Water-stopping and ground reinforcement device for soft soil
By setting up a continuous horizontal and vertical wall grid structure and reinforced unit piles in soft soil, the problems of groundwater seepage and uneven pile foundation stress were solved, achieving uniform stress distribution and improved bearing capacity of the foundation, thus ensuring the stability and safety of the project.
Patent Information
- Application Number
- CN202522742750.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-24
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-24
AI Technical Summary
Traditional plum blossom single pile layout has problems of seepage and uneven distribution of pile foundation stress points in the foundation of the Yangtze River middle and lower reaches plain area with abundant groundwater. This results in low natural foundation bearing capacity, easy uneven settlement, and failure to meet design requirements.
A closed grid structure is formed by the intersection of horizontal and vertical continuous walls, and the unit piles are embedded in the underlying sandy loam or gravel layer to form a 'pile-grid-soil' collaborative force system. The water-proof performance of the wall is used to block the groundwater seepage path, and the interlocking structure and grouting reinforcement treatment form a sealed water-stop node to ensure the balanced force of the foundation.
It improves the overall bearing capacity of the foundation, suppresses uneven settlement, meets the bearing capacity requirements of the foundation, and ensures the stability and service life of the main structure.
Smart Images

Figure CN225014196U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of concrete engineering construction technology, and in particular relates to a device for water-stopping and foundation reinforcement treatment of soft soil. Background Technology
[0002] The project is located in the middle and lower reaches of the Yangtze River Plain, where groundwater is abundant. The geological soil layers of the foundation pit mainly consist of silty clay, clay, sandy loam, silty clay, alternating layers of sandy loam, fine sand, and gravel. The overall soil layer distribution exhibits a "soft upper layer and sandy lower layer" characteristic, with the upper layer being silty clay and silty clay, and the lower layer being permeable layers such as sandy loam and alternating layers of sandy loam. The foundation slab of the main structure rests directly on the natural foundation, with a layer of alternating layers of sandy loam interspersed with sandy loam soil below a thickness of 1.0m to 2.5m. This natural foundation has low bearing capacity and moderate compressibility, making it prone to uneven settlement, which will adversely affect the service life of the main structure and does not meet the design requirements. Therefore, foundation reinforcement treatment is necessary to improve the bearing capacity.
[0003] Based on the groundwater and geological distribution of this project, if the traditional plum blossom single pile arrangement is adopted, there will be technical problems such as groundwater seepage and uneven distribution of pile foundation stress points. Utility Model Content
[0004] In view of this, the present invention aims to provide a device for water-stopping and foundation reinforcement treatment of soft soil, so as to solve the above-mentioned technical problems.
[0005] To achieve the above objectives, the technical solution of this utility model is implemented as follows: This utility model provides a device for water-stopping and foundation reinforcement treatment of soft soil, comprising: Multiple transverse continuous walls are vertically set in the soil, and the multiple transverse continuous walls are arranged in parallel at intervals along the longitudinal axis of the soil. Multiple longitudinal continuous walls are vertically set in the soil. The multiple longitudinal continuous walls are arranged in parallel at intervals along the transverse axis of the soil. The longitudinal continuous walls are set between two adjacent transverse continuous walls, and the two ends of the longitudinal continuous walls are perpendicularly intersecting and fixedly connected to the two transverse continuous walls respectively. The transverse continuous walls and the longitudinal continuous walls form multiple regularly arranged closed spaces. Multiple reinforcing unit piles are set up one-to-one with multiple enclosed spaces. The reinforcing unit piles are vertically embedded in the enclosed spaces, and the lower end of the reinforcing unit piles penetrates the upper soft soil layer and is embedded in the lower sandy loam or gravel layer.
[0006] In one embodiment, the transverse continuous wall includes a plurality of first mixing piles, and an interlocking structure is provided between two adjacent first mixing piles.
[0007] In one embodiment, the longitudinal continuous wall includes a plurality of second mixing piles, and an interlocking structure is provided between two adjacent second mixing piles.
[0008] In one embodiment, the intersection of the transverse continuous wall and the longitudinal continuous wall is reinforced with an interlocking structure or grouting to form a sealed water-stopping node.
[0009] In one embodiment, both the first mixing pile and the second mixing pile include a plurality of plain piles and a plurality of solid piles; the plain piles and solid piles are arranged vertically at intervals, and adjacent plain piles and solid piles interlock with each other.
[0010] In one embodiment, the radius of the cross-section of the plain pile is greater than half the center distance between adjacent plain piles and the ballast piles, and less than the center distance between adjacent plain piles and the ballast piles.
[0011] In one embodiment, the reinforcing unit pile is a precast reinforced concrete pile or a bored cast-in-place pile, and the upper end of the reinforcing unit pile is flush with or lower than the top surface of the transverse continuous wall and the longitudinal continuous wall.
[0012] In one embodiment, the plain pile is a fiber cement soil grouting pile, and the solid pile is a reinforced concrete pile.
[0013] In one embodiment, both the transverse continuous wall and the longitudinal continuous wall are cement-soil mixing pile continuous walls with a wall thickness of 300-600mm and a wall penetration depth of not less than 1.5-3m below the top surface of the lower permeable layer.
[0014] Beneficial effects: This utility model provides a water-stopping and foundation reinforcement device for soft soil, comprising a transverse continuous wall, a longitudinal continuous wall, and reinforcing unit piles. The transverse and longitudinal continuous walls intersect to form a closed grid, utilizing the wall's water-tight properties to block the transverse infiltration path of groundwater. Simultaneously, the grid structure constrains the upper soft soil, reducing uneven settlement. The reinforcing unit piles are embedded within the closed space of the grid, with their lower ends embedded in the underlying sandy loam or gravel layer, forming a collaborative "pile-grid-soil" force-bearing system. This enhances the overall bearing capacity of the foundation, solving the problem of insufficient bearing capacity in natural foundations. The grid structure ensures a regular and uniform distribution of the reinforcing unit piles, avoiding the concentration of stress points seen in traditional single-pile arrangements, ensuring balanced foundation stress, and further suppressing uneven settlement. This application, together with the foundation soil, evenly shares the downward load applied by the upper main structure, meeting the foundation bearing capacity requirements. Attached Figure Description
[0015] The accompanying drawings, which form part of this utility model, are used to provide a further understanding of the utility model. The illustrative embodiments of the utility model and their descriptions are used to explain the utility model and do not constitute an undue limitation of the utility model. In the drawings: Figure 1 This is a schematic diagram of the structure of the water-stopping and foundation reinforcement device for soft soil as described in an embodiment of the present invention; Figure 2 This is a schematic diagram of the structure between the plain pile, the non-plain pile, and the interlocking structure described in the embodiment of this utility model; Figure 3 This is a schematic diagram of the structure between the transverse continuous wall and the soil layer as described in an embodiment of the present utility model; Figure 4 This is a schematic diagram of the structure between the longitudinal continuous wall and the soil layer as described in an embodiment of this utility model.
[0016] Explanation of reference numerals in the attached figures: 10-Horizontal continuous wall; 11-Interlocking structure; 12-Enclosed space; 30-Reinforced unit pile; 101-Plain pile; 102-Hard pile; 20-Longitudinal continuous wall. Detailed Implementation
[0017] It should be noted that, unless otherwise specified, the embodiments and features described in these embodiments can be combined with each other.
[0018] In the description of this utility model, it should be understood that the terms "center," "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," and "outer," etc., indicating orientation or positional relationships based on the orientation or positional relationships shown in the accompanying drawings, are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model. Furthermore, the terms "first," "second," etc., are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, features defined with "first," "second," etc., may explicitly or implicitly include one or more of that feature. In the description of this utility model, unless otherwise stated, "a plurality of" means two or more.
[0019] In the description of this utility model, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "joining" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.
[0020] The following will refer to the appendix. Figure 1-4 The present invention will be described in detail with reference to the embodiments.
[0021] This utility model provides a device for water-stopping and foundation reinforcement treatment of soft soil, as shown in the attached figure. Figure 1-2 As shown, the structure includes transverse continuous walls 10, longitudinal continuous walls 20, and reinforcing unit piles 30. Multiple transverse continuous walls 10 are vertically installed within the soil, arranged parallel to each other along the longitudinal axis of the soil. Multiple longitudinal continuous walls 20 are vertically installed within the soil, arranged parallel to each other along the transverse axis of the soil. A longitudinal continuous wall 20 is positioned between two adjacent transverse continuous walls 10, with both ends perpendicularly intersecting and fixedly connected to the two transverse continuous walls 10. The transverse continuous walls 10 and longitudinal continuous walls 20 enclose multiple regularly arranged closed spaces 12. Multiple reinforcing unit piles 30 are correspondingly installed in each of the closed spaces 12, vertically embedded within the closed spaces 12, with the lower end of each reinforcing unit pile penetrating the upper soft soil layer and embedding into the lower sandy loam or gravel layer.
[0022] In this embodiment, the transverse continuous wall 10 and the longitudinal continuous wall 20 intersect to form a closed grid. The water-resistant properties of the walls block the transverse infiltration path of groundwater, while the grid structure constrains the upper soft soil, reducing uneven settlement. Reinforcing unit piles 30 are embedded within the grid's closed space 12, with their lower ends embedded in the underlying sandy loam or gravel layer, forming a collaborative "pile-grid-soil" load-bearing system. This enhances the overall bearing capacity of the foundation and solves the problem of insufficient bearing capacity in natural foundations. The grid structure ensures a regular and uniform distribution of the reinforcing unit piles 30, avoiding the concentration of stress points seen in traditional single-pile arrangements, ensuring balanced foundation stress, and further suppressing uneven settlement. In this application, the reinforcing unit piles and the foundation soil share the downward load applied by the upper main structure evenly, meeting the foundation bearing capacity requirements.
[0023] Specifically, the transverse continuous wall 10 includes multiple first mixing piles, with an interlocking structure 11 between adjacent first mixing piles. When constructing the transverse continuous wall 10, a deep cement mixer is used to construct multiple first mixing piles. During construction, the positional deviation of adjacent first mixing piles is strictly controlled to ensure tight interlocking between adjacent piles. After completing the construction of a single pile using a "two-mixing, two-spraying" process, the piles are constructed sequentially to form a complete transverse continuous wall 10, laying the foundation for the subsequent cross-connection of the longitudinal continuous wall 20. The interlocking structure 11 between adjacent first mixing piles completely eliminates the gaps between piles, preventing groundwater from seeping through the gaps in the transverse wall, strengthening the transverse water-stopping line, and compensating for the defects of traditional single-pile arrangements that are prone to leakage channels. The interlocking structure 11 integrates multiple first-stage mixing piles into a continuous, integral load-bearing component, rather than independent and dispersed piles. This enhances the shear and bending resistance of the transverse wall, better resists lateral soil pressure, and provides stable connection support for the longitudinal continuous wall 20. Utilizing conventional construction techniques with deep cement mixers, interlocking can be achieved simply by optimizing pile placement, eliminating the need for additional complex equipment. This results in high construction efficiency, and the degree of interlocking can be precisely controlled through pile placement and construction process monitoring, ensuring the construction quality of the transverse wall.
[0024] In one embodiment, the transverse continuous wall 10 includes a plurality of first mixing piles, with an interlocking structure 11 between adjacent first mixing piles. When laying the longitudinal continuous wall 20 between the completed transverse continuous walls 10, the same deep cement mixer construction process as the first mixing piles is used to construct a plurality of second mixing piles sequentially. The pile positions are strictly controlled to ensure that adjacent second mixing piles are tightly interlocked, while ensuring that the two ends of the second mixing piles are precisely connected and interlocked with the first mixing piles of the transverse continuous wall 10, ultimately forming a crisscrossing grid frame.
[0025] In one embodiment, the longitudinal continuous wall 20 includes multiple second mixing piles, with an interlocking structure 11 between adjacent second mixing piles. The interlocking structure 11 of the longitudinal continuous wall 20 and the interlocking structure 11 of the transverse continuous wall 10 form a closed loop, ensuring that the entire grid frame has no weak points prone to leakage. This effectively blocks the transverse and longitudinal infiltration of groundwater into the soil, significantly improving the overall water-stopping effect. After the longitudinally interlocking second mixing piles are cross-connected with the transversely interlocking first mixing piles, the grid frame forms a spatial force-bearing system rather than a planar force-bearing structure. This allows for a more even distribution and transmission of the upper load, further suppressing uneven settlement of the soft soil.
[0026] Based on the above embodiments, the intersection of the transverse continuous wall 10 and the longitudinal continuous wall 20 is reinforced with an interlocking structure 11 or grouting to form a sealed water-stopping node. After the transverse continuous wall 10 and the longitudinal continuous wall 20 are constructed, the intersection is the focus of treatment: if the interlocking structure 11 is used, the end of the longitudinal second mixing pile is overlapped and interlocked with the transverse first mixing pile during construction to ensure a tight connection; if grouting is used, holes are drilled at the intersection, cement grout is injected, and a sealed node is formed after the grout solidifies, completing the sealing and reinforcement of the entire grid frame. The intersection is a weak point of the grid frame, and traditional connection methods are prone to gaps due to construction deviations. This claim uses interlocking or grouting reinforcement to form a sealed whole at the node, completely preventing groundwater leakage from the node and ensuring the reliability of the overall water-stopping effect. The interlocking structure 11 is suitable for working conditions with sufficient construction space and precise pile position control, while grouting reinforcement is suitable for working conditions with slight pile position deviations or limited space. The two methods can be flexibly selected, improving the construction adaptability of the device.
[0027] In one embodiment, both the first mixing pile and the second mixing pile include a plurality of plain piles 101 and a plurality of solid piles 102; the plain piles 101 and solid piles 102 are arranged vertically at intervals, and adjacent plain piles 101 and solid piles 102 interlock with each other.
[0028] The specific process is as follows: First, position and adjust the piling machine, set the verticality of the piling machine's guide frame, and determine the starting and ending points of the drilling. Start the mixing drill plate and, after confirming it is functioning correctly, manipulate the drill rod to descend along the guide frame while mixing. Control the current and maximum speed of each piling machine according to the length of each pile. After sinking to the designed pile bottom elevation, start the grout pump, causing the drill bit to rotate in the opposite direction, lift, and spray grout simultaneously to initially mix the cement slurry in the soil. When the pile is lifted to 50cm above the top, turn off the cement delivery device and slowly mix for several seconds at 1.0m below ground level to ensure the pile head is uniformly compacted. When constructing the first mixing pile (transverse) and the second mixing pile (longitudinal), plain piles 101 and raw piles 102 are arranged alternately. Plain piles 101 are constructed first using a deep cement mixer, and then raw piles 102 are constructed between adjacent plain piles 101 to ensure that plain piles 101 and raw piles 102 are tightly interlocked. The principle of "skipping pile construction" is followed (first 1-3-5-7 sequence piles, then 2-4-6-8 sequence piles). After the first sequence piles have initially set, the second sequence piles are constructed to complete the pile layout of the transverse and longitudinal continuous wall 20.
[0029] Plain pile 101 (unreinforced or low-reinforced) has a lower cost and can meet the needs of foundation water-stopping and shallow soil reinforcement; reinforced pile 102 has high strength and can improve the load-bearing capacity and deformation resistance of the wall. The alternating arrangement of the two ensures the water-stopping effect and overall strength of the grid wall, while significantly reducing the project cost and avoiding the cost waste caused by using only reinforced pile 102. Improved wall crack resistance and durability: The interlocking structure 11 of plain pile 101 and reinforced pile 102 makes the wall more evenly stressed, reducing cracking caused by local stress concentration; the reinforcement of reinforced pile 102 can enhance the wall's corrosion resistance and fatigue resistance, making it suitable for the harsh environment of flood storage areas where it is constantly soaked in groundwater, and extending the service life of the wall. Ensure construction continuity and quality: The alternating arrangement combined with skip-construction construction can avoid mutual disturbance during the construction of adjacent piles, ensuring the solidification quality of the piles; at the same time, plain pile 101 and reinforced pile 102 use the same mixing construction process, with a unified construction process, which facilitates quality control and efficiency improvement.
[0030] In one embodiment, the radius of the cross-section of the plain pile 101 is greater than half the center-to-center distance between adjacent plain piles 101 and adjacent piles 102, and less than the center-to-center distance between adjacent plain piles 101 and adjacent piles 102. This ensures effective interlocking and eliminates leakage channels: precise control of the radius of the plain pile 101 allows it to form a stable interlocking overlap area with the adjacent piles 102, completely eliminating gaps between piles, preventing groundwater from seeping between piles, ensuring the sealing and water-stopping effect of the transverse and longitudinal continuous wall 20, and solving the leakage problem caused by insufficient interlocking in traditional pile arrangements.
[0031] In one embodiment, the reinforcing unit pile 30 is a precast reinforced concrete pile or a bored cast-in-place pile, and the upper end of the reinforcing unit pile 30 is flush with or lower than the top surface of the transverse continuous wall 10 and the longitudinal continuous wall 20.
[0032] When installing reinforced unit piles 30 within the enclosed space 12 formed by the horizontal and vertical continuous walls 20, either precast reinforced concrete piles or bored cast-in-place piles are selected based on the engineering geological conditions and bearing requirements. If precast piles are selected, a pile driver is used to vertically embed them into the enclosed space 12, ensuring that the lower end penetrates the upper soft soil layer and is embedded in the lower sandy loam or gravel layer. If bored cast-in-place piles are selected, the hole is first drilled to the design depth, and then reinforced concrete is poured to form the pile body. During construction, the pile top elevation is strictly controlled to ensure that its upper end is flush with or lower than the top surface of the horizontal and vertical continuous walls 20, so as to avoid protrusion that may affect the subsequent construction of the main structure. Reinforced concrete precast piles or bored piles have high strength and bearing capacity. After being embedded in the underlying hard sandy loam or gravel layer, they can effectively transfer the load of the superstructure to the deep stable soil layer, completely solving the problem of low bearing capacity of the natural foundation. This allows the top of the reinforcing unit piles 30 in pump station main structures to be flush with or lower than the top surface of the wall, ensuring that the upper load is evenly transferred to the piles and foundation soil through the wall. This avoids localized stress concentration caused by protruding piles and achieves synergistic stress distribution between the "grid wall + reinforcing unit piles 30 + foundation soil," further suppressing uneven settlement. Reinforced concrete precast piles offer fast construction speed and controllable quality, suitable for relatively uniform soil conditions; bored piles are suitable for complex geological conditions (such as those containing boulders or with large soil undulations). The two pile types can be flexibly selected, improving the construction adaptability of the device. Simultaneously, controlling the pile top elevation provides a flat working surface for the subsequent construction of the main structure's base slab, ensuring smooth progress of subsequent construction.
[0033] In one embodiment, the plain pile 101 is a fiber cement soil cast-in-place pile, and the reinforced pile 102 is a reinforced concrete pile. When constructing the plain pile 101 of the transverse and longitudinal continuous wall 20, fiber cement soil material is used. The fiber, cement, and soil are thoroughly mixed using a deep cement mixer before being poured to form the fiber cement soil cast-in-place pile. When constructing the reinforced pile 102, reinforced concrete material is used. A reinforcing cage is first laid, and then concrete is poured to form the reinforced concrete pile. The construction strictly follows the principle of interlocking and skip-layer construction of the plain pile 101 and reinforced pile 102 to complete the pile construction and form the continuous wall. The fiber cement soil plain pile 101 focuses on water stopping and shallow reinforcement, while the reinforced concrete reinforced pile 102 focuses on load bearing and deep stability. The complementary material properties of the two, combined with the interlocking structure 11, enable the continuous wall to simultaneously possess excellent water stopping effect and load bearing capacity, perfectly meeting the reinforcement needs of soft soil with a "soft upper layer and sandy lower layer".
[0034] In one embodiment, both the transverse continuous wall 10 and the longitudinal continuous wall 20 are cement-soil mixing pile continuous walls with a thickness of 300-600mm. The wall's embedment depth is not less than 1.5-3m below the top surface of the lower permeable layer. The water-stopping effect is thorough, blocking the permeable layer channel: the wall's embedment depth extends 1.5-3m below the top surface of the permeable layer, completely penetrating the upper soft soil layer and embedding into the permeable layer to a certain depth, forming an "underground water-stopping curtain." This fundamentally blocks the infiltration path of groundwater in the permeable layer, effectively solving the problem of abundant and easily leaking groundwater in the project, while also preventing the vibration liquefaction of the fine sand in the permeable layer. The 300-600mm wall thickness is precisely calculated to ensure sufficient shear and bending strength to bear the upper load and constrain soil deformation, while also ensuring the wall's density to avoid water-stopping failure due to insufficient thickness, and to avoid material waste due to excessive thickness, achieving a balance between performance and cost. Cement-soil mixing pile technology is a mature technology for reinforcing weak soil. Construction equipment is widely available and the process is standardized. The wall thickness and penetration depth can be precisely controlled through construction monitoring, which can effectively ensure the quality of wall construction and improve the reliability and stability of the entire device. It is suitable for large-scale flood storage and detention area construction projects.
[0035] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.
Claims
1. A water stop and ground reinforcement treatment device for soft soil, characterized by, include: Multiple transverse continuous walls are vertically set in the soil, and the multiple transverse continuous walls are arranged in parallel at intervals along the longitudinal axis of the soil. Multiple longitudinal continuous walls are vertically set in the soil. The multiple longitudinal continuous walls are arranged in parallel at intervals along the transverse axis of the soil. The longitudinal continuous walls are set between two adjacent transverse continuous walls, and the two ends of the longitudinal continuous walls are perpendicularly intersecting and fixedly connected to the two transverse continuous walls respectively. The transverse continuous walls and the longitudinal continuous walls form multiple regularly arranged closed spaces. Multiple reinforcing unit piles are set up one-to-one with multiple enclosed spaces. The reinforcing unit piles are vertically embedded in the enclosed spaces, and the lower end of the reinforcing unit piles penetrates the upper soft soil layer and is embedded in the lower sandy loam or gravel layer.
2. The device for water-stopping and foundation reinforcement of soft soil according to claim 1, characterized in that, The transverse continuous wall includes multiple first mixing piles, and an interlocking structure is provided between two adjacent first mixing piles.
3. The device for water-stopping and foundation reinforcement of soft soil according to claim 2, characterized in that, The longitudinal continuous wall includes multiple second mixing piles, and an interlocking structure is provided between two adjacent second mixing piles.
4. The device for water-stopping and foundation reinforcement of soft soil according to claim 3, characterized in that, The intersection of the horizontal and vertical continuous walls is reinforced with an interlocking structure or grouting to form a sealed and waterproof joint.
5. The device for water-stopping and foundation reinforcement of soft soil according to claim 4, characterized in that, Both the first mixing pile and the second mixing pile include multiple plain piles and multiple solid piles; the plain piles and solid piles are arranged vertically at intervals, and adjacent plain piles and solid piles interlock with each other.
6. The device for water-stopping and foundation reinforcement of soft soil according to claim 5, characterized in that, The radius of the cross-section of the plain pile is greater than half the center distance between adjacent plain piles and the stub pile, and less than the center distance between adjacent plain piles and the stub pile.
7. The device for water-stopping and foundation reinforcement of weak soil according to claim 6, characterized in that, The reinforcing unit pile is a precast reinforced concrete pile or a bored cast-in-place pile, and the upper end of the reinforcing unit pile is flush with or lower than the top surface of the transverse continuous wall and the longitudinal continuous wall.
8. The device for water-stopping and foundation reinforcement of soft soil according to claim 7, characterized in that, The plain pile is a fiber cement soil grouting pile, and the solid pile is a reinforced concrete pile.
9. The device for water-stopping and foundation reinforcement of soft soil according to claim 1, characterized in that, Both the transverse and longitudinal continuous walls are cement-soil mixing pile continuous walls with a wall thickness of 300-600mm and a wall penetration depth of not less than 1.5-3m below the top surface of the lower permeable layer.
