On-site sprayed fender wall

By using a field-sprayed splash wall structure and employing lightweight steel components and prefabricated installation technology, the problems of heavy self-weight and long construction period of heat-insulating and fire-resistant splash walls in steelmaking projects have been solved, achieving lightweight, rapid construction and efficient splash protection.

CN225014389UActive Publication Date: 2026-11-24CISDI ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522281564.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-10-28
Publication Date
2026-11-24
Estimated Expiration
2035-10-28

AI Technical Summary

Technical Problem

The existing brick masonry and cast-in-place concrete construction methods for heat-insulating, fire-resistant, and splash-proof walls in steelmaking projects suffer from problems such as excessive weight, long construction period, poor flexibility, high cost, and poor site adaptability, making it difficult to meet the needs of rapid construction.

Method used

The splash wall structure is designed for on-site spraying and includes steel columns, steel beams, beam mounting bases, and backing plates. A heat-insulating splash layer is formed by spraying heat-insulating castable material. By utilizing lightweight steel components and prefabricated installation technology, combined with anchors and stiffening ribs, a lightweight and rigid splash wall structure is formed.

Benefits of technology

It reduced the overall steel consumption and structural weight, simplified the construction process, improved construction efficiency, shortened the construction period, enhanced site adaptability and splash protection, and reduced raw material and labor costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225014389U_ABST
    Figure CN225014389U_ABST
Patent Text Reader

Abstract

This utility model discloses a field-applied splash guard, including steel columns, steel beams, beam mounting bases, and lining plates. The beam mounting bases are fixed to the steel columns for support and to fix the steel beams to form a support frame. After the lining plates are installed on the support frame, the outer surface of the lining plates is sprayed with heat-insulating castable material to form a heat-insulating and splash-proof layer. The steel columns, steel beams, beam mounting bases, and lining plates are all prefabricated components produced in a standardized factory, which makes it easy to control the quality of the components and the amount of raw materials used. Moreover, the steel columns and steel beams adopt a light steel thin-walled structure, which can reduce the overall steel consumption, reduce the overall structural weight, and reduce raw material costs while ensuring the rigidity and fire resistance performance. At the same time, it simplifies the construction process, solves the problems of poor site adaptability and high labor costs, improves construction efficiency, and shortens the construction period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of steelmaking engineering, and in particular to a field-sprayed splash guard. Background Technology

[0002] In steelmaking engineering, the LF furnace (ladle refining furnace) is the core equipment for steel refining and tempering. During its operation, the hoisting, pouring and refining of high-temperature molten steel are often accompanied by the risk of high-temperature molten steel splashing. This not only damages the surrounding production equipment and corrodes the structural components of the plant, but also threatens the personal safety of the operators. Therefore, it has promoted the development of heat-insulating and fire-resistant splash-proof wall technology in steelmaking engineering.

[0003] In existing technologies, heat-insulating, fire-resistant, and splash-proof walls are generally made using brick masonry or cast-in-place concrete processes. Brick masonry uses refractory bricks as the core material and forms the wall through mortar. Although it has certain fire resistance, the unit weight of refractory bricks and supporting masonry materials is large, resulting in an excessively high overall self-weight of the wall. This requires a specially designed reinforced concrete foundation to support the wall load, which not only increases the material consumption and cost of foundation construction but also extends the construction period due to on-site excavation and concrete curing processes. Furthermore, the masonry accuracy of brick walls depends on manual operation, and the mortar joints between bricks are prone to cracking due to thermal expansion and contraction at high temperatures, leading to a decrease in heat insulation performance. While cast-in-place concrete construction solves the integrity problem of brick walls by forming walls on-site with formwork and pouring refractory concrete, it requires a complex formwork system and a long curing period to reach the design strength. This results in complicated construction procedures, a lengthy construction period, and difficulty in meeting the demand for rapid construction. It also has the problem of excessive weight, which places strict requirements on the bearing capacity of the factory floor and foundation. In addition, cast-in-place concrete walls cannot be adjusted after they are formed. If the walls need to be partially demolished or modified later due to equipment maintenance or process adjustments, it is not only difficult to construct, but also easy to damage the surrounding structure, resulting in poor flexibility.

[0004] Therefore, it is necessary to improve the existing technology of heat-insulating and fire-resistant splash walls in steelmaking projects. While ensuring the rigidity and fire resistance, it is also necessary to reduce the overall steel consumption, reduce the overall structural weight, reduce raw material costs, simplify the construction process, solve the problems of poor site adaptability and high labor costs, improve construction efficiency, and shorten the construction period. Utility Model Content

[0005] In view of the shortcomings of the current technology for heat-insulating and fire-resistant splash walls in steelmaking projects, the purpose of this utility model is to provide a field-sprayed splash wall that can reduce the overall steel consumption, reduce the overall structural weight, and reduce raw material costs while ensuring the rigidity and fire resistance of the wall. At the same time, it simplifies the construction process, solves the problems of poor site adaptability and high labor costs, improves construction efficiency, and shortens the construction period.

[0006] This utility model discloses a field-sprayable splash wall, comprising steel columns, steel beams, beam mounting bases, and a liner. The beam mounting bases are fixed to the steel columns for support and to fix the steel beams to form a support frame. The liner is installed on the support frame, and the outer surface of the liner is sprayed with heat-insulating castable material to form a heat-insulating splash-proof layer.

[0007] Furthermore, the beam mounting base includes mounting plate I and mounting plate II, with the top surface of mounting plate I overlapping and being fixed to the center of the bottom surface of mounting plate II.

[0008] Furthermore, the longitudinal section of the steel beam is U-shaped, including a beam bottom plate and a beam side plate. The beam bottom plate is fixedly installed on the top surface of the mounting plate II, and the beam side plate is fixedly connected to the liner plate.

[0009] Furthermore, it also includes ground-embedded components, wherein the steel columns are arranged laterally along the ground-embedded components and multiple such components are provided;

[0010] The steel beams are multiple in number and are assembled onto the steel columns via beam mounting seats to form the support frame.

[0011] Furthermore, in the transverse direction of the support frame, the mounting plates II on the adjacent beam mounting seats jointly support the steel beam.

[0012] Furthermore, a pouring gap is formed between the steel crossbeam and the adjacent crossbeam mounting base for pouring connection after positioning.

[0013] Furthermore, the outer surface of the liner is uniformly distributed with several anchors to prevent the thermal insulation casting material from falling off during the spraying process.

[0014] Furthermore, the non-insulating surface of the liner has several stiffening ribs arranged vertically.

[0015] The steel columns and steel beams are all lightweight steel components.

[0016] The beneficial effects of this utility model are as follows: This utility model provides a field-applied spray-on splash wall, comprising steel columns, steel beams, beam mounting bases, and lining plates. The beam mounting bases are fixed to the steel columns for support and to fix the steel beams to form a support frame. After the lining plates are installed on the support frame, the outer surface of the lining plates is sprayed with heat-insulating castable material to form a heat-insulating and splash-proof layer. The steel columns, steel beams, beam mounting bases, and lining plates are all prefabricated components produced in a standardized factory, making it easy to control the quality of the components and the amount of raw materials used. Furthermore, the steel columns and steel beams adopt a lightweight thin-walled structure, which can reduce the overall steel consumption, reduce the overall structural weight, and reduce raw material costs while ensuring the rigidity and fire resistance of the components. At the same time, it simplifies the construction process, solves the problems of poor site adaptability and high labor costs, improves construction efficiency, and shortens the construction period. Attached Figure Description

[0017] The present invention will be further described below with reference to the accompanying drawings and embodiments:

[0018] Figure 1 This is a schematic diagram of the structure of the on-site sprayable splash barrier of this utility model;

[0019] Figure 2 for Figure 1 Enlarged view of point A in the middle;

[0020] Figure 3 Rear view of the on-site spray-applied splash guard;

[0021] Figure 4 A schematic diagram of the structure of a field-sprayed splash wall without the sprayed heat-insulating cast-in-place material;

[0022] Figure 5 This is a structural schematic diagram of the beam mounting base.

[0023] Reference numerals: 1. Steel column; 2. Steel beam; 201. Beam base plate; 202. Beam side plate; 3. Beam mounting base; 301. Mounting plate I; 302. Mounting plate II; 4. Liner plate; 5. Ground embedded part; 6. Anchor; 7. Stiffening rib. Detailed Implementation

[0024] The following is in conjunction with the appendix Figure 1-5 The present invention will be described in further detail below.

[0025] This utility model discloses an on-site sprayable splash wall, including a steel column 1, a steel beam 2, a beam mounting base 3, and a liner 4. The beam mounting base 3 is fixed to the steel column 1 for support and to fix the steel beam 2 to form a support frame. After the liner 4 is installed on the support frame, the outer surface of the liner 4 is sprayed with heat-insulating castable material to form a heat-insulating splash-proof layer. The steel column 1 serves as a vertical support structure, and the steel beam 2 serves as a horizontal connecting component. Both are made of steel. With the dual function of fixing and supporting the beam mounting base 3, a highly rigid frame structure can be formed. Even when faced with the impact of high-temperature molten material or high-pressure fluid, it can prevent the support frame from deforming or collapsing, ensuring that the splash wall does not fail. The beam mounting base 3 can accurately position the connection position between the steel beam 2 and the steel column 1, reducing on-site assembly errors. At the same time, the liner 4 serves as an intermediate load-bearing layer, which can absorb external impacts. The load is evenly distributed to the supporting frame, avoiding structural damage caused by localized stress concentration and extending the overall service life. The heat-insulating castable material usually contains lightweight aggregate or high-temperature resistant cementitious materials, forming a continuous and seamless heat insulation layer through on-site spraying. This effectively blocks high-temperature conduction, isolating the external ambient temperature outside the splash wall and preventing personnel and equipment on the other side of the wall from being damaged by high temperatures. The lining plate 4 is usually a metal plate or a high-temperature resistant composite board, serving as an intermediate transition layer between the supporting frame and the heat insulation layer. It can further buffer impacts, prevent the heat insulation layer from falling off due to direct force, and prevent fine particles in the heat-insulating castable material from penetrating into the supporting frame, ensuring the structural cleanliness and stability of the supporting frame. On-site spraying can be flexibly adjusted according to the actual shape of the supporting frame, directly forming a continuous and complete heat-insulating and splash-proof layer on the surface of the lining plate 4, eliminating gaps caused by the splicing of prefabricated components and improving the reliability of protection.

[0026] In this embodiment, the crossbeam mounting base 3 includes mounting plate I 301 and mounting plate II 302. The top surface of mounting plate I 301 overlaps and is fixed to the center of the bottom surface of mounting plate II 302. Figure 5 As shown, the mounting plate II 302 is a component directly connected to the steel beam 2. The steel beam 2 is typically fixed to the top surface of mounting plate II 302, with its bottom center overlapping the top surface of mounting plate I 301. This transfers the vertical load borne by the steel beam 2 to the central area of ​​mounting plate I 301, rather than towards the edges, avoiding torque stress caused by load offset in mounting plate I 301 and reducing the risk of deformation and cracking of the beam mounting base 3 itself. Mounting plate I 301 is typically directly fixed to the steel column 1, such as through welding or bolting. The central overlap structure allows the load to be evenly transferred to the steel column 1 through mounting plate I 301, rather than concentrating in a localized area of ​​the steel column, thus improving the overall deformation resistance of the support frame. The mounting plate I 301 and mounting plate II 302 use a surface contact connection, resulting in a larger contact area, which can disperse shear force and prevent the beam mounting base 3 from being sheared due to excessive shear stress at the connection point, enhancing lateral deformation resistance. Further details are omitted here.

[0027] In this embodiment, the longitudinal section of the steel beam 2 is U-shaped, including a beam base plate 201 and beam side plates 202. The beam base plate 201 is fixedly installed on the top surface of the mounting plate II 302, and the beam side plates 202 are fixedly connected to the liner plate 4. The beam base plate 201 serves as the load-bearing bottom edge, and the beam side plates 202 on both sides extend upward to form flanges, increasing the moment of inertia of the steel beam 2. When the steel beam 2 bears a vertical load, the beam side plates 202 can effectively disperse the stress, prevent the middle area of ​​the steel beam 2 from bending downward, and ensure the flatness of the overall frame. Under the same load-bearing capacity, the U-shaped section concentrates the material in the key load-bearing parts, which can reduce the amount of steel used compared to a solid rectangular section. This reduces the weight of the steel beam 2 itself and saves material costs, meeting the actual production needs of lightweight and economy. Further details are omitted here.

[0028] In this embodiment, the system also includes embedded ground components 5, with multiple steel columns 1 arranged laterally along the embedded ground components 5. This arrangement forms a continuous support system that collectively bears the weight of the splash wall and various external forces. Compared to support by a single or a few steel columns 1, this layout can more evenly distribute the load, reduce local pressure, and enhance the stability and load-bearing capacity of the overall structure. The lateral arrangement of multiple steel columns 1 allows the length of the splash wall to be increased according to actual installation needs, thereby better covering the area to be protected, effectively blocking splashing liquids or particles, improving the splash-proof effect of the splash wall, and protecting the surrounding environment and personnel from the impact of splashing objects. The embedded ground components 5 provide accurate positioning and a stable foundation for the installation of the steel columns 1, ensuring installation accuracy, which will not be elaborated further here.

[0029] Multiple steel beams 2 are assembled and installed on the steel columns 1 via beam mounting seats 3 to form the support frame. Assembled installation often relies on positioning benchmarks and standardized connectors. Construction personnel do not need advanced welding skills; they only need to align according to preset marks and tighten the connectors to complete the installation. This not only reduces the technical requirements on the construction team but also reduces installation errors caused by differences in manual operation, improving the overall accuracy of the support frame. The multiple steel beams 2 are arranged in parallel at equal intervals, which can evenly distribute the self-weight of the lining plate 4 and the heat insulation and splash-proof layer, as well as external impact loads, onto each steel beam 2, and then transfer them to the steel columns 1 through the beam mounting seats 3. This even load distribution avoids localized overload. The spacing of the multiple steel beams 2 can be flexibly adjusted according to the actual scenario. In areas with lower loads, the spacing of the steel beams 2 can be increased to save materials; in high-temperature and high-impact areas, the spacing can be reduced to enhance support strength. This flexibility allows the same frame design to adapt to various working conditions, reducing production costs.

[0030] In this embodiment, in the transverse direction of the support frame, the mounting plates II 302 on adjacent beam mounting seats 3 jointly support the steel beam 2. When the transverse span of the steel beam 2 is large, relying solely on a single beam mounting seat 3 for support can easily lead to excessive bending stress in the middle area of ​​the steel beam 2 due to the cantilever effect, resulting in lateral bending or cracking after long-term use. However, the joint support of several adjacent mounting plates II 302 is equivalent to providing multi-point support for the steel beam 2, evenly distributing the vertical load borne by the steel beam 2 to several beam mounting seats 3 in the transverse direction, and then transferring it to the steel column 1. This reduces the maximum bending stress of the steel beam 2, can adapt to the transverse support requirements of larger spans, and avoids the steel beam 2 from failing due to overload deformation. Because the load is distributed, a single mounting plate II 302 does not need to be designed with excessively large dimensions or use high-strength special steel. At the same time, the cross-sectional dimensions of the steel beam 2 can also be appropriately reduced, such as reducing the height of the beam side plate 202. This saves steel usage while ensuring load-bearing capacity, thereby reducing manufacturing costs, which will not be elaborated further here.

[0031] In this embodiment, a pouring gap is formed between the steel beam 2 and the adjacent beam mounting base 3 for casting connection after positioning. The clay refractory mortar and other filling materials poured within the pouring gap can tightly bond with the steel beam 2 and beam mounting base 3 to form an integral connection, effectively transferring force and bending moment, improving the overall stability and load-bearing capacity of the structure, and reducing the risk of structural damage. The poured clay refractory mortar can fill the gap between the steel beam 2 and beam mounting base 3, preventing rainwater and other substances from penetrating into the interior of the overall structure, avoiding problems such as steel reinforcement corrosion caused by leakage, and extending the service life of the splash wall. During use, due to factors such as temperature changes, the steel beam 2 and beam mounting base 3 will undergo certain deformations. The clay refractory mortar within the pouring gap usually has a certain degree of flexibility and adaptability, which can coordinate the deformation differences between the steel beam 2 and beam mounting base 3 to a certain extent, avoiding cracks or damage caused by deformation incoordination. This will not be elaborated further here.

[0032] In this embodiment, the outer surface of the liner 4 is evenly distributed with several anchors 6 to prevent the thermal insulation casting material from falling off during the spraying process, such as... Figure 4As shown, the anchor 6 is typically a metal claw, pin, or mesh structure. It embeds itself within the insulation castable during the spraying process and forms a physical bond after curing. When the insulation layer experiences thermal expansion and contraction stress due to temperature changes or is subjected to external impact, the anchor 6 can counteract the peeling force between the insulation material and the liner 4 through mechanical restraint, preventing the entire insulation layer from detaching. Compared to relying solely on the material's own adhesion, the anchor 6 enhances the bonding strength. The protruding structure of the anchor 6, such as claw or hook shapes, increases the roughness of the outer surface of the liner 4, allowing the insulation castable to form a bond with the liner 4 during spraying. The interlocking interface, with its larger contact area, enhances the friction and adhesion between materials, effectively solving the problem of poor adhesion between the smooth lining plate 4 and the insulation material. This reduces localized hollowing and cracking caused by interface slippage. The evenly distributed anchors 6 disperse stress to multiple anchor points, preventing stress concentration in a specific area. When spraying the insulation casting material on-site, uncured material is prone to sagging or localized accumulation due to gravity. The anchors 6 can act as support points to hold the uncured material, helping it maintain its preset thickness and shape before curing, thus preventing insufficient thickness or excessive accumulation due to material loss.

[0033] In this embodiment, the non-insulating surface of the liner 4 has several stiffening ribs 7 arranged vertically; such as Figure 3 As shown, the stiffening rib 7 can improve the overall rigidity and strength of the liner plate 4, enhance its ability to withstand external impacts, reduce the possibility of deformation and damage, and also enhance the stability of the liner plate 4 after installation. It is not easy for the liner plate 4 to shake or tip over during use, thus extending the service life of the liner plate 4. This design optimizes the structure of the liner plate 4 by setting the stiffening rib 7, while ensuring the performance of the liner plate 4, reducing the amount of raw materials used and lowering the production cost. Further details are omitted here.

[0034] Both the steel column 1 and the steel beam 2 are lightweight steel components. Lightweight steel typically has high strength, which meets the load-bearing requirements of the splash wall. While ensuring the safety of the splash wall, a lightweight design is achieved, facilitating transportation and installation, and reducing transportation costs and construction difficulty. Lightweight steel also has good flexibility and ductility, which can effectively absorb and dissipate the energy generated by vibration, reduce the degree of damage to the splash wall, and improve its seismic performance. At the same time, lightweight steel prefabricated components generate less waste during production, resulting in less environmental pollution. Furthermore, lightweight steel is recyclable and reusable, which meets the requirements of sustainable development. Further details will not be elaborated here.

[0035] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this utility model and are not intended to limit it. Although this utility model has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of this utility model without departing from the spirit and scope of the technical solutions of this utility model, and all such modifications or substitutions should be covered within the scope of the claims of this utility model.

Claims

1. A field-sprayable splash guard, characterized in that: It includes steel columns, steel beams, beam mounting bases, and lining plates. The beam mounting bases are fixed to the steel columns to support and fix the steel beams to form a support frame. After the lining plates are installed on the support frame, the outer surface of the lining plates is sprayed with heat-insulating castable material to form a heat-insulating and splash-proof layer.

2. The on-site spray-applied splash guard according to claim 1, characterized in that: The crossbeam mounting base includes mounting plate I and mounting plate II, with the top surface of mounting plate I overlapping and being fixed to the center of the bottom surface of mounting plate II.

3. The on-site spray-applied splash guard according to claim 2, characterized in that: The longitudinal section of the steel beam is U-shaped, including a beam bottom plate and beam side plates. The beam bottom plate is fixedly installed on the top surface of the mounting plate II, and the beam side plates are fixedly connected to the liner plate.

4. The on-site spray-applied splash guard according to claim 1, characterized in that: It also includes ground-embedded components, wherein the steel columns are arranged laterally along the ground-embedded components and multiple columns are provided; The steel beams are multiple in number and are assembled onto the steel columns via beam mounting seats to form the support frame.

5. The on-site spray-applied splash guard according to claim 4, characterized in that: In the transverse direction of the support frame, the mounting plates II on the adjacent beam mounting seats jointly support the steel beam.

6. The on-site spray-applied splash guard according to claim 5, characterized in that: The steel crossbeam and the adjacent crossbeam mounting base form a pouring gap for pouring connection after positioning.

7. The on-site spray-applied splash guard according to claim 1, characterized in that: The outer surface of the liner is evenly distributed with several anchors to prevent the thermal insulation grout from falling off during the spraying process.

8. The on-site spray-applied splash guard according to claim 7, characterized in that: The non-insulating surface of the liner has several stiffening ribs arranged vertically. The steel columns and steel beams are all lightweight steel components.