Opposite support structure of photovoltaic pile body arrangement power transmission line
By ensuring the support structure is tightly fitted to the photovoltaic pile and the friction strips are in contact with it, the problem of the photovoltaic pile tilting inside the cable trench is solved, thus achieving stability and ease of construction for both the photovoltaic pile and the transmission line.
Patent Information
- Application Number
- CN202522591240.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-05
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-05
AI Technical Summary
During the construction of photovoltaic piles, after the cable trench is excavated, the photovoltaic piles on the inner sides of both sides of the cable trench are prone to losing soil support and tilting, resulting in unstable photovoltaic panel positions.
The structure employs a support foot structure, using arc-shaped clips to fit tightly against the photovoltaic pile. Combined with auxiliary plates and friction strips, it contacts and rubs against the inner side of the cable trench to ensure the stability of the photovoltaic pile. The power transmission line is fixed by backfilling and brickwork to prevent displacement.
It effectively prevents the photovoltaic piles and transmission lines from tilting and shifting in the cable trench, ensuring construction stability and convenient operation of the construction site in the later stages.
Smart Images

Figure CN225014208U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to an opposing support structure for the arrangement of transmission lines in a photovoltaic pile, belonging to the field of photovoltaic power station construction technology. Background Technology
[0002] The electricity generated by the photovoltaic panels needs to be transmitted to inverters and other equipment via transmission lines; therefore, cable trenches need to be dug in the construction site to lay and bury the transmission lines (see Chinese Patent Publication No. CN221989423U).
[0003] When using small-diameter steel pipes inserted into the construction site as photovoltaic piles, the photovoltaic piles on the inner sides of the cable trench are prone to losing soil support and tilting after the cable trench is excavated. Summary of the Invention
[0004] To solve the above-mentioned technical problems, this utility model provides an opposing support structure for the arrangement of power transmission lines in a photovoltaic pile.
[0005] This utility model is achieved through the following technical solution.
[0006] This utility model provides a counter-support structure for photovoltaic piles arranging power transmission lines, comprising: Photovoltaic piles are spaced out on the inner side of both sides of the cable trench; The support legs are fixed at both ends with arc-shaped clips, which fit tightly against the spaced photovoltaic piles.
[0007] The middle part of the support leg is shaped like a plate, and the plate has multiple through holes.
[0008] The arc-shaped clip is fixedly connected to an auxiliary plate extending into the inner side of the cable trench.
[0009] The auxiliary plate is integrally fixedly connected with a friction strip that extends into the construction site, and the friction strip contacts and rubs against the construction site on the inner side of the cable trench.
[0010] The photovoltaic pile is fixed with a photovoltaic frame on top, and photovoltaic panels that collect solar energy to generate electricity are fixedly installed on the photovoltaic frame.
[0011] The beneficial effects of this utility model are as follows: by using the arc-shaped clips at both ends of the support feet to fit tightly against the photovoltaic piles on the inner sides of the cable trench, the position of the photovoltaic piles does not tilt into the cable trench, thus solving the problem that the photovoltaic piles on the inner sides of the cable trench easily lose soil support and tilt after the cable trench is excavated. Attached Figure Description
[0012] Figure 1 This is a schematic diagram of the structure of the construction site where a cable trench is excavated according to this utility model; Figure 2This is a schematic diagram of the structure of the utility model, showing two photovoltaic piles supported by opposing support legs; Figure 3 This is a schematic diagram of the structure of the support leg of this utility model; Figure 4 This is a schematic diagram of the structure of the present invention for arranging power transmission lines by installing a cable tray on the support leg; In the diagram: 1-Construction site; 11-Cable trench; 12-Photovoltaic frame; 13-Photovoltaic panel; 2-Supporting feet; 21-Arc clip; 22-Auxiliary plate; 23-Friction strip; 31-Transmission line; 32-Covering layer; 33-Brick body; 41-Bolt; 42-Nut; 43-Sleeve; 44-Cable sleeve; 4-Photovoltaic pile. Detailed Implementation
[0013] The technical solution of this utility model is further described below, but the scope of protection is not limited to what is described.
[0014] like Figures 1 to 4 As shown.
[0015] This application discloses a method for excavating a photovoltaic pile across a power transmission line, comprising: Excavating machinery dug a cable trench 11 in the construction site 1 in the Gobi Desert environment. The bottom of the photovoltaic piles 4 on both sides of the inner side of the cable trench 11 lost the soil support and was exposed.
[0016] The arc-shaped clips 21 at both ends of the support legs 2 are used to fit tightly against the photovoltaic piles 4 on both sides of the inner side of the cable trench 11, ensuring that the position of the photovoltaic piles 4 does not tilt into the cable trench 11. At this time, a counter-support structure for the photovoltaic piles and power transmission lines is presented.
[0017] The middle part of the support leg 2 is shaped like a plate with multiple through holes. The purpose of setting multiple through holes at intervals is to allow the sandy soil, which is mainly mobile sandy soil, to flow through the through holes of the plate during backfilling, thus avoiding the sandy soil from causing lateral loads on the support leg 2 during backfilling.
[0018] The arc-shaped clip 21 is integrally fixedly connected to an auxiliary plate 22 extending into the inner side of the cable trench 11. A friction strip 23 extending into the construction site 1 is integrally fixedly connected to the auxiliary plate 22. The friction strip 23 contacts and rubs against the construction site 1 on the inner side of the cable trench 11, thereby limiting the arc-shaped clip 21.
[0019] A photovoltaic frame 12 is fixed to the top of the photovoltaic pile 4, and a photovoltaic panel 13 is fixedly installed on the photovoltaic frame 12. The photovoltaic panel 13 absorbs solar energy to generate electricity.
[0020] After the support feet 2 are installed to support the photovoltaic piles 4 on both sides of the inner side of the cable trench 11, the transmission lines 31 are laid in the cable trench 11. The transmission lines 31 converge and are arranged upwards along the photovoltaic piles 4 for connection with the inverters to be installed later. After the transmission lines 31 are laid for a distance of one to three meters in the cable trench 11, the covering layer 32 is immediately backfilled into the cable trench 11 and level with the top of the transmission lines 31. Then, bricks 33 are used to press down the transmission lines 31. At this time, a photovoltaic pile arrangement and transmission line construction structure is presented in the construction trench. The bricks 33 are spaced about 30 centimeters apart to press down the transmission lines 31, which limits the transmission lines 31 from being too long and swinging in the cable trench 11 without restraint, making it easier to avoid them during secondary excavation of the construction site. This solves the problem that the transmission lines are easily displaced and swing in the cable trench when directly laid in the cable trench, resulting in a curved path that is not easy to avoid during secondary excavation of the construction site.
[0021] The support leg 2 is fixed with a sleeve 43 by bolts 41 and nuts 42. The bolts 41 pass through the through hole in the plate of the support leg 2. A cable sleeve 44 for the transmission line 31 to pass through is fixedly connected to the sleeve 43. When the transmission line 31 is laid upward along the photovoltaic pile 4, it first passes through the cable sleeve 44. After the transmission line 31 is laid, the sleeve 43 is fixed to the through hole in the plate of the support leg 2 by bolts 41 and nuts 42 to ensure that the position of the transmission line 31 is fixed.
[0022] After the inverter installed on the power transmission line 31 and the photovoltaic pile 4 is connected, the cable trench 11 is backfilled as a whole, and the support foot 2 is directly in the cable trench 11 and is backfilled together.
Claims
1. A photovoltaic pile arrangement power transmission line counter support structure, characterized by, include: Photovoltaic piles (4) are spaced out on the inner sides of both sides of the cable trench (11); The two ends are fixed with arc-shaped clips (21) for the support feet (2), and the arc-shaped clips (21) are fitted and pressed tightly against the spaced photovoltaic piles (4).
2. The opposing support structure for the photovoltaic pile arrangement of transmission lines as described in claim 1, characterized in that: The middle part of the support leg (2) is in the shape of a plate, and the plate has multiple through holes.
3. The opposing support structure for photovoltaic pile arrangement of transmission lines as described in claim 1, characterized in that: The arc-shaped clip (21) is fixedly connected to an auxiliary plate (22) extending into the inner side of the cable trench (11).
4. The opposing support structure for photovoltaic pile arrangement of transmission lines as described in claim 3, characterized in that: The auxiliary plate (22) is fixedly connected with a friction strip (23) extending into the construction site (1), and the friction strip (23) contacts and rubs against the construction site (1) on the inner side of the cable trench (11).
5. The opposing support structure for the photovoltaic pile arrangement of transmission lines as described in claim 1, characterized in that: The photovoltaic pile (4) is fixed with a photovoltaic frame (12) on top, and a photovoltaic panel (13) for collecting solar energy to generate electricity is fixedly installed on the photovoltaic frame (12).