of the excavation area below ground level is 1:3. Assuming an excavation depth of 2m, the distance from the slope to the central excavation boundary of the reservoir area is 6m. During the garbage removal process, efforts should be made to remove as much garbage as possible down to the slope drainage network or the bottom gravel drainage layer to avoid incomplete garbage removal and increase the workload of subsequent finishing work.

[0061] Furthermore, using an HDPE geomembrane with a thickness of not less than 1.0 mm, the excavated area is isolated from the unexcavated waste. The excavated area is backfilled. The area near the slope or bottom of the reservoir is backfilled with loess or other fillers with a particle size of less than 8 mm and no sharp edges. The thickness of the bottom loess backfill is not less than 50 cm. The middle layer can be backfilled with a small amount of aggregate, construction waste and other waste. The surface layer is backfilled with loess. The backfilling process strictly follows the requirements of layered compaction to ensure that the strength of the backfilled area meets the requirements of the workshop construction.

[0062] Furthermore, according to the "Technical Regulations for Operation and Maintenance of Municipal Solid Waste Sanitary Landfills" (CJJ93), waste should be spread and compacted in layers, with each layer not exceeding 60cm in thickness and each unit not exceeding 6m in thickness. When a suitable compactor is unavailable, a large bulldozer should be used instead of a compactor, with more than three consecutive compaction passes and a compaction density greater than 600kg / m². However, in actual landfill operations, strict layering and unitization are not implemented. Compaction is only carried out during the leveling process. The compaction density of waste within the landfill area is typically lower than 600kg / m², and compaction is usually conducted in the relatively open central area, with lower compaction on the slopes. For example, the Caterpillar D4 series bulldozer has a working weight of 13.5 tons, and the D8 series has a working weight of 39.5 tons. Landfill bulldozers typically weigh less than 20 tons. Therefore, the load-bearing capacity of waste within the landfill area falls within this range. Due to the low compaction, the load-bearing capacity of the slopes is lower than that in the central area.

[0063] Furthermore, the garbage on the inner side of the slope is cleared, and then loess is backfilled in layers of 50cm thickness and compacted repeatedly using a small bulldozer. The first layer at the bottom is compacted no less than 3 times. After that, each layer is compacted in layers of no more than 50cm thickness, and each layer is compacted no less than 4 times. The final overall compaction degree is no less than 90%, which can withstand repeated rolling by vehicles with a total weight of more than 40 tons.

[0064] Furthermore, a geomembrane is laid over the compacted area to create an independent unit between the domestic waste and the backfill area, preventing contamination of the backfill soil by existing domestic waste or leachate within the reservoir area. A geotextile with a density greater than 600 g / m² or a composite drainage net with a thickness of at least 5 mm is laid on top of the geomembrane to protect it. Subsequently, a steel plate can be laid on top or cement can be poured to integrate the backfill area with the original ground outside the reservoir area, meeting the needs of the workshop's foundation construction.

[0065] Furthermore, the resulting basic structure, from top to bottom, is as follows: 1. Concrete surface or steel plate; 2.600g / ㎡ geotextile or 5mm composite drainage net; 3. Compact clay or loess (thickness > 50cm); 4. Aggregate or construction waste (approximately 50cm per layer); 5. Repeat step 4 based on the actual depth of the landfill area; 6. Foundation compaction of clay or loess layer (thickness > 50cm); 7. The original leachate backflow layer at the bottom of the reservoir; 8. Original seepage-proof layer at the bottom of the reservoir; 9. The original foundation layer at the bottom of the reservoir; 10. The original groundwater backflow layer at the bottom of the reservoir; Items 1 through 6 are newly constructed structural layers.

[0066] Furthermore, taking a municipal solid waste sanitary landfill with a boundary length of 100m as an example, with a dredging depth of 2m, it is estimated that an area of ​​600㎡ can be expanded through the above methods. This will effectively integrate the screening operation area outside the landfill with the landfill area inside the landfill, increase the usable area, shorten the material transportation distance, make the transportation path smoother, and prevent waste from entering other areas of the site during transportation, thus avoiding secondary pollution.

[0067] Furthermore, the above measures can also be adopted for engineering projects where the construction site is not restricted and there is a need for backfilling of the reservoir area. During the waste screening and treatment process, the sorted humus and inorganic aggregates are used as backfill materials, reducing the storage pressure on humus and inorganic aggregates, reducing the need for purchasing external loess, and simultaneously implementing reservoir backfilling. This shortens the engineering treatment cycle, expands the usable construction area, and increases the temporary storage space for various screened materials, forming a virtuous cycle.

[0068] Understandably, this utility model innovatively proposes using the slope area of ​​a municipal solid waste sanitary landfill as the foundation for a screening workshop. Priority is given to excavating and reshaping the municipal solid waste on the slope area, changing the traditional landfill excavation and remediation process which requires complete excavation of the entire surface layer of the landfill before excavating the bottom waste. After excavating the existing waste, an impermeable membrane is laid for effective isolation and partitioning, effectively preventing contamination of the backfill material. Since the screening operation area and the landfill area are on the same plane, a direct passage from the landfill area to the screening area is opened, facilitating the transfer of raw materials. Simultaneous excavation and backfilling operations can effectively shorten the construction period.

[0069] The technical features described above can be combined arbitrarily. Although not all possible combinations of these technical features are described, any combination of these technical features should be considered to be covered by this specification, provided that such combination does not contain contradictions.

[0070] The specific embodiments of this utility model described above do not constitute a limitation on the scope of protection of this utility model. Any other corresponding changes and modifications made based on the technical concept of this utility model should be included within the scope of protection of the claims of this utility model.

Claims

1. A basic structure for a temporary screening workshop inside a landfill area, characterized in that, include: The layers are arranged from bottom to top as follows: base compaction layer, intermediate backfill layer, and surface compaction layer; The basic compacted layer is laid on the original structural layer at the bottom of the landfill, and an anti-seepage isolation layer and a surface layer are sequentially arranged above the surface compacted layer.

2. The basic structure of the temporary screening workshop inside the landfill area according to claim 1, characterized in that, Both the base compacted layer and the surface compacted layer are compacted clay or loess layers, with a thickness greater than 50cm.

3. The basic structure of the temporary screening workshop inside the landfill area according to claim 1, characterized in that, The intermediate backfill layer includes one or more layers of aggregate or construction waste, with a single layer thickness of 50cm.

4. The basic structure of the temporary screening workshop inside the landfill area according to claim 1, characterized in that, The impermeable isolation layer includes an HDPE geomembrane with a thickness of not less than 1.0 mm.

5. The basic structure of the temporary screening workshop inside the landfill area according to claim 4, characterized in that, A protective layer is also provided above the seepage-proof isolation layer. The protective layer is a geotextile with a density greater than 600g / m² or a composite drainage net with a thickness of not less than 5mm.

6. The basic structure of the temporary screening workshop inside the landfill area according to claim 1, characterized in that, The surface layer is either a concrete surface layer or a steel plate paving layer.

7. The basic structure of the temporary screening workshop inside the landfill area according to claim 1, characterized in that, It also includes a vertical impermeable isolation layer installed on the side of the foundation structure, which isolates the foundation structure from the surrounding waste pile.

8. The basic structure of the temporary screening workshop inside the landfill area according to claim 7, characterized in that, The vertical impermeable barrier layer is an HDPE geomembrane with a thickness of not less than 1.0 mm.

9. The basic structure of the temporary screening workshop inside the landfill area according to claim 1, characterized in that, Below the foundation compaction layer are sequentially arranged the original leachate backflow layer at the bottom of the reservoir, the original seepage prevention layer at the bottom of the reservoir, the original foundation layer at the bottom of the reservoir, and the original groundwater backflow layer at the bottom of the reservoir.

10. The foundation structure of the temporary screening workshop inside the landfill area according to any one of claims 1-9, characterized in that, The overall compaction degree of the foundation structure is not less than 90%, and the bearing capacity meets the requirements of repeated rolling by vehicles of more than 40 tons.