Concrete pouring anti-seepage structure at construction joint of beam body
By installing interlocking structures, main waterstops, waterproof reinforcement layers, and water-guiding components at the construction joints of the beams, combined with a high-pressure grouting system, the potential leakage at the construction joints of the beams was resolved, achieving long-term sealing and early detection, and reducing maintenance costs.
Patent Information
- Application Number
- CN202522788562.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-29
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-29
AI Technical Summary
Existing technologies lack a systematic approach to preventing leakage at construction joints in beams, making it difficult to effectively coordinate structural deformation and long-term environmental impacts. This results in the difficulty in early detection of potential leakage problems and high maintenance costs.
It adopts a combination design of interlocking structure, main waterstop, water-swellable waterstop strip, waterproof reinforcement layer and water-conducting components. By increasing the seepage path and automatically collecting seepage water, it achieves three-dimensional sealing and is equipped with a high-pressure grouting system for rapid repair.
It significantly extends the seepage path, achieving long-term sealing of construction joint areas. It can automatically collect and display trace leaks, reducing maintenance costs and enabling early detection and rapid treatment of hidden leaks.
Smart Images

Figure CN225014366U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to a concrete pouring anti-leakage structure at the construction joint of a beam, belonging to the field of building construction technology. Background Technology
[0002] In the field of building construction, construction joints are the joint interfaces formed between concrete poured earlier and later due to construction organization needs or technical intervals. They are weak links in cast-in-place concrete structures, especially in buildings with high requirements for the usage environment, such as experimental teaching buildings. The quality of the treatment of construction joints in beams directly affects the sealing, durability and functionality of the overall structure.
[0003] Currently, conventional techniques for preventing leakage at construction joints in beams mainly focus on optimizing the crack resistance of the concrete itself, setting a single waterstop in the construction joint, and applying a waterproof coating to the structural surface.
[0004] These methods can improve the waterproofing of construction joints to some extent, but they often focus on passive sealing and lack a systematic multi-protection concept. Existing technologies are usually unable to effectively coordinate and cope with the combined effects of structural deformation, material shrinkage, and long-term environmental effects. Moreover, once external waterproofing measures fail locally for various reasons, leakage will occur. Because the migration path of water inside the structure is hidden, the problem is difficult to detect in the early stage. Often, it is not until obvious water stains appear indoors that it is dealt with. At this time, not only are the repair costs high, but the water seepage may have already caused substantial damage to internal precision instruments, building decoration, and structural safety. Utility Model Content
[0005] In view of the shortcomings of the existing technology, the purpose of this utility model is to provide a concrete pouring anti-leakage structure at the construction joint of the beam to solve the existing problems.
[0006] To achieve the above objectives, this utility model is implemented through the following technical solution: a concrete pouring anti-seepage structure at the construction joint of a beam, comprising a pre-cast concrete beam and a post-cast concrete structure, wherein the interface between the pre-cast concrete beam and the post-cast concrete structure is provided with an interlocking structure, a main waterstop is pre-embedded in the middle of the construction joint between the pre-cast concrete beam and the post-cast concrete structure, a water-swellable waterstop strip is provided on one side of the main waterstop, a waterproof reinforcement layer bridging the construction joint is covered between the outer surfaces of the pre-cast concrete beam and the post-cast concrete structure, and a water-guiding component is provided between the construction joint between the pre-cast concrete beam and the post-cast concrete structure.
[0007] By adopting the above technical solution, interlocking structures are set on the pre-cast concrete beams and post-cast concrete structures, and a main waterstop and a water-swellable waterstop strip are added between the construction joints of the pre-cast and post-cast concrete structures. A waterproof reinforcement layer is added to the outer surface, and water-guiding components are set to collect possible seepage. This can significantly extend the water penetration path, coordinate with structural deformation, and ultimately achieve a three-dimensional and long-lasting seal for the entire construction joint area. This greatly improves the reliability of the beam joint's anti-leakage. At the same time, it can automatically collect, guide, and visually display the trace amounts of water seeping in from the construction joint, achieving the purpose of early detection of hidden leaks.
[0008] Furthermore, the interlocking structure is a stepped or wavy joint.
[0009] By adopting the above technical solution, the interlocking structure is set as a stepped or wavy shape, which increases the contact area between the pre-cast concrete beam and the post-cast concrete structure. This not only greatly increases the path that water needs to bypass, but also effectively transmits and resists the shear force at the joint through mechanical interlocking.
[0010] Furthermore, the waterproof reinforcement layer is composed of polymer cement waterproof coating, and a reinforcing base is pressed into its center. The width of the waterproof reinforcement layer covers the construction joint and extends 200-300mm to each side.
[0011] By adopting the above technical solution, the polymer cement waterproof coating provides an overall flexible seal, while the non-woven fabric reinforcing base pressed in the middle plays a reinforcing role similar to the steel bars in reinforced concrete, thereby avoiding the problem that traditional thin-coat waterproof layers are prone to failure due to substrate cracking, and greatly improving the crack resistance and durability of surface waterproofing.
[0012] Furthermore, the water guiding component includes a water guiding groove pre-embedded in the pre-cast concrete beam, a water guiding pipe pre-embedded in the pre-cast concrete beam, a collection pipe fixed on the pre-cast concrete beam, and the collection pipe connected to the water guiding pipe.
[0013] By adopting the above technical solution, water can be collected from construction joints that may pass through the water channel and then concentrated into a collection pipe, which makes it convenient to collect water and facilitates subsequent observation of leaks.
[0014] Furthermore, a transparent resin plate is fixed on the collection tube, and the transparent resin plate penetrates the collection tube.
[0015] By adopting the above technical solution, a transparent resin plate is fixed on the collection pipe, which makes it easy to observe the water in the collection pipe and detect leaks in the construction joint in a timely manner.
[0016] Furthermore, a water guide plate is fixed in the water guide channel, and the water guide plate is inclined toward the water guide pipe.
[0017] By adopting the above technical solution, the water guide plate is tilted towards the water guide pipe, thereby enabling the collected water to be guided into the water guide pipe more quickly.
[0018] Furthermore, a grouting pipe is pre-embedded in the post-cast concrete structure, one end of which is connected to a water guide channel, and the other end of which penetrates the post-cast concrete structure.
[0019] By adopting the above technical solution, high-pressure grouting equipment is used to inject grout into the grouting pipe. The waterproof material injected fills the gap between the grouting pipe and the water guide channel, so that when a leakage warning is detected, high-pressure grouting can be quickly activated to fully fill and seal the core leakage channel.
[0020] Furthermore, the end of the grouting pipe furthest from the water guide channel is threaded with a protective cap, which is flush with the post-poured concrete structure.
[0021] By adopting the above technical solution and using a protective cover to protect the grouting pipe, the entry of foreign objects into the grouting pipe can be reduced.
[0022] In summary, this application includes at least one of the following beneficial effects; 1. In this application, during the pouring of the pre-cast concrete beam, a concave-convex interlocking structure is molded onto the outer upper surface of the pre-cast concrete beam. Simultaneously, a water-guiding component is poured into the pre-cast concrete beam, and a rubber main waterstop is pre-embedded. A water-swellable waterstop strip is fixed to one side of the pre-cast concrete beam with an adhesive. Finally, the subsequent concrete structure is poured. A waterproof reinforcement layer formed by polymer cement waterproof coating is applied to the outer surfaces of both the pre-cast and subsequent concrete structures. A non-woven fabric layer is pressed into the center of this reinforcement layer as a reinforcing base, and its width covers the construction joint and extends 250mm to each side. Water seeps through the main waterproof layer of the construction joint... The water seepage drips into the drainage channel, collects along the inclined drainage plate, and flows smoothly into the inlet of the drainage pipe. The water then drips into the bottom of the vertical collection pipe. As the water accumulates, the liquid level at the bottom of the collection pipe gradually rises. Workers can clearly see the water inside the pipe through a transparent observation window. This significantly extends the water seepage path, coordinates with structural deformation, and ultimately achieves a three-dimensional and long-lasting seal for the entire construction joint area. This greatly improves the reliability of the beam joint's anti-leakage mechanism. At the same time, it can automatically collect, guide, and visually display the trace amounts of water seeping into the construction joint, achieving the goal of early detection of hidden leaks.
[0023] 2. In this application, when leakage is observed from the collection pipe, the flush protective cover is unscrewed to expose the threaded interface of the grouting pipe. Then, high-pressure grouting equipment is used to inject grout into the grouting pipe. The waterproof material of the grout fills the gap between the grouting pipe and the water guide channel. Subsequently, under pressure, it penetrates and fills the capillary pores and micro-cracks of the concrete until the entire leakage channel is completely blocked. This achieves the goal of being able to quickly activate high-pressure grouting when leakage warning is detected, so that the grout fully fills and seals the core leakage channel. Finally, it links with the monitoring system to form a rapid response mechanism of detection and treatment, and completely eliminates the hidden danger of leakage. Attached Figure Description
[0024] Figure 1 This is a first three-dimensional structural schematic diagram of the anti-seepage structure for concrete pouring at the construction joint of the beam in this application. Figure 2 This is a second three-dimensional structural diagram of the anti-seepage structure for concrete pouring at the construction joint of the beam in this application; Figure 3 This is a schematic diagram of the cross-sectional structure of the concrete pouring anti-seepage structure at the construction joint of the beam in this application; Figure 4 This application Figure 3 Enlarged diagram of point A in the middle.
[0025] Explanation of reference numerals in the attached figures: 1. Precast concrete beam; 2. Postcast concrete structure; 3. Interlocking structure; 4. Main waterstop; 5. Water-swellable waterstop strip; 6. Waterproof reinforcement layer; 7. Water guiding component; 71. Water guiding channel; 72. Water guiding pipe; 73. Collection pipe; 74. Transparent resin board; 75. Water guiding plate; 8. Grouting pipe; 9. Protective cover. Detailed Implementation
[0026] The following is in conjunction with the appendix Figure 1-4 This application will be described in further detail.
[0027] This application discloses a concrete pouring anti-seepage structure at the construction joint of a beam.
[0028] Reference Figure 1 , Figure 2 and Figure 3A concrete pouring anti-seepage structure at the construction joint of a beam includes a pre-cast concrete beam 1 and a post-cast concrete structure 2. The interface between the pre-cast concrete beam 1 and the post-cast concrete structure 2 is provided with a concave-convex interlocking structure 3. A main waterstop 4 is pre-embedded in the middle of the construction joint between the pre-cast concrete beam 1 and the post-cast concrete structure 2. A water-swellable waterstop strip 5 is provided on one side of the main waterstop 4. A waterproof reinforcement layer 6 that crosses the construction joint is covered between the outer surfaces of the pre-cast concrete beam 1 and the post-cast concrete structure 2. A water-guiding component 7 is provided between the construction joint between the pre-cast concrete beam 1 and the post-cast concrete structure 2.
[0029] Furthermore, the interlocking structure 3 is a stepped or wavy joint.
[0030] Furthermore, the waterproof reinforcement layer 6 is composed of polymer cement waterproof coating, and a reinforcing base is pressed into its middle. The width of the waterproof reinforcement layer 6 covers the construction joint and extends 200-300mm to both sides.
[0031] When pouring the pre-cast concrete beam 1, a portion of the interlocking structure 3 is molded onto the outer upper surface of the pre-cast concrete beam 1. Simultaneously, the water-guiding component 7 is poured into the pre-cast concrete beam 1, and a rubber main waterstop 4 is pre-embedded. A water-swellable waterstop strip 5 is fixed to one side of the main waterstop strip 4 with adhesive. Finally, the post-cast concrete structure 2 is poured. A waterproof reinforcing layer 6, formed by polymer cement waterproof coating, is applied to the outer surfaces of both the pre-cast concrete beam 1 and the post-cast concrete structure 2. A layer of non-woven fabric is pressed into the center of this reinforcing layer as a reinforcing base, its width covering the construction joint and extending 250mm to each side. An interlocking structure 3 is installed in the concrete beam 1 and the post-cast concrete structure 2. Then, a main waterstop 4 and a water-swellable waterstop strip 5 are added to the construction joint between the two. A waterproof reinforcement layer 6 is added to the outer surface to form multiple waterproof layers. Water-conducting components 7 are used to collect and monitor any water that may seep in. This can significantly extend the water penetration path and coordinate with structural deformation to achieve a three-dimensional and long-lasting seal for the entire construction joint area. This greatly improves the reliability of the beam joint in preventing leakage. At the same time, it can automatically collect, guide and visually display the trace amounts of water that seep in from the construction joint, enabling early detection of hidden leaks.
[0032] Reference Figure 2 , Figure 3 and Figure 4 The water guiding component 7 includes a water guiding channel 71 pre-embedded in the pre-cast concrete beam 1, a water guiding pipe 72 pre-embedded in the pre-cast concrete beam 1, and a collection pipe 73 fixed on the pre-cast concrete beam 1, which is connected to the water guiding pipe 72.
[0033] In addition, a transparent resin plate 74 is fixed on the collection tube 73, and the transparent resin plate 74 penetrates the collection tube 73.
[0034] Furthermore, a water guide plate 75 is fixed in the water guide channel 71, and the water guide plate 75 is tilted towards the water guide pipe 72.
[0035] The water guide channel 71 is made of stainless steel and has a U-shaped cross-section. Before pouring the pre-cast concrete beam 1, the water guide channel 71 is firmly tied to the upper inner side of the beam's reinforcing steel skeleton using thin iron wire or special clamps, ensuring that its opening faces upward and is tightly against the construction joint surface. The length of the water guide channel 71 should be slightly shorter than the width of the beam, and both ends should be sealed with sealant to prevent concrete slurry from flowing in. One end of the water guide pipe 72 is tightly connected to the pre-set connection port at the bottom of the water guide channel 71 and passes through the gap in the beam's reinforcing steel. Its outlet end is positioned inside the side formwork of the pre-cast concrete beam 1. The collection pipe 73 is a section of PVC round pipe, which is vertically fixed to the side of the pre-cast concrete beam 1. After the beam is demolded, holes are drilled at the predetermined positions, and the collection pipe 73 is firmly bonded to the wall using epoxy resin mortar. During installation, it is necessary to ensure that the outlet end of the water guide pipe 72 extends into the bottom of the collection pipe 73. A rectangular observation window is opened on the outer wall of the collection pipe 73. A transparent resin plate 74 is cut to the appropriate size and sealed with transparent silicone sealant and embedded in the observation window to form an observation window that allows for a direct view of the internal water conditions. The main function of the water guide plate 75 is to ensure that the water flowing into the water guide channel 71 can be completely and quickly guided to the inlet of the water guide pipe 72, avoiding accumulation or evaporation in the channel. Water seeping through the main waterproofing line of the construction joint will drip into the water guide channel 71. The seepage water collects along the inclined water guide plate 75 and flows smoothly into the inlet of the water guide pipe 72. The water flows through the water guide pipe 72 and finally drips into the bottom of the vertical collection pipe 73. As the water volume accumulates, the liquid level at the bottom of the collection pipe 73 gradually rises. Workers can clearly see the water in the pipe through the transparent observation window. By pre-setting the water guide channel 71 and water guide plate 75 on the inner side of the pre-cast concrete beam 1 and connecting them to the collection pipe 73 with a transparent observation window, it is possible to automatically collect, guide, and visually display the trace amounts of water seeping in from the construction joint, thus enabling early detection of hidden leaks.
[0036] Reference Figure 2 , Figure 3 and Figure 4 A grouting pipe 8 is pre-embedded in the post-cast concrete structure 2. One end of the grouting pipe 8 is connected to the water guide channel 71, and the other end of the grouting pipe 8 penetrates the post-cast concrete structure 2.
[0037] Furthermore, the end of the grouting pipe 8 away from the water guide channel 71 is threaded with a protective cover 9, which is flush with the post-poured concrete structure 2.
[0038] When leakage is observed through the collection pipe 73, the flush protective cover 9 is unscrewed to expose the threaded interface of the grouting pipe 8. Then, grout is injected into the grouting pipe 8 using high-pressure grouting equipment. The waterproof grout fills the gap between the grouting pipe 8 and the water guide channel 71. Under pressure, it penetrates and fills the capillary pores and micro-cracks of the concrete until the entire leakage channel is completely blocked. After grouting is completed, the protective cover 9 is screwed back on. By pre-embedding the annular grouting pipe 8 in the post-cast concrete structure 2 and connecting its port to the water guide channel 71, and equipping the outside with a flush, removable protective cover 9, high-pressure grouting can be quickly activated when a leakage warning is detected. This allows the grout to fully fill and seal the core leakage channel, and ultimately, it links with the monitoring system to form a rapid response mechanism of detection and treatment, completely eradicating the potential leakage hazard.
[0039] Working principle: During the structural construction phase, a stepped or wavy interlocking structure 3 is set at the interface between the pre-cast concrete beam 1 and the post-cast concrete structure 2 to extend the seepage path and enhance the shear resistance of the interface. A rubber main waterstop 4 is pre-embedded in the middle of the construction joint as a rigid barrier, and a water-swellable waterstop strip 5 is fixed on its inner side. After being exposed to water, it expands and seals the tiny gaps. A polymer cement waterproof coating is applied to the outer surface of the structure, and a non-woven fabric reinforcing base is pressed in to form a surface waterproof reinforcement layer 6. These three layers of protection together constitute a three-dimensional waterproof system from structure to materials. When moisture breaches the external defenses and seeps into the interior, the seepage flows into the pre-embedded water guide channel 71, is guided by the inclined water guide plate 75 into the water guide pipe 72, and finally collects into the collection pipe 73 with an observation window of transparent resin plate 74, realizing visualized management of leakage. When a leakage warning is detected through the observation window, the protective cover 9 flush with the surface of the post-cast concrete structure 2 is unscrewed, and grout is injected into the grouting pipe 8 connected to the water guide channel 71 through high-pressure grouting equipment. The grout fills the leakage channel and solidifies and seals it, forming a complete closed loop from monitoring to treatment, ultimately achieving long-term reliable protection of the construction joint area.
[0040] The above are all preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made in accordance with the structure, shape and principle of this application should be covered within the scope of protection of this application.
Claims
1. A concrete pouring anti-leakage structure at the construction joint of a beam, characterized in that: The structure includes a pre-cast concrete beam and a post-cast concrete structure. The interface between the pre-cast concrete beam and the post-cast concrete structure is provided with a concave-convex interlocking structure. A main waterstop is pre-embedded in the middle of the construction joint between the pre-cast concrete beam and the post-cast concrete structure. A water-swellable waterstop strip is provided on one side of the main waterstop. A waterproof reinforcement layer for bridging the construction joint is covered between the outer surfaces of the pre-cast concrete beam and the post-cast concrete structure. A water-guiding component is provided between the construction joint between the pre-cast concrete beam and the post-cast concrete structure.
2. The anti-leakage structure for concrete pouring at construction joints of beams according to claim 1, characterized in that: The interlocking structure is a stepped or wavy joint.
3. The anti-leakage structure for concrete pouring at construction joints of beams according to claim 2, characterized in that: The waterproof reinforcement layer is composed of polymer cement waterproof coating, and a reinforcing base is pressed into its middle. The width of the waterproof reinforcement layer covers the construction joint and extends 200-300mm to both sides.
4. The anti-leakage structure for concrete pouring at construction joints of beams according to claim 3, characterized in that: The water guiding component includes a water guiding channel pre-embedded in the pre-cast concrete beam, a water guiding pipe pre-embedded in the pre-cast concrete beam, and a collection pipe fixed on the pre-cast concrete beam, the collection pipe being connected to the water guiding pipe.
5. A concrete pouring anti-leakage structure at the construction joint of a beam according to claim 4, characterized in that: A transparent resin plate is fixed on the collection tube, and the transparent resin plate penetrates the collection tube.
6. A concrete anti-leakage structure for construction joints of beams according to claim 5, characterized in that: A water guide plate is fixed in the water guide channel, and the water guide plate is inclined toward the water guide pipe.
7. A concrete anti-leakage structure for construction joints of beams according to claim 6, characterized in that: A grouting pipe is pre-embedded in the post-cast concrete structure. One end of the grouting pipe is connected to the water guide channel, and the other end of the grouting pipe penetrates the post-cast concrete structure.
8. A concrete anti-leakage structure for construction joints of beams according to claim 7, characterized in that: The end of the grouting pipe away from the water guide channel is threaded with a protective cover, which is flush with the post-poured concrete structure.
