Quickly dredging device for trench of direct-buried pipeline
By combining an adjustable push plate and a screw conveyor mechanism, the problem of low efficiency of traditional dredging devices in silt environments with varying humidity is solved, achieving efficient, continuous cleaning and easy maintenance of buried pipeline trenches.
Patent Information
- Application Number
- CN202522732185.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-24
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-24
AI Technical Summary
Traditional pipeline trench dredging relies on manual labor or simple machinery, which results in discontinuous cleaning, low efficiency, and the fixed weight of the equipment makes it difficult to adapt to different humidity and sludge environments, and internal maintenance and troubleshooting are difficult.
The device features an adjustable counterweight pusher plate design, combined with a screw conveyor mechanism and a modular quick-release structure. It continuously transports sludge through screw blades and discharges it directionally through a discharge pipe. The weight can be flexibly adjusted to adapt to different sludge environments, and the sludge removal shell can be quickly disassembled for easy maintenance.
It enables efficient and continuous mechanized cleaning of silt in buried pipeline trenches, improving cleaning speed, reducing labor intensity, and facilitating equipment maintenance.
Smart Images

Figure CN225014259U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of dredging technology, specifically to a rapid dredging device for buried pipeline trenches. Background Technology
[0002] As urbanization continues to advance, the construction requirements for water conservancy projects are becoming increasingly stringent, and silt may be present in the trenches for direct-buried pipelines during construction. Traditional pipeline trench dredging relies on manual labor or simple machinery, which results in discontinuous cleaning, low efficiency, and the fixed weight of the device makes it difficult to adapt to different humidity and silt environments. In addition, there are technical problems such as difficulty in internal maintenance and troubleshooting. Therefore, a rapid dredging device for directly buried pipeline trenches is proposed. Utility Model Content
[0003] This utility model proposes a rapid dredging device for directly buried pipeline trenches, which solves the problems of discontinuous cleaning, low efficiency, and difficulty in adapting to different humidity silt environments when traditional pipeline trench dredging relies on manual labor or simple machinery, as well as the difficulty in internal maintenance and troubleshooting.
[0004] The technical solution of this utility model is as follows: a rapid dredging device for buried pipeline trenches, comprising: a push plate; One side of the push plate is provided with a counterweight component, and another side of the push plate is provided with a sludge removal shell. Both ends of the sludge removal shell are provided with bearing seats. The inner ring of the bearing seat is provided with a spiral shaft. Spiral blades are fixedly connected to the surface of the spiral shaft. The top of the sludge removal shell is provided with a power component. The surface of the dredging shell has an inlet, the back of the dredging shell has an outlet, the inner wall of the outlet has a guide, the surface of the push plate is fixedly connected with multiple traction rings, one side of the push plate is provided with multiple fixing bolts, and the back of the dredging shell is fixedly connected with multiple fixing nuts that cooperate with the fixing bolts.
[0005] Optionally, the counterweight component includes a counterweight water tank, a water inlet on one side of the counterweight water tank, an internal thread on the inner wall of the water inlet, a sealing cap and a drain component threadedly connected inside the water inlet.
[0006] Optionally, the drainage component includes a drain pipe located on one side of the counterweight water tank and a switch valve located on the horizontal section of the drain pipe.
[0007] Optionally, the dredging shell includes a dredging cover, a back plate, and multiple mounting components.
[0008] Optionally, the mounting component includes a bolt and a nut; Both the sludge hood and the back plate have multiple through holes on their surfaces.
[0009] Optionally, the power component includes a reducer and a motor disposed on one side of the reducer; The top of the dredging shell is fixedly connected to a bracket that works with a speed reducer.
[0010] Optionally, the guide component includes a sludge discharge shell fixedly connected to the inner wall of the outlet, a flange, a sludge discharge pipe fixedly connected to one side of the flange, and multiple bolts and multiple nuts.
[0011] Optionally, a flow collection hood is fixedly connected to the inner wall of the inlet, and a protective shell is fixedly connected to the lower end of the sludge removal shell.
[0012] The working principle and beneficial effects of this utility model are as follows: This application features a rationally designed device. The device allows for flexible adjustment of the overall counterweight via a water tank that can be filled and drained, enabling the pusher plate to closely adhere to the bottom of silt of different types, achieving the best scraping effect. Its core spiral conveying mechanism can continuously and rapidly transport the silt collected in front, and discharge it directionally through the silt discharge pipe. The device adopts a modular quick-disassembly design, allowing the silt cleaning shell to be quickly disassembled, facilitating the cleaning, maintenance, or replacement of the internal spiral blades. This combination of "adjustable counterweight + spiral conveying + modular quick-disassembly" design achieves efficient, adaptive, and easy-to-maintain mechanized cleaning of ditch silt. Attached Figure Description
[0013] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments.
[0014] Figure 1 This is a schematic diagram of the three-dimensional structure of the present invention. Figure 1 ; Figure 2 This is a schematic diagram of the three-dimensional structure of the present invention. Figure 2 ; Figure 3 This is a front view structural diagram of the present utility model; Figure 4 for Figure 2 Enlarged structural diagram at point A in the diagram; In the diagram: 1. Push plate; 2. Counterweight water tank; 3. Dredging shell; 301. Dredging cover; 302. Back plate; 303. Bolt 1; 304. Nut 1; 4. Bearing housing; 5. Reducer; 6. Motor; 7. Sludge discharge pipe; 8. Traction ring; 9. Protective shell; 10. Flow collector; 11. Sealing cover; 12. Fixing bolt; 13. Drain pipe; 14. Switch valve; 15. Sludge discharge shell; 16. Flange; 17. Two bolts; 18. Two nuts; 19. Spiral shaft; 20. Spiral blade. Detailed Implementation
[0015] The technical solutions of this utility model will be clearly and completely described below with reference to the embodiments of this utility model. Obviously, the described embodiments are only some embodiments of this utility model, and not all embodiments. Based on the embodiments of this utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of this utility model.
[0016] Example: Please refer to Figure 1 - Figure 4 The rapid dredging device for buried pipeline trenches provided by this utility model includes: a push plate 1; One side of the push plate 1 is provided with a counterweight component, and the other side of the push plate 1 is provided with a sludge removal shell 3. Both ends of the sludge removal shell 3 are provided with bearing seats 4. The inner ring of the bearing seat 4 is provided with a spiral shaft 19. Spiral blades 20 are fixedly connected to the surface of the spiral shaft 19. The top of the sludge removal shell 3 is provided with a power component. The surface of the dredging shell 3 has an inlet, and the back of the dredging shell 3 has an outlet. The inner wall of the outlet is equipped with a guide. Multiple traction rings 8 are fixedly connected to the surface of the push plate 1. Multiple fixing bolts 12 are provided on one side of the push plate 1. Multiple fixing nuts that match the fixing bolts 12 are fixedly connected to the back of the dredging shell 3. Its traction rings 8 are connected to external traction equipment. The traction equipment pulls the push plate 1 through the traction rings 8 to move inside the pipe groove, so that the sludge is concentrated.
[0017] Furthermore, the counterweight components include a counterweight water tank 2, a water inlet on one side of the counterweight water tank 2, an internal thread on the inner wall of the water inlet, a sealing cap 11 threadedly connected to the inside of the water inlet, and a drain component. The drainage components include a drain pipe 13 located on one side of the counterweight water tank 2 and a switch valve 14 located on the horizontal section of the drain pipe 13.
[0018] Specifically, the counterweight component increases the overall weight of the device by injecting water into the counterweight water tank 2. Before the dredging operation, the sealing cover 11 is opened to inject water from the inlet. After the operation is completed, the switch valve 14 on the drain pipe 13 can be opened to drain the water. This design allows the device to flexibly adapt to sludge environments with different humidity and consistency. By adjusting the water volume, the optimal downward pressure is obtained to ensure that the push plate 1 moves close to the bottom of the trench.
[0019] Furthermore, the dredging shell 3 includes a dredging cover 301, a back plate 302, and multiple mounting components; The mounting components include bolt 303 and nut 304; Both the sludge hood 301 and the back plate 302 have multiple through holes on their surfaces.
[0020] Specifically, the sludge removal shell 3 is assembled from the sludge removal cover 301 and the back plate 302 by connecting multiple bolts 303 and nuts 304. This split structure facilitates quick disassembly when the spiral blade 20 or the spiral shaft 19 needs maintenance, cleaning or replacement, greatly improving the maintainability of the equipment.
[0021] Furthermore, the power components include a reducer 5 and a motor 6 disposed on one side of the reducer 5; The top of the dredging shell 3 is fixedly connected to a bracket that matches the reducer 5.
[0022] Specifically, the power component is powered by the motor 6. After the speed is reduced and the torque is increased by the reducer 5, the screw shaft 19 is directly driven to rotate stably in the bearing housing 4, thereby driving the screw blades 20 to rotate at high speed, forming a continuous conveying force.
[0023] Furthermore, the guide components include a sludge discharge shell 15 fixedly connected to the inner wall of the outlet, a flange 16, a sludge discharge pipe 7 fixedly connected to one side of the flange 16, multiple bolts 17 and multiple nuts 18.
[0024] Specifically, the guide component securely connects the discharge shell 15 to the discharge pipe 7 via flange 16 and is tightened with bolts 17 and nuts 18. The sludge pushed out by the spiral blades 20 is collected by the discharge shell 15 and then forcibly guided into the discharge pipe 7, which can transport the sludge in a directional and concentrated manner to the storage point or transport vehicle next to the ditch.
[0025] Furthermore, a flow collector 10 is fixedly connected to the inner wall of the inlet, and a protective shell 9 is fixedly connected to the lower end of the sludge sludge shell 3. The flow collector 10 can be customized in different sizes according to the work site to facilitate the entry of sludge into the interior of the sludge sludge shell 3.
[0026] Specifically, the inlet inner wall of the flow collection hood 10 is funnel-shaped, which can more smoothly collect the silt accumulated in front of the push plate 1 and guide it into the sludge removal shell 3. The protective shell 9 at the lower end of the sludge removal shell 3 can effectively prevent hard objects such as stones from entering and protect the rotating spiral shaft 19 from accidental jamming or damage.
[0027] The workflow for this application is as follows: First, the sludge removal shell 3 is installed on the push plate 1 using the fixing bolts 12 and the fixing nuts on its back. According to the actual humidity and viscosity of the sludge in the trench, an appropriate amount of clean water is injected through the inlet of the counterweight water tank 2 to adjust the total weight of the device, ensuring that the push plate 1 can stick to the bottom of the trench during operation to obtain sufficient traction and scraping effect. The steel cable of the external traction equipment (such as a winch or engineering vehicle) is connected to the traction ring 8 on the push plate 1, and the sludge discharge pipe 7 is extended to the designated sludge dumping point or transport vehicle. The motor 6 is started, and the power is adjusted by the reducer 5 to drive the spiral shaft 19 to rotate at high speed in the bearing seat 4, which in turn drives the spiral blades 20 to rotate. The external traction equipment slowly drags the entire device forward along the trench. During the forward movement, the push plate 1 pushes the silt accumulated in front to the collection hood 10 at the front end of the sludge removal shell 3, and the rotating spiral blades 20 continuously transport the silt that has been collected to the rear. The sludge, conveyed by the screw conveyor to the rear, enters the guide component through the outlet on the back of the sludge removal shell 3. The sludge first enters the sludge discharge shell 15, and is then forced into the sludge discharge pipe 7, which is tightly connected to it by flange 16, bolt 17 and nut 18. Finally, the sludge is transported in a directional and continuous manner to the designated location next to the trench through the sludge discharge pipe 7, so as to achieve rapid removal and centralized treatment of sludge in the trench. When a section of the trench is cleaned or the work surface needs to be moved, stop the traction equipment and motor 6, open the switch valve 14 on the drain pipe 13, drain the water in the counterweight water tank 2, reduce the weight of the device for relocation. If the spiral blade 20 is worn or the inside of the sludge removal shell is blocked, the bolt 303 and nut 304 can be unscrewed to separate the sludge removal cover 301 from the back plate 302, so as to quickly clean, repair or replace the parts inside. In summary, this device, through its "adjustable counterweight traction," "screw mechanical conveying," and "modular quick-disassembly" design, achieves efficient and continuous cleaning of silt in buried pipeline trenches, effectively replacing traditional manual excavation, increasing work speed, and reducing labor intensity.
[0028] The above are merely preferred embodiments of the present utility model and are not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model shall be included within the protection scope of the present utility model.
Claims
1. A device for rapid trench dredging of a buried pipeline, characterized in that, include: Push plate (1); One side of the push plate (1) is provided with a counterweight component, and one side of the push plate (1) is provided with a sludge removal shell (3). Both ends of the sludge removal shell (3) are provided with bearing seats (4). The inner ring of the bearing seat (4) is provided with a spiral shaft (19). The surface of the spiral shaft (19) is fixedly connected with a spiral blade (20). The top of the sludge removal shell (3) is provided with a power component. The surface of the dredging shell (3) has an inlet, the back of the dredging shell (3) has an outlet, the inner wall of the outlet has a guide, the surface of the push plate (1) is fixedly connected with multiple traction rings (8), one side of the push plate (1) is provided with multiple fixing bolts (12), and the back of the dredging shell (3) is fixedly connected with multiple fixing nuts that match the fixing bolts (12).
2. The rapid dredging device for buried pipeline trenches according to claim 1, characterized in that: The counterweight components include a counterweight water tank (2), an inlet on one side of the counterweight water tank (2), an internal thread on the inner wall of the inlet, a sealing cap (11) threaded inside the inlet, and a drain component.
3. The rapid dredging device for directly buried pipeline trenches according to claim 2, characterized in that: The drainage components include a drain pipe (13) located on one side of the counterweight water tank (2) and a switch valve (14) located on the horizontal section of the drain pipe (13).
4. The rapid dredging device for buried pipeline trenches according to claim 1, characterized in that: The dredging shell (3) includes a dredging cover (301), a back plate (302), and multiple mounting components.
5. The rapid dredging device for directly buried pipeline trenches according to claim 4, characterized in that: The mounting components include a bolt (303) and a nut (304); The surfaces of the sludge removal cover (301) and the back plate (302) are both provided with multiple through holes.
6. The rapid dredging device for buried pipeline trenches according to claim 1, characterized in that: The power component includes a reducer (5) and a motor (6) located on one side of the reducer (5). The top of the dredging shell (3) is fixedly connected to a bracket that works with the reducer (5).
7. The rapid dredging device for directly buried pipeline trenches according to claim 1, characterized in that: The guide includes a sludge discharge shell (15) fixedly connected to the inner wall of the outlet, a flange (16), a sludge discharge pipe (7) fixedly connected to one side of the flange (16), a plurality of bolts (17) and a plurality of nuts (18).
8. The rapid dredging device for buried pipeline trenches according to claim 1, characterized in that: The inner wall of the inlet is fixedly connected to a flow collection hood (10), and the lower end of the sludge removal shell (3) is fixedly connected to a protective shell (9).
