一种电厂机房用泄漏检测与排水集成的地板结构
By integrating leak detection and drainage functions into the floor structure, the shortcomings of power plant equipment room floor structures in terms of leak detection and drainage are solved, enabling rapid liquid detection and efficient discharge, and improving the safety and reliability of equipment room operation.
Patent Information
- Application Number
- CN202522520356.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-27
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-11-27
AI Technical Summary
The existing power plant generator room floor structure suffers from problems such as insufficient coverage, low efficiency, structural separation, poor integration, high maintenance costs, and prominent safety hazards in terms of leak detection and drainage, making it difficult to achieve comprehensive monitoring and timely discharge.
A floor structure integrating leak detection and drainage functions was designed, including an anti-static floor layer, floor support, drainage base layer and support bolts. Multi-level support is achieved through vertical connection and adjustable bolts. Automatic flow guidance and monitoring are achieved by combining drainage slope and sensing rope, thus integrating leak detection and drainage functions.
It enables rapid detection and efficient discharge of liquid leaks in the computer room, improves the early warning capability and emergency response efficiency of leakage risks, reduces the risk of equipment damage, improves the stability and safety of the floor system, and reduces maintenance costs.
Smart Images

Figure CN225014534U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of machinery, specifically to a floor structure that integrates leak detection and drainage for power plant computer rooms. Background Technology
[0002] Power plant equipment rooms, as critical locations in power systems with highly concentrated equipment and stringent operating environment requirements, typically house numerous electrical control devices, power distribution equipment, cable trays, and auxiliary piping systems. During long-term operation, these devices are often exposed to various liquid media, such as cooling water systems, air conditioning condensate systems, and fire sprinkler systems. Leaks are highly likely to occur if pipes age, connections loosen, or equipment seals fail. Furthermore, water accumulation during floor cleaning and equipment maintenance is common within equipment rooms. If these liquids are not drained promptly, they pose a serious threat to the safe operation of the equipment room.
[0003] In existing technologies, power plant machine room floors mostly use ordinary raised anti-static floor structures. Their main function is to raise the floor height to accommodate cables or pipes and provide some ventilation space. However, such structures typically only provide basic load-bearing and anti-static functions, without systematic design for leak detection and drainage. Once water seepage or accumulation occurs under the floor, it is often difficult to detect in time. It can only be detected when water seeps to the floor surface or equipment malfunctions, exhibiting a significant delay.
[0004] While some existing solutions incorporate drainage slopes or ditches into the computer room floor, these are mostly traditional building drainage methods. Their drainage structures are typically located on exposed surfaces or in limited areas, failing to cover the entire space beneath the floor, leading to localized water accumulation and difficulty in timely drainage. Furthermore, these drainage structures are often designed separately from the anti-static floor system, lacking an integrated structure, resulting in complex construction, poor compatibility, and difficult maintenance. Moreover, structural incompatibility can easily affect the floor's flatness and load-bearing capacity.
[0005] In terms of leak detection, existing technologies mostly employ independent leak alarm systems, such as laying induction lines or installing point sensors under critical equipment. However, this approach has limited coverage and is restricted in installation location, making it difficult to achieve comprehensive monitoring of the entire subfloor space. If a leak occurs in a blind spot, timely warnings are still impossible. Furthermore, these systems are often not integrated with the drainage system, serving only an alarm function and failing to achieve synchronized flow diversion and discharge.
[0006] Furthermore, in terms of support structure, traditional raised floors mostly use simple column supports or fixed bracket structures, which have limited height adjustment precision and poor adaptability to uneven ground, making it difficult to guarantee the long-term stability of the overall floor system. At the same time, for waterproofing, seepage prevention, and structural sealing of the space under the floor, existing technologies mostly rely on simple adhesive strips or sealing materials, which have unstable sealing effects and are prone to failure due to aging or deformation.
[0007] In summary, existing power plant computer room floor structures generally suffer from technical problems such as insufficient leak detection coverage, low drainage efficiency, structural separation, poor integration, high maintenance costs, and significant safety hazards. There is an urgent need for a comprehensive floor structure that can effectively integrate leak detection and drainage functions while taking into account load-bearing capacity, anti-static properties, and structural stability, in order to improve the safety and reliability of the computer room operating environment. Summary of the Invention
[0008] To solve the above-mentioned technical problems, this utility model provides a floor structure that integrates leakage detection and drainage for power plant machine rooms.
[0009] This utility model is achieved through the following technical solution: This utility model discloses a floor structure integrating leakage detection and drainage for power plant machine rooms, comprising: An anti-static floor layer placed on the top floor, adapted to the shape of the computer room; Several floor supports are vertically connected to the bottom of the antistatic floor layer; A drainage base layer connected to several floor supports is provided, wherein the drainage base layer is inclined downward at a certain corner of itself, having a drainage slope; A number of ground support bolts equal to the number of floor brackets, each of the aforementioned ground support bolts corresponding to a floor bracket and located directly below it; one end of each of the aforementioned ground support bolts is fixedly connected to the ground. An adjustable bolt, with the same number as the ground support bolts, has one end threadedly connected to the ground support bolt and the other end connected to the lower contact support of the drainage base layer.
[0010] The aforementioned structure is a comprehensive protective floor system designed for the unique operating environment of power plant equipment rooms. By integrating leak detection and drainage functions within the floor structure, it enables timely diversion and effective discharge of potential liquid leaks within the equipment room, thereby preventing water accumulation from damaging equipment, cables, and infrastructure. The anti-static floor layer, as the uppermost usable layer, not only supports personnel and equipment movement but also, through the use of anti-static materials, effectively reduces the risk of static electricity buildup, making it particularly suitable for areas with static-sensitive power plant control equipment.
[0011] The antistatic floor layer is fixed to several floor supports below it via vertical connections, forming a stable spatial hierarchy. The floor supports, as key load-bearing and connecting components, transfer the load of the upper antistatic floor layer to the drainage base layer, and further to the ground foundation via ground support bolts. This multi-level support system ensures the stability and reliability of the floor structure during long-term use.
[0012] The drainage base layer is designed with a slope, tilting downwards at one corner. This design allows any seepage or leakage under the floor to automatically collect at the lowest point under gravity, preventing the formation of stagnant water beneath the floor. The slope can be rationally designed based on the server room area and drainage direction to ensure efficient drainage.
[0013] The ground support bolts and adjustable bolts form an adjustable-height support structure through threaded engagement. The adjustable bolts allow for precise adjustment of the drainage base layer height according to actual construction conditions, ensuring the overall flatness of the anti-static floor layer and accommodating minor unevenness in the ground. This structural combination not only enhances the installation flexibility of the floor system but also strengthens its stability and safety during long-term operation.
[0014] Furthermore, the aforementioned antistatic floor layer includes several rectangular floor panels, which are spliced together to form a large rectangle, and are connected to floor joists underneath.
[0015] The anti-static floor layer adopts a modular design, composed of multiple rectangular floor panels, allowing the overall structure to flexibly adapt to computer room spaces of different sizes and shapes. Each floor panel can be disassembled and installed individually. During later maintenance or partial repairs, only the corresponding area's floor panel needs to be removed, greatly improving the convenience and efficiency of maintenance while minimizing the impact on normal operating areas.
[0016] The floor joists installed beneath the floor slabs serve to enhance structural rigidity and distribute loads. Typically made of metal or high-strength composite materials, the floor joists work in a stable fit with the floor supports to evenly distribute the load from above, preventing deformation or warping of the floor slabs due to excessive localized stress. The presence of the floor joists also improves the overall load-bearing capacity of the anti-static floor layer, enabling it to withstand the pressure from equipment handling, maintenance tools, and frequent foot traffic.
[0017] This structure, composed of floorboards and floor joists, not only has good structural strength but also facilitates standardized production and rapid on-site assembly, which helps to shorten the construction cycle and improve the standardization and consistency of project implementation.
[0018] Furthermore, several of the aforementioned floor supports are respectively installed at the intersection of the cross joints of four adjacent floor slabs; The aforementioned floor support system includes: The lower end of the floor support base contacts and is connected to the drainage base layer. A floor support screw that is threadedly connected to the floor support base, can extend upwards and be fixed at a certain height; Connecting plates are respectively installed below the support base and above the floor support screw; The connecting piece is used to increase the contact area; the supporting screw is arranged perpendicular to the antistatic floor layer; the angle between the connecting piece below the support base and the drainage base layer is filled with flexible filler.
[0019] The floor supports are set at the intersection of the cross joints formed by four adjacent floor slabs. This arrangement can make full use of the stress characteristics of the corners of the floor slabs, so that each support forms a support relationship with the four floor slabs, thereby achieving a uniform distribution of force, effectively reducing the situation of single-point stress on the floor slabs, and improving the overall structural stability.
[0020] The floor support base, as the lower component of the floor support frame, directly contacts and supports the drainage base layer. Its main function is to provide a stable base for the support screws, while reducing localized pressure on the drainage base layer through its large contact area. The floor support screws are threaded onto the floor support base, allowing for height adjustment and fixation in the appropriate position, thus enabling precise leveling of the anti-static floor layer.
[0021] The connecting plates, positioned below the support base and above the floor support bolts, expand the contact area and distribute the load, helping to reduce pressure on the drainage base layer and floor joists, thus improving structural safety. Simultaneously, the flexible filler between the connecting plates below the support base and the drainage base layer buffers stress caused by vibration, thermal expansion and contraction, or minor displacements, thereby reducing noise, preventing structural loosening, and extending the overall service life.
[0022] Furthermore, the aforementioned drainage base layer includes: Several interconnected base units form the main body of the drainage base; A flexible sealing strip is attached to the outer edge of the main body of the drainage base and seals against the wall. A series of drainage grooves are set at the joints of several base units, forming an interconnected grid on the upper surface of the main body of the drainage base; a leakage sensing rope is installed in the drainage groove. A water outlet is provided on the base unit at the lowest point, and the water outlet is connected to a drainage pipe or drainage well.
[0023] The drainage base layer adopts a modular structure composed of several base units, which facilitates transportation and on-site installation, and can be flexibly combined according to the actual area of the computer room to form the main body of the drainage base covering the entire space under the floor. Multiple base units are spliced together to form an integral structure, and the joints not only serve as structural connections but are also an important part of the drainage system's function.
[0024] A flexible sealing strip is installed on the outer edge of the drainage base, ensuring a tight seal with the wall. This effectively prevents leaked liquid from seeping into the wall or floor substrate from the base edge, avoiding the formation of hidden water accumulation areas and thus improving overall waterproofing reliability. The flexible sealing strip, through its inherent flexibility, can adapt to minor unevenness in the wall or deformation caused by temperature changes, maintaining a long-term stable seal.
[0025] Drainage trenches are installed at the joints of adjacent base units, forming an interconnected grid structure after splicing. This grid-like drainage path ensures that leaked liquid, regardless of its origin, can quickly flow into the trenches and to the lowest point, effectively improving drainage efficiency. Leakage sensing ropes installed within the drainage trenches are used to monitor the presence of liquid in the trenches in real time. Once a leak occurs, the sensing ropes send a signal to the monitoring system, enabling early warning and enhancing the safety of data center operations and maintenance.
[0026] The outlet is located on the base unit at the lowest point, allowing all the liquid collected in the grooves to be discharged in a concentrated manner. By connecting with the drainage pipe or drainage well, orderly discharge is achieved, preventing liquid from remaining in the base layer and thus ensuring a dry environment in the space under the floor.
[0027] Furthermore, the aforementioned base unit includes: The main body is a rectangular sheet-like unit; Splicing slots are provided on two adjacent sides of the unit body; Splicing strips are installed on the other two adjacent sides of the main body of the unit; The splicing groove and splicing strip are shaped to match each other, and the splicing strip can be inserted into the splicing groove.
[0028] The base unit adopts a regular rectangular sheet structure. The shape of its main body facilitates the formation of standardized modules, making it easy to produce, stack, and assemble on-site. By setting splicing slots on two adjacent sides of the main body of the unit and splicing strips on the other two adjacent sides, each base unit has four-way splicing capability, allowing for orderly combination on-site according to the predetermined drainage direction.
[0029] The interlocking grooves and strips are shaped to match each other, forming a strong connection after insertion. This not only enhances the overall strength of the drainage base but also reduces the risk of misalignment between adjacent units, ensuring the continuity of the drainage channel after splicing and facilitating unobstructed drainage. This interlocking structure also helps prevent water from seeping downwards through the joints, improving waterproofing performance.
[0030] Furthermore, this structural design allows for the replacement of individual units in the event of partial damage to the base unit, without the need to remove the entire drainage base layer, thereby reducing maintenance costs and enhancing the system's sustainability.
[0031] Furthermore, four flexible sealing strips are provided, which are respectively connected to the four sides of the main body of the drainage base; The side of the sealing strip connected to the main body of the drainage base has a groove-like structure or a strip-like structure, which is respectively fitted and connected to the splicing strip or splicing groove; The other side of the aforementioned sealing strip is wedge-shaped and contacts the wall for sealing.
[0032] Flexible sealing strips are arranged around the perimeter of the drainage base body, forming a ring-shaped sealing structure that protects the entire space under the floor, preventing leaked liquid from overflowing into the building structure. The sealing strip engages with the drainage base body on one side via a grooved or strip-like structure, allowing it to be firmly fixed to the edge of the base and preventing it from falling off due to vibration or displacement during long-term use.
[0033] The other side of the sealing strip has a wedge-shaped structure, which allows it to gradually pressurize and seal against the wall when in contact with it. Through deformation, it adheres tightly to the wall surface, filling the gap between the wall and the main body of the drainage base, thus improving sealing reliability. This structure can also buffer any micro-vibrations that may occur in the wall, reducing noise and the transmission of structural stress.
[0034] Furthermore, the aforementioned drainage ditch is located on the upper outer edge of the unit body, and is in the shape of a quarter circle. Two adjacent unit bodies are spliced together to form a corresponding semi-circular drainage ditch.
[0035] The drainage trench is located at the upper outer edge of the main unit, which facilitates the formation of a continuous drainage channel after the base units are assembled, and ensures that the trench does not affect the main load-bearing capacity of the main unit. The quarter-circular cross-section structure makes the inner wall of the trench smooth, which is conducive to smooth liquid flow and reduces the possibility of water accumulation and sediment retention.
[0036] When two adjacent unit bodies are spliced together, their respective quarter-circular grooves combine to form a semi-circular drainage ditch. This structure not only increases the volume of the ditch and improves the drainage capacity, but also improves the structural strength of the ditch edge, preventing collapse or deformation under load.
[0037] Furthermore, the edges of the aforementioned water outlet have a smooth, rounded transition.
[0038] The outlet features a smooth, rounded corner design, effectively preventing sharp edges from scratching drainage pipe connections or leak detection ropes. It also reduces eddies and resistance during water flow, allowing for smoother liquid drainage. The rounded corner structure also helps reduce the probability of sediment buildup, minimizing the risk of outlet blockage and ensuring long-term stable operation of the drainage system.
[0039] Furthermore, the aforementioned bottom support bolt is an expansion bolt, and the aforementioned adjustable bolt is coaxially connected to the portion of the ground support bolt exposed above the ground, and is connected through a pre-set threaded hole on the ground support bolt.
[0040] Using expansion bolts for the ground support allows them to be firmly anchored into the concrete floor during installation, enhancing the overall structure's pull-out resistance and seismic performance, thereby improving the stability of the floor system. Adjustable bolts are coaxially connected to the ground support bolts and screwed into pre-drilled threaded holes, making the entire adjustment structure more compact and the force distribution more even, which helps prevent tilting or loosening caused by eccentric loading.
[0041] This coaxial structure also makes it easy for construction workers to adjust the height during installation. By rotating the adjustable bolts, the support height between it and the drainage base layer can be changed, achieving rapid leveling and improving construction efficiency.
[0042] Furthermore, an internal hexagonal hole is provided at the upper end face of the aforementioned adjustable bolt for turning the adjustable bolt; A movable rubber pad can be inserted into the aforementioned hexagonal socket to fill the gap between the pad and the drainage base layer.
[0043] An internal hexagonal hole is provided on the upper end face of the adjustable bolt, allowing it to be rotated and adjusted using an internal hexagonal wrench. This enables precise control of the height of the drainage base layer, facilitating fine-tuning during construction or later maintenance. This structure not only improves the convenience of adjustment operations but also reduces the interference of exposed parts with the surrounding structure.
[0044] The movable rubber pad at the hexagonal socket fills the tiny gap between the adjustable bolt and the drainage base, providing cushioning and shock absorption while preventing moisture from entering the threaded connection, thus preventing corrosion or loosening. The movable design of the rubber pad also facilitates disassembly and replacement during maintenance, enhancing the overall durability and practicality of the structure.
[0045] The beneficial effects of this utility model are as follows: This utility model, through its overall structural design, enables the computer room floor system to quickly detect and efficiently discharge liquid leaks, significantly improving the power plant's ability to warn of leakage risks and its emergency response efficiency.
[0046] It can effectively prevent liquids from lingering in the space under the floor for a long time, thereby reducing the corrosion and damage of water accumulation to electrical equipment, cables and ground foundation, extending the service life of equipment and reducing the failure rate.
[0047] This improves the overall stability and load-bearing reliability of the floor system, enabling it to maintain good flatness and structural safety during long-term operation.
[0048] It enhances the waterproofing and sealing performance of the computer room environment, reduces the risk of liquid seeping into the walls and building structure, and improves the durability of the building structure.
[0049] It achieves comprehensive coverage of the leakage monitoring range, making data center operation and maintenance management more intuitive and efficient, and is conducive to improving the level of automated management.
[0050] It helps reduce maintenance costs and downtime risks, providing a safer, more reliable, and intelligent operating environment for power plant generator rooms, and has good practical value and prospects for promotion. Attached Figure Description
[0051] Figure 1 : A three-dimensional structural schematic diagram of this utility model; Figure 2 Another three-dimensional structural schematic diagram of this utility model; Figure 3 : Front view of this utility model; Figure 4 : An exploded view of the structure of this utility model; Figure 5 : A partial three-dimensional structural diagram of the antistatic floor layer of this utility model; Figure 6 : A three-dimensional structural diagram of the floor joists of this utility model; Figure 7 : A three-dimensional structural diagram of the ground support bolt and adjustable bolt of this utility model; Figure 8 : A three-dimensional structural diagram of the drainage base layer of this utility model; Figure 9 : Front view of the drainage base layer of this utility model; Figure 10 : Exploded three-dimensional structure of the drainage base layer of this utility model; Figure 11 : A schematic diagram of the installation position of the flexible sealing strip of this utility model; In the diagram: 1-Antistatic floor layer, 2-Floor support, 3-Drainage base layer, 4-Ground support bolt, 5-Adjustable bolt, 11-Floor panel, 12-Floor joist, 21-Floor support base, 22-Floor support screw, 23-Connecting piece, 31-Base unit, 32-Flexible sealing strip, 33-Drainage trench, 34-Water outlet, 311-Unit body, 312-Splicing groove, 313-Splicing strip. Detailed Implementation
[0052] The present invention will be further described below with reference to the accompanying drawings and specific embodiments: Example: Figure 1-11 As shown, in this embodiment, the floor structure is composed of an anti-static floor layer 1, a floor support 2, a drainage base layer 3, ground support bolts 4, and adjustable bolts 5, forming a multi-layered structural system distributed from top to bottom. This system is installed on the original floor of the power plant's machine room to support personnel passage, equipment placement, and to detect and centrally discharge any condensate, leaking water from pipes, or other liquids that may occur under the floor.
[0053] The antistatic floor layer 1 is located on the top layer and is composed of several rectangular floor panels 11. These panels 11 are tightly joined together horizontally to form a large rectangular planar structure adapted to the space of the computer room. Floor joists 12 are fixedly connected to the bottom of the floor panels 11. The floor joists 12 cooperate with the floor support 2 to ensure that the antistatic floor layer 1 maintains good flatness while possessing high load-bearing capacity and structural stability. While ensuring antistatic performance, the antistatic floor layer 1 effectively prevents static electricity from adversely affecting the precision equipment in the power plant's computer room.
[0054] Floor supports 2 are positioned at the intersection of the cross joints of four adjacent floor tiles 11, allowing each support 2 to simultaneously support multiple floor tiles, thus evenly distributing the load. Each floor support 2 includes a floor support base 21, a floor support screw 22, and connecting plates 23. The floor support base 21 is located below and contacts the drainage base layer 3 for support. The floor support screw 22 is threaded to the floor support base 21 and can be adjusted vertically to precisely control the height of the antistatic floor layer 1. Connecting plates 23 are positioned below the support base 21 and above the floor support screw 22 to increase the contact area and reduce local pressure. Flexible filler is also placed between the connecting plates 23 and the drainage base layer 3 to reduce vibration and compensate for minor displacements.
[0055] The drainage base layer 3 is located below the floor support 2 and is formed by splicing multiple base units 31 to form the main body of the drainage base. Each base unit 31 includes a rectangular sheet-shaped unit body 311 with splicing grooves 312 on two adjacent sides and splicing strips 313 on the other two adjacent sides. Through the interlocking of the splicing strips 313 and the splicing grooves 312, multiple base units 31 are combined into an integral structure, which is stable and has good continuity. After splicing, the joints of each base unit 31 form drainage channels 33. The drainage channels 33 are distributed in an interconnected grid pattern and have an overall drainage slope that slopes towards the lowest point in a certain corner. In the figure, A is the highest point and B is the lowest point.
[0056] A leakage sensing rope is installed inside the drainage ditch 33. When liquid appears in the drainage ditch 33, the leakage sensing rope can detect the moisture and transmit the signal to the monitoring system, thereby realizing real-time monitoring of the leakage situation in the computer room. Once a leak occurs, an alarm message can be issued immediately to remind maintenance personnel to deal with it in time and prevent the leakage from spreading.
[0057] At the lowest point of the drainage base layer 3, a water outlet 34 is provided on the corresponding base unit 31. The water outlet 34 is connected to the drainage pipe or drainage well, so that the liquid collected along the drainage slope can be discharged in a concentrated manner. The edge of the water outlet 34 has a smooth rounded corner transition, which is conducive to the smooth flow of water and reduces the risk of impurity accumulation and blockage.
[0058] Flexible sealing strips 32 are provided around the main body of the drainage base. One side of the flexible sealing strip 32 is connected to the main body of the drainage base through a groove-shaped structure or a strip-shaped structure to form a fitting connection with the splicing strip 313 or splicing groove 312. The other side is wedge-shaped and in close contact with the wall of the machine room, thereby forming a reliable seal between the drainage base layer 3 and the wall to prevent water from seeping into the interior of the wall.
[0059] Below the drainage base layer 3, a ground support bolt 4 is installed. The ground support bolt 4 is an expansion bolt, one end of which is firmly anchored in the concrete ground, and the other end is exposed above the ground and coaxially connected to the adjustable bolt 5. The adjustable bolt 5 is screwed into the pre-set threaded hole on the ground support bolt 4, and its upper end contacts and supports the drainage base layer 3. By rotating the adjustable bolt 5, the height of the drainage base layer 3 can be adjusted to meet the design slope requirements and maintain horizontal stability.
[0060] The upper end face of the adjustable bolt 5 is provided with an internal hexagonal hole, which can be rotated and adjusted by the construction personnel using an internal hexagonal tool. At the same time, a rubber pad can be inserted into the internal hexagonal hole. The rubber pad is used to fill the gap between the adjustable bolt 5 and the drainage base layer 3, which plays a role in buffering, shock absorption and sealing, and prevents vibration and moisture from having an adverse effect on the thread structure.
[0061] In actual operation, when a liquid leaks from equipment in the computer room or condensate drips into the space under the floor, the liquid first contacts the upper surface of the drainage base layer 3 and automatically flows into the drainage ditch 33 under the action of the drainage slope. The liquid gradually flows towards the lowest point along the drainage ditch 33 in the grid structure, while the leakage sensing rope detects the liquid and sends an alarm signal. Finally, the liquid is discharged into the drainage pipe or drainage well through the outlet 34, completing the drainage process. The entire process can achieve automatic diversion and centralized discharge without manual intervention.
[0062] Through the aforementioned structure and working method, this floor structure, while meeting the requirements of load-bearing, anti-static properties, and daily use, achieves real-time monitoring and efficient drainage of leakage in the power plant's computer room. This effectively improves the safety and operational reliability of the power plant's computer room environment, reduces the risk of equipment damage, and has good practical value and promotional significance.
[0063] Finally, it should be noted that the above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Although the present utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.
Claims
1. A floor structure integrating leak detection and drainage for power plant machine rooms, characterized in that, include: An antistatic floor layer (1) is placed on the top floor and adapted to the shape of the computer room. Several floor supports (2) are vertically connected below the antistatic floor layer (1); A drainage base layer (3) is connected below several floor supports (2), the drainage base layer (3) is configured to slope downwards at a certain corner of itself, having a drainage slope; A number of ground support bolts (4) equal to the number of floor brackets (2), each of the ground support bolts (4) corresponding one-to-one with the floor brackets (2) and located directly below them; one end of each ground support bolt (4) is fixedly connected to the ground. Adjustable bolts (5) of the same number as ground support bolts (4) are threaded to one end of the ground support bolts (4) and to the lower contact support of the drainage base layer (3) at the other end.
2. The floor structure according to claim 1, characterized in that, The antistatic floor layer (1) includes several rectangular floor panels (11), which are spliced together to form a large rectangle, and are connected to floor joists (12) below.
3. The floor structure according to claim 2, characterized in that, Several of the floor supports (2) are respectively set at the intersection of the cross joints of four adjacent floor slabs (11); The floor support (2) includes: The floor support base (21) is connected to the drainage base layer (3) at the lower end. A floor support screw (22) is threadedly connected to the floor support base (21), and can extend and retract upwards and be fixed at a certain height. Connecting pieces (23) are respectively installed below the support base (21) and above the floor support screw (22); The connecting piece (23) is used to increase the contact area; the supporting screw (22) is arranged perpendicularly to the antistatic floor layer (1); the angle between the connecting piece (23) located below the support base (21) and the drainage base layer (3) is filled with flexible filler.
4. The floor structure according to claim 2, characterized in that, The drainage base layer (3) includes: Several interconnected base units (31) form the main body of the drainage base; A flexible sealing strip (32) is connected to the outer edge of the main body of the drainage base and seals against the wall. A drainage groove (33) is formed on the upper surface of the main body of the drainage base by setting at the joint of several base units (31); a leakage sensing rope is provided in the drainage groove (33); A water outlet (34) is provided on the base unit (31) at the lowest point, and the water outlet (34) is connected to a drainage pipe or drainage well.
5. The floor structure according to claim 4, characterized in that, The base unit (31) includes: The unit body is rectangular in shape (311). Splicing slots (312) are provided on two adjacent sides of the unit body (311). Splicing strips (313) are set on the other two adjacent sides of the main body of the unit (311). The splicing groove (312) and the splicing strip (313) are matched in shape, and the splicing strip (313) can be inserted into the splicing groove (312).
6. The floor structure according to claim 5, characterized in that, Four flexible sealing strips (32) are provided, which are respectively connected to the four sides of the main body of the drainage base; The sealing strip (32) has a groove-shaped structure or a strip-shaped structure on the side connected to the main body of the drainage base, which is respectively fitted and connected to the splicing strip (313) or the splicing groove (312); The other side of the sealing strip (32) is wedge-shaped and contacts the wall for sealing.
7. The floor structure according to claim 4, characterized in that, The drainage ditch (33) is located on the upper outer edge of the unit body (311) and is in the shape of a quarter circle. Two adjacent unit bodies (311) are spliced together to form a corresponding semi-circular drainage ditch (33).
8. The floor structure according to claim 4, characterized in that, The edge of the outlet (34) has a smooth rounded transition.
9. The floor structure according to any one of claims 1-8, characterized in that, The ground support bolt (4) is an expansion bolt, and the adjustable bolt (5) is coaxially connected to the part of the ground support bolt (4) exposed above the ground, and is connected through the pre-set threaded hole on the ground support bolt (4).
10. The floor structure according to any one of claims 1-8, characterized in that, The adjustable bolt (5) has an internal hexagonal hole at the upper end face for turning the adjustable bolt (5). The internal hexagonal hole can be movably inserted with a rubber pad to fill the gap between it and the drainage base layer (3).