A pipe pile structure for improving construction efficiency
By setting a positioning mechanism on the pipe piles, and using components such as installation grooves and connecting grooves, the precise positioning and reinforcement of adjacent piles can be achieved, solving the parallelism problem during welding and improving construction efficiency and stability.
Patent Information
- Application Number
- CN202522716174.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-22
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-22
AI Technical Summary
In existing pipe pile construction, the length of a single pipe pile is insufficient to meet the requirements, and it is difficult to ensure the parallelism of adjacent pipe piles during welding, which affects construction efficiency.
The positioning mechanism, which includes multiple mounting slots and connecting slots, uses components such as mounting blocks, connecting plates, and reinforcing frames to achieve precise positioning and reinforcement of adjacent piles, reducing welding difficulty and improving construction efficiency.
By precisely positioning and reinforcing, the parallelism of adjacent piles during welding is ensured, reducing welding difficulty and improving construction efficiency and stability.
Smart Images

Figure CN225014134U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of pipe pile construction, and in particular to a pipe pile structure that is conducive to improving construction efficiency. Background Technology
[0002] Pipe piles are a type of prestressed concrete pile, mainly used in the foundation of building projects, and have the characteristics of high bearing capacity and convenient construction.
[0003] Currently, the main construction methods for pipe piles are driving the piles into the ground, such as hammering and static pressure methods. However, the length of a single pipe pile is often insufficient to meet the construction length requirements. In such cases, it is necessary to weld adjacent pipe piles together. However, when welding adjacent pipe piles, it is usually necessary to ensure the parallelism of the two adjacent pipe piles. The existing method usually involves directly splicing two pipe piles together, which makes it difficult to ensure the parallelism of the splice. Further adjustments are required, which affects the construction efficiency. Therefore, there is a need to provide a pipe pile structure that can improve construction efficiency. Utility Model Content
[0004] In order to improve the processing efficiency during pipe pile construction, this application provides a pipe pile structure that is conducive to improving construction efficiency.
[0005] The present application provides a pipe pile structure that is beneficial to improving construction efficiency, which adopts the following technical solution: A pipe pile structure that is beneficial to improving construction efficiency includes a pile body, and each adjacent pile body is provided with a corresponding positioning mechanism;
[0006] The positioning mechanism includes multiple first mounting slots formed on one of the piles, each containing a corresponding first mounting block that is slidably installed. Each first mounting block is fixedly installed to the bottom of the other pile. Two first connecting slots are symmetrically formed on one of the piles, each containing a corresponding connecting plate that is slidably installed. The connecting plate is fixedly installed to the bottom of the other pile. Multiple corresponding ingot-shaped components are welded onto the pile, with the spacing between adjacent ingot-shaped components ranging from 50 centimeters to 200 centimeters.
[0007] By adopting the above technical solution, the splicing of adjacent piles can be completed through the cooperation of multiple first mounting slots and first mounting blocks, and then the corresponding first connecting slots and connecting plates can be used to fix the position again.
[0008] Preferably, one of the pile bodies is fixedly installed with an installation plate, the installation plate has a groove, a reinforcing frame is slidably installed in the groove, and the reinforcing frame is integrally connected with the connecting plate.
[0009] By adopting the above technical solution, and through the coordinated installation of grooves and reinforcing frames, adjacent piles can be further positioned and supported.
[0010] Preferably, the mounting plate has an opening on its side, the opening is through the first connecting groove, and the connecting plate is located inside the opening.
[0011] By adopting the above technical solution and setting openings, an auxiliary installation function can be achieved.
[0012] Preferably, the length of the first mounting block is the same as the length of the mounting plate.
[0013] By adopting the above technical solution, the length of the first mounting block is set to be the same as the length of the mounting plate, which facilitates positioning and installation.
[0014] Preferably, the length of the groove is less than the length of the mounting plate.
[0015] By adopting the above technical solution, the length of the groove is less than the length of the mounting plate, thus enabling support installation.
[0016] Preferably, the positioning mechanism further includes multiple corresponding second mounting slots formed on one of the pile bodies and two corresponding through-connected second connecting slots. Each of the multiple second mounting slots has a corresponding second mounting block slidably installed in it, and each of the two second connecting slots has a corresponding connecting rod slidably installed in it. Both connecting rods are integrally connected to the corresponding second mounting blocks.
[0017] By adopting the above technical solution, and through the cooperation of the second connecting groove and the connecting rod, the splicing and positioning of the upper pile and the lower pile can be completed.
[0018] Preferably, one of the pile bodies has two symmetrically formed T-slots, and a corresponding T-block is slidably installed in each of the two T-slots. The second mounting block, the connecting rod, and the T-block are all fixedly installed to the bottom of the other pile body. The second mounting block has two symmetrically formed mounting openings on its side, and a corresponding spring is fixedly installed in each of the two mounting openings. A corresponding protrusion is fixedly installed at one end of each of the two springs, and most of the two protrusions are located inside the mounting openings. The inner wall of the second mounting slot has symmetrically formed inner grooves that are adapted to the corresponding protrusions. The second connecting slot has multiple corresponding toothed grooves that are formed through it. A corresponding locking tooth is slidably installed in each of the multiple toothed grooves, and the multiple locking teeth are integrally installed with the corresponding connecting rod.
[0019] By adopting the above technical solution, and through the cooperation of the corresponding T-slots and T-blocks, the piles above and below can be reinforced and connected, further improving the stability and firmness of the connection between adjacent piles.
[0020] By making the upper protrusion smaller than the lower protrusion, the lower protrusion will not enter the upper inner groove when it passes through it. This allows the two protrusions of different sizes to be inserted into the corresponding inner grooves, further improving the stability and firmness of the installation.
[0021] The toothed groove and locking teeth are used in conjunction for installation, and multi-directional force locking can be achieved, thus further improving shear and pull-out resistance and reducing dependence on welding quality.
[0022] In summary, this application includes at least one of the following beneficial technical effects:
[0023] 1. This application utilizes the cooperation of first mounting slots, etc., to complete the splicing of adjacent piles through the cooperation of multiple first mounting slots and first mounting blocks. Then, the corresponding first connecting slots and connecting plates can be used to fix the position again. Finally, the installation of grooves and reinforcing frames can further position and support adjacent piles. At this time, welding operations can be performed on adjacent piles. Therefore, the parallelism of adjacent piles during welding can be further guaranteed, the welding difficulty can be reduced, and the processing efficiency during pile construction can be improved.
[0024] 2. This application employs an inner groove and the like, where the upper protrusion is smaller than the lower protrusion. This prevents the lower protrusion from entering the upper inner groove when it passes through it, allowing two protrusions of different sizes to be inserted into the corresponding inner grooves. This further enhances the stability and firmness of the installation. Furthermore, the combination of toothed grooves and locking teeth enables multi-directional force locking, thus further improving shear and pull-out resistance and reducing reliance on welding quality. Attached Figure Description
[0025] Figure 1 This is a schematic diagram of the overall structure of a pipe pile structure that is beneficial to improving construction efficiency, as described in Embodiment 1 of this application.
[0026] Figure 2 This is a bottom view of Embodiment 2 of this application, which mainly illustrates the positioning structure.
[0027] Figure 3 This is a partial unfolded schematic diagram of Embodiment 2 of this application, which mainly illustrates the positioning structure.
[0028] Figure 4 This is a top view schematic diagram of Embodiment 3 of this application, which mainly illustrates the positioning structure;
[0029] Figure 5 This is an exploded view of the positioning structure, which is the main feature of Embodiment 3 of this application.
[0030] Figure 6This is a schematic diagram of the slot portion of the positioning structure, which is the main feature of Embodiment 3 of this application.
[0031] Reference numerals: 1. Pile body; 2. First mounting groove; 3. First mounting block; 4. Mounting plate; 5. Groove; 6. Reinforcing frame; 7. First connecting groove; 8. Connecting plate; 9. Opening; 10. Second mounting groove; 11. Second mounting block; 12. Second connecting groove; 13. Connecting rod; 15. T-slot; 16. T-block; 17. Tooth groove; 18. Mounting port; 19. Spring; 20. Protrusion; 21. Inner groove; 22. Clamping tooth; 23. Ingot component. Detailed Implementation
[0032] The following is in conjunction with the appendix Figures 1-6 This application will be described in further detail.
[0033] This application discloses a pipe pile structure that is beneficial to improving construction efficiency.
[0034] Reference Figure 1 A pipe pile structure that is beneficial to improving construction efficiency includes a pile body 1, wherein the ingot-shaped component 23 on the outer surface of the pile body 1 is ingot-shaped and the adjacent ingot-shaped components 23 are evenly distributed on the pile body 1 with a spacing of 50 cm to 200 cm. When the pile body 1 is inserted into the ground, the ingot-shaped component 23 can increase the contact area with the soil and further improve the stability and firmness of the pile body 1.
[0035] Furthermore, the ingot-shaped component 23 has four protrusions on the side near the pile body 1, which are distributed around the outer perimeter of the pile body 1. These protrusions are inlaid with the ingot-shaped component 23, thus improving the tensile stability and firmness of the pile body 1 when used in conjunction with the ingot-shaped component 23.
[0036] Among them, the overall shape of the ingot piece 23 is roughly a three-dimensional boat-shaped structure with a thick middle and upturned ends, and its shape imitates the traditional ingot.
[0037] The top surface is an approximately elliptical curved surface that is wider in the middle and narrower at both ends, with the central area smoothly concave downwards, forming one or more arc-shaped grooves.
[0038] Viewed from the front or side, the exterior outline is symmetrical mountain shape, with both ends clearly curving upwards and gradually tapering, the middle part being full and arched, and the side lines being smooth S-shaped curves.
[0039] Among them, the end is a near-triangular or fan-shaped structure with a pointed top and a wider bottom, and the inner side of the raised part often has an inward concave arc.
[0040] Example 2
[0041] Reference Figure 2-3 The difference from Embodiment 1 is that a corresponding positioning mechanism is also provided on the adjacent pile body 1;
[0042] The positioning mechanism includes multiple first mounting slots 2 opened on one of the pile bodies 1, each of which has a corresponding first mounting block 3 slidably installed in the multiple first mounting slots 2, and each of the multiple first mounting blocks 3 is fixedly installed to the bottom of the other pile body 1. Two first connecting slots 7 are symmetrically opened on one of the pile bodies 1, and each of the two first connecting slots 7 has a corresponding connecting plate 8 slidably installed in the two first connecting slots 7, and the connecting plate 8 is fixedly installed to the bottom of the other pile body 1.
[0043] One of the piles 1 has an installation plate 4 fixedly installed inside it. The installation plate 4 has a groove 5. A reinforcing frame 6 is slidably installed inside the groove 5. The reinforcing frame 6 is integrally connected with the connecting plate 8.
[0044] The mounting plate 4 has an opening 9 on its side, which is connected to the first connecting groove 7, and the connecting plate 8 is located inside the opening 9.
[0045] The length of the first mounting block 3 is the same as the length of the mounting plate 4, and the length of the groove 5 is less than the length of the mounting plate 4.
[0046] In use, the joint of multiple first mounting slots 2 and first mounting blocks 3 can complete the splicing of adjacent piles 1. Then, the corresponding first connecting slots 7 and connecting plates 8 can be used to fix the position again. Finally, the joint installation of grooves 5 and reinforcing frames 6 can further position and support adjacent piles 1. At this time, welding operations can be performed on adjacent piles 1. Therefore, the parallelism of adjacent piles 1 during welding can be further guaranteed and the welding difficulty can be reduced, which is conducive to improving the processing efficiency of pile 1 during construction.
[0047] Example 3
[0048] Reference Figure 4-6 The difference from Embodiment 2 is that the positioning mechanism on the adjacent pile 1 has a different structure than the positioning mechanism in Embodiment 2.
[0049] The positioning mechanism also includes multiple corresponding second mounting slots 10 opened on one of the pile bodies 1 and two corresponding through-connected second connecting slots 12. Each of the multiple second mounting slots 10 has a corresponding second mounting block 11 slidably installed in it, and each of the two second connecting slots 12 has a corresponding connecting rod 13 slidably installed in it. Both connecting rods 13 are integrally connected to the corresponding second mounting block 11.
[0050] Among them, two T-slots 15 are symmetrically opened on one of the pile bodies 1, and corresponding T-blocks 16 are slidably installed in both T-slots 15. The second mounting block 11, the connecting rod 13 and the T-blocks 16 are all fixedly installed to the bottom of the other pile body 1.
[0051] The second mounting block 11 has two symmetrical mounting openings 18 on its side. A corresponding spring 19 is fixedly installed in each of the two mounting openings 18. A corresponding protrusion 20 is fixedly installed at one end of each of the two springs 19. Most of the two protrusions 20 are located inside the mounting openings 18. The inner wall of the second mounting groove 10 has symmetrically opened inner grooves 21 that are adapted to the corresponding protrusions 20. A plurality of corresponding toothed grooves 17 are opened through the second connecting groove 12. A corresponding locking tooth 22 is slidably installed in each of the plurality of toothed grooves 17. The plurality of locking teeth 22 are integrally installed with the corresponding connecting rod 13.
[0052] In use, the upper pile 1 and the lower pile 1 can be spliced and positioned by the cooperation of the second connecting groove 12 and the connecting rod 13. Then, by the cooperation of the corresponding T-slot 15 and T-block 16, the upper and lower piles 1 can be reinforced and connected, which further improves the stability and firmness of the connection between adjacent piles 1. Welding can then be carried out. Therefore, there is no need for workers to hold the piles 1 for support and positioning, which further reduces the use of personnel.
[0053] By making the upper protrusion 20 smaller than the lower protrusion 20, the lower protrusion 20 will not enter the upper inner groove 21 when it passes through it. This allows the two protrusions 20 of different sizes to be inserted into the corresponding inner groove 21, further improving the stability and firmness after installation.
[0054] The toothed groove 17 and the locking tooth 22 are installed together, and multi-directional force locking can be achieved, thus further improving the shear and pull-out resistance and reducing the dependence on welding quality.
[0055] This application employs two different structural methods for positioning and support splicing, which can be selected according to usage requirements, thus further improving adaptability and flexibility during use.
[0056] The implementation principle of a pipe pile structure that improves construction efficiency according to an embodiment of this application is as follows: When it is necessary to weld and lengthen adjacent piles 1, the adjacent piles 1 can be spliced by the cooperation of multiple first mounting grooves 2 and first mounting blocks 3. Then, the corresponding first connecting grooves 7 and connecting plates 8 can be used to fix the position again. Finally, the adjacent piles 1 can be positioned and supported by the cooperation of grooves 5 and reinforcing frames 6. At this time, the adjacent piles 1 can be welded. Therefore, the parallelism of adjacent piles 1 during welding can be further guaranteed and the welding difficulty can be reduced, which is conducive to improving the processing efficiency of pile 1 during construction.
[0057] Through the cooperation of the second connecting groove 12 and the connecting rod 13, the splicing and positioning of the upper pile 1 and the lower pile 1 can be completed. Then, through the cooperation of the corresponding T-slot 15 and T-block 16, the upper and lower piles 1 can be reinforced and connected, further improving the stability and firmness of the connection between adjacent piles 1. Then welding can be carried out. Therefore, there is no need for workers to hold the piles 1 for support and positioning, further reducing the use of personnel.
[0058] This application employs two different structural methods for positioning and support splicing, which can be selected according to usage requirements, thus further improving adaptability and flexibility during use.
[0059] The above are all preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made in accordance with the structure, shape and principle of this application should be covered within the scope of protection of this application.
Claims
1. A pipe pile structure that improves construction efficiency, comprising a pile body (1), characterized in that: Each of the adjacent piles (1) is provided with a corresponding positioning mechanism; The positioning mechanism includes multiple first mounting slots (2) opened on one of the pile bodies (1), and a corresponding first mounting block (3) is slidably installed in each of the multiple first mounting slots (2). The multiple first mounting blocks (3) are fixedly installed to the bottom of the other pile body (1). Two first connecting slots (7) are symmetrically opened on one of the pile bodies (1). A corresponding connecting plate (8) is slidably installed in each of the two first connecting slots (7). The connecting plate (8) is fixedly installed to the bottom of the other pile body (1). Multiple corresponding ingot-shaped parts (23) are welded on the pile body (1). The distance between adjacent ingot-shaped parts (23) is 50 cm to 200 cm.
2. The pipe pile structure according to claim 1, which is beneficial to improving construction efficiency, is characterized in that: An installation plate (4) is fixedly installed inside one of the pile bodies (1). A groove (5) is provided on the installation plate (4). A reinforcing frame (6) is slidably installed in the groove (5). The reinforcing frame (6) is integrally connected with the connecting plate (8).
3. The pipe pile structure according to claim 2, which is beneficial to improving construction efficiency, is characterized in that: The mounting plate (4) has an opening (9) on its side, and the opening (9) is connected to the first connecting groove (7). The connecting plate (8) is located inside the opening (9).
4. The pipe pile structure according to claim 3, which is beneficial to improving construction efficiency, is characterized in that: The length of the first mounting block (3) is the same as the length of the mounting plate (4).
5. The pipe pile structure according to claim 4, which is beneficial to improving construction efficiency, is characterized in that: The length of the groove (5) is less than the length of the mounting plate (4).
6. The pipe pile structure according to claim 1, which is beneficial to improving construction efficiency, is characterized in that: The positioning mechanism also includes multiple corresponding second mounting slots (10) opened on one of the pile bodies (1) and two corresponding through-connected second connecting slots (12). Each of the multiple second mounting slots (10) has a corresponding second mounting block (11) slidably installed in it, and each of the two second connecting slots (12) has a corresponding connecting rod (13) slidably installed in it. Both connecting rods (13) are integrally connected to the corresponding second mounting block (11).
7. A pipe pile structure according to claim 6 that is beneficial for improving construction efficiency, characterized in that: Two T-slots (15) are symmetrically provided on one of the pile bodies (1), and a corresponding T-block (16) is slidably installed in each of the two T-slots (15). The second mounting block (11), the connecting rod (13), and the T-block (16) are all fixedly installed to the bottom of the other pile body (1). Two mounting openings (18) are symmetrically provided on the side of the second mounting block (11), and a corresponding spring (19) is fixedly installed in each of the two mounting openings (18). One end of each of the two protrusions (20) is fixedly installed. Most of the two protrusions (20) are located in the mounting opening (18). The inner wall of the second mounting groove (10) is symmetrically provided with inner grooves (21) that are adapted to the corresponding protrusions (20). Multiple corresponding toothed grooves (17) are provided through the second connecting groove (12). A corresponding locking tooth (22) is slidably installed in each of the multiple toothed grooves (17). The multiple locking teeth (22) are integrally installed with the corresponding connecting rod (13).