UHPC ceiling panel mounting structure
By combining the UHPC ceiling panel unit with the main mounting components and fall arrest rope components, the problem of difficult installation of UHPC ceiling panels is solved, achieving rapid installation and safety protection, and improving construction efficiency and safety.
Patent Information
- Application Number
- CN202522746443.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-25
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-25
AI Technical Summary
UHPC ceiling panels have a strong overall structure, making it difficult to drill holes and install.
The design combines UHPC ceiling panel units with main mounting components and anti-fall rope components. Through pre-embedded sleeves, angle steel and bolt connections, it can achieve rapid installation and prevent the panels from falling in extreme cases.
It enables rapid and convenient installation of UHPC ceiling panels, reduces on-site welding work, improves construction efficiency, and provides safety protection in extreme situations.
Smart Images

Figure CN225014454U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of ceiling panel installation technology, and particularly relates to the field of UHPC ceiling panels, specifically to a UHPC ceiling panel installation structure. Background Technology
[0002] Ultra-high performance concrete ceiling panels, or UHPC ceiling panels for short, are a new type of building ceiling. They can easily integrate lighting, audio, sprinkler, smoke detectors, air conditioning vents, and other equipment, achieving a unity of structure and function. This makes the ceiling look cleaner, more organized, easier to maintain and clean, and has a dense, smooth surface that does not attract dust and grease, exhibiting self-cleaning properties. When cleaning is needed, a simple wipe is sufficient, resulting in extremely low maintenance costs. While the initial purchase cost of UHPC ceiling panels may be higher than traditional materials (such as gypsum board and aluminum panels), their ultra-long lifespan, near-zero maintenance costs, and colorfastness and deformation resistance make their overall cost-effectiveness throughout their entire lifespan competitive.
[0003] However, due to the structural integrity and high strength of UHPC ceiling panels, drilling holes is difficult and installation is challenging. Therefore, an easy-to-install UHPC ceiling panel installation structure is needed. Utility Model Content
[0004] To address the shortcomings of existing technologies, this utility model provides a UHPC ceiling panel installation structure.
[0005] To solve the above-mentioned technical problems, this utility model provides a UHPC ceiling panel installation structure, the main feature of which is that it includes a UHPC ceiling panel unit, a main hanging assembly, and a fall arrest rope assembly independent of the main hanging assembly. The UHPC ceiling panel unit includes a UHPC ceiling panel and a first mounting keel fixed to the top surface of the UHPC ceiling panel. The first mounting keel is connected to a second mounting keel through the main hanging assembly and the fall arrest rope assembly, and the second mounting keel is fixed to the fixing body.
[0006] Preferably, the UHPC ceiling panel unit includes a pre-embedded sleeve and a first angle steel. The pre-embedded sleeve is disposed on the top surface of the UHPC ceiling panel, and the first angle steel is fixedly connected to the pre-embedded sleeve and the first mounting keel respectively.
[0007] Preferably, the fall arresting rope assembly includes a second angle steel, a fall arresting rope, and a pair of ring bolts. The second angle steel is fixedly connected to the second mounting keel. One of the pair of ring bolts is fixed to the first angle steel or the first mounting keel, and the other of the pair of ring bolts is fixed to the second angle steel. The fall arresting rope is used to connect the pair of ring bolts.
[0008] Preferably, the plane containing the ring portion of the pair of ring bolts is perpendicular to the UHPC ceiling panel.
[0009] Preferably, the fall arresting rope is equipped with an anti-detachment clamp.
[0010] Preferably, the pre-embedded sleeve is fixedly connected to the first angle steel by a bolt group, and the first mounting keel is welded and fixed to the first angle steel.
[0011] Preferably, the main mounting assembly includes a third angle steel, a fourth angle steel, and a fifth angle steel. One end of the first angle steel is fixed to the first mounting keel, and the other end of the first angle steel is fixed to the fifth angle steel via the fourth angle steel. The fifth angle steel is fixed to the second mounting keel.
[0012] Preferably, the third, fourth, and fifth angle steels are all L-shaped angle steels.
[0013] Preferably, the third angle steel is welded and fixed to the first mounting keel, and the fifth angle steel is welded and fixed to the second mounting keel.
[0014] The UHPC ceiling panel installation structure of this utility model has an independent anti-fall rope assembly in addition to the main hanging component. In the event of accidental failure of the main hanging component due to extreme conditions (such as earthquake, impact, metal fatigue), it can immediately bear the load and prevent the panel from falling. The modular and standardized design enables quick and convenient installation. Attached Figure Description
[0015] Figure 1 This is an installation diagram of the UHPC ceiling panel installation structure of this utility model.
[0016] Figure 2 for Figure 1 A magnified view of a portion of the image. Detailed Implementation
[0017] To make the technical problem solved by this utility model clearer, the present utility model is further described below with reference to embodiments and accompanying drawings. The specific embodiments described herein are only for explaining the present utility model and are not intended to limit the present utility model.
[0018] like Figure 1 and Figure 2The diagram illustrates a specific embodiment of the UHPC ceiling panel installation structure of this utility model. The installation structure includes a UHPC ceiling panel unit, a main mounting assembly 5, and a fall arrestor rope assembly 4 independent of the main mounting assembly 5. The UHPC ceiling panel unit includes a UHPC ceiling panel 1 and a first mounting keel 2 fixed to the top surface of the UHPC ceiling panel 1. The first mounting keel 2 is connected to a second mounting keel 3 via the main mounting assembly 5 and the fall arrestor rope assembly 4. The second mounting keel 3 is fixed to a fixing body 6. The fixing body 6 can be a hot-dip galvanized square steel pipe, fixed to the ceiling wall via pre-embedded fasteners on a fixing plate. Both the first mounting keel 2 and the second mounting keel 3 can be hot-dip galvanized square steel pipes.
[0019] like Figure 2 As shown, the UHPC ceiling panel 1 unit includes an embedded sleeve 7 and a first angle steel 8. The embedded sleeve 7 is disposed on the top surface of the UHPC ceiling panel 1, and the first angle steel 8 is fixedly connected to both the embedded sleeve 7 and the first mounting keel 2. The embedded sleeve 7 is fixedly connected to the first angle steel 8 by bolts, and the first mounting keel 2 is welded to the first angle steel 8.
[0020] The fall arrestor rope assembly 4 includes a second angle steel 11, a fall arrestor rope 10, and a pair of ring bolts. The second angle steel 11 is fixedly connected to the second mounting keel 3. One of the pair of ring bolts is fixed to the first angle steel 8, and the other of the pair of ring bolts is fixed to the second angle steel 11. The fall arrestor rope 10 is used to connect the pair of ring bolts. The fall arrestor rope 10 is equipped with an anti-derailment clamp. The ring bolts can also be directly fixed to the first mounting keel 2.
[0021] like Figure 2 As shown, the plane containing the ring portion of the pair of ring bolts is perpendicular to the UHPC ceiling panel 1.
[0022] The specific installation and connection of the fall arrest rope can be completed in the early stages of installation, achieving "protection as soon as it is installed".
[0023] like Figure 2 As shown, the main mounting assembly 5 includes a third angle steel 12, a fourth angle steel 13 and a fifth angle steel 14. One end of the first angle steel 8 is fixed to the first mounting keel 2, and the other end of the first angle steel 8 is fixed to the fifth angle steel 14 through the fourth angle steel 13. The fifth angle steel 14 is fixed to the second mounting keel 3.
[0024] The first angle steel 8, the second angle steel 11, the third angle steel 12, the fourth angle steel 13, and the fifth angle steel 14 are all L-shaped angle steel.
[0025] The third angle steel 12 is welded and fixed to the first mounting keel 2, and the fifth angle steel 14 is welded and fixed to the second mounting keel 3. The others can be fixed by bolt groups.
[0026] Based on the installation structure of this utility model, welding is minimized, with bolt connections or mechanical clips being the primary methods used. This reduces on-site welding work, significantly increases installation speed, and is not strictly limited by weather, power supply, or other conditions. Angle steel, fall arrest rope components, and pre-embedded sleeves are formed into standard modules, reducing wet work such as on-site cutting, welding, and drilling. For example, the connection between angle steel and square steel pipe uses standardized bolt components, and the fall arrest rope uses a standard length with prefabricated ends. The detachable design allows for easy maintenance, as subsequent inspection or replacement of a single panel does not require disturbing surrounding panels.
[0027] The UHPC ceiling panel installation structure of this utility model has an independent anti-fall rope assembly in addition to the main hanging component. In the event of accidental failure of the main hanging component due to extreme conditions (such as earthquake, impact, metal fatigue, etc.), it can immediately bear the load and prevent the panel from falling. The modular and standardized design enables quick and convenient installation.
[0028] In this specification, the present invention has been described with reference to specific embodiments thereof. However, it will be apparent that various modifications and variations can be made without departing from the spirit and scope of the present invention. Therefore, the specification and drawings should be considered illustrative rather than restrictive.
Claims
1. A UHPC ceiling panel installation structure, characterized in that, The device includes a UHPC ceiling panel unit, a main mounting assembly, and a fall arrest rope assembly independent of the main mounting assembly. The UHPC ceiling panel unit includes a UHPC ceiling panel and a first mounting keel fixed to the top surface of the UHPC ceiling panel. The first mounting keel is connected to a second mounting keel through the main mounting assembly and the fall arrest rope assembly. The second mounting keel is fixed to a fixed body.
2. The UHPC ceiling panel installation structure according to claim 1, characterized in that, The UHPC ceiling panel unit includes a pre-embedded sleeve and a first angle steel. The pre-embedded sleeve is installed on the top surface of the UHPC ceiling panel, and the first angle steel is fixedly connected to the pre-embedded sleeve and the first mounting keel.
3. The UHPC ceiling panel installation structure according to claim 2, characterized in that, The fall arresting rope assembly includes a second angle steel, a fall arresting rope, and a pair of ring bolts. The second angle steel is fixedly connected to the second mounting keel. One of the pair of ring bolts is fixed to the first angle steel or the first mounting keel, and the other of the pair of ring bolts is fixed to the second angle steel. The fall arresting rope is used to connect the pair of ring bolts.
4. The UHPC ceiling panel installation structure according to claim 3, characterized in that, The plane containing the ring portion of the pair of ring bolts is perpendicular to the UHPC ceiling panel.
5. The UHPC ceiling panel installation structure according to claim 3, characterized in that, The aforementioned fall arresting rope is equipped with an anti-detachment clamp.
6. The UHPC ceiling panel installation structure according to claim 2, characterized in that, The pre-embedded sleeve is fixedly connected to the first angle steel by a bolt group, and the first mounting keel is welded and fixed to the first angle steel.
7. The UHPC ceiling panel installation structure according to claim 2, characterized in that, The main mounting assembly includes a third angle steel, a fourth angle steel, and a fifth angle steel. One end of the first angle steel is fixed to the first mounting keel, and the other end of the first angle steel is fixed to the fifth angle steel via the fourth angle steel. The fifth angle steel is fixed to the second mounting keel.
8. The UHPC ceiling panel installation structure according to claim 7, characterized in that, The third, fourth, and fifth angle steels mentioned are all L-shaped angle steels.
9. The UHPC ceiling panel installation structure according to claim 7, characterized in that, The third angle steel is welded and fixed to the first mounting keel, and the fifth angle steel is welded and fixed to the second mounting keel.