Prestressed pipe pile water resistance protection structure

By combining the first and second clamps, along with the rubber sealing block and trapezoidal sealing ring, the problem that the protective sleeve cannot adapt to the diameter of the pile core reinforcement in the existing technology is solved, thus achieving efficient waterproofing and stable connection of the prestressed pipe pile head.

CN225014135UActive Publication Date: 2026-11-24ZHEJIANG HONGCHAO CONSTR GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202522786741.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-29
Publication Date
2026-11-24
Estimated Expiration
2035-12-29

AI Technical Summary

Technical Problem

In existing waterproof structures for prestressed pipe pile heads, the protective sleeves are difficult to adapt to the different diameters of the pile core steel bars, resulting in reduced sealing performance and easy failure due to construction errors or material deformation.

Method used

The system employs a combination of first and second clamps, connected by positioning blocks and positioning bolts. The rubber sealing block is squeezed and deformed to fit tightly against the pile core reinforcement, and the sealing performance is improved by trapezoidal sealing rings and structural adhesive. The cover plate and fixing ring enhance stability.

Benefits of technology

It achieves a tight fit between reinforcing bars of different diameters in the pile core, avoiding sealing failure and improving the waterproofing effect and structural stability of the pile head.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225014135U_ABST
    Figure CN225014135U_ABST
Patent Text Reader

Abstract

This application relates to a water-resistant protection structure for prestressed concrete pipe piles, belonging to the technical field of prestressed concrete pipe piles. It includes a pile head body, with two core steel bars fixedly connected to the inner wall of the pile head body, and a cement waterproof layer fixedly connected to the outer surface of the pile head body. This application utilizes components such as positioning bolts, threaded cylinders, rubber sealing blocks, and receiving grooves. First, the first and second clamps are aligned. The positioning block and positioning bolts pass through the positioning holes. Finally, the connection between the positioning bolts and the threaded cylinder completes the connection between the first and second clamps. At this time, the rubber sealing block is compressed and deformed, tightly adhering to the core steel bars. Excess deformation is squeezed into the receiving groove. Therefore, during use, the connection between the first and second clamps compresses and deforms the rubber sealing block, allowing it to tightly fit core steel bars of different diameters, achieving an adaptive effect to the core steel bar diameter and avoiding sealing failure due to construction errors or material deformation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of prestressed pipe pile technology, and in particular to a water-resistant protection structure for prestressed pipe piles. Background Technology

[0002] As a widely used type of pile foundation, prestressed concrete pipe piles often expose their pile heads to groundwater, rainwater, or soil moisture. If waterproofing measures are not in place, moisture can easily seep into the pile core, causing problems such as steel corrosion and concrete spalling, which seriously affect the durability and structural safety of the pile foundation. Existing technologies have various pile head waterproofing structures, such as using waterproof membranes to cover the pile head surface and forming a waterproof barrier by combining cement waterproofing layers, side waterproof membranes, and top waterproof membranes.

[0003] An existing patent (publication number: CN222923805U) discloses a waterproof structure for prestressed concrete pipe pile heads, including a cement waterproof layer covering the surface of the pile head body, a bottom waterproof membrane laid on top of the concrete base layer, a side waterproof membrane laid on the outer surface of the cement waterproof layer, and a top waterproof membrane laid on the top surface of the cement waterproof layer; the edge of the top waterproof membrane is bent downwards and covers the side waterproof membrane inside, and a weather-resistant adhesive A is provided between the side waterproof membrane and the top waterproof membrane; this utility model improves and optimizes the waterproof structure of prestressed concrete pipe pile heads in the prior art. By designing a top waterproof membrane with a downward folded edge and an annular protrusion, the top and bottom ends of the side waterproof membrane can be effectively wrapped and sealed, further improving the waterproof effect and preventing water seepage. At the same time, protective sleeves and other structures are designed to ensure the sealing of the top of the pile core reinforcement, thereby improving the overall waterproof effect of the prestressed concrete pipe pile head.

[0004] However, in the above-mentioned solution, it was found that a protective sleeve needs to be used to cover the outside of the pile core reinforcement. The sleeve is sealed by connecting the sleeve to the protrusion through a pre-cut groove to accommodate the protrusion. However, the protective sleeve does not have self-adaptive ability and is difficult to fit tightly with pile core reinforcement of different diameters. In actual use, it is often affected by construction errors or material deformation, which reduces the compatibility between the protective sleeve and the pile core reinforcement. This causes the joint between the pile core reinforcement and the waterproof membrane to become a weak point for water seepage. Therefore, it is necessary to design an adaptive sealing structure that can adapt to reinforcement of different diameters. Utility Model Content

[0005] The purpose of this application is to provide a water-resistant protection structure for prestressed pipe piles, which has the advantage of being able to squeeze and deform the rubber sealing block through the connection of the first clamp and the second clamp, thereby being able to fit tightly with the core steel bars of different diameters, achieving the effect of adapting to the diameter of the core steel bars, avoiding sealing failure due to construction errors or material deformation, and solving the problems mentioned in the background art.

[0006] This application provides a prestressed concrete pipe pile water-resistant protection structure with the following technical solution: It includes a pile head body, with two core steel bars fixedly connected to the inner wall of the pile head body. A cement waterproof layer is fixedly connected to the outer surface of the pile head body, and a first waterproof membrane is laid on the upper surface of the cement waterproof layer. Each core steel bar penetrates the cement waterproof layer and the first waterproof membrane. A protective sleeve is fitted onto the outer surface of each core steel bar. Each protective sleeve includes a first clamp and a second clamp. Two positioning blocks are fixedly connected to the back of each first clamp, and a positioning bolt is fixedly connected to the back of each positioning block. Two positioning holes are opened on the front of each second clamp. The outer surfaces of each positioning block and positioning bolt are adapted to the inner walls of the corresponding positioning holes. A threaded cylinder is threaded onto the outer surface of each positioning bolt. A rubber sealing block is fixedly embedded in the inner wall of each first clamp and second clamp. Two receiving grooves are opened in the inner wall of each first clamp and second clamp, and each rubber sealing block is adapted to the corresponding receiving groove.

[0007] By adopting the above technical solution, the core steel bars are set on the inner wall of the pile head body, a cement waterproof layer is set on the outer surface of the pile head body, and a first waterproof membrane is laid on the upper surface of the cement waterproof layer. The core steel bars penetrate the cement waterproof layer and the first waterproof membrane to achieve the laying of the first waterproof membrane. A protective sleeve is set on the surface of the core steel bars, and a first clamp and a second clamp are combined to form a complete sleeve. The positioning block and positioning bolt are fixed to the first clamp to achieve the installation of the positioning bolt. A positioning hole is opened on the front of the second clamp, and the positioning block and positioning bolt are adapted to the corresponding positioning hole, so that the end of the positioning block can penetrate the positioning hole and extend out of the second clamp. The first and second clamps are connected by a threaded cylinder and a positioning bolt. Rubber sealing blocks are embedded in the inner walls of the first and second clamps, and receiving grooves are formed in the inner walls of the first and second clamps. When the first and second clamps are fitted together, the rubber sealing blocks can be compressed and deformed. At this time, the rubber sealing blocks are tightly fitted with the pile core steel bars, and the excess part is squeezed into the receiving groove. This allows the device to compress and deform the rubber sealing blocks through the connection of the first and second clamps, thereby enabling it to fit tightly with pile core steel bars of different diameters, achieving the effect of adapting to the diameter of the pile core steel bars and avoiding sealing failure due to construction errors or material deformation.

[0008] Preferably, structural adhesive is provided between each of the first clamps and the second clamps and the first waterproof membrane, and a trapezoidal sealing ring is fixedly embedded on the bottom surface of each of the first clamps and the second clamps.

[0009] By adopting the above technical solution, after the first clamp and the second clamp are connected, structural adhesive is set between them and the first waterproof membrane, so that the protective sleeve can be firmly bonded to the upper surface of the first waterproof membrane through the structural adhesive. A trapezoidal sealing ring is set on the bottom surface of the first clamp and the second clamp. When the first clamp and the second clamp are fixed to the upper surface of the first waterproof membrane, the trapezoidal sealing ring is in contact with the first waterproof membrane. Moreover, the inclined surface design of the trapezoidal sealing ring can improve the sealing performance at the joint between the first clamp and the second clamp and the first waterproof membrane.

[0010] Preferably, each of the first clamps is provided with a cover plate above it, and a fixing ring is fixedly connected to the bottom surface of each cover plate.

[0011] By adopting the above technical solution, the cover plate is placed above the first clamp, and a fixing ring is installed on the bottom surface of the cover plate to fix the fixing ring.

[0012] Preferably, the inner wall of each fixing ring is adapted to the outer surface of the corresponding first clamp and second clamp, and the upper surface of each first clamp and second clamp is fixedly connected with a fixing bolt.

[0013] By adopting the above technical solution, the fixing ring is adapted to the surface of the corresponding first clamp and second clamp, so that after the cover plate is placed above the first clamp and second clamp, the fixing ring can be fitted onto the outer surface of the first clamp and second clamp, and the fixing bolt is fixed on the upper surface of the corresponding first clamp and second clamp, thereby realizing the installation of the fixing bolt.

[0014] Preferably, each of the fixing bolts has a nut threaded onto its outer surface, and each fixing bolt passes through the corresponding cover plate.

[0015] By adopting the above technical solution, the nut is placed on the outer surface of the fixing bolt, and the fixing bolt passes through the corresponding cover plate. At this time, the connection between the cover plate and the first clamp and the second clamp is completed through the connection of the fixing bolt and the nut, thereby improving the stability of the first clamp and the second clamp after connection.

[0016] Preferably, a concrete base layer is fixedly connected to the outer surface of the pile head body, and a second waterproof membrane is laid on the upper surface of the concrete base layer.

[0017] By adopting the above technical solution, the concrete base layer is set on the outer surface of the pile head body, and the second waterproof membrane is set on the upper surface of the concrete base layer to achieve the laying of the second waterproof membrane.

[0018] Preferably, a third waterproof membrane is laid on the outer surface of the cement waterproof layer, and the outer surface of the third waterproof membrane is in contact with the inner walls of the first and second waterproof membranes.

[0019] By adopting the above technical solution, the third waterproof membrane is laid on the outer surface of the cement waterproof layer, and the third waterproof membrane is bonded to the first and second waterproof membranes, so that the third waterproof membrane can support the first and second waterproof membranes.

[0020] Preferably, a first weather-resistant adhesive is provided between the first waterproof membrane and the third waterproof membrane, and a second weather-resistant adhesive is provided between the second waterproof membrane and the third waterproof membrane.

[0021] By adopting the above technical solution, a first weather-resistant adhesive is provided between the first waterproof membrane and the third waterproof membrane, and a second weather-resistant adhesive is provided between the second waterproof membrane and the third waterproof membrane. The sealing performance of the joint between the first waterproof membrane, the second waterproof membrane and the third waterproof membrane can be improved by providing the first weather-resistant adhesive and the second weather-resistant adhesive.

[0022] In summary, this application includes at least one of the following beneficial technical effects: This prestressed concrete pipe pile water-resistant protection structure, through the setting of positioning bolts, threaded cylinders, rubber sealing blocks, and receiving grooves, firstly aligns the first and second clamps, then passes the positioning block and positioning bolts through the positioning holes, and finally connects the first and second clamps by connecting the positioning bolts and the threaded cylinder. At this time, the rubber sealing block is compressed and deformed, tightly adhering to the pile core reinforcement. The excess deformed part is squeezed into the receiving groove. Therefore, during use, the connection of the first and second clamps compresses and deforms the rubber sealing block, enabling it to tightly adhere to pile core reinforcements of different diameters, achieving... To achieve the effect of adaptive pile core steel bar diameter, and to avoid sealing failure due to construction errors or material deformation, the first and second clamps are connected to the first waterproof membrane through the receiving groove. The trapezoidal sealing rings embedded at the bottom of the first and second clamps improve the sealing performance at the joint between the first and second clamps and the first waterproof membrane. The cover plate and fixing ring are placed on the upper surface of the first and second clamps, and the fixing bolts are passed through the corresponding cover plates. The connection between the cover plate and the first and second clamps is completed through the connection of the fixing bolts and nuts, thereby improving the stability of the first and second clamps after connection. Attached Figure Description

[0023] Figure 1 This is a schematic diagram of the entire application in three dimensions; Figure 2 This is a schematic diagram of the overall front view of this application; Figure 3 This is a structural schematic diagram of the main sectional view of this application; Figure 4 This is a structural diagram illustrating the connection between the cover plate and the retaining ring in this application; Figure 5This is a structural schematic diagram showing the connection relationship between the second clamp and the positioning hole in this application; Figure 6 This is a schematic diagram showing the connection between the rubber sealing block and the receiving groove in this application.

[0024] In the picture: 1. Pile head body; 2. Pile core reinforcement; 3. Cement waterproof layer; 4. First waterproof membrane; 5. Protective sleeve; 501. First clamp; 502. Second clamp; 503. Positioning block; 504. Positioning bolt; 505. Positioning hole; 506. Threaded cylinder; 507. Rubber sealing block; 508. Structural adhesive; 509. Receiving groove; 510. Trapezoidal sealing ring; 511. Cover plate; 512. Fixing ring; 513. Fixing bolt; 514. Nut; 6. Concrete base layer; 7. Second waterproof membrane; 8. Third waterproof membrane; 9. First weather-resistant adhesive; 10. Second weather-resistant adhesive. Detailed Implementation

[0025] The following is in conjunction with the appendix Figure 1 - Appendix Figure 6 This application will be described in further detail below.

[0026] Example 1: A water-resistant protection structure for prestressed pipe piles, please refer to [link / reference]. Figure 1 , Figure 2 and Figure 3 The system includes a pile head body 1, with two core steel bars 2 fixedly connected to the inner wall of the pile head body 1. A cement waterproof layer 3 is fixedly connected to the outer surface of the pile head body 1. A first waterproof membrane 4 is laid on the upper surface of the cement waterproof layer 3. Each core steel bar 2 penetrates the cement waterproof layer 3 and the first waterproof membrane 4. The core steel bars 2 are set on the inner wall of the pile head body 1, the cement waterproof layer 3 is set on the outer surface of the pile head body 1, and the first waterproof membrane 4 is laid on the upper surface of the cement waterproof layer 3. The core steel bars 2 penetrate the cement waterproof layer 3 and the first waterproof membrane 4 to achieve the laying of the first waterproof membrane 4.

[0027] Please see Figure 4 , Figure 5 and Figure 6Each core steel bar 2 has a protective sleeve 5 fitted on its outer surface. Each protective sleeve 5 includes a first clamp 501 and a second clamp 502. The protective sleeve 5 is set on the surface of the core steel bar 2, and the first clamp 501 and the second clamp 502 are combined to form a complete sleeve. Two positioning blocks 503 are fixedly connected to the back of each first clamp 501, and positioning bolts 504 are fixedly connected to the back of each positioning block 503. Two positioning holes 505 are opened on the front of each second clamp 502. Each positioning block 503 and positioning bolt 504 are connected to the back of each positioning bolt 504. The outer surface of each positioning bolt 504 is adapted to the inner wall of the corresponding positioning hole 505. Each positioning bolt 504 has a threaded sleeve 506 threaded onto its outer surface. The positioning bolt 504 is installed by fixing the positioning block 503 and positioning bolt 504 to the first clamp 501. A positioning hole 505 is opened on the front of the second clamp 502, allowing the positioning block 503 and positioning bolt 504 to be adapted to the corresponding positioning hole 505. This allows the end of the positioning block 503 to pass through the positioning hole 505 and extend out of the second clamp 502. The threaded sleeve 506 is then used to further install the positioning bolt 504. The cylinder 506 is connected to the positioning bolt 504, thereby connecting the first clamp 501 and the second clamp 502. A rubber sealing block 507 is fixedly embedded in the inner wall of each first clamp 501 and second clamp 502. Two receiving grooves 509 are formed in the inner wall of each first clamp 501 and second clamp 502. Each rubber sealing block 507 is adapted to the corresponding receiving groove 509. The rubber sealing block 507 is embedded in the inner wall of the first clamp 501 and second clamp 502, and the receiving grooves 509 are formed in the first clamp 501 and second clamp 502. When the first clamp 501 and the second clamp 502 are in contact, the rubber sealing block 507 can be compressed and deformed. At this time, the rubber sealing block 507 is tightly attached to the core steel bar 2, and the excess part is squeezed into the interior of the receiving groove 509. This allows the device to compress and deform the rubber sealing block 507 through the connection of the first clamp 501 and the second clamp 502 during use, so that it can be tightly attached to the core steel bar 2 of different diameters, achieving the effect of adapting to the diameter of the core steel bar 2, and avoiding sealing failure due to construction errors or material deformation.

[0028] Example 2: A water-resistant protection structure for prestressed pipe piles, please refer to [link / reference]. Figure 3 , Figure 5 and Figure 6Each first clamp 501 and second clamp 502 is provided with structural adhesive 508 between itself and the first waterproof membrane 4. A trapezoidal sealing ring 510 is fixedly embedded on the bottom surface of each first clamp 501 and second clamp 502. When the first clamp 501 and second clamp 502 are connected, structural adhesive 508 is provided between them and the first waterproof membrane 4, so that the protective sleeve 5 can be firmly bonded to the upper surface of the first waterproof membrane 4 through the structural adhesive 508. The trapezoidal sealing ring 510 is provided on the bottom surface of the first clamp 501 and second clamp 502. When the first clamp 501 and second clamp 502 are fixed to the upper surface of the first waterproof membrane 4, the trapezoidal sealing ring 510 fits with the first waterproof membrane 4. And through the inclined surface design of the trapezoidal sealing ring 510, the sealing performance of the fit between the first clamp 501 and second clamp 502 and the first waterproof membrane 4 can be improved.

[0029] Please see Figure 4 , Figure 5 and Figure 6 Each first clamp 501 is provided with a cover plate 511 above it. A fixing ring 512 is fixedly connected to the bottom surface of each cover plate 511. The cover plate 511 is placed above the first clamp 501, and the fixing ring 512 is installed on the bottom surface of the cover plate 511 to fix the fixing ring 512. The inner wall of each fixing ring 512 is adapted to the outer surface of the corresponding first clamp 501 and second clamp 502. A fixing bolt 513 is fixedly connected to the upper surface of each first clamp 501 and second clamp 502. The fixing ring 512 is adapted to the surface of the corresponding first clamp 501 and second clamp 502, so that after the cover plate 511 is placed above the first clamp 501 and second clamp 502, the fixing ring... 512 can be fitted onto the outer surface of the first clamp 501 and the second clamp 502, and the fixing bolt 513 is fixed on the upper surface of the corresponding first clamp 501 and the second clamp 502 to realize the installation of the fixing bolt 513. The outer surface of each fixing bolt 513 is threaded with a nut 514. Each fixing bolt 513 penetrates the corresponding cover plate 511. The nut 514 is set on the outer surface of the fixing bolt 513. Through the connection of the fixing bolt 513 and the nut 514, the connection of the cover plate 511 and the first clamp 501 and the second clamp 502 is completed, thereby improving the stability of the first clamp 501 and the second clamp 502 after connection.

[0030] Please see Figure 1 , Figure 2 and Figure 3A concrete base layer 6 is fixedly connected to the outer surface of the pile head body 1. A second waterproof membrane 7 is laid on the upper surface of the concrete base layer 6. The concrete base layer 6 is set on the outer surface of the pile head body 1, and the second waterproof membrane 7 is set on the upper surface of the concrete base layer 6 to realize the laying of the second waterproof membrane 7. A third waterproof membrane 8 is laid on the outer surface of the cement waterproof layer 3. The outer surface of the third waterproof membrane 8 is attached to the inner wall of the first waterproof membrane 4 and the second waterproof membrane 7. The third waterproof membrane 8 is laid on the outer surface of the cement waterproof layer 3, and the third waterproof membrane 8 is attached to the first waterproof membrane 4 and the second waterproof membrane 7, so that the third waterproof membrane 8 can support between the first waterproof membrane 4 and the second waterproof membrane 7.

[0031] Please see Figure 1 , Figure 2 and Figure 3 A first weather-resistant adhesive 9 is provided between the first waterproof membrane 4 and the third waterproof membrane 8, and a second weather-resistant adhesive 10 is provided between the second waterproof membrane 7 and the third waterproof membrane 8. The provision of the first weather-resistant adhesive 9 and the second weather-resistant adhesive 10 can improve the sealing performance of the connection between the first waterproof membrane 4, the second waterproof membrane 7 and the third waterproof membrane 8.

[0032] The implementation principle of this application embodiment is as follows: First, the third waterproof membrane 8 is laid on the outer periphery of the cement waterproof layer 3. Then, the first waterproof membrane 4 and the second waterproof membrane 7 are laid on the upper surfaces of the cement waterproof layer 3 and the concrete base layer 6, respectively. The first weather-resistant adhesive 9 and the second weather-resistant adhesive 10 are set between the first waterproof membrane 4 and the third waterproof membrane 8 and the second waterproof membrane 7 and the third waterproof membrane 8, thus completing the laying of the waterproof membrane. At this time, the protective sleeve 5 is put on the outside of the corresponding pile core steel bar 2, and the positioning block 503 and the positioning bolt 504 are passed through the corresponding positioning hole 505. The connection of the first clamp 501 and the second clamp 502 is completed through the connection of the positioning bolt 504 and the threaded cylinder 506. At this time, the rubber sealing block 507 is deformed under pressure and tightly fits the pile core steel bar 2. The excess rubber sealing block 507 is squeezed into the interior of the receiving groove 509, thereby enabling... By connecting the first clamp 501 and the second clamp 502, the rubber sealing block 507 is squeezed and deformed to achieve a tight fit with the core steel bars 2 of different diameters. It can adapt to the diameter of the core steel bars 2 and avoid sealing failure due to construction errors or material deformation. The first clamp 501 and the second clamp 502 are stably connected to the first waterproof membrane 4 by the structural adhesive 508. The trapezoidal sealing ring 510 improves the sealing performance at the joint between the first clamp 501 and the second clamp 502 and the first waterproof membrane 4. After installation, the cover plate 511 and the fixing ring 512 are put on the first clamp 501 and the second clamp 502. The connection between the cover plate 511 and the first clamp 501 and the second clamp 502 is completed by the connection of the fixing bolts 513 and the nuts 514, thereby improving the stability of the first clamp 501 and the second clamp 502 after connection.

Claims

1. A water-resistant protection structure for prestressed pipe piles, comprising a pile head body (1), characterized in that: Two core steel bars (2) are fixedly connected to the inner wall of the pile head body (1). A cement waterproof layer (3) is fixedly connected to the outer surface of the pile head body (1). A first waterproof membrane (4) is laid on the upper surface of the cement waterproof layer (3). Each core steel bar (2) penetrates the cement waterproof layer (3) and the first waterproof membrane (4). A protective sleeve (5) is fitted on the outer surface of each core steel bar (2). Each protective sleeve (5) includes a first clamp (501) and a second clamp (502). Two positioning blocks (503) are fixedly connected to the back of each first clamp (501). A positioning screw is fixedly connected to the back of each positioning block (503). Each of the first clamps (501) and the second clamps (502) has two positioning holes (505) on its front side. The outer surface of each positioning block (503) and the positioning bolt (504) is adapted to the inner wall of the corresponding positioning hole (505). The outer surface of each positioning bolt (504) is threaded with a threaded cylinder (506). The inner wall of each first clamp (501) and the second clamp (502) is fixedly inlaid with a rubber sealing block (507). The inner wall of each first clamp (501) and the second clamp (502) has two receiving grooves (509). Each rubber sealing block (507) is adapted to the corresponding receiving groove (509).

2. The prestressed pipe pile water-resistant protection structure according to claim 1, characterized in that: Structural adhesive (508) is provided between each of the first clamp (501) and the second clamp (502) and the first waterproof membrane (4), and a trapezoidal sealing ring (510) is fixedly embedded on the bottom surface of each of the first clamp (501) and the second clamp (502).

3. The prestressed pipe pile water-resistant protection structure according to claim 1, characterized in that: Each of the first clamps (501) is provided with a cover plate (511) above it, and a fixing ring (512) is fixedly connected to the bottom surface of each cover plate (511).

4. The prestressed pipe pile water-resistant protection structure according to claim 3, characterized in that: The inner wall of each of the fixed rings (512) is adapted to the outer surface of the corresponding first clamp (501) and second clamp (502), and the upper surface of each first clamp (501) and second clamp (502) is fixedly connected with a fixing bolt (513).

5. The prestressed pipe pile water-resistant protection structure according to claim 4, characterized in that: Each of the fixing bolts (513) has a nut (514) threaded onto its outer surface, and each of the fixing bolts (513) passes through the corresponding cover plate (511).

6. The water-resistant protection structure for prestressed pipe piles according to claim 1, characterized in that: The outer surface of the pile head body (1) is fixedly connected to a concrete base layer (6), and a second waterproof membrane (7) is laid on the upper surface of the concrete base layer (6).

7. A prestressed pipe pile water-resistant protection structure according to claim 6, characterized in that: The outer surface of the cement waterproof layer (3) is covered with a third waterproof membrane (8), and the outer surface of the third waterproof membrane (8) is in contact with the inner wall of the first waterproof membrane (4) and the second waterproof membrane (7).

8. A prestressed pipe pile water-resistant protection structure according to claim 7, characterized in that: A first weather-resistant adhesive (9) is provided between the first waterproof membrane (4) and the third waterproof membrane (8), and a second weather-resistant adhesive (10) is provided between the second waterproof membrane (7) and the third waterproof membrane (8).