Anti-skid structure
By setting up installation grooves and drainage pipes on the water-facing side of the pile, combined with a filter layer and a pumping mechanism, the drainage difficulties and safety hazards of the anti-sliding structure were solved, thereby improving the stability of the pile and the long-term stability of the slope.
Patent Information
- Application Number
- CN202522568308.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-03
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-03
AI Technical Summary
Existing anti-sliding structures are prone to pile cracking and displacement under groundwater activity, and seepage water retention softens the slope, leading to a decrease in slope stability and posing drainage difficulties and safety hazards.
An installation groove is set on the water-facing side of the pile, a drainage pipe is installed and a filter layer is provided. Seepage water is collected through the guide channel and water collection hole, and the seepage water is discharged through the drainage hole, thus constructing a three-dimensional drainage system. Combined with a pumping mechanism and sealing components, smooth flow is ensured.
It significantly releases pore water pressure in the slope, reduces stress on the piles, prevents seepage and softening, improves the long-term stability and safety of the slope, and reduces the risk of landslides.
Smart Images

Figure CN225014180U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of landslide control engineering technology, and in particular to an anti-slide structure. Background Technology
[0002] Anti-sliding structures are a common and effective control measure in landslide management projects. By embedding piles into stable soil or bedrock, the piles' rigidity and resistance help resist slope thrust, thus achieving overall slope stability.
[0003] However, slopes are often accompanied by groundwater activity, especially during periods of concentrated rainfall or when the groundwater level rises, leading to high pore water pressure within the slope. Therefore, current anti-slide structures are subjected to static and seepage pressures that cannot be released, exacerbating the stress on the piles and increasing the risk of instability such as pile cracking and displacement. Furthermore, seepage from the slope is blocked by the piles on their upstream side, and the accumulated seepage generates additional thrust. Moreover, the retained seepage softens the slope, reducing its strength and weakening its stability, making it more susceptible to new landslides. Therefore, current anti-slide structures suffer from drawbacks such as poor drainage and significant safety hazards. Utility Model Content
[0004] Therefore, it is necessary to provide an anti-slip structure to address the problems of drainage difficulties and significant safety hazards associated with existing anti-slip structures.
[0005] This utility model provides an anti-slip structure for stabilizing landslides, the anti-slip structure comprising:
[0006] The pile body is used to be buried in soil or bedrock. The pile body has a water-facing surface, which faces the landslide and has an installation groove.
[0007] A reverse filter layer is disposed on the water-facing surface, and the reverse filter layer is provided with a flow guiding channel;
[0008] A drain pipe is provided in the mounting groove. The drain pipe has a water collection hole, a drain hole, and a drain channel. The water collection hole is connected to the drain channel and the guide channel, and the drain hole is connected to the guide channel.
[0009] In one embodiment, the opening of the water collection hole is oriented toward the opening of the mounting groove.
[0010] In one embodiment, the water collection holes include a plurality of holes, which are spaced apart along the length of the drain pipe.
[0011] In one embodiment, the mounting slots include multiple slots, which are spaced apart along the horizontal direction of the pile body, and the length direction of each mounting slot is along the height direction of the pile body. The drainage pipes include multiple pipes, which are installed in the mounting slots one by one.
[0012] In one embodiment, the top of the pile body protrudes from the construction reference surface, the drainage hole is located on the portion of the drainage pipe that protrudes from the construction reference surface, and the anti-slip structure also includes a drainage ditch located on the side of the construction reference surface near the water-facing side, and the drainage hole communicates with the drainage ditch.
[0013] In one embodiment, the end of the drain pipe that protrudes from the construction reference surface is provided with a first pipe opening, the first pipe opening is connected to the drainage channel, and the drain pipe also includes a sealing member, the sealing member being installed at the first pipe opening.
[0014] In one embodiment, the anti-slip structure further includes a pumping mechanism detachably connected to the drain hole.
[0015] In one embodiment, the drain pipe is detachably installed in the mounting groove.
[0016] In one embodiment, the drainage channel is filled with a filter material.
[0017] In one embodiment, the pile body is rectangular in shape.
[0018] The aforementioned anti-slide structure embeds the piles in the soil or bedrock. The rigidity and resistance of the piles will resist the slope thrust, preventing landslides. Furthermore, an installation groove is set on the water-facing side of the pile, where a drainage pipe is installed. A filter layer is also installed on the water-facing side to prevent mud and sand from clogging the drainage pipe's collection holes. When seepage occurs on the water-facing side of the pile, the seepage flows through the guide channels of the filter layer and then enters the drainage channel of the drainage pipe from the collection holes, allowing the seepage to be discharged. This significantly releases the pore water pressure on the slope, reduces the hydrostatic pressure and additional thrust on the water-facing side of the pile, and prevents seepage from stagnating and softening the slope. This ensures the long-term stability of the piles and slope, reducing the risk of landslides and offering advantages such as good stability and low safety risk. Attached Figure Description
[0019] Figure 1 This is a schematic diagram of the anti-slip structure described in an embodiment of this application.
[0020] Figure 2 This is a top view of the anti-slip structure described in an embodiment of this application.
[0021] Figure 3 for Figure 1 Enlarged view of point A.
[0022] Figure 4 for Figure 1 Enlarged view of point B.
[0023] Figure 5 for Figure 2 Enlarged view of point C.
[0024] Icon labels:
[0025] 100. Pile body; 110. Water-facing side; 120. Installation groove; 130. Water-repellent side;
[0026] 200. Filter layer; 210. Flow channel;
[0027] 300. Drain pipe; 310. Water collection hole; 320. Drain hole; 330. Drainage channel; 340. First pipe opening; 350. Sealing component; 360. Filter material;
[0028] 400. Drainage ditch; 500. Pumping mechanism;
[0029] 10. Construction reference surface. Detailed Implementation
[0030] To make the above-mentioned objectives, features, and advantages of this application more apparent and understandable, the specific embodiments of this application are described in detail below with reference to the accompanying drawings. Many specific details are set forth in the following description to provide a thorough understanding of this application. However, this application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar modifications without departing from the spirit of this application. Therefore, this application is not limited to the specific embodiments disclosed below.
[0031] In the description of this application, it should be understood that if terms such as "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential" appear, these terms indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this application.
[0032] Furthermore, where the terms "first" and "second" appear, these terms are for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined with "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this application, where the term "multiple" appears, "multiple" means at least two, such as two, three, etc., unless otherwise explicitly specified.
[0033] In this application, unless otherwise expressly specified and limited, the terms "installation," "connection," "joining," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components, unless otherwise expressly limited. Those skilled in the art can understand the specific meaning of the above terms in this application based on the specific circumstances.
[0034] In this application, unless otherwise expressly specified and limited, the use of descriptions such as "above" or "below" the second feature indicates that the first and second features are in direct contact or indirect contact via an intermediate medium. Furthermore, "above," "on top of," and "over" the second feature can mean that the first feature is directly above or diagonally above the second feature, or simply that the first feature is at a higher horizontal level than the second feature. Similarly, "below," "below," and "under" the second feature can mean that the first feature is directly below or diagonally below the second feature, or simply that the first feature is at a lower horizontal level than the second feature.
[0035] It should be noted that if an element is referred to as being "fixed to" or "set on" another element, it can be directly on the other element or there may be an intervening element. If an element is considered to be "connected to" another element, it can be directly connected to the other element or there may be an intervening element. If so, the terms "vertical," "horizontal," "upper," "lower," "left," "right," and similar expressions used in this application are for illustrative purposes only and do not represent the only possible implementation.
[0036] See Figures 1 to 5The diagram shows a schematic representation of an anti-slide structure according to an embodiment of this application. The anti-slide structure is used to stabilize landslides and includes a pile body 100, a filter layer 200, and a drainage pipe 300. The pile body 100 is embedded in the soil or bedrock and has a water-facing surface 110 facing the landslide. The water-facing surface 110 has an installation groove 120. Specifically, the side opposite to the water-facing surface 110 is the backwater surface 130 of the pile body 100.
[0037] The filter layer 200 is located on the water-facing side 110 and has a flow guiding channel 210.
[0038] The drain pipe 300 is installed in the mounting groove 120. The drain pipe 300 is provided with a water collection hole 310, a drain hole 320 and a drain channel 330. The water collection hole 310 is connected to the drain channel 330 and the guide channel 210, and the drain hole 320 is connected to the guide channel 210.
[0039] In one exemplary embodiment, the drain pipe 300 is a plastic pipe, which has the advantage of good durability.
[0040] The anti-slide mechanism described in this application embeds the pile 100 in the soil or bedrock. The rigidity and resistance of the pile 100 will resist the slope thrust, preventing landslides. Furthermore, an installation groove 120 is provided on the water-facing side 110 of the pile 100, and a drainage pipe 300 is installed in the installation groove 120. A filter layer 200 is provided on one side of the water-facing side 110 to prevent mud and sand from clogging the water collection hole 310 of the drainage pipe 300. When seepage occurs on the water-facing side 110 of the pile 100, the seepage water passes through the guide channel 210 of the filter layer 200, and then enters the drainage channel 330 of the drainage pipe 300 from the water collection hole 310, allowing the seepage water to be discharged from the drainage hole 320.
[0041] The anti-slide mechanism described in this application embodiment, by setting a filter layer 200 and a drainage pipe 300 on the water-facing side 110 of the pile body 100, allows seepage water in the slope to pass through the filter layer 200 and then enter the drainage pipe 300 for collection and discharge. This significantly releases the pore water pressure of the slope, reduces the hydrostatic pressure and additional thrust borne by the water-facing side 110 of the pile body 100, and at the same time avoids seepage water retention and softening of the slope, ensuring the long-term stability of the pile body 100 and the slope, reducing the risk of landslides, and has the advantages of good stability and low safety risk.
[0042] In some embodiments, such as Figure 4As shown, the opening of the water collection hole 310 is oriented towards the opening of the mounting groove 120. In this embodiment, by oriented the opening of the water collection hole 310 towards the opening of the mounting groove 120, the seepage water discharged from the guide channel 210 of the filter layer 200 can be efficiently collected, reducing water flow resistance and allowing the seepage water to be discharged quickly. This effectively reduces the pore water pressure of the slope, reduces the hydrostatic pressure and additional thrust borne by the water-facing surface 110 of the pile body 100, prevents the slope from softening due to seepage water retention, and improves the overall effect and long-term stability of the anti-sliding structure.
[0043] In an optional embodiment, such as Figure 4 As shown, there are multiple water collection holes 310, which are spaced apart along the extension direction of the drainage pipe 300. Specifically, the extension direction of the drainage pipe 300 is the length direction of the pile body 100.
[0044] In this embodiment, multiple water collection holes 310 are spaced apart along the vertical direction of the drainage pipe 300, which can fully cover the seepage areas at different heights on the water-facing side 110 of the pile body 100, achieving efficient and uniform collection of groundwater at multiple vertical levels on the slope and avoiding local seepage accumulation. At the same time, the decentralized layout of the water collection holes 310 can reduce the water collection load and blockage risk of a single water collection hole 310, ensuring the long-term unobstructed flow of the drainage channel 330, thereby continuously releasing the pore water pressure at different depths of the slope, further improving the overall effect and long-term stability of the anti-sliding structure.
[0045] In an optional embodiment, such as Figure 1 and Figure 2 As shown, there are multiple mounting slots 120, which are spaced apart along the horizontal direction of the pile body 100, and the length direction of each mounting slot 120 is along the height direction of the pile body 100. There are also multiple drainage pipes 300, which are installed in the mounting slots 120 one by one. The length direction of the mounting slot 120 is the same as the length direction in which the drainage pipes 300 are installed.
[0046] In this embodiment, multiple installation grooves 120 are provided on the water-facing surface 110, horizontally spaced along the pile body and extending along the height direction. Multiple drainage pipes 300 are installed one-to-one in the installation grooves 120, forming a horizontally dispersed and vertically connected three-dimensional drainage system on the water-facing surface 110 of the pile body 100. This comprehensively covers seepage areas at different horizontal levels and vertical depths, preventing localized water accumulation. Simultaneously, the dispersed layout of the drainage pipes 300 effectively distributes the water collection load of each pipe, reducing the impact of blockage in a single pipe on the overall drainage effect, ensuring long-term unobstructed drainage, and improving the overall drainage efficiency and long-term stability of the anti-slip structure.
[0047] Combination Figure 3The diagram shows an enlarged structural schematic of the anti-slip structure in one embodiment of the present application. In an optional embodiment, the top of the pile body 100 protrudes from the construction reference surface 10, and the drainage hole 320 is provided on the part of the drainage pipe 300 that protrudes from the construction reference surface 10. The anti-slip structure also includes a drainage ditch 400, which is provided on the side of the construction reference surface 10 near the water-facing side 110. The drainage hole 320 is connected to the drainage ditch 400.
[0048] In this embodiment, drainage holes 320 are installed at the top of the pile body 100, and together with drainage ditch 400 installed on the construction reference surface 10, a complete drainage path is constructed. The drainage ditch 400 is installed adjacent to the water-facing side 110 to quickly receive the seepage water discharged from the drainage holes 320 and guide it outward, preventing seepage water from stagnating around the pile body 100 or near the construction reference surface 10. Ultimately, through this drainage system, the pore water pressure of the slope is continuously and smoothly released, significantly reducing the stress on the water-facing side 110 of the pile body 100 and the risk of soil softening. While ensuring the original anti-sliding stiffness and resistance of the pile body 100, the drainage efficiency and long-term stability of the anti-sliding structure are greatly improved.
[0049] In an optional embodiment, such as Figure 3 As shown, the drain pipe 300 has a first pipe opening 340 at one end protruding from the construction reference surface 10. The first pipe opening 340 is connected to the drainage channel 330. The drain pipe 300 also includes a sealing element 350, which is installed at the first pipe opening 340.
[0050] In this embodiment, a sealing element 350 is installed at the first opening 340 at the top of the drainage pipe 300 to fix and seal the first opening 340. This seal isolates the first opening 340 from external debris or surface rainwater, preventing it from entering the drainage channel 330 and causing blockage or backflow. This ensures the long-term unobstructed flow of the drainage channel 330. Furthermore, the fixing effect of the sealing element 350 strengthens the structural stability of the drainage pipe 300, preventing the drainage pipe 300 from loosening or shifting due to construction or external disturbances, and improving the structural reliability and long-term stability of the anti-slip structure.
[0051] In an optional embodiment, such as Figure 1 and Figure 3 As shown, the anti-slip structure also includes a water pumping mechanism 500, which is detachably connected to the drain hole 320.
[0052] In this embodiment, the pumping mechanism 500 is detachably connected to the drainage hole 320. This allows for enhanced drainage efficiency through active pumping in scenarios such as waterlogged slopes, high pore water pressure, or flood seasons, rapidly reducing internal water pressure and effectively alleviating stress on the water-facing surface 110. Furthermore, it can be disassembled when daily drainage needs are met, avoiding wear and tear from prolonged idleness. It can also be flexibly transferred to other locations requiring enhanced drainage for reuse, improving equipment economy and enhancing the adaptability of the anti-sliding structure to different hydrological conditions. While ensuring the anti-sliding performance of the pile body 100, it significantly improves the flexibility, economy, and long-term stability of the anti-sliding structure.
[0053] In an optional embodiment, the drainage pipe 300 and the mounting groove 120 are detachably installed, allowing the drainage pipe 300 to be replaced. This facilitates quick disassembly and replacement of the drainage pipe 300 without damaging the pile body 100 when blockages, damage, or aging occur, significantly reducing maintenance difficulty and costs. Furthermore, it allows for flexible replacement of drainage pipes 300 with different diameters or different collection hole densities according to changes in slope hydrological conditions, adapting to dynamic drainage needs. Simultaneously, if installation deviations or quality problems occur during the construction phase, the drainage pipe 300 can be easily replaced to ensure construction quality and maintain the efficient and unobstructed drainage system of the anti-slip structure. This significantly improves the maintenance flexibility, adaptability to operating conditions, and long-term operational reliability of the anti-slip structure.
[0054] In an optional embodiment, such as Figure 4 and Figure 5 As shown, the drainage channel 330 is filled with a filter material 360, which can intercept fine particles from the slope that enter the drainage channel 330 with the seepage water. Together with the filter layer 200, it forms a double anti-clogging guarantee, effectively preventing the drainage channel 330 from accumulating and clogging. At the same time, the good water permeability of the filter material 360 ensures that the seepage water is smoothly discharged through the drainage channel 330 without affecting the drainage efficiency.
[0055] In one exemplary embodiment, such as Figure 5 As shown, the filter layer 200 and the filter material 360 are graded crushed stone, pebbles or coarse sand with a particle size of 20mm to 40mm.
[0056] In this embodiment, the filter material 360 in the filter layer 200 and drainage channel 330 uses 20mm-40mm graded crushed stone, pebbles, or coarse sand. These materials are widely available and easy to obtain, combining economy with excellent permeability. The 20mm-40mm graded crushed stone, pebbles, or coarse sand has strong particle size adaptability, which can effectively intercept fine particles from the slope that migrate with seepage water, forming a synergistic anti-clogging effect with the double filter structure, avoiding siltation and blockage in the drainage channel 330 or filter layer 200, while ensuring smooth passage and discharge of seepage water due to its reasonable porosity.
[0057] In an optional embodiment, such as Figure 1 and Figure 2 As shown, the pile body 100 is rectangular. The rectangular shape of the pile body 100 facilitates formwork fabrication and concrete pouring, ensuring the quality and uniformity of pile forming and rigidity. The water-facing surface 110 is a flat plane, increasing the contact area with the slope thrust and making the stress distribution more uniform, fully utilizing the anti-sliding resistance of the pile body 100. Simultaneously, the flat water-facing surface 110 facilitates precise cutting of the installation groove 120, which is beneficial for the stable installation of the drainage pipe 300 and the tight fit of the filter layer, adapting to the integrated drainage system requirements.
[0058] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0059] The embodiments described above are merely illustrative of several implementation methods of this application, and while the descriptions are relatively specific and detailed, they should not be construed as limiting the scope of the patent application. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this application, and these all fall within the protection scope of this application. Therefore, the protection scope of this patent application should be determined by the appended claims.
Claims
1. An anti-sliding structure for stabilizing landslides, characterized in that, The anti-slip structure includes: A pile body (100) is used to be buried in soil or bedrock. The pile body (100) is provided with a water-facing surface (110) facing the landslide. The water-facing surface (110) is provided with an installation groove (120). A reverse filter layer (200) is disposed on the water-facing surface (110), and the reverse filter layer (200) is provided with a flow guiding channel (210). A drain pipe (300) is provided in the mounting groove (120). The drain pipe (300) is provided with a water collection hole (310), a drain hole (320) and a drain channel (330). The water collection hole (310) is connected to the drain channel (330) and the guide channel (210). The drain hole (320) is connected to the guide channel (210).
2. The anti-slip structure according to claim 1, characterized in that: The opening of the water collection hole (310) is oriented toward the opening of the mounting groove (120).
3. The anti-slip structure according to claim 1, characterized in that: The water collection holes (310) include a plurality of holes, which are spaced apart along the length of the drain pipe (300).
4. The anti-slip structure according to any one of claims 1-3, characterized in that: The mounting groove (120) includes multiple grooves, which are spaced apart along the horizontal direction of the pile body (100), and the length direction of each mounting groove (120) is along the height direction of the pile body (100). The drainage pipe (300) includes multiple pipes, which are installed in the mounting grooves (120) one by one.
5. The anti-slip structure according to claim 1, characterized in that: The top of the pile body (100) protrudes from the construction reference surface (10), the drainage hole (320) is located on the part of the drainage pipe (300) that protrudes from the construction reference surface (10), the anti-slip structure also includes a drainage ditch (400), the drainage ditch (400) is located on the side of the construction reference surface (10) near the water-facing side (110), and the drainage hole (320) is connected to the drainage ditch (400).
6. The anti-slip structure according to claim 5, characterized in that: The drain pipe (300) has a first pipe opening (340) at one end protruding from the construction reference surface (10). The first pipe opening (340) is connected to the drainage channel (330). The drain pipe (300) also includes a sealing element (350), which is installed at the first pipe opening (340).
7. The anti-slip structure according to claim 1, characterized in that: The anti-slip structure also includes a water pumping mechanism (500), which is detachably connected to the drain hole (320).
8. The anti-slip structure according to claim 1, characterized in that: The drain pipe (300) and the mounting groove (120) are detachably installed.
9. The anti-slip structure according to claim 1, characterized in that: The drainage channel (330) is filled with filter material (360).
10. The anti-slip structure according to claim 1, characterized in that: The pile body (100) is rectangular in shape.
