A precast pile and pile row

By designing precast piles with asymmetrical mortise and tenon structures and grout overflow ports, the problems of slippage and insufficient water stoppage of existing precast piles in soft soil layers have been solved, achieving adaptation to complex river channels and soil reinforcement effects.

CN225014130UActive Publication Date: 2026-11-24NINGBO ZHONGCHUN HIGH-TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522818926.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-30
Publication Date
2026-11-24
Estimated Expiration
2035-12-30

AI Technical Summary

Technical Problem

Existing precast piles are prone to slippage and tilting in soft soil layers, and traditional connection methods make it difficult to achieve large-angle assembly, resulting in insufficient water-stopping performance, inability to adapt to complex river channels, and construction disturbance of soil structure strength.

Method used

Design a precast pile with an asymmetrical mortise and tenon structure, allowing for large rotation angles during splicing, and achieve grout penetration reinforcement through grouting chambers and overflow outlets to enhance water-stopping performance and overall stability.

Benefits of technology

It improves the adaptability of precast piles in complex river channels, enhances water-stopping performance and overall structural stability, effectively prevents leakage and soil loss, and improves the soil reinforcement effect during construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225014130U_ABST
    Figure CN225014130U_ABST
Patent Text Reader

Abstract

This utility model provides a precast pile and a pile bank, belonging to the technical field of hydraulic or support concrete components. It includes a pile body with a first splicing end and a second splicing end in its width direction. The first splicing end has a mortise extending along the length of the pile body, and the second splicing end has a tenon adapted to the mortise, with the length of the tenon being less than the length of the mortise. Specifically, one side of the first splicing end located at the mortise is recessed by a predetermined distance L relative to the other side in the width direction of the pile body, and / or one side of the second splicing end located at the tenon is recessed by a predetermined distance L relative to the other side in the width direction of the pile body. This structure allows the precast pile to have a large rotation angle during splicing, adapting to complex or curved riverbanks; and the grouting in the mortise penetrates into the soil along the pile body through the overflow port formed by the recessed portion, reinforcing the soil disturbed during construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the technical field of hydraulic or support concrete components, and relates to a precast pile and pile row. Background Technology

[0002] With the continuous advancement of water conservancy infrastructure construction in my country, the importance of river and lake bank slope management projects in preventing soil erosion, ensuring bank stability, and maintaining the ecological environment is becoming increasingly prominent. Among various bank protection structures, precast piles are widely used in water conservancy projects due to their advantages such as convenient construction, controllable quality, and good durability. Currently, common bank protection pile types mainly include steel sheet piles, bored piles, and diaphragm walls, and their construction methods mostly rely on on-site pile driving or cast-in-place operations.

[0003] However, existing technologies still have several prominent problems in practical applications: First, in areas with weak soil layers (such as silt, soft clay, etc.), due to the low shear strength and poor bearing capacity of the soil, traditional piles are difficult to form an effective synergy with the surrounding soil. They are prone to slippage, tilting, or even instability under lateral water and soil pressure, which seriously affects the overall stability of the revetment structure. Second, there are usually large gaps between traditional piles, resulting in insufficient water-stopping performance. This can easily lead to groundwater or river water seeping along the pile joints, which not only weakens the support effect but may also cause soil erosion behind the bank, structural settlement, and even environmental pollution.

[0004] Currently, the industry primarily uses mortise and tenon joints to form pile bank revetment structures to improve the water-stopping performance between piles and overall stability. Some designs utilize tenon joints. However, in practical engineering applications, because concrete remains on both sides of the tenon, adjacent piles are prone to mutual compression when making corner joints, making it difficult to achieve large-angle turning arrangements and weakening the structure's adaptability to complex or curved riverbanks. Furthermore, in soft soil conditions, vibratory pile driving can significantly disturb the structural strength of the surrounding soil, and in high-moisture-content sand, it can even induce localized liquefaction, further reducing the water-stopping and support effects between piles, failing to simultaneously meet the requirements of water-stopping performance and large-angle assembly. Utility Model Content

[0005] The purpose of this utility model is to address the aforementioned problems existing in the prior art by proposing a precast pile and a pile arrangement.

[0006] The purpose of this utility model can be achieved through the following technical solution: a precast pile, including a pile body, the pile body having a first splicing end and a second splicing end in its width direction, the first splicing end having a mortise extending along the length direction of the pile body, the second splicing end having a tenon adapted to the mortise, and the length of the tenon being less than the length of the mortise.

[0007] Wherein, the first splicing end located on one side of the mortise is recessed by a predetermined distance L relative to the other side in the width direction of the pile body, and / or the second splicing end located on one side of the tenon is recessed by a predetermined distance L relative to the other side in the width direction of the pile body.

[0008] Preferably, the value of the predetermined distance L gradually increases along the direction away from the mortise or the tenon.

[0009] Preferably, the tenon extends from one end to the other end along the length of the pile body, and the length of the tenon is more than 1 / 4 of the length of the mortise; the predetermined distance L is greater than or equal to 5 mm.

[0010] Preferably, the second splicing end also has a groove aligned with the tenon along the length of the pile body.

[0011] Preferably, it also includes a grouting pipe embedded in the pile body, wherein the grout outlet of the grouting pipe is located at the junction of the groove and the tenon.

[0012] Preferably, it also includes a reinforcing cage located inside the pile body, and the grouting pipe is tied to the reinforcing cage.

[0013] Preferably, the steel cage is configured with an asymmetrical reinforcement structure in the two halves in the thickness direction of the pile body, and / or the width of the pile body is greater than its thickness.

[0014] Preferably, the pile body is a hollow structure, the cross-sectional profile of one end of the pile body is circular, the cross-sectional profile of the remaining part of the pile body is polygonal or elliptical, and the one end of the pile body and the remaining part of the pile body are transitioned by a diameter reduction structure.

[0015] Preferably, the other end of the pile body is provided with a chamfer at at least one of the first splicing end and the second splicing end.

[0016] A pile bank includes at least two precast piles; in two adjacent precast piles, a tenon on one pile body is tenon-mortise connected to a portion of a mortise on the other pile body, and the upper portion of the tenon on one pile body is joined with the upper portion of the mortise on the other pile body to form a grouting cavity.

[0017] Compared with the prior art, the beneficial effects of this utility model are as follows:

[0018] 1. The protrusion dimensions of the first splicing end and / or the second splicing end on both sides of the mortise and / or tenon are inconsistent, thus forming a thickness difference L. This allows the precast pile to have a larger rotation angle during splicing, so as to adapt to complex or curved riverbanks and avoid concrete damage or failure to interlock between adjacent precast piles due to compression during rotation.

[0019] 2. The gap between the first and second joint ends of two adjacent piles is no longer of equal width, but rather a gradually widening wedge-shaped gap. When there is a slight angular deviation between the two piles during construction or when active cornering is required, this wedge-shaped gap design allows for a larger relative deflection angle, thereby enhancing cornering adaptability.

[0020] 3. Two adjacent piles are joined at the mortise joint to form a grouting cavity. During grouting, the grout is injected from the outlet at the bottom of the grouting pipe, initially entering the bottom of the grouting cavity. As grouting continues, the grout gradually fills the entire grouting cavity from bottom to top under pressure. This method effectively removes air and water from the cavity, preventing the formation of voids or air-filled layers at the top, ensuring the grout is dense, and thus significantly improving the water-stopping performance and integrity of the support or riverbank structure. After the grouting cavity is gradually filled, continued pressurization causes the grout to seep out through the overflow outlet formed at the concave section. The grout penetrates into the soil along the pile body, thereby reinforcing the soil disturbed during construction. Attached Figure Description

[0021] Figure 1A This is an end view of a precast pile in an embodiment of this utility model.

[0022] Figure 1B This is an end view of the precast pile in Embodiment 1 of this utility model.

[0023] Figure 2 This is an axonometric view of a precast pile in an embodiment of this utility model.

[0024] Figure 3 This is a half-sectional schematic diagram of a precast pile in an embodiment of this utility model.

[0025] Figure 4 This is a schematic diagram of the large-angle splicing of various precast piles in an embodiment of this utility model.

[0026] Figure 5 This is a schematic diagram of the precast piles being arranged and spliced ​​along a straight line in an embodiment of this utility model.

[0027] Figure 6 This is a schematic diagram showing the precast pile in the correct installation position in an embodiment of this utility model.

[0028] Figure 7 This is a schematic diagram of the grouting pipe inside the pile body in an embodiment of this utility model.

[0029] In the diagram, 100 is the pile body; 110 is the grouting pipe; 111 is the grout outlet; 120 is the reinforcing cage; 121 is the prestressed steel bar; 122 is the non-prestressed steel bar; 130 is the chamfer; 200 is the first splice end; 210 is the mortise; 300 is the second splice end; 310 is the tenon; 320 is the groove; 400 is the grouting cavity; and 500 is the overflow outlet. Detailed Implementation

[0030] The following are specific embodiments of the present invention, which are described in conjunction with the accompanying drawings. However, the present invention is not limited to these embodiments.

[0031] like Figures 1A to 7 As shown, the precast pile in this embodiment includes a pile body 100. The pile body 100 has a first splicing end 200 and a second splicing end 300 in its width direction. The first splicing end 200 has a mortise 210 extending along the length direction of the pile body 100. The second splicing end 300 has a tenon 310 adapted to the mortise 210, and the length of the tenon 310 is less than the length of the mortise 210.

[0032] Specifically, the first splicing end 200 is recessed by a predetermined distance L on one side of the mortise 210 relative to the other side in the width direction of the pile body 100, and / or the second splicing end 300 is recessed by a predetermined distance L on one side of the tenon 310 relative to the other side in the width direction of the pile body 100.

[0033] The pile body 100 serves as the foundation structure for the entire precast pile, and is made of concrete with an internal steel reinforcement cage 120 to enhance overall strength. The first splicing end 200 and the second splicing end 300 are located on opposite sides of the pile body 100, and are used to splice with other precast piles to form a continuous pile revetment structure.

[0034] The main function of the mortise 210 is to cooperate with the tenon 310 on the adjacent precast pile to form a mortise and tenon interlocking structure, thereby realizing the mechanical interlocking connection between the two precast piles. The shape of the tenon 310 matches the mortise 210, allowing for mortise and tenon interlocking within the mortise 210 of adjacent precast piles. The length of the mortise 210 is greater than the length of the tenon 310. This design ensures that when two adjacent precast piles are spliced, the tenon 310 is only inserted into the lower area of ​​the mortise 210, while the upper area of ​​the mortise 210 remains empty, reserving space for subsequent grouting.

[0035] The mortise 210 is preferably located in the central region of the side of the first splicing end 200. Taking the mortise 210 as the dividing line in the thickness direction of the pile body 100, the protrusion dimensions along the width direction on both sides of the mortise 210 on the first splicing end 200 are different; wherein, the protrusion dimension on one side of the mortise 210 is smaller than the protrusion dimension on the other side of the mortise 210, thus forming a predetermined recess distance L on one side. Similarly, the tenon 310 is located in the central region of the side of the second splicing end 300. Taking the tenon 310 as the dividing line in the thickness direction of the pile body 100, the protrusion dimensions along the width direction on both sides of the tenon 310 on the second splicing end 300 are different; wherein, the protrusion dimension on one side of the tenon 310 is smaller than the protrusion dimension on the other side of the tenon 310, thus forming a predetermined recess distance L on one side.

[0036] The above design significantly improves the adaptability of the pile body to rotation angles during splicing. Because the thickness of the two sides on the splicing end is inconsistent, this asymmetrical design allows the pile body to have a larger rotation angle during splicing, avoiding damage caused by concrete compression and improving the adaptability to complex river channel shapes.

[0037] From an overall structural perspective, when two adjacent precast piles are spliced, the tenon 310 of the second splicing end 300 of one pile is inserted into the lower part of the mortise 210 of the first splicing end 200 of the other pile. Since the length of the tenon 310 is less than the length of the mortise 210, the two only achieve mechanical engagement in the lower region, bearing shear force and providing guidance. In the upper region, the second splicing end 300 is also provided with a groove 320 aligned with the tenon 310. This groove 320 mates with the upper cavity of the mortise 210, together forming a grouting cavity 400. Because the first splicing end 200 and the second splicing end 300 each have different protrusion sizes on both sides of the mortise 210 / tenon 310, after the first splicing end 200 and the second splicing end 300 are spliced, on the backwater side, the sides of the two splicing ends cannot be completely fitted together, but a gap is left, allowing the pile body to adjust freely within a certain angle range.

[0038] It should be further explained that after the first splicing end 200 and the second splicing end 300 are joined together, the gap formed on the back side is the overflow port 500. During the grouting construction, the grout is injected into the grouting cavity 400 through the pre-embedded grouting pipe 110. When the grouting pressure reaches a certain value, some of the grout will seep out to the back side through the overflow port 500 and enter the soil around the pile. This process can effectively fill the disturbance zone or void formed during the pile driving process and improve the pile-soil synergy performance, which is especially suitable for soft soil layers (such as silt and soft clay).

[0039] The above structure allows the precast piles to have a large rotation angle during splicing, so as to adapt to complex or curved riverbanks; and the grouting of the groove 210 penetrates into the soil through the overflow port 500 formed by the recessed part along the pile body 100, which can reinforce the soil disturbed during construction.

[0040] Example 1:

[0041] like Figure 1B As shown, the value of the predetermined distance L gradually increases in the direction away from the mortise 210 or the tenon 310.

[0042] Specifically, the surface of the side with the smaller protrusion size on the splicing end is a sloped or curved surface structure. For example, as the side with the smaller protrusion size of the first splicing end 200 extends from the area near the mortise 210 towards the outer edge of the splicing end (away from the mortise 210), the protrusion size on that side gradually decreases, thereby gradually increasing the indentation (i.e., the local L value) of that side relative to the other side.

[0043] After splicing, the gap between the first splicing end 200 and the second splicing end 300 of two adjacent piles is no longer of equal width, but rather a gradually widening wedge-shaped gap. When there is a slight angular deviation between the two piles during construction or when active cornering is required, this wedge-shaped gap design allows for a larger relative deflection angle, thereby enhancing cornering adaptability.

[0044] like Figure 1A As shown, in another embodiment, the value of the predetermined distance L is a constant, that is, the value of the predetermined distance L remains unchanged along the direction away from the mortise 210 or the tenon 310.

[0045] like Figures 1A to 3 , Figure 7 As shown, based on the above embodiment, the tenon 310 extends from one end of the pile body 100 along its length to the other end, and the length of the tenon 310 is more than 1 / 4 of the length of the mortise 210; the predetermined distance L is greater than or equal to 5 mm.

[0046] The tenon 310 needs to be inserted into the lower part of the mortise 210 of the adjacent pile to form a reliable shear force transfer interface. If the tenon 310 is too short (e.g., <1 / 4 of the length of the mortise 210), the interlocking area is insufficient, and relative slippage is likely to occur under lateral soil and water pressure, weakening the overall integrity of the pile row. A tenon 310 of appropriate length can ensure good deformation coordination between adjacent piles under stress, avoid stress concentration at local nodes, and a longer tenon 310 can slide more stably along the mortise 210 during pile driving, acting as a guide rail and improving the verticality of pile driving and the alignment accuracy of the joint. In addition, the predetermined distance L has a minimum threshold limit. If the value of L is less than 5 mm, it means that the gap is too narrow, making it difficult to guarantee the feasibility of large-angle construction, that is, the concrete surfaces of the two pile bodies 100 joint ends will still contact and collide during large-angle splicing.

[0047] Based on the above embodiment, the second splicing end 300 also has a groove 320 aligned with the tenon 310 along the length of the pile body 100. Specifically, the groove 320 and the tenon 310 are strictly aligned along the length of the pile body 100, that is, they are coaxial and in the same longitudinal position. The groove 320 and the tenon 310 are connected end to end and occupy the entire length of the second splicing end 300, forming a composite splicing profile that is convex at the bottom and concave at the top.

[0048] The width, depth, and cross-sectional shape of the groove 320 match the mortise 210 on the first splicing end 200, ensuring that a grouting cavity 400 can be formed after splicing. After splicing two adjacent precast piles, a grouting cavity 400 can be formed between the mortise 210 and the groove 320. Concrete grout is injected into the joint of the two adjacent precast piles above the soil through the grouting cavity 400, thereby forming a waterstop. Based on this, because the protrusions on both sides of the splicing part are of different sizes, the grouting cavity 400 is not closed in the circumferential direction. Instead, an overflow port 500 is formed between the mortise 210 and the groove 320 near the backwater side. The overflow port 500 allows the grout in the grouting cavity 400 to penetrate into the soil around the pile, thereby reinforcing the soil.

[0049] like Figure 3 , Figure 5 , Figure 7 As shown, based on the above embodiment, it also includes a grouting pipe 110 embedded in the pile body 100, and the grout outlet 111 of the grouting pipe 110 is located at the junction of the groove 320 and the tenon 310.

[0050] The joint area refers to the transition area where the top of the tenon 310 on the second splicing end 300 meets the bottom of the groove 320. It is usually located in the lower middle to middle part of the longitudinal height of the pile body 100. Spatially, this position corresponds exactly to the bottom of the grouting cavity 400 formed after the splicing of two adjacent piles.

[0051] like Figures 1A to 7 As shown, two adjacent piles are joined at the mortise joint to form a grouting cavity. During grouting, the grout is injected from the outlet 111 at the bottom of the grouting pipe 110, first entering the bottom of the grouting cavity 400. As grouting continues, the grout gradually fills the entire grouting cavity 400 from bottom to top under pressure. This method effectively removes air and water from the cavity, preventing the formation of voids or air-filled layers at the top, ensuring the grout is dense, and thus significantly improving the water-stopping performance and integrity of the support or riverbank structure. After the grouting cavity 400 is gradually filled, continued pressurization causes the grout to seep out through the overflow outlet 500 formed at the concave part. The grout penetrates into the soil along the pile body, thereby reinforcing the soil disturbed during construction.

[0052] In principle, setting the grout outlet 111 at the junction of the groove 320 and the tenon 310, i.e. the lowest geometric point of the grouting cavity 400, allows the grout to rise from the most unfavorable filling area, which conforms to the optimal path of fluid mechanics.

[0053] like Figures 4 to 6 As shown, based on the above embodiment, it also includes a steel cage 120 located inside the pile body 100, and the grouting pipe 110 is tied to the steel cage 120.

[0054] Based on the above implementation method, the mortise 210 or tenon 310 is used as the dividing line in the thickness direction of the pile body 100, and the steel cage 120 is configured to have an asymmetrical reinforcement structure in the two halves in the thickness direction of the pile body 100, and / or the width value of the pile body 100 is greater than the thickness value.

[0055] The reinforcing cage 120 is composed of several prestressed steel bars 121 and non-prestressed steel bars 122. The prestressed steel bars 121 and non-prestressed steel bars 122 are arranged in a ring around the circumference of the pile body 100 cross-section, but their distribution is not uniform and symmetrical. Instead, they are directionally and asymmetrically configured according to the stress characteristics of the revetment pile under actual service conditions, thus forming an asymmetrical reinforcement structure. Specifically, only prestressed steel bars 121 are arranged in one half of the circumferential area of ​​the pile body 100 cross-section; in the other half of the circumferential area, prestressed steel bars 121 and non-prestressed steel bars 122 are arranged alternately.

[0056] In river and lake bank protection projects, precast piles typically bear lateral soil and water pressure from the water-facing side. Therefore, the half of the pile body's cross-section closest to the water-facing side is the compression zone, while the half closest to the backwater side (the side behind the bank) is the tension zone. Based on this stress characteristic, when arranging precast piles, the compression zone (water-facing side) of the pile body uses prestressed steel bars 121 throughout, utilizing their high compressive stiffness and prestress to effectively suppress concrete cracking and improve flexural bearing capacity. Meanwhile, the tension zone (backwater side) of the pile body uses a mixture of prestressed steel bars 121 and non-prestressed steel bars 122, which effectively bears tensile forces and controls crack development.

[0057] Based on the above design, the first splicing end 200 and the second splicing end 300 are located on both sides of the width of the pile body 100, and their positions strictly correspond to the asymmetrical reinforcement area of ​​the steel cage 120. When the pile body is installed in the correct posture (i.e., the compression zone faces the river channel), when two adjacent piles are spliced, the first splicing end 200 of one pile is exactly aligned with the second splicing end 300 of the other pile, achieving normal interlocking and the formation of the grouting cavity 400. If the installation angle of the pile body 100 is incorrect, the position that should be in the compression zone becomes the tension zone, and the steel reinforcement arrangement is a mixture of prestressed and non-prestressed steel reinforcement 122. The splicing end types of the two piles will be mismatched, that is, the first splicing end 200 is opposite to the first splicing end 200, or the second splicing end 300 is opposite to the second splicing end 300, causing the precast pile to be unable to be assembled.

[0058] The above design enables the precast piles to have installation direction recognition and error-proof assembly functions. Only when the pile body is installed in the correct orientation can the splicing ends be successfully connected. When the pile body is in the wrong orientation, the mortise 210 cannot engage with the mortise 210, and the tenon 310 cannot be inserted into the tenon 310, making it physically impossible to complete the assembly.

[0059] like Figures 1A to 3 As shown, based on the above implementation method, the pile body 100 is a hollow structure, the cross-sectional profile of one end of the pile body 100 is circular, the cross-sectional profile of the rest of the pile body 100 is polygonal or elliptical, and the one end of the pile body 100 and the rest of the pile body 100 are connected by a diameter reduction structure.

[0060] Currently, most mainstream hydraulic pile hammers, static pressure pile drivers, or vibratory pile driving equipment feature clamping devices with circular inner cavities, specifically designed for circular piles or pipe piles. If the entire pile has a polygonal cross-section, it is difficult to stably clamp it using existing equipment. Precast piles, however, by having a circular end at the top, allow them to be directly compatible with existing pile driving equipment, eliminating the need for customized clamps. Furthermore, a 100mm polygonal main body segment (such as a hexagon) provides higher torsional stiffness and lateral stability, and the tenon-and-mortise interlocking between adjacent piles is more reliable.

[0061] Based on the above implementation method, the other end of the pile body 100 is provided with a chamfer 130 at at least one of the first splicing end 200 and the second splicing end 300.

[0062] One or more edges at the lower part of the pile body 100 are cut into bevels or chamfered angles 130, thus shaping the pile tip. During pile driving, the pile tip is the first to enter the soil. If the standard polygonal edges are maintained, significant soil resistance will be encountered, especially in hard soil layers or strata containing gravel, where jamming is likely to occur. The chamfered angle 130 design forms a pointed structure, reducing the lateral friction and penetration resistance when the pile tip enters the soil layer, guiding the pile tip to smoothly cut into the soil layer, and avoiding deviation or sinking difficulties caused by edge scraping.

[0063] like Figures 1A to 7 As shown, a pile bank includes at least two precast piles; in two adjacent precast piles, the tenon 310 of one pile body 100 is mortised and tenoned with a portion of the mortise 210 of the other pile body 100, and the upper part of the tenon 310 of one pile body 100 is joined with the upper part of the mortise 210 of the other pile body 100 to form a grouting cavity 400.

[0064] Two adjacent precast piles are functionally connected through their splicing ends. Specifically, the second splicing end 300 of one precast pile mates with the first splicing end 200 of the adjacent precast pile. During installation, the tenon 310 is inserted into the mortise 210 of the adjacent pile, but only occupies the lower part of the mortise 210. The tenon and mortise form a mechanical interlocking connection, which not only effectively transmits lateral shear force, but also plays a guiding and limiting role during pile driving. At the same time, the groove 320 mates with the upper part of the mortise 210 of the adjacent pile that is not occupied by the tenon 310, and the two together enclose a grouting cavity 400 that extends continuously along the length of the pile body 100. Thus, the same mortise 210 is used in sections, with the lower section used for structural interlocking and the upper section used to form the grouting space. After the pile wall construction is completed, solidifiable grout is injected into the grouting cavity 400 through the grouting pipe 110 pre-embedded inside the pile body 100. Under the grouting pressure, the grout fully fills the entire grouting cavity 400 and forms a continuous concrete water-stop structure after hardening. This water-stop structure effectively seals the seepage channels existing between traditional precast piles due to splicing gaps, significantly improving the water-stopping performance between piles and preventing river water or groundwater from seeping into the soil behind the bank along the joints, thus solving the long-standing problem of insufficient water-stopping between piles in hydraulic revetment projects. At the same time, the solidified water-stop structure rigidly connects adjacent precast piles, transforming the originally discrete single-pile system into a continuous wall with overall load-bearing capacity, greatly enhancing the bending resistance, shear resistance, and overall stability of the pile wall structure.

[0065] It should be noted that all directional indicators (such as up, down, left, right, front, back, etc.) in this utility model embodiment are only used to explain the relative positional relationship and movement of each component in a certain specific posture (as shown in the figure). If the specific posture changes, the directional indicator will also change accordingly.

[0066] Furthermore, in this utility model, the use of terms such as "first," "second," and "a" is for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this utility model, "multiple" means at least two, such as two, three, etc., unless otherwise explicitly specified.

[0067] In this utility model, unless otherwise explicitly specified and limited, the terms "connection," "fixing," etc., should be interpreted broadly. For example, "fixing" can mean a fixed connection, a detachable connection, or an integral part; it can mean a mechanical connection or an electrical connection; it can mean a direct connection or an indirect connection through an intermediate medium; it can mean the internal communication of two components or the interaction between two components, unless otherwise explicitly limited. Those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.

[0068] Furthermore, the technical solutions of the various embodiments of this utility model can be combined with each other, but only if they are based on the ability of those skilled in the art to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such combination of technical solutions does not exist and is not within the scope of protection claimed by this utility model.

Claims

1. A precast pile, comprising a pile body (100), said pile body (100) having a first splicing end (200) and a second splicing end (300) in its width direction, characterized in that, The first splicing end (200) has a mortise (210) extending along the length of the pile body (100), and the second splicing end (300) has a tenon (310) adapted to the mortise (210), and the length of the tenon (310) is less than the length of the mortise (210). Wherein, the first splicing end (200) located on one side of the mortise (210) is recessed by a predetermined distance L in the width direction of the pile body (100) relative to the other side, and / or the second splicing end (300) located on one side of the tenon (310) is recessed by a predetermined distance L in the width direction of the pile body (100) relative to the other side.

2. A precast pile as described in claim 1, characterized in that: The value of the predetermined distance L gradually increases in the direction away from the mortise (210) or the tenon (310).

3. A precast pile as described in claim 1 or 2, characterized in that: The tenon (310) extends from one end of the pile body (100) along its length to the other end, and the length of the tenon (310) is more than 1 / 4 of the length of the mortise (210); the predetermined distance L is greater than or equal to 5 mm.

4. A precast pile as described in claim 1, characterized in that: The second splicing end (300) also has a groove (320) that is aligned with the tenon (310) in the length direction of the pile body (100).

5. A precast pile as described in claim 4, characterized in that: It also includes a grouting pipe (110) embedded in the pile body (100), the grout outlet of the grouting pipe (110) being located at the junction of the groove (320) and the tenon (310).

6. A precast pile as described in claim 5, characterized in that: It also includes a steel cage (120) located inside the pile body (100), and the grouting pipe (110) is tied to the steel cage (120).

7. A precast pile as described in claim 6, characterized in that: The steel cage (120) is configured to have an asymmetrical reinforcement structure in the two halves of the pile body (100) in the thickness direction, and / or the width of the pile body (100) is greater than the thickness.

8. A precast pile as described in claim 1 or 2, characterized in that: The pile body (100) is a hollow structure. The cross-sectional profile of one end of the pile body (100) is circular, and the cross-sectional profile of the rest of the pile body (100) is polygonal or elliptical. The end of the pile body (100) and the rest of the pile body (100) are connected by a diameter reduction structure.

9. A precast pile as described in claim 8, characterized in that: The other end of the pile body (100) is provided with a chamfer (130) at at least one of the first splicing end (200) and the second splicing end (300).

10. A type of pile foundation, characterized in that, It includes at least two precast piles as described in any one of claims 1 to 9; in two adjacent precast piles, the tenon (310) of one pile body (100) is mortised and tenoned with a portion of the mortise (210) of the other pile body (100), and the upper part of the tenon (310) of one pile body (100) is joined with the upper part of the mortise (210) of the other pile body (100) to form a grouting cavity (400).