Deep soil foundation pumped storage power station reservoir bottom drainage system

By constructing a multi-layered reverse filtration and drainage system in a deep soil foundation, the structural damage caused by foundation settlement in traditional drainage systems has been solved, achieving the stability and long-term effectiveness of the drainage system and ensuring the safe operation of the power station.

CN225014232UActive Publication Date: 2026-11-24NORTHWEST ELECTRIC POWER DESIGN INST OF CHINA POWER ENG CONSULTING GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522839212.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-31
Publication Date
2026-11-24
Estimated Expiration
2035-12-31

AI Technical Summary

Technical Problem

In deep soil foundations, traditional drainage systems are prone to structural damage due to uneven settlement and compression of the foundation, affecting the safe operation of power plants. They also lack long-term stability solutions that can adapt to frequent water level changes and high water pressure.

Method used

The system employs a combination of blind drain foundation pit, crushed stone vibratory piles, geotextile filter layer, filter material layer, cushion layer, medium and fine sand layer, three-dimensional composite drainage net, geomembrane and sandbags to form a multi-layered filter and drainage system that adapts to foundation deformation and maintains smooth drainage.

Benefits of technology

It effectively reduces uneven settlement of the foundation, prevents blockage of drainage channels, ensures the stability and long-term effective operation of the reservoir bottom drainage system, and safeguards the safety of the power station.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225014232U_ABST
    Figure CN225014232U_ABST
Patent Text Reader

Abstract

This utility model belongs to the field of drainage technology and relates to a drainage system for the bottom of a pumped-storage power station with a deep soil foundation. It includes: a blind ditch pit, set in a deep soil foundation; crushed stone vibratory compaction piles, set in the deep soil foundation below the bottom of the blind ditch pit; a geotextile filter layer, laid on the foundation surface and slopes of the blind ditch pit; a filter material layer, laid on top of the geotextile filter layer; a cushion layer, a medium-fine sand layer, a three-dimensional composite drainage net, a geomembrane, and sandbags, laid sequentially from bottom to top above the filter material layer; a drainage blind ditch, buried within the blind ditch pit; and a transition material zone, filled between the filter material layer and the cushion layer and wrapping the drainage blind ditch. This utility model can adapt to uneven settlement of deep soil foundations, ensuring the smooth flow and long-term effective use of the reservoir bottom drainage system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of drainage technology and relates to a drainage system for the bottom of a pumped storage power station with a deep soil foundation. Background Technology

[0002] With the rapid development of pumped storage power station construction, the site selection scope is constantly expanding. Especially in some areas, deep soil foundation conditions have become an unavoidable engineering geological environment in power station construction. These foundations are usually characterized by high compressibility, low bearing capacity, and susceptibility to consolidation and uneven settlement, bringing new technical challenges to the design and construction of power station projects.

[0003] Pumped storage power stations, as key facilities in the power system responsible for peak shaving, frequency regulation, and energy storage, rely heavily on the reliability of their auxiliary systems for safe and stable operation. The reservoir bottom drainage system, a crucial component, directly affects the timely and effective removal of seepage from the reservoir bottom, playing a vital role in maintaining stable groundwater levels, preventing seepage damage, and ensuring long-term operational safety. Traditional pumped storage power station reservoir bottom drainage systems are often designed based on stable rock foundation conditions, typically employing methods such as excavating trenches and then pouring concrete drainage ditches or burying prefabricated drainage pipes. These systems offer high structural rigidity and integrity, performing well on rock foundations.

[0004] However, traditional rigid drainage structures face significant limitations in deep soil foundations. As the soil undergoes continuous consolidation and compression under load, uneven settlement easily occurs, causing concrete drainage ditches or pipes to bear additional bending and shear stresses, leading to structural cracking, fractures, or misalignment of joints. Such structural damage not only directly causes drainage channel blockage and drainage failure, but may also exacerbate foundation softening or seepage deformation due to changes in seepage paths, seriously affecting the operational safety and lifespan of the power plant.

[0005] Currently, while existing civil engineering technologies include drainage measures for general soil foundations, such as soft soil treatment and flexible drainage bodies, these are mainly applied to highways, municipal projects, or general water conservancy projects. They lack solutions for the specific drainage conditions at the bottom of pumped storage power stations, such as frequent water level changes, high water pressure, long-term stability requirements, and the potential risks of large deformation in deep soil foundations.

[0006] Therefore, how to construct a reservoir bottom drainage system that can adapt to foundation deformation, maintain smooth drainage, and operate reliably for a long time under deep soil foundation conditions has become a key technical problem that urgently needs to be solved in the engineering design of pumped storage power stations. Utility Model Content

[0007] To address the problems of poor drainage and insufficient foundation stability in existing pumped storage power stations with deep soil foundations, this utility model provides a drainage system for the bottom of pumped storage power stations with deep soil foundations. This system can adapt to uneven settlement of deep soil foundations, ensuring smooth drainage and long-term effective use of the bottom drainage system.

[0008] To achieve the above objectives, the present invention adopts the following technical solution: This utility model provides a drainage system for the bottom of a pumped storage power station with deep soil foundation, comprising: Blind drain foundation pits are set in deep soil foundations; Vibratory compaction piles are installed in the deep soil foundation below the bottom of the blind ditch foundation pit; A reverse filter geotextile layer is laid on the foundation surface and slope of the blind drain pit; A reverse filter layer is laid on top of the reverse filter geotextile layer; The following layers are laid sequentially from bottom to top above the filter material layer: cushion layer, medium and fine sand layer, three-dimensional composite drainage net, geomembrane and sandbags. Drainage blind ditch, buried in the foundation pit of the blind ditch; The transition material zone is filled between the filter material layer and the padding layer zone and wraps around the drainage blind ditch.

[0009] Preferably, the slope ratio of the excavation line of the blind ditch foundation pit is 1:m, where the value of m ranges from 1.2 to 2.0.

[0010] Preferably, the diameter of the crushed stone vibratory compaction pile is 50~80cm and the depth is 2.5~3.5m; and the crushed stone vibratory compaction pile is arranged in an array in the deep soil foundation below the bottom of the blind ditch pit, and the spacing between adjacent crushed stone vibratory compaction piles is not less than 3 times the pile diameter.

[0011] Preferably, the geotextile filter layer comprises two layers of geotextile laid in layers, each layer having a thickness of not less than 3 mm and a unit area mass of not less than 150 g / m². 2 Furthermore, its permeability coefficient is greater than 0.1 cm / s.

[0012] Preferably, the cross-section of the drainage ditch is an inverted trapezoid, and its bottom longitudinal slope is 1.0% to 3.0%.

[0013] Preferably, the drainage ditch is filled with continuously graded crushed stone; the crushed stone has a non-uniformity coefficient Cu≥5, a curvature coefficient Cc of 1~3, and a particle size of 100~200mm.

[0014] Preferably, the average particle size of the medium and fine sand in the medium and fine sand layer is 0.25~0.50mm, the fineness modulus is 1.6~3.0, the maximum particle size does not exceed 5mm, and the content of particles with a particle size less than 0.075mm does not exceed 5%.

[0015] Preferably, the three-dimensional composite drainage net comprises a core made of high-density polyethylene and geotextiles respectively laminated on two surfaces of the core.

[0016] Preferably, the sandbags are arranged in an array on the upper surface of the geomembrane.

[0017] Preferably, the center-to-center distance between adjacent sandbags is 150cm.

[0018] Compared with the prior art, the present invention has the following beneficial effects: This invention utilizes vibratory compaction piles to form a composite foundation, effectively reinforcing the weak soil layer at the bottom of the foundation pit, reducing uneven settlement of the foundation, and providing a stable foundation for the upper drainage structure. The geotextile filter layer adheres closely to the foundation pit soil, acting as the first barrier to effectively prevent the loss and intrusion of fine particles from the foundation soil. The filter material layer, through its gradation characteristics, further filters seepage, prevents clogging, and also provides horizontal drainage. The drainage blind ditch is responsible for quickly and longitudinally guiding the collected seepage water; while the transition material zone wraps around the blind ditch and fills the space between the filter layer and the cushion layer, playing a role in stress diffusion, material transition, and protecting the structural integrity of the blind ditch. The cushion layer and medium-fine sand layer from bottom to top provide a flat and uniform support surface, preventing damage caused by stress concentration. The three-dimensional composite drainage net utilizes its three-dimensional core structure to efficiently collect and laterally guide seepage water through the geomembrane, while the attached geotextile provides secondary filtration protection. The uppermost geomembrane forms a crucial impermeable layer, preventing large amounts of reservoir water from seeping downwards; while the sandbags arranged in an array on the surface fix the geomembrane through pressure, preventing it from being lifted by wind or water flow and ensuring the overall stability of the system. Attached Figure Description

[0019] To more clearly illustrate the technical solutions of the embodiments of this utility model, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of this utility model and should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0020] Figure 1 This is a schematic diagram of a drainage system at the bottom of a pumped storage power station with a deep soil foundation, according to the present invention. Figure 2 for Figure 1 AA cross-section view; Figure 3for Figure 1 A magnified view of a section at point B in the middle.

[0021] The components include: 1. Sandbags; 2. Geomembrane; 3. Three-dimensional composite drainage net; 4. Medium and fine sand layer; 5. Subbase area; 6. Transition material area; 7. Drainage blind ditch; 8. Filter material layer; 9. Filter geotextile layer; 10. Crushed stone vibratory pile; 11. Original ground line; 12. Excavation line; 13. Deep soil foundation. Detailed Implementation

[0022] To make the objectives, technical solutions, and advantages of the embodiments of this utility model clearer, the technical solutions of the embodiments of this utility model will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this utility model, and not all embodiments. The components of the embodiments of this utility model described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.

[0023] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without inventive effort are within the scope of protection of the present invention.

[0024] It should be noted that similar labels and letters in the following figures indicate similar items. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures.

[0025] In the description of the embodiments of this utility model, it should be noted that if terms such as "upper," "lower," "horizontal," or "inner" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship commonly used when the utility model product is in use, they are only for the convenience of describing the utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation on the utility model. Furthermore, terms such as "first" and "second" are only used to distinguish descriptions and should not be construed as indicating or implying relative importance.

[0026] Furthermore, the use of the term "horizontal" does not imply that the component must be absolutely horizontal, but rather that it can be slightly tilted. For example, "horizontal" simply means that its direction is more horizontal than "vertical," and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0027] In the description of the embodiments of this utility model, it should also be noted that, unless otherwise explicitly specified and limited, the terms "set," "install," "connect," and "link" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.

[0028] The present invention will now be described in further detail with reference to the accompanying drawings: The primary objective of this invention is to provide a drainage system for the bottom of a pumped-storage power station with deep soil foundations, such as... Figures 1-3 As shown, it includes: The blind drain pit is set in the deep soil foundation 13; 10 vibratory compaction piles are installed in the deep soil foundation 13 below the bottom of the blind ditch pit; The reverse filter geotextile layer 9 is laid on the foundation surface and slope of the blind ditch foundation pit; The filter material layer 8 is laid on top of the filter geotextile layer 9; The following layers are laid from bottom to top on top of the filter material layer 8: cushion layer 5, medium and fine sand layer 4, three-dimensional composite drainage net 3, geomembrane 2 and sandbag 1. Drainage blind ditch 7 is buried in the foundation pit of the blind ditch; The transition material zone 6 is filled between the filter material layer 8 and the padding layer zone 5 and wraps the drainage blind ditch 7.

[0029] Among them, the crushed stone vibratory compaction piles 10 reinforce the deep soil foundation 13 below the blind drain pit, forming a composite foundation. Its core function is to significantly improve the bearing capacity of the foundation and effectively reduce the uneven settlement that may occur later, providing a stable and reliable foundation for the overall drainage structure above. The geotextile layer 9 laid on the reinforced foundation surface and slope of the pit serves as the first barrier closely attached to the foundation soil. Its main function is to prevent fine particles in the foundation soil from migrating and being lost under the action of water flow, thus avoiding damage to the soil structure. The filter material layer 8 laid on the geotextile layer constitutes the second fine filter defense line. It can further intercept extremely fine particles that may penetrate the geotextile, while ensuring the smooth passage of seepage water and preventing the drainage channel from being blocked. The drainage blind drain 7, as the main drainage channel of the system, is buried in the middle of the structure. The permeable material filled inside it forms an efficient water collection and conduction path, responsible for quickly discharging the collected seepage water from the reservoir area. The transition material zone 6, which wraps around and supports the drainage blind ditch 7, ensures a smooth transition in particle size distribution between the filter material and the upper cushion layer, preventing material mixing. It also firmly wraps around and supports the drainage blind ditch 7, maintaining its structural form and drainage function. Above the transition material zone 6, from bottom to top, are the cushion layer 5 and the medium-fine sand layer 4. These provide a uniform, flat, and dense support base for the upper flexible impermeable layer, preventing the top waterproofing material from being punctured or experiencing stress concentration. The three-dimensional composite drainage net 3, laid on top of the medium-fine sand layer 4, provides horizontal drainage space, effectively removing any small amounts of seepage water or gas that might penetrate the impermeable layer, eliminating its adverse effects on the stability of the impermeable layer. The uppermost geomembrane 2 is the core impermeable layer, directly blocking reservoir water infiltration. The sandbags 1 covering its surface provide weight and protection for the geomembrane 2, preventing it from floating or breaking under reservoir water pressure or external forces.

[0030] For example, the slope ratio of the excavation line 12 of the blind ditch foundation pit is 1:m, where m ranges from 1.2 to 2.0. Since it is a temporary slope and its depth is generally within 5 meters, this slope ratio design can ensure the stability of the foundation pit slope and facilitate construction operations.

[0031] For example, the crushed stone vibratory compaction piles 10 have a diameter of 50-80cm and a depth of 2.5-3.5m, and are arranged in an array below the bottom of the foundation pit. The spacing between adjacent crushed stone vibratory compaction piles 10 is not less than 3 times the pile diameter, that is, the spacing is not less than 150cm. As a composite foundation for blind drains, the crushed stone vibratory compaction piles 10 can effectively reduce uneven settlement and improve the bearing capacity of the foundation.

[0032] For example, the reverse filter geotextile layer 9 comprises two layers of geotextile (e.g., polyester staple fiber geotextile) laid in layers, each layer of which has a thickness of not less than 3 mm and a unit area mass of not less than 150 g / m². 2Furthermore, its permeability coefficient is greater than 0.1 cm / s. The geotextile layer 9 is located close to the soil foundation and serves as a second layer of filtration, effectively preventing fine particles from entering the drainage system.

[0033] The filter media layer 8, with a thickness of 80cm, is laid on top of the geotextile layer 9. Its main function is to filter soil and prevent drainage, preventing soil clay particles from entering the gaps between the gravel in the drainage ditch 7, thus avoiding drainage failure due to blockage. It serves as the first layer of filtration. The filter media is made from weakly weathered to slightly weathered material excavated from the bottom of the reservoir or from a tunnel, with a mud content of no more than 3% for particles smaller than 0.075mm and a permeability coefficient of not less than 1×10⁻⁶. -3 cm / s, dry density not less than 1.65 g / cm³ 3 .

[0034] For example, the cross-section of the drainage blind ditch 7 is an inverted trapezoid, with a bottom longitudinal slope of 1.0% to 3.0% to ensure drainage efficiency. The specific dimensions of the drainage blind ditch 7 are determined based on a comprehensive analysis of seepage volume, drainage efficiency, etc. To ensure smooth drainage, the bottom width is not less than 1.0m and the height is not less than 2.0m.

[0035] The drainage ditch 7 is filled with continuously graded crushed stone; the crushed stone has a uniformity coefficient Cu≥5, a curvature coefficient Cc of 1~3, and a particle size of 100~200mm. The crushed stone is required to have a porosity of not less than 30%, and must be washed to remove dust before backfilling, with a mud content of less than 3% to ensure permeability. Continuously graded crushed stone can form a stable skeleton structure, providing good permeable channels for drainage.

[0036] The transition material zone 6 is filled between the filter material layer 8 and the cushion layer zone 5 and wraps around the drainage blind ditch 7, with a thickness of 160cm. The transition material consists of graded boulders or crushed stone, with a maximum particle size not exceeding 30cm, a particle content of less than 20mm particles not less than 15%, continuous gradation, and a compacted porosity not exceeding 20%. The main function of the transition material zone 6 is to adapt to the slag-filled foundation at the bottom of the silo, diffuse stress, and have a permeability coefficient of not less than 1×10⁻⁶. -2 cm / s, the load-bearing capacity meets the design requirements.

[0037] The medium-fine sand layer 4 is 8cm thick. The average particle size of the medium-fine sand in the medium-fine sand layer 4 is 0.25~0.50mm, the fineness modulus is 1.6~3.0, the maximum particle size does not exceed 5mm, and the content of particles with a particle size smaller than 0.075mm does not exceed 5%. By strictly controlling the gradation, particle size and mud content of the medium-fine sand, uniform support is provided for the three-dimensional composite drainage net 3 and geomembrane 2 above, effectively preventing damage to the membrane material and ensuring the long-term unobstructed flow of the interface drainage channels.

[0038] The three-dimensional composite drainage net 3 is composed of a rigid core made of high-density polyethylene (HDPE) and a double-sided composite geotextile. This structure integrates the functions of filtration, drainage, air permeability, and protection. The double-sided composite geotextile effectively prevents the intrusion of surrounding fine soil particles, serving as a filter and protector. The HDPE core forms stable three-dimensional drainage channels, ensuring smooth drainage of seepage water. Simultaneously, its rigid structure provides uniform support for the upper geomembrane 2, preventing localized depressions and dissipating potential pore air pressure, thus achieving air permeability and ensuring the long-term effective operation of the entire drainage system.

[0039] The geomembrane 2 is 1.5mm thick and serves as a seepage preventer.

[0040] The sandbags 1 are arranged in an array on the upper surface of the geomembrane 2, and the center-to-center distance between adjacent sandbags 1 is 150cm, forming a 150cm×150cm grid, which plays a role in covering and protecting the geomembrane 2.

[0041] The working principle of this drainage system is as follows: When there is seepage at the bottom of the reservoir, the water first flows through sandbags 1 and geomembrane 2, then sequentially through the three-dimensional composite drainage net 3, medium-fine sand layer 4, cushion layer 5, and enters transition material zone 6. In transition material zone 6, the seepage water is guided to drainage blind ditch 7, and flows along the bottom longitudinal slope to the drainage outlet through the gravel permeable channels within the blind ditch. The reverse filter geotextile layer 9 and the reverse filter material layer 8 form a double reverse filter protection, effectively preventing fine particles from entering the drainage system and ensuring the long-term unobstructed flow of the drainage channels. The gravel vibratory compaction piles 10 provide foundation reinforcement, adapting to the uneven settlement of the deep soil foundation 13, ensuring the stability and long-term effectiveness of the entire drainage system.

[0042] The second objective of this invention is to provide a construction method for a drainage system at the bottom of a pumped-storage power station with deep soil foundation, comprising the following steps: In the deep soil foundation 13 below the original ground line 11, the blind ditch foundation pit is excavated according to the designed cross-section and slope. The slope ratio of the excavation line of the blind ditch foundation pit is 1:m, where the value of m ranges from 1.2 to 2.0. After the excavation is completed, the foundation surface and slope of the foundation pit are compacted by using a 25t to 32t vibratory roller for 4 to 8 passes to eliminate the collapsibility of the soil foundation and ensure the stability of the foundation.

[0043] The reverse filter geotextile layer 9 is laid on the foundation surface and slope of the blind ditch foundation pit after compaction, and the crushed stone vibratory pile 10 is constructed below the bottom of the blind ditch foundation pit.

[0044] The filter material layer 8 is formed by filling the filter geotextile layer 9 with filter material.

[0045] Within the foundation pit of the blind ditch, a transition material is filled on the filter material layer 8 to form the transition material area 6 that encloses the drainage blind ditch 7, and crushed stone is buried in the transition material area 6 to form the drainage blind ditch 7; the crushed stone is backfilled in layers with compaction, each layer having a loose thickness of no more than 30cm, and is compacted by a small road roller or manually, with a compaction degree ≥93%, and is wrapped with geotextile and fixed firmly with wire or binding straps.

[0046] On the transition material zone 6, the cushion layer zone 5 and the medium-fine sand layer 4 are formed by filling from bottom to top.

[0047] The three-dimensional composite drainage net 3 and the geomembrane 2 are laid sequentially on the medium-fine sand layer 4, and then covered and fixed with sandbags 1.

[0048] Through the above construction steps, a complete drainage system for the bottom of the pumped-storage power station with deep soil foundation was formed. This system, through the organic combination of a multi-layered filter structure and drainage blind ditches 7, can adapt to the uneven settlement of the deep soil foundation 13, ensuring the smooth flow and long-term effectiveness of the drainage system.

[0049] The above are merely preferred embodiments of this utility model and are not intended to limit the scope of this utility model. Various modifications and variations can be made to this utility model by those skilled in the art. Any modifications, equivalent substitutions, or improvements made within the spirit and principles of this utility model should be included within the protection scope of this utility model.

Claims

1. A drainage system for the bottom of a pumped-storage power station with deep soil foundation, characterized in that, include: Blind drain foundation pits are set in deep soil foundations (13); Crushed stone vibratory compaction piles (10) are installed in the deep soil foundation (13) below the bottom of the blind ditch foundation pit; A reverse filter geotextile layer (9) is laid on the foundation surface and slope of the blind drain foundation pit; The reverse filter layer (8) is laid on top of the reverse filter geotextile layer (9); The following layers are laid from bottom to top: cushion layer (5), medium and fine sand layer (4), three-dimensional composite drainage net (3), geomembrane (2) and sandbag (1) above the filter material layer (8). Drainage blind ditch (7) is buried in the foundation pit of the blind ditch; The transition material zone (6) is filled between the filter material layer (8) and the padding layer zone (5) and wraps the drainage blind ditch (7).

2. The drainage system for a deep soil foundation pumped storage power station reservoir bottom as described in claim 1, characterized in that, The slope ratio of the slope excavation line (12) of the blind ditch foundation pit is 1:m, where the value of m ranges from 1.2 to 2.

0.

3. The drainage system for the bottom of a pumped-storage power station with deep soil foundation as described in claim 1, characterized in that, The diameter of the crushed stone vibratory pile (10) is 50~80cm and the depth is 2.5~3.5m; and the crushed stone vibratory pile (10) is arranged in an array in the deep soil foundation (13) below the bottom of the blind ditch pit, and the spacing between adjacent crushed stone vibratory piles (10) is not less than 3 times the pile diameter.

4. The drainage system for the bottom of a pumped-storage power station with deep soil foundation as described in claim 1, characterized in that, The geotextile layer (9) comprises two layers of geotextile laid in layers, each layer having a thickness of not less than 3 mm and a unit area mass of not less than 150 g / m². 2 Furthermore, its permeability coefficient is greater than 0.1 cm / s.

5. The drainage system for the bottom of a pumped-storage power station with deep soil foundation as described in claim 1, characterized in that, The cross-section of the drainage blind ditch (7) is an inverted trapezoid, and its bottom longitudinal slope is 1.0% to 3.0%.

6. The drainage system for the bottom of a pumped-storage power station with deep soil foundation as described in claim 1, characterized in that, The drainage blind ditch (7) is filled with continuously graded crushed stone; the non-uniformity coefficient Cu≥5, the curvature coefficient Cc is 1~3, and the particle size is 100~200mm.

7. The drainage system for the bottom of a pumped-storage power station with deep soil foundation as described in claim 1, characterized in that, The average particle size of the medium and fine sand in the medium and fine sand layer (4) is 0.25~0.50mm, the fineness modulus is 1.6~3.0, the maximum particle size does not exceed 5mm, and the content of particles with a particle size less than 0.075mm does not exceed 5%.

8. The drainage system for the bottom of a pumped-storage power station with deep soil foundation as described in claim 1, characterized in that, The three-dimensional composite drainage net (3) includes a core made of high-density polyethylene and geotextiles respectively laminated on two surfaces of the core.

9. A deep soil foundation pumped storage power station reservoir bottom drainage system according to claim 1, characterized in that, The sandbags (1) are arranged in an array on the upper surface of the geomembrane (2).

10. A deep soil foundation pumped storage power station reservoir bottom drainage system according to claim 9, characterized in that, The center-to-center distance between adjacent sandbags (1) is 150cm.