Waterproof structure for lower part of roof air conditioning unit

By pouring a concrete layer between the outdoor units of the air conditioner and spraying a polymer waterproof coating to form a drainage slope, the leakage problem caused by the limited space under the air conditioning unit was solved, achieving a fast and low-cost waterproofing effect.

CN225014494UActive Publication Date: 2026-11-24WUXI DONGFANG YUHONG WATERPROOF ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522706410.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-22
Publication Date
2026-11-24
Estimated Expiration
2035-12-22

AI Technical Summary

Technical Problem

In existing technologies, the problem of water accumulation and leakage due to inadequate waterproofing construction caused by the limited space under roof air conditioning units is difficult to completely solve.

Method used

A C20 strength concrete layer is poured into the narrow space between the outdoor units of the air conditioner, and a drainage slope is formed on its surface. Combined with an exposed polymer waterproof coating layer, a sealed waterproof barrier is formed.

Benefits of technology

It enables quick and low-cost solutions to water accumulation and leakage problems in confined spaces. It is easy to construct, has reliable waterproofing effects, and is suitable for the lower part of roof air conditioning units in confined spaces.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225014494U_ABST
    Figure CN225014494U_ABST
Patent Text Reader

Abstract

This application discloses a waterproof structure for the lower part of a roof air conditioning unit, relating to the field of leak prevention technology. The waterproof structure includes a roof base layer and air conditioning unit supports mounted on the roof base layer. A concrete layer is provided between the air conditioning unit supports, and the surface of the concrete layer has drainage high points that extend outward to form a drainage slope with a slope of not less than 3%. The upper surface of the concrete layer is covered with an exposed polymer waterproof coating layer. The exposed polymer waterproof coating layer is sprayed in two coats, and after the exposed polymer waterproof coating layer dries, its highest point is not higher than the air conditioning unit supports. The structure is stable, waterproof, and reliable, requiring no modification to the original roof structure. It is convenient to construct, low in cost, and suitable for waterproofing the area under roof air conditioning units.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of roof waterproofing technology, specifically to a waterproof structure for the lower part of a roof air conditioning unit. Background Technology

[0002] Roof leaks are a common and troublesome problem, especially in areas with many appliances on the roof. Due to insufficient space, conventional repair methods are often ineffective. A prime example is the area around rows of air conditioner units; leaks beneath these units are extremely difficult to treat or impossible to completely resolve. Currently, the industry often uses a simple method: workers use long bamboo poles and rollers to apply paint. However, this method fails to effectively reach and complete the work on the numerous areas below, leaving the problem of water accumulation and leakage unresolved. Utility Model Content

[0003] The purpose of this utility model is to overcome the defects in the existing technology where the waterproofing construction is inadequate and water accumulation and leakage are easy to occur due to the small space under the roof air conditioning unit. It provides a waterproof structure for the lower part of the roof air conditioning unit that is simple in structure, has reliable waterproofing effect, and is suitable for small spaces.

[0004] The waterproof structure at the lower part of the roof air conditioning unit includes a roof base layer and air conditioning outdoor unit supports set on the roof base layer. A concrete layer is provided between the air conditioning outdoor unit supports. The surface of the concrete layer has drainage high points. The drainage high points extend outward to form a drainage slope with a slope of not less than 3%. The upper surface of the concrete layer is covered with an exposed polymer waterproof coating layer.

[0005] The strength grade of the concrete layer is C20; The highest point for drainage should not be higher than the air conditioner outdoor unit support. The drainage high point can be set at any position, either in the middle, slightly to the left, or slightly to the right. The exposed polymer waterproof coating layer is sprayed in two coats, and after the exposed polymer waterproof coating layer dries, its highest point is not higher than the air conditioner outdoor unit pier. The exposed polymer waterproof coating layer is one of a single-component water-based acrylic coating or a single-component water-based asphalt coating.

[0006] Beneficial effects: By utilizing the space between air conditioning outdoor units and the fluidity of concrete, this solution overcomes the problems inherent in conventional methods. It eliminates the need for significant modifications to the existing roof structure, simplifies the construction process, reduces costs, and allows for rapid completion of new or repaired roof waterproofing work. First, concrete is poured to address the root cause of water accumulation. Then, a spraying process creates an exposed polymer waterproof coating layer on the concrete surface, which bonds tightly to the concrete layer to form a sealed waterproof barrier, blocking rainwater penetration. This solution efficiently, quickly, and cost-effectively resolves water accumulation and leakage problems beneath roof air conditioning units. Attached Figure Description

[0007] Figure 1 This is a schematic diagram of the structure of this application; Figure 2 This is a top view of the concrete section; Figure 3 This is a schematic diagram of the drainage slope morphology of a concrete layer (with the highest drainage point in the middle); Figure 4 This is a schematic diagram of the drainage slope morphology of the concrete layer (with the highest drainage point on the left). Figure 5 This is a schematic diagram of the drainage slope morphology of the concrete layer (with the highest drainage point on the right).

[0008] In the picture: 10. Roof base layer; 101. Concrete protective layer; 102. Insulation layer; 103. Original waterproof layer of roof; 104. Structural floor slab. 20. Air conditioner outdoor unit; 30. Air conditioner outdoor unit support; 40. Concrete layer; 50. Exposed polymer waterproof coating layer; 60. Highest point for drainage. Detailed Implementation

[0009] The technical solutions in the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the embodiments described in this application are only some embodiments of this application, and not all embodiments. Based on the embodiments in this application, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of this application.

[0010] Combination Figures 1 to 5 To further explain this application, the waterproof structure at the lower part of the roof air conditioning unit includes a roof base layer 10, which includes a concrete protective layer 101, an insulation layer 102, an original roof waterproof layer 103, and a structural floor slab 104. Air conditioning outdoor unit supports 30 are fixedly installed on the concrete protective layer 101 at intervals, and the air conditioning outdoor unit 20 is installed on the air conditioning outdoor unit supports 30.

[0011] Before pouring concrete, use an industrial-grade blower to thoroughly clean the gaps between the air conditioner outdoor unit supports 30 and the surrounding area. Completely remove all loose debris such as dust, gravel, fallen leaves, and fibrous materials from the gaps and the surface of the roof base layer 10, ensuring the roof base layer surface 10 is clean, dry, free of oil stains and obvious cracks, meeting the requirements for subsequent construction.

[0012] Pour C20 grade concrete into the gap between the air conditioner outdoor unit supports 30. During pouring, the location of the drainage high point can be flexibly set according to the actual drainage needs of the roof: this high point can be set in the exact center of the gap, or it can be offset towards the outer drainage outlet on either side; it does not need to be fixed in the center of the gap (e.g., Figure 3 , Figure 4 and Figure 5 (As shown).

[0013] It should be noted that, Figure 3 , Figure 4 and Figure 5 This example only shows some typical locations for the drainage high point and does not exhaust all feasible location options in this solution. In actual applications, the specific location of the high point can be flexibly adjusted within the gap range according to the specific drainage needs of the roof.

[0014] At the same time, the height of the drainage high point 60 of the concrete layer 40 should be strictly controlled. The drainage high point 60 of the concrete layer 40 should not be higher than the air conditioner outdoor unit pier 30. It is preferable that the concrete layer is 5-10cm higher, so that it will not lift the air conditioner outdoor unit 20, ensuring that the air conditioner outdoor unit 20 can be placed stably, and will not block the ventilation and heat dissipation space at the bottom of the air conditioner outdoor unit 20.

[0015] The drainage slope extends from the highest point of 60 to both ends to form a drainage slope. The slope of all slopes is not less than 3%. The key is to control the continuous flatness of the surface to avoid local depressions that are lower than the adjacent slopes. This ensures that rainwater can flow naturally to the outer drainage outlet along the continuous and smooth slope and will not accumulate in the gaps.

[0016] After the concrete layer 40 is tested and confirmed to have reached a strength of C20, the exposed polymer waterproof coating is sprayed. The first coat is sprayed at a uniform speed along the drainage slope, and the second coat is sprayed in a perpendicular and cross direction. After the exposed polymer waterproof coating layer 50 dries, its highest point does not exceed the air conditioner outdoor unit pier 30. The exposed polymer waterproof coating layer 50 is one of two types: a single-component water-based acrylic coating or a single-component water-based asphalt coating.

[0017] The exposed polymer waterproof coating layer 50 will penetrate into the pores of the concrete layer 40 and bond tightly with the concrete layer 40 to form a continuous and sealed waterproof barrier, which can not only block rainwater penetration but also resist ultraviolet erosion and extend the durability of the structure.

Claims

1. A waterproof structure for the lower part of a roof air conditioning unit, comprising a roof base layer and an air conditioning outdoor unit support mounted on the roof base layer, characterized in that: A concrete layer is provided between the air conditioner outdoor unit supports. The surface of the concrete layer is provided with drainage high points. The drainage high points extend outward to form a drainage slope with a slope of not less than 3%. The upper surface of the concrete layer is covered with an exposed polymer waterproof coating layer.

2. The waterproof structure at the lower part of the roof air conditioning unit as described in claim 1, characterized in that, The strength grade of the concrete layer is C20.

3. The waterproof structure at the lower part of the roof air conditioning unit as described in claim 1, characterized in that, The drainage point is not higher than the air conditioner outdoor unit support.

4. The waterproof structure at the lower part of the roof air conditioning unit as described in claim 1, characterized in that, The drainage high point can be set at any position, either in the center, slightly to the left, or slightly to the right.

5. The waterproof structure at the lower part of the roof air conditioning unit as described in claim 1, characterized in that, The exposed polymer waterproof coating layer is sprayed in two coats, and after the exposed polymer waterproof coating layer dries, its highest point is not higher than the air conditioner outdoor unit pier.

6. The waterproof structure at the lower part of the roof air conditioning unit as described in claim 1, characterized in that, The exposed polymer waterproof coating layer is one of a single-component water-based acrylic coating or a single-component water-based asphalt coating.