Modular ecological revetment pile construction guide

By using a modular ecological bank-stabilizing wooden pile construction guide device, the wooden piles are kept vertically sinking by using guide rails and adaptive clamping units, which solves the problems of wooden pile offset and verticality in traditional construction and achieves efficient and precise wooden pile construction results.

CN225014151UActive Publication Date: 2026-11-24HUBEI TENGSHENG ENG MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522797950.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-30
Publication Date
2026-11-24
Estimated Expiration
2035-12-30

AI Technical Summary

Technical Problem

Traditional wooden pile construction in water or soft soil areas has a long construction period. The wooden piles are easily displaced by water flow, making it difficult to maintain verticality and positional accuracy, which affects the structural quality and aesthetics.

Method used

A modular ecological bank stabilization timber pile construction guide device is adopted, which includes parallel-arranged guide rails and adaptive clamping units. It is fixed in the design position by rigid connectors and positioning rods, and the timber pile posture is maintained by roller brackets and spring buffer structure to achieve the initial positioning and vertical sinking of multiple timber piles.

Benefits of technology

It improves construction efficiency, ensures the verticality and positional accuracy of wooden piles, reduces overall costs, adapts to construction needs of different scales and spacings, and enhances the quality and aesthetics of pile formation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225014151U_ABST
    Figure CN225014151U_ABST
Patent Text Reader

Abstract

This invention provides a modular ecological bank stabilization timber pile construction guide device, comprising two parallel guide rails, with rigid connectors at both ends of the guide rails, connecting the two guide rails via the rigid connectors. A float is provided at the bottom of the guide rails, and multiple adaptive clamping units are provided on opposite sides of the two guide rails. Each adaptive clamping unit includes rollers, which are elastically slidably connected to the guide rails. The rollers on the two guide rails are used to clamp the timber piles located between the two guide rails. This invention enables the simultaneous or batch installation and initial positioning of all timber piles within a construction section. The piling equipment does not need to be frequently moved for individual timber piles; multiple pre-positioned timber piles can be driven sequentially at fixed points, increasing construction efficiency several times over.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of bank stabilization pile construction technology, specifically to a modular ecological bank stabilization pile construction guidance device. Background Technology

[0002] In river management and ecological bank protection projects, wooden piles are commonly used as structural materials for bank stabilization and slope protection. Traditional wooden pile construction, especially in water or soft soil areas, typically involves using excavators equipped with hydraulic vibratory hammers to drive each pile individually. For each pile driven, the construction equipment must be moved to the target location, and manual labor or auxiliary machinery is required to support, center, and correct the verticality of the pile to resist water flow impact and ensure accurate positioning and verticality. This construction method is cumbersome, has a long overall construction period, and in flowing water environments, the wooden piles are easily displaced and tilted during hoisting and sinking due to water flow impact. It is difficult to continuously and stably control their posture manually or with a crane, resulting in significant deviations in the verticality and planar position of the final pile, affecting structural quality and aesthetics. Utility Model Content

[0003] The purpose of this invention is to address the shortcomings of existing technologies by providing a modular ecological bank stabilization timber pile construction guidance device. This device enables the simultaneous or batch-wise hoisting and initial positioning of all timber piles within a construction section. The piling equipment does not require frequent movement for individual piles; it can sequentially drive multiple pre-positioned piles from a fixed point, increasing construction efficiency several times over.

[0004] To address the aforementioned technical problems, this utility model provides a modular ecological bank stabilization timber pile construction guide device, comprising two parallel guide rails, with rigid connectors at both ends of the guide rails, the two guide rails being connected by the rigid connectors, a float at the bottom of the guide rails, and multiple adaptive clamping units on opposite sides of the two guide rails, each adaptive clamping unit including a roller, the roller being elastically slidably connected to the guide rail, and the rollers on the two guide rails being used to clamp the timber pile located between the two guide rails.

[0005] In some embodiments, the adaptive clamping unit includes a guide bracket and a roller bracket. The roller is mounted on the roller bracket, and a sliding hole is formed on the guide bracket. The roller bracket is slidably connected to the guide bracket through the sliding hole, and the guide bracket and the roller bracket are elastically connected by a spring.

[0006] In some embodiments, the sliding holes are symmetrically opened on both sides of the guide bracket, the roller bracket includes a sliding rod, the sliding rod is slidably disposed in the two sliding holes, and two springs are symmetrically disposed inside the guide bracket, one end of the two springs is fixedly connected to the sliding rod, and the other end of the two springs is fixedly connected to the inner wall of the guide bracket.

[0007] In some embodiments, the included angle between the two springs is an acute angle.

[0008] In some embodiments, the rigid connector includes two end connectors and a chain connecting the two end connectors. The end connectors are fixedly connected to the ends of the guide rails. A connecting gear is rotatably disposed on the end connector and meshes with the chain. A plurality of positioning rods are disposed between the two guide rails. The positioning rods abut against the two guide rails through rollers, thereby tauting the chain.

[0009] In some embodiments, the guide rail includes multiple guide rail units, each with a bayonet at both ends. Adjacent guide rail units are connected by a connecting stabilizer. The connecting stabilizer includes a float, and two connecting blocks are provided on the top of the float. The two connecting blocks are respectively installed in the bayonet of two adjacent guide rail units and are interference-fitted with the bayonet.

[0010] In some embodiments, slots are provided at the bottom of both ends of the guide rail unit, and the float and the connecting block are connected by a connecting plate, which is inserted into the slot.

[0011] In some embodiments, a partition is provided between the two connecting blocks, and the partition abuts against the end face of the guide rail unit.

[0012] In some embodiments, a rubber sleeve is fitted onto the roller.

[0013] In some embodiments, the distance between two adjacent pulleys is no greater than the radius of the wooden stake.

[0014] The beneficial effects of this utility model are as follows: 1. This utility model, through two parallel guide rails and a densely packed adaptive clamping unit in between, enables the simultaneous or batch lifting and initial positioning of all wooden piles within a construction section. The piling equipment does not require frequent movement for individual piles; it can sequentially drive multiple piles already in place at a fixed point, increasing construction efficiency several times over.

[0015] 2. This utility model utilizes positioning rods inserted into both ends of the guide rail and submerged to the bottom of the water. Through their squeezing action and the synergy of rigid connecting parts (such as chains), the entire guiding device is quickly and accurately fixed in the designed position.

[0016] 3. The V-shaped guide bracket and the roller bracket with spring buffer set on the inner side of the guide rail of this utility model constitute an adaptive clamping unit. During the sinking process, the wooden pile is subjected to elastic compression and guidance from the rollers on both sides, which can automatically center and maintain an approximately vertical posture, effectively resist the impact of water flow, ensure the stability of the wooden pile during sinking and driving, and greatly improve the accuracy of the pile position.

[0017] 4. The guide rail of this utility model is assembled from standardized guide rail units by connecting stabilizers. It can be flexibly assembled according to the construction design length and adapt to different scales of work sections.

[0018] 5. The rigid connector of this utility model can adopt the connection method of "connecting gear + chain". By changing the chain of different lengths, it can adapt to the construction needs of wooden piles with different spacing, and has high versatility.

[0019] 6. The guiding device of this utility model has a high reusability, which reduces the overall cost. Attached Figure Description

[0020] Figure 1 This is a schematic diagram illustrating the use of this utility model; Figure 2 This is a schematic diagram showing the connection between the two guide rail units of this utility model; Figure 3 This is a schematic diagram of the guide rail unit of this utility model; Figure 4 This is a cross-sectional view of the guide rail unit of this utility model; Figure 5 This is a schematic diagram of the structure of the connection stabilizer of this utility model; Figure 6 This is a structural schematic diagram of the rigid connector of this utility model; Figure 7 This is a schematic diagram of the assembly of the rigid connector and the guide rail unit of this utility model; Figure 8 This is an isometric view of the adaptive clamping unit of this utility model; Figure 9 This is a schematic diagram of the internal structure of the guide bracket of this utility model.

[0021] Reference numerals: guide rail 1; guide rail unit 11; bayonet 111; slot 112; connecting stabilizer 2; first float 21; connecting block 22; connecting plate 23; partition 24; rigid connector 3; second float 31; end block 32; connecting gear 33; chain 34; adaptive clamping unit 4; guide bracket 41; sliding hole 411; roller bracket 42; sliding rod 421; roller 43; V-shaped rod 44; spring 45; positioning rod 5; wooden stake 6. Detailed Implementation

[0022] To make the technical problems, technical solutions, and beneficial effects to be solved by this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and are not intended to limit the scope of this application.

[0023] like Figure 1As shown, this utility model provides a modular ecological bank stabilization timber pile construction guide device, including a guide rail 1, a connecting stabilizer 2, a rigid connector 3, an adaptive clamping unit 4, and a positioning rod 5.

[0024] like Figure 1 As shown, two guide rails 1 are arranged in parallel and connected by a rigid connector 3. The two guide rails 1 are used to position the wooden piles 6 during construction. Figure 2 As shown, the guide rail 1 includes multiple guide rail units 11 connected in sequence, and adjacent guide rail units 11 are connected by a connecting stabilizer 2.

[0025] like Figure 3 As shown, the guide rail unit 11 is made of high-strength, corrosion-resistant aluminum alloy material. The guide rail unit 11 adopts a rectangular hollow profile design, as shown... Figure 4 As shown, its cross-section is arranged in a double I-shape, forming a hollow slot. The two ends of the slot are bayonets 111 for connection to the stabilizer 2 or the rigid connector 3. The standard cross-sectional dimensions of the guide rail unit 11 are 180mm high, 190~230mm wide, and 10mm thick. The bottom of the guide rail unit 11 has a 30mm wide slot 112 for connection to the stabilizer 2 or the rigid connector 3.

[0026] like Figure 5 As shown, the connecting stabilizer 2 includes a first float 21, a connecting block 22, a connecting plate 23, and a partition 24. The first float 21 is trapezoidal and is composed of a sealed steel cylinder filled with high-density polyethylene floats. The connecting plate 23 is fixedly mounted on the top of the first float 21. Two connecting blocks 22 are provided and symmetrically fixed on the top of the connecting plate 23. The partition 24 is located between the two connecting blocks 22. The size of the connecting block 22 is adapted to the size of the bayonet 111 of the guide rail unit 11, so that the connecting block 22 can be interference-fitted with the bayonet 111 after being inserted into the bayonet 111, thereby fixing the connecting block 22 to the guide rail unit 11. The thickness of the connecting plate 23 is adapted to the width of the slot 112 of the guide rail unit 11, and is used for positioning the connecting block 22 during the insertion process into the bayonet 111.

[0027] like Figure 6 , 7As shown, the rigid connector 3 includes two second floats 31. An end block 32 is fixedly mounted on the top of each second float 31. The structure of the end block 32 is the same as that of the connecting block 22. The end block 32 is used for an interference fit with the bayonet 111 of the guide rail unit 11. A connecting gear 33 is rotatably mounted on the top of each second float 31. The two connecting gears 33 are connected by a chain 34. Two positioning rods 5 are provided between the two guide rails 1. The two positioning rods 5 are located at both ends of the guide rails 1. By pressing the two guide rails 1, the two guide rails 1 tend to move away from each other, thereby tauting the chain 34. The positioning rods 5 can be made directly from wooden stakes 6, with pointed ends. Figure 1 As shown.

[0028] Furthermore, the connecting gear 33 and chain 34 of the rigid connector 3 can be replaced by a crossbeam, which can be directly welded to the two second floats 31 to fix the two guide rails 1 together. In this case, the positioning rod 5 is not needed. However, the connection method of using the connecting gear 33 and chain 34 makes the connection of the two guide rails 1 more flexible. For wooden stakes 6 of different diameters, only chains of different lengths need to be replaced.

[0029] It should be noted that when the first float 21 and the second float 31 cannot ensure that the guide rail 1 floats on the water surface during the piling process, a float can also be welded to the bottom of the guide rail 1.

[0030] like Figure 8 As shown, multiple adaptive clamping units 4 are fixedly installed on one side of the two guide rails 1 facing each other. Each adaptive clamping unit 4 includes a guide bracket 41 and a roller bracket 42. The guide bracket 41 is V-shaped, with sliding holes 411 on both sides. The roller bracket 42 is rectangular, with rollers 43 mounted on it. The rollers 43 are located outside the guide bracket 41. The roller bracket 42 includes two parallel sliding rods 421. One end of each sliding rod 421 is inserted into one of the two sliding holes 411 and slidably connected to them. The ends of the two sliding rods 421 inserted into the guide bracket 41 are connected by a connecting rod. Figure 9 As shown, a V-shaped rod 44 and two springs 45 are provided inside the guide bracket 41. The V-shaped rod 44 is welded to the connecting rod. The two ends of the V-shaped rod 44 are fixedly connected to one end of the two springs 45 respectively. The other ends of the two springs 45 are fixedly connected to the guide bracket 41. The included angle between the two springs 45 is an acute angle.

[0031] Understandably, by setting up elastic rollers 43, when the wooden stake 6 is inserted between the two guide rails 1, the two rollers 43 can press firmly against both sides of the wooden stake 6, restricting the posture of the wooden stake 6 and ensuring the stability of the wooden stake 6 during sinking into the water and the sinking process. The rollers 43 should be as densely distributed as possible; for example, the distance between two adjacent rollers 43 should not be greater than the radius of the wooden stake 6, so that the rollers 43 can restrict the horizontal movement of each wooden stake 6. In addition, rubber sleeves are fitted on the rollers 43 to increase the friction with the wooden stake 6 and prevent slippage.

[0032] The method for constructing timber piles 6 using this modular ecological bank stabilization timber pile construction guide device includes: Step 1: According to the construction design drawings, the guide rail unit 11, connecting stabilizer 2, rigid connector 3, and adaptive clamping unit 4 are prefabricated in the factory. The adaptive clamping unit 4 can be directly welded to the web of the guide rail unit 11 after the guide rail unit 11 is produced. After the guide rail unit 11, connecting stabilizer 2, and rigid connector 3 are transported to the construction site, the guide rail unit 11 is assembled into two guide rails 1 that meet the design length through the connecting stabilizer 2 according to the construction design drawings. The two guide rails 1 are then connected by the rigid connector 3.

[0033] Step 2: Move the two connected guide rails 1 to the planned construction section (e.g., a 20-30 meter long work unit) using a crane. At this point, the two guide rails 1 can move relative to each other, and the chain 34 is not taut. The crane is needed to ensure the stability of the two guide rails 1. Hoist the two positioning rods 5 to the designed positions near the two ends of the guide rails 1 and insert them between the two guide rails 1. Under the action of gravity, the positioning rods 5 gradually sink to the bottom of the water. The two guide rails 1 are squeezed until the chain 34 is taut. During the sinking process, the top of the positioning rods 5 is limited by the crane, and the middle is squeezed and positioned by rollers 43 with rubber sleeves. Therefore, it can resist the impact of the water flow and avoid large displacement or tilting. After the positioning rods 5 sink to the bottom of the water, use pile driving equipment (such as an excavator) to drive the positioning rods 5 to the design elevation. At this point, the positioning of the modular ecological bank stabilization wooden pile construction guide device is completed. The crane stops hoisting the guide rails 1, and the guide rails 1 float on the water surface under the action of the buoy.

[0034] Step 3: All the wooden piles 6 required for this construction section are hoisted sequentially and in batches between the two guide rails 1. During the sinking process, the wooden piles 6 are also straightened by the crane and the adaptive clamping unit 4 to achieve self-centering, so that the bottom of each wooden pile 6 remains approximately vertical when it sinks to the bottom of the water. Since the bottom of the wooden pile 6 is pointed, some of the pointed ends have already penetrated the riverbed when it sinks to the bottom of the water, and they can restrain each other between adjacent wooden piles 6 to prevent the wooden piles 6 from tilting. At this time, the crane can stop hoisting the wooden piles 6. The piling equipment (such as a long-arm excavator equipped with a hydraulic vibratory hammer) is positioned at the best point on the barge or on the shore. Without large-scale movement, the pre-positioned wooden piles 6 can be driven one by one to the design elevation. During the piling process, after each wooden pile 6 is driven, the operator only needs to turn slightly to immediately drive the next wooden pile 6. This completely eliminates the waste of time in the traditional process of "moving equipment - precise positioning - manual straightening" for each pile, realizing a near-continuous driving operation and improving construction efficiency.

[0035] Step 4: Once all the wooden piles 6 in a construction section have been driven to the design elevation, the chain 34 is removed manually, and the two guide rails 1 are separated. The guide rails 1 are then towed to the next adjacent construction section by boat for piling in the next construction section.

[0036] When the rigid connector 3 is a crossbeam, the two guide rails can be directly fixedly connected by the crossbeam before being launched into the water when assembling the modular ecological bank stabilization pile construction guide device. After completing a construction section, the entire modular ecological bank stabilization pile construction guide device can be lifted to the top of the pile 6 using a crane, thereby separating the modular ecological bank stabilization pile construction guide device from the pile.

[0037] The above-described embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this application, and should all be included within the protection scope of this application.

Claims

1. A modular ecological bank stabilization timber pile construction guidance device, characterized in that: It includes two parallel guide rails (1), with rigid connectors (3) at both ends of the guide rails (1), and the two guide rails (1) are connected by the rigid connectors (3). A float is provided at the bottom of the guide rails (1), and multiple adaptive clamping units (4) are provided on the opposite side of the two guide rails (1). The adaptive clamping unit (4) includes a roller (43), which is elastically slidably connected to the guide rail (1). The rollers (43) on the two guide rails (1) are used to clamp the wooden stake (6) located between the two guide rails (1).

2. The modular ecological bank stabilization timber pile construction guide device according to claim 1, characterized in that: The adaptive clamping unit (4) includes a guide bracket (41) and a roller bracket (42). The roller (43) is mounted on the roller bracket (42). A sliding hole (411) is opened on the guide bracket (41). The roller bracket (42) is slidably connected to the guide bracket (41) through the sliding hole (411). The guide bracket (41) and the roller bracket (42) are elastically connected by a spring (45).

3. The modular ecological bank stabilization pile construction guide device according to claim 2, characterized in that: The sliding holes (411) are symmetrically opened on both sides of the guide bracket (41). The roller bracket (42) includes a sliding rod (421). The sliding rod (421) is slidably arranged in the two sliding holes (411). Two springs (45) are symmetrically arranged inside the guide bracket (41). One end of the two springs (45) is fixedly connected to the sliding rod (421), and the other end of the two springs (45) is fixedly connected to the inner wall of the guide bracket (41).

4. The modular ecological bank stabilization timber pile construction guide device according to claim 3, characterized in that: The included angle between the two springs (45) is an acute angle.

5. The modular ecological bank stabilization timber pile construction guidance device according to any one of claims 1 to 4, characterized in that: The rigid connector (3) includes two end connectors and a chain (34) connecting the two end connectors. The end connectors are fixedly connected to the ends of the guide rails (1). A connecting gear (33) is rotatably provided on the end connectors. The connecting gear (33) meshes with the chain (34). Multiple positioning rods (5) are provided between the two guide rails (1). The positioning rods (5) abut against the two guide rails (1) through rollers (43), so that the chain (34) is taut.

6. The modular ecological bank stabilization timber pile construction guidance device according to any one of claims 1 to 4, characterized in that: The guide rail (1) includes multiple guide rail units (11). The two ends of the guide rail unit (11) are provided with bayonets (111). Two adjacent guide rail units (11) are connected by a connecting stabilizer (2). The connecting stabilizer (2) includes a float. Two connecting blocks (22) are provided on the top of the float. The two connecting blocks (22) are respectively installed in the bayonets (111) of two adjacent guide rail units (11) and are interference-fitted with the bayonets (111).

7. The modular ecological bank stabilization timber pile construction guide device according to claim 6, characterized in that: The bottom of both ends of the guide rail unit (11) has slots (112), the float and the connecting block (22) are connected by a connecting plate (23), and the connecting plate (23) is inserted into the slot (112).

8. The modular ecological bank stabilization timber pile construction guide device according to claim 6, characterized in that: A partition (24) is provided between the two connecting blocks (22), and the partition (24) abuts against the end face of the guide rail unit (11).

9. The modular ecological bank stabilization timber pile construction guidance device according to any one of claims 1 to 4, characterized in that: A rubber sleeve is fitted onto the roller (43).

10. The modular ecological bank stabilization timber pile construction guidance device according to any one of claims 1 to 4, characterized in that: The distance between two adjacent pulleys is no greater than the radius of the wooden stake (6).