An adjustable connected formwork shear wall structure

CN225014414UActive Publication Date: 2026-11-24CHINA CONSTR EIGHTH ENG BUREAU TECH CONSTR CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202522653679.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-15
Publication Date
2026-11-24
Estimated Expiration
2035-12-15

AI Technical Summary

Technical Problem

The existing connectors have fixed lengths, which cannot compensate for construction errors. The pull-out resistance depends on the bond between the end plate and the formwork concrete, making them prone to cracking. There is a lack of waterproof and thermal insulation measures, and the construction process is cumbersome, requiring the erection of scaffolding.

Method used

It adopts adjustable screw connectors, equipped with an expanded bottom head, water-stop ring and foundation sleeve, combined with steel reinforcement frame, to achieve quick positioning and adjustable fixation, ensuring wall thickness and verticality, eliminating the traditional formwork erection and dismantling process, and the surface of the formwork shell can be used as a decorative surface.

Benefits of technology

Simplify construction procedures, improve connection reliability and construction quality, reduce external scaffolding operations, reduce safety risks, meet the requirements of industrialized construction, shorten the construction period, and reduce labor costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225014414U_ABST
    Figure CN225014414U_ABST
Patent Text Reader

Abstract

This utility model relates to a shear wall structure, belonging to the field of industrialized construction technology. Specifically, it is an adjustable connection formwork shear wall structure, including an outer formwork and an inner formwork, as well as connecting components and a reinforcing steel skeleton. The connecting components include multiple screws commonly arranged on the outer and inner formworks. The reinforcing steel skeleton is fixedly installed between the outer and inner formworks. This utility model achieves the effect of ensuring integrated formwork construction while realizing connection reliability and adjustability, and meeting the requirements of industrialized construction. It solves the problems of existing patented connectors having fixed lengths, which cannot compensate for construction errors; pull-out resistance relying on the bond between the end plate and the formwork concrete, which is prone to cracking of the formwork concrete due to local stress concentration; lack of waterproof and thermal insulation measures; and the need to build scaffolds for construction, resulting in a cumbersome construction procedure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of industrialized construction technology, and in particular to an adjustable connection type molded shear wall structure. Background Technology

[0002] The construction process of cast-in-place concrete shear walls is gradually adopting the formwork system construction method, which eliminates the need for formwork removal by using the formwork as a permanent template.

[0003] A search revealed Chinese patent CN220814406U, which discloses a prefabricated modular shear wall. The shear wall includes two concrete-filled formworks on either side, a connector for linking the two formworks, and a steel reinforcement frame between the two formworks. The connector is fixed to the steel reinforcement frame. The connector includes tie bars and end plates fixed to both ends of the tie bars, with the end plates embedded within the formwork. This prefabricated modular shear wall improves connection reliability, enhances the seismic performance of the shear wall, and improves building quality.

[0004] Based on the above search and existing technology, the findings were as follows:

[0005] The existing patented connectors have a fixed length, which cannot compensate for construction errors. Their pull-out resistance depends on the bond between the end plate and the formwork concrete. They are prone to cracking of the formwork concrete due to local stress concentration. They lack waterproof and heat insulation measures and require scaffolding to complete the construction, making the construction process cumbersome. Therefore, they have certain limitations. Utility Model Content

[0006] To address the aforementioned technical problems, this utility model proposes an adjustable connection formwork shear wall structure, which can ensure integrated formwork construction while achieving connection reliability and adjustability, and meeting the requirements of industrialized construction.

[0007] The technical solution to achieve the purpose of this utility model is: an adjustable connection type formwork shear wall structure, including an outer formwork and an inner formwork, and also including connecting components and a steel reinforcement skeleton.

[0008] The connecting assembly includes multiple screws that are commonly disposed on the outer mold shell and the inner mold shell;

[0009] The steel reinforcement cage is fixedly installed between the outer and inner mold shells.

[0010] Preferably, an expanding head is fixedly installed at the bottom of the screw, the expanding head is located inside the outer mold shell, an adjusting plate is installed on the external thread of the screw, and a self-locking washer is provided between the screw and the adjusting plate.

[0011] Preferably, a pair of water-stop rings and a base sleeve are sleeved on the outside of the screw, and the water-stop rings and the base sleeve are both set on the inner mold shell. A connector is threaded on the top of the screw, and the connector is set on the top of the inner mold shell.

[0012] Compared with existing technologies, the significant advantages of this invention are:

[0013] Firstly, this utility model enables rapid positioning, adjustable fixing, and high-strength connection during the installation of the formwork, which simplifies the construction process and improves the construction quality. The use of single-sided tensioning connectors can reduce or even eliminate external scaffolding operations, thereby reducing safety risks. At the same time, the formwork system and connectors can be prefabricated in the factory and assembled on-site, meeting the requirements of industrialized construction.

[0014] Secondly, the connector of this utility model is equipped with an adjusting plate, which can correct deviations during installation to ensure that the wall thickness and verticality meet the specifications and that the positioning accuracy is high. The anchoring end adopts an expanded bottom head to ensure the anchoring force with the outer formwork shell and avoid detachment or displacement during the pouring process. The traditional formwork erection and dismantling process is eliminated, realizing formwork shell construction without dismantling, shortening the construction period and reducing labor costs. The surface of the formwork shell can be used as a decorative surface, reducing the subsequent plastering process. The connector arrangement is flexible and can be adjusted according to different wall thicknesses and load requirements. The single-sided tension connector can reduce or even eliminate the need for external scaffolding.

[0015] This invention solves the problems of existing patented connectors having fixed lengths, which cannot compensate for construction errors; pull-out resistance relying on the bond between the end plate and the formwork concrete, which is prone to cracking of the formwork concrete due to local stress concentration; lack of waterproof and heat insulation measures; and the need to complete construction by erecting scaffolding, which makes the construction process relatively cumbersome. Attached Figure Description

[0016] The present invention will be further explained below with reference to the accompanying drawings and embodiments:

[0017] Figure 1 This is a three-dimensional structural schematic diagram provided in one embodiment of the present invention;

[0018] Figure 2 This is a top view of the structure provided in one embodiment of the present invention;

[0019] Figure 3 This is a schematic diagram of the screw structure provided in two embodiments of the present invention;

[0020] Figure 4 This is a side sectional view of the structure provided in two embodiments of the present invention.

[0021] Explanation of reference numerals in the attached figures:

[0022] 1. Outer mold shell; 2. Inner mold shell; 201. Water stop ring; 202. Foundation sleeve; 3. Screw; 4. Reinforcing steel cage; 5. Joint; 6. Adjusting plate; 601. Self-locking washer; 7. Expanded bottom head. Detailed Implementation

[0023] The present invention will now be described in detail, and the technical solutions in the embodiments of the present invention will be clearly and completely described. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of the present invention.

[0024] This utility model provides an adjustable connection type molded shear wall structure through improvements. The technical solution of this utility model is as follows:

[0025] Example 1

[0026] like Figures 1-2 As shown, an adjustable connection formwork shear wall structure includes an outer formwork 1 and an inner formwork 2. The surface of the formwork can be used as a decorative surface, reducing subsequent plastering processes. It also includes connecting components and a steel reinforcement frame 4.

[0027] The connecting assembly includes multiple screws 3 that are commonly arranged on the outer mold shell 1 and the inner mold shell 2. The connecting assembly can be made of stainless steel base material + epoxy + epoxy resin coating or galvanized to improve its corrosion resistance in humid environments.

[0028] The steel reinforcement cage 4 is fixedly installed between the outer formwork 1 and the inner formwork 2, enabling formwork construction without dismantling, shortening the construction period and reducing labor costs.

[0029] Example 2:

[0030] Based on the adjustable connection formwork shear wall structure provided in the first embodiment of this application, the second embodiment of this application proposes another adjustable connection formwork shear wall structure. The second embodiment is merely a preferred embodiment of the first embodiment, and the implementation of the second embodiment will not affect the separate implementation of the first embodiment.

[0031] The second embodiment of this utility model will be further described below with reference to the accompanying drawings and embodiments.

[0032] like Figures 3-4 As shown, an expanding head 7 is fixedly installed at the bottom of the screw 3. The expanding head 7 is located inside the outer mold shell 1. An adjusting plate 6 is installed on the external thread of the screw 3. A self-locking washer 601 is provided between the screw 3 and the adjusting plate 6 to strengthen the connection and prevent loosening due to vibration.

[0033] Furthermore, a pair of water-stop rings 201 and a base sleeve 202 are fitted on the outside of the screw 3. Both the water-stop rings 201 and the base sleeve 202 are set on the inner mold shell 2. A connector 5 is threaded on the top of the screw 3. The connector 5 is set on the top of the inner mold shell 2, forming multiple protections to effectively block water penetration and cold bridging effect.

[0034] Specific working method: During the prefabrication of the outer formwork 1 in the factory or on-site, the anchoring end of the connecting component, i.e., the enlarged bottom head 7, is first embedded into the outer formwork 1 according to the design layout; when the concrete of the outer formwork 1 is poured to the initial setting stage, the anchoring end is placed in place, and support or positioning measures are taken to ensure its accurate position; after the concrete has fully set, the connecting component and the outer formwork 1 form an integral whole and are firmly anchored; after the inner formwork 2 has been cured, through holes are opened according to the arrangement position of the connecting component of the outer formwork 1, using pre-drilled holes or on-site drilling, and foundation sleeves 202 and water-stop rings 201 are installed in the holes so that the connecting component can be inserted and ensure sealing performance; during wall installation, the outer formwork 1 is first hoisted into place and fixed with temporary supports; then the steel reinforcement cage 4 is inserted or tied to the design position to ensure that the steel reinforcement and the connecting component do not interfere with each other; subsequently, the inner formwork 2 is installed. The formwork 2 is aligned with the connector, allowing the connecting component to pass through the opening in the inner formwork 2. Adjusting plates 6 and connectors 5 are then sequentially installed on the threaded section of the connecting component. The adjusting plates 6 move along the screw 3 by rotation, gradually pressing the inner formwork 2 to the designed position and achieving a precise distance between it and the outer formwork 1. Finally, the connectors 5 are tightened to securely lock both formworks. During formwork adjustment, the adjusting plates 6 control the wall thickness, and the self-locking washers 601 prevent loosening, meeting the geometric accuracy requirements of the wall. After the formwork system is installed, the two formworks form a closed cavity, serving as a permanent template. During concrete pouring, the connecting component bears and transmits the lateral pressure of the concrete, preventing deformation or displacement of the formwork. After pouring and curing to the required strength, the formwork does not need to be removed and can be used directly as a finishing layer, eliminating the need for subsequent plastering and reducing construction time and labor input.

[0035] The technical means disclosed in this utility model are not limited to those described above, but also include technical solutions composed of equivalent substitutions of the above technical features. Matters not covered in this utility model are common knowledge to those skilled in the art.

Claims

1. An adjustable connected formwork shear wall structure comprising an outer formwork (1) and an inner formwork (2), characterized in that: Also include: The connecting assembly comprises a plurality of screw rods (3) arranged on the outer formwork (1) and the inner formwork (2); The steel reinforcement cage (4) is fixedly installed between the outer formwork (1) and the inner formwork (2).

2. An adjustable connected formwork shear wall structure according to claim 1, wherein: The bottom of the screw rod (3) is fixedly installed with an expanded base head (7), which is arranged inside the outer formwork (1), the outer thread of the screw rod (3) is installed with an adjusting piece (6), and the self-locking washer (601) is arranged between the screw rod (3) and the adjusting piece (6).

3. A tunable connected formwork shear wall structure according to any one of claims 1-2, characterized in that: The screw rod (3) is sleeved with a pair of water stop rings (201) and foundation sleeves (202), the water stop rings (201) and the foundation sleeves (202) are arranged in the inner formwork (2), the top of the screw rod (3) is threadedly installed with a connector (5), and the connector (5) is arranged at the top of the inner formwork (2).