A tower crane foundation structure of a rear anchor climbing cone attached to a pile cap

By constructing a post-anchored climbing cone-attached pier-type tower crane foundation on the pier bearing platform, and utilizing pre-embedded bolts and climbing cone-type steel members, the problems of high construction cost and low efficiency of tower crane foundations were solved, achieving efficient and economical construction results, and possessing the ability to be reused.

CN225014209UActive Publication Date: 2026-11-24CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522609568.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-09
Publication Date
2026-11-24
Estimated Expiration
2035-12-09

AI Technical Summary

Technical Problem

Existing tower crane foundation construction is costly and inefficient, especially in cases of poor foundation or limited site conditions, and does not conform to the concept of green construction.

Method used

The tower crane foundation adopts a rear-anchored climbing cone attachment platform structure, which utilizes the pre-embedded bolts and pre-embedded climbing cones on the pier bearing platform, combined with steel rods and bolted joints, to form a prefabricated integral structure, achieving efficient and economical construction of the tower crane foundation.

Benefits of technology

It improves the construction efficiency and economy of tower crane foundations, reduces construction costs, has the ability to be reused, and meets the requirements of green construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225014209U_ABST
    Figure CN225014209U_ABST
Patent Text Reader

Abstract

This utility model relates to a tower crane foundation structure, belonging to the field of building engineering technology. Specifically, it is a rear-anchored climbing cone-attached pedestal tower crane foundation structure, including a bearing platform. Two sets of pre-embedded bolts and pre-embedded climbing cones are pre-embedded on the surface and sidewalls of the bearing platform. A main steel beam is fixedly installed on the surface of the bearing platform through the pre-embedded bolts. A fixing ear plate is fixedly installed at the end of the main steel beam. A fixing bolt is fixedly installed between the fixing ear plate and the bearing platform. It also includes a support component. This invention solves the problems of existing tower crane construction methods, which require a certain amount of concrete pouring for enlarged foundations when the foundation is good, and often require pile foundation pedestal tower crane foundations when the foundation is poor. These methods are not only costly but also inefficient. Furthermore, for projects with deep foundation pits or limited space, they not only consume a lot of materials and are costly, but also generate a large amount of construction waste, which is inconsistent with the concept of green construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building engineering technology, and in particular to a rear-anchor climbing cone attachment platform type tower crane foundation structure. Background Technology

[0002] Currently, tower cranes are the main construction equipment for high-pier bridges in China. As the main equipment for bridge construction, tower cranes often require a certain scale of tower crane foundation. As the core vertical and horizontal transportation equipment, the reliability, economy and efficiency of the foundation of tower cranes are of paramount importance.

[0003] When erecting a tower crane, if the foundation is good, a certain amount of concrete needs to be poured into an enlarged foundation; if the foundation is poor, a pile-type tower crane foundation is often required, which not only increases construction costs but also reduces construction efficiency. Secondly, for projects with deep foundation pits or limited sites, a large reinforced concrete foundation needs to be constructed in advance, which not only consumes a lot of materials, is costly, and has a long construction period, but also requires demolition after the underground structure is completed, generating a large amount of construction waste, which does not conform to the concept of green construction.

[0004] Based on this, this utility model proposes a rear-anchor climbing cone attachment platform type tower crane foundation structure. Utility Model Content

[0005] To address the aforementioned technical problems, this utility model proposes a rear-anchor climbing cone-attached pier type tower crane foundation structure. By attaching to the bridge pier bearing platform, it effectively solves the technical problems of high construction costs and difficulties in traditional tower crane foundation construction.

[0006] The technical solution to achieve the purpose of this utility model is as follows: a tower crane foundation structure with a rear anchor climbing cone attachment platform, including a bearing platform, two sets of pre-embedded bolts and pre-embedded climbing cones are pre-embedded on the surface and sidewalls of the bearing platform, a main steel beam is fixedly installed on the surface of the bearing platform by the pre-embedded bolts, a fixing ear plate is fixedly installed at the end of the main steel beam, and a fixing bolt is fixedly installed between the fixing ear plate and the bearing platform, and also includes a support component.

[0007] The support components are mounted on the main steel beam and the load-bearing platform.

[0008] The support assembly includes a pair of anchor plates two that are fixedly installed on the side wall of the bearing platform by pre-embedded climbing cones. An anchor plate one is fixedly installed at the bottom of the main steel beam. An anchor plate one and the main steel beam are fixedly installed together by connecting bolts. An inclined bracing steel beam is fixedly connected between anchor plate one and anchor plate two.

[0009] In some embodiments, a pair of fixing plates are fixedly installed on one side of the bearing platform, and two fixing bolts are fixedly installed between the fixing plates and the bearing platform. A reinforcing steel beam is fixedly connected between the fixing plates and the diagonal bracing steel beam, and a connecting steel beam is fixedly connected between the pair of reinforcing steel beams.

[0010] In some embodiments, a lattice column is fixedly installed at the ends of a pair of main steel beams.

[0011] Compared with existing technologies, the significant advantages of this invention are: Firstly, this utility model, through the pre-embedded bolts and climbing cones in the bearing platform, enables the tower crane foundation to make full use of the existing bearing platform as its attachment structure, thus achieving both high construction efficiency and economy while maintaining high operational safety performance. In addition, all components of this tower crane foundation are steel rods and all connection nodes are bolted, which enables the foundation to have the capability of prefabricated overall construction, and has the advantages of high construction efficiency and recyclability.

[0012] Secondly, by attaching itself to the bridge pier bearing platform, this utility model effectively solves the technical problems of high construction costs and difficulties in traditional tower crane foundation construction; at the same time, it has the ability of overall assembly construction, and the installation and dismantling are simple and quick, which can effectively improve construction efficiency, reduce construction costs, and has the ability to be reused.

[0013] This solution addresses the existing problems when erecting tower cranes: when the foundation is good, a certain amount of concrete needs to be poured for an enlarged foundation; when the foundation is poor, a pile-type tower crane foundation is often required, which is not only costly but also inefficient. Furthermore, for projects with deep pits or limited space, a large reinforced concrete foundation needs to be constructed in advance, which not only consumes a lot of materials and is costly, but also requires demolition and generates a lot of construction waste, which does not conform to the concept of green construction. Attached Figure Description

[0014] The present invention will be further explained below with reference to the accompanying drawings and embodiments: Figure 1 This is a schematic diagram of the overall three-dimensional structure provided by this utility model; Figure 2 This is a schematic diagram of the support component structure provided by this utility model; Figure 3 This is a schematic diagram of a half-section of the support component provided by this utility model.

[0015] Explanation of reference numerals in the attached figures: 1. Load-bearing platform; 2. Main steel beam; 3. Embedded bolts; 4. Fixing ear plate; 5. Fixing bolt one; 6. Anchor plate one; 7. Connecting bolts; 8. Anchor plate two; 9. Embedded climbing cone; 10. Diagonal bracing steel beam; 11. Fixing plate; 12. Fixing bolt two; 13. Reinforcing steel beam; 14. Connecting steel beam; 15. Lattice column. Detailed Implementation

[0016] The present invention will now be described in detail, and the technical solutions in the embodiments of the present invention will be clearly and completely described. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of the present invention.

[0017] This utility model provides an improved structure for a rear-anchored climbing cone-attached pedestal tower crane foundation. The technical solution of this utility model is as follows: like Figures 1-3 As shown, a tower crane foundation structure with a rear-anchored climbing cone attachment platform includes a bearing platform 1. Two sets of pre-embedded bolts 3 and pre-embedded climbing cones 9 are pre-embedded on the surface and sidewalls of the bearing platform 1, respectively. A main steel beam 2 is fixedly installed on the surface of the bearing platform 1 through the pre-embedded bolts 3. A fixing ear plate 4 is fixedly installed at the end of the main steel beam 2. A fixing bolt 5 is fixedly installed between the fixing ear plate 4 and the bearing platform 1. The structure also includes a support component. The bearing platform 1 is a bridge pier or an existing concrete foundation of a building. The pre-embedded bolts 3 and pre-embedded climbing cones 9 are embedded at one time during concrete pouring, and their positions are precisely measured. The main steel beam 2 is made of H-beams and serves as the main load-bearing structure of the tower crane. The fixing ear plate 4 enhances the connection strength between the main steel beam 2 and the bearing platform 1.

[0018] The support components are installed on the main steel beam 2 and the load-bearing platform 1.

[0019] The support assembly includes a pair of anchor plates 2 8 fixedly installed on the side wall of the bearing platform 1 by pre-embedded climbing cones 9. An anchor plate 1 6 is fixedly installed at the bottom of the main steel beam 2. An anchor plate 1 6 and the main steel beam 2 are fixedly installed together by connecting bolts 7. An inclined steel beam 10 is fixedly connected between the anchor plate 1 6 and the anchor plate 2 8. The anchor plate 2 8 transmits the tension of the inclined steel beam 10 to the bearing platform 1. The inclined steel beam 10 is made of channel steel, forming a triangular stable support structure.

[0020] Furthermore, a pair of fixing plates 11 are fixedly installed on one side of the bearing platform 1. Fixing bolts 12 are fixedly installed between the fixing plates 11 and the bearing platform 1. A reinforcing steel beam 13 is fixedly connected between the fixing plates 11 and the diagonal bracing steel beam 10. A connecting steel beam 14 is fixedly connected between the pair of reinforcing steel beams 13. Fixing bolts 12 provide additional connection safety, the reinforcing steel beam 13 improves the lateral stability of the overall structure, and the connecting steel beam 14 ensures that the two reinforcing steel beams 13 work together.

[0021] Furthermore, a lattice column 15 is fixedly installed at the ends of a pair of main steel beams 2. The lattice column 15 serves as the installation foundation for the standard section of the tower crane and is connected to the main steel beams 2 by high-strength bolts.

[0022] The specific working method is as follows: During construction, pre-embedded bolts 3 and pre-embedded climbing cones 9 are first embedded in the predetermined position of the bearing platform 1; after the concrete reaches the strength, the main steel beam 2 is installed and fixed by the pre-embedded bolts 3; then, anchor plates 8 are installed on the side wall by the pre-embedded climbing cones 9, and diagonal bracing steel beams 10 are installed between the anchor plates 6 at the bottom of the main steel beam 2; finally, reinforcing steel beams 13 and connecting steel beams 14 are installed to form a spatial support system; lattice columns 15 are erected on the main steel beam 2 for installing tower crane standard sections.

[0023] The technical means disclosed in this utility model are not limited to those described above, but also include technical solutions composed of equivalent substitutions of the above technical features. Matters not covered in this utility model are common knowledge to those skilled in the art.

Claims

1. A tower crane foundation structure of the post anchor climbing cone attached pile type, comprising a bearing platform (1), the surface and the side wall of the bearing platform (1) are respectively embedded with two groups of embedded bolts (3) and embedded climbing cones (9), characterized in that: The surface of the bearing platform (1) is fixedly installed with a main steel beam (2) by pre-embedded bolts (3), and a fixing ear plate (4) is fixedly installed at the end of the main steel beam (2). The fixing ear plate (4) and the bearing platform (1) are fixedly installed with a fixing bolt (5), and the platform also includes: Support components are provided on the main steel beam (2) and the load-bearing platform (1); The support assembly includes a pair of anchor plates two (8) fixedly installed on the side wall of the bearing platform (1) by pre-embedded climbing cones (9), an anchor plate one (6) fixedly installed at the bottom of the main steel beam (2), a connecting bolt (7) fixedly installed between the anchor plate one (6) and the main steel beam (2), and a diagonal bracing steel beam (10) fixedly connected between the anchor plate one (6) and the anchor plate two (8).

2. A tower foundation construction of the post-anchored climbing-cone pile cap type according to claim 1, characterized in that: A pair of fixing plates (11) are fixedly installed on one side of the bearing platform (1). Fixing bolts (12) are fixedly installed between the fixing plates (11) and the bearing platform (1). A reinforcing steel beam (13) is fixedly connected between the fixing plates (11) and the diagonal bracing steel beam (10). A connecting steel beam (14) is fixedly connected between the pair of reinforcing steel beams (13).

3. A tower foundation construction of the post-anchored climbing-cone pile cap type according to any one of claims 1-2, characterized in that: A lattice column (15) is fixedly installed at the ends of a pair of main steel beams (2).