A foldable cage for steel structure installation
By designing a foldable hoist cage, the problems of inconvenient transportation and storage and insufficient structural stability in steel structure installation were solved, achieving efficient construction process management and a safe working environment.
Patent Information
- Application Number
- CN202522474888.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-21
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-11-21
AI Technical Summary
Existing steel structure installation cages suffer from problems such as inconvenient transportation and storage, insufficient structural stability, and poor operational adaptability.
A foldable cage was designed. Through the rotating connection of the first, second, and third supports, combined with the removal of the inclined support rod and the clamping structure of the fixed support, the cage can be quickly folded and unfolded, ensuring structural stability and convenient installation.
This significantly reduced storage space requirements, improved transportation efficiency and operational adaptability, and ensured the safety and efficiency of the construction process.
Smart Images

Figure CN225014579U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of cage installation technology, specifically a foldable cage for steel structure installation. Background Technology
[0002] In steel structure installation, suspended cages are indispensable construction equipment, especially in the installation of steel structures and process pipelines in chemical engineering projects. The numerous edge-prone operations at considerable heights above the ground place higher demands on the safety and practicality of the equipment. Currently, the common safety protection method for such high-altitude edge-prone installations involves erecting temporary work platforms on the supporting beams of the factory building, using metal scaffolding systems to construct the high-altitude work plane. Platform erection takes time, requiring the transport of building materials to the top, which easily leads to the risk of tools and materials falling again. Traditional steel structure installation suspended cages are mostly fixed structures with a large overall volume, occupying a lot of space during transportation, and having a limited number transported at one time, increasing transportation costs. When not in use, they require a large amount of storage space, causing inconvenience to site space management. Therefore, there is an urgent need for a new type of foldable suspended cage to solve these problems. Utility Model Content
[0003] This utility model provides a foldable hoisting cage for steel structure installation, which can solve the problems of inconvenient transportation and storage, insufficient structural stability, and poor operational adaptability of existing steel structure installation hoisting cages and operation schemes.
[0004] To achieve the above objectives, this utility model provides the following technical solution: a foldable hoisting cage for steel structure installation, comprising a cage body and a fixed support. The cage body includes a first support, the upper end of which is connected to the fixed support. A second support is rotatably mounted on the lower end of the first support, and a third support is rotatably mounted on the front end of the second support. The third support and the first support are arranged vertically relative to each other, and multiple connecting rods are hinged between the third support and the first support. Two inclined support rods are detachably mounted on both sides of the upper end of the third support, and the ends of the two inclined support rods are respectively hinged to the upper and lower ends of the first support. When folding, the connecting bolts between the upper end of the third support and the inclined support rods are removed, and the third support is lifted to complete the folding. It is easy to install, has a stable structure, and greatly reduces the volume after folding. A crane can transport multiple hoisting cages to the top of the factory building for installation at one time. One hoisting cage is equipped with a safety guardrail to form a working space for personnel, and the remaining hoisting cages serve as temporary material storage points.
[0005] As a supplement to the technical solution described in this utility model, a bearing panel is fixedly installed on the upper side of the second bracket. The bearing panel is made of high-strength steel plate, and its surface can be provided with anti-slip texture to prevent construction workers from slipping during operation.
[0006] As a supplement to the technical solution described in this utility model, the first support includes two vertically arranged first vertical beams, which are connected by multiple first horizontal beams. The first vertical beams and the first horizontal beams are welded and fixed to form the first support, and the two are fixed by welding to form a stable frame structure.
[0007] As a supplement to the technical solution described in this utility model, the third support includes two vertically arranged second vertical beams, which are connected by multiple second horizontal beams. The second vertical beams and the second horizontal beams are welded and fixed to form the third support, ensuring the symmetry and stability of the overall structure.
[0008] As a supplement to the technical solution described in this utility model, the fixed bracket includes a connecting part fixedly connected to the first vertical beam. A screw is fixedly connected to the connecting part, and a clamping plate is sleeved on the screw. The bottom of the clamping plate is provided with a protrusion extending towards the connecting part. The space between the clamping plate and the connecting part is used to clamp the support beam of the factory roof. The fixed bracket can quickly connect to the support beam. The protrusion can hook the bottom of the support beam, improving the stability of the clamping.
[0009] As a supplement to the technical solution described in this utility model, a nut is threaded onto the screw on the side of the clamping plate, and a drive rod is fixedly connected to the outside of the nut. Construction workers can rotate the drive rod to drive the nut to rotate on the screw, thereby pushing the clamping plate to move towards the connecting part, so as to clamp and fix the support beam. The operation is convenient and labor-saving.
[0010] Compared with the prior art, the beneficial effects of this utility model are: By rotating the first, second, and third supports, folding can be completed simply by removing the connecting bolts between the inclined support rod and the third support, significantly reducing storage space. The screws and clamping plates of the fixed supports provide secure clamping, improving operational adaptability and construction quality. The drive rod-driven nut adjustment method facilitates installation. This solution addresses the problems of inconvenient transportation and storage, insufficient structural stability, and poor operational adaptability inherent in existing steel structure installation cages and operational solutions. Attached Figure Description
[0011] Figure 1 The three-dimensional structure of this utility model Figure 1 ; Figure 2 The three-dimensional structure of this utility model Figure 2 ; Figure 3 This is a side view of the present invention; Figure 4 This is an exploded view of the present invention; Figure 5This is a schematic diagram of the folded state of this utility model; Figure 6 This is a structural schematic diagram of the fixed bracket of this utility model.
[0012] Reference numerals in the attached drawings: 1. Main body of the cage; 2. Fixed bracket; 3. First bracket; 31. First vertical beam; 32. First horizontal beam; 4. Second bracket; 5. Third bracket; 51. Second vertical beam; 52. Second horizontal beam; 6. Connecting rod; 7. Inclined support rod; 8. Bearing panel; 9. Support beam; 21. Connecting part; 22. Clamping plate; 23. Screw; 24. Nut; 25. Drive rod. Detailed Implementation
[0013] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention.
[0014] The present invention relates to a foldable hoisting cage for steel structure installation, such as... Figure 1-6 As shown, the device includes a cage body 1 and a fixed support 2. The cage body 1 includes a first support 3, the upper end of which is connected to the fixed support 2. A second support 4 is rotatably mounted on the lower end of the first support 3. The second support 4 is made of four angle steel welded together. A third support 5 is rotatably mounted on the front end of the second support 4. The third support 5 and the first support 3 are arranged vertically relative to each other. Multiple connecting rods 6 are hinged between the third support 5 and the first support 3. Two inclined support rods 7 are detachably mounted on both sides of the upper end of the third support 5. The ends of the two inclined support rods 7 are respectively... The inclined support rod 7 is made of steel plate and is hinged to the upper and lower ends of the first bracket 3. When folding, the connecting bolts between the upper end of the third bracket 5 and the inclined support rod 7 are removed, and the third bracket 5 can be lifted to complete the folding. It is easy to install, the structure is stable, and the volume is greatly reduced after folding. The folded cage is transported to the steel structure installation site by transport vehicle. Due to its small size after folding, multiple cages can be transported at one time, which improves transportation efficiency. The crane can carry multiple cage devices to the top of the factory building and install them at one time. One cage is equipped with a safety guardrail to form a working space for personnel, and the remaining cages are used as temporary material storage points.
[0015] In this embodiment, as Figure 4 As shown, a bearing panel 8 is fixedly installed on the upper side of the second bracket 4. The bearing panel 8 is made of high-strength steel plate, and its surface can be provided with anti-slip texture to prevent construction workers from slipping during operation.
[0016] In this embodiment, as Figure 4As shown, the first support 3 includes two vertically arranged first vertical beams 31, which are connected by four first horizontal beams 32. The first vertical beams 31 are made of angle steel, and the first horizontal beams 32 are made of steel plates. The two are fixed by welding to form a stable frame structure.
[0017] In this embodiment, as Figure 4 As shown, the third support 5 includes two relatively vertically arranged second vertical beams 51, which are connected by three second horizontal beams 52. The second vertical beams 51 and the second horizontal beams 52 are welded and fixed to form the third support 5. The second vertical beams 51 are made of angle steel, and the second horizontal beams 52 are made of steel plates. The two are fixed by welding to ensure the symmetry and stability of the overall structure.
[0018] In this embodiment, as Figure 6 As shown, the fixed bracket 2 includes a connecting part 21 fixedly connected to the first vertical beam 31. A screw 23 is fixedly connected to the connecting part 21, and a clamping plate 22 is sleeved on the screw 23. The bottom of the clamping plate 22 is provided with a protrusion extending towards the connecting part 21. The space between the clamping plate 22 and the connecting part 21 is used to clamp the support beam 9 of the factory roof. The fixed bracket 2 can quickly connect to the support beam 9. The protrusion can hook the bottom of the support beam 9, improving the stability of the clamping.
[0019] In this embodiment, as Figure 6 As shown, a nut 24 is threaded onto the screw 23 on the side of the clamping plate 22. A drive rod 25 is fixedly connected to the outside of the nut 24. Construction workers can rotate the drive rod 25 to drive the nut 24 to rotate on the screw 23, thereby pushing the clamping plate 22 to move towards the connecting part 21, thus clamping and fixing the support beam 9. The operation is convenient and labor-saving.
[0020] In this embodiment, as Figure 1As shown, the folded cage is transported to the steel structure installation site by a transport vehicle. Due to its small size after folding, multiple cages can be transported at once. The cage is moved to the support beam 9 on the top of the factory building, and its position is adjusted so that the connecting part 21 of the fixed bracket 2 and the clamping plate 22 are respectively located on both sides of the support beam 9, completing the initial positioning of the device. Then, the drive rod 25 is rotated to drive the nut 24 to rotate on the screw 23, pushing the clamping plate 22 to move towards the connecting part 21 until the clamping plate 22 and the connecting part 21 tightly clamp the support beam 9, and the two fixed brackets 2 are installed to complete the fixing of the cage. The third bracket 5 is pulled down to rotate it around the second bracket 4 to a position that is vertically opposite to the first bracket 3. Then, the four inclined support rods 7 are fixed to the upper end of the third bracket 5 by connecting bolts, completing the unfolding of the cage body 1. Construction personnel can stand on the bearing panel 8 to work. During the operation, the triangular support structure of the cage body 1 ensures the stability of the structure. After the operation is completed, the clamping of the support beam 9 by the fixed bracket 2 is removed, which is convenient for disassembly.
[0021] It should be noted that all directional indicators (such as up, down, left, right, front, back, etc.) in this utility model embodiment are only used to explain the relative positional relationship and movement of each component in a certain specific posture (as shown in the figure). If the specific posture changes, the directional indicator will also change accordingly.
[0022] Furthermore, in this utility model, the use of terms such as "first," "second," etc., is for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this utility model, "multiple" means at least two, such as two, three, etc., unless otherwise explicitly and specifically defined.
[0023] In this utility model, unless otherwise explicitly specified and limited, the terms "connection," "fixing," etc., should be interpreted broadly. For example, "fixing" can mean a fixed connection, a detachable connection, or an integral part; it can mean a mechanical connection or an electrical connection; it can mean a direct connection or an indirect connection through an intermediate medium; it can mean the internal communication of two components or the interaction between two components, unless otherwise explicitly limited. Those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.
[0024] Furthermore, the technical solutions of the various embodiments of this utility model can be combined with each other, but only if they are based on the ability of those skilled in the art to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such combination of technical solutions does not exist and is not within the scope of protection claimed by this utility model.
Claims
1. A foldable hoisting cage for steel structure installation, comprising a cage body (1) and a fixing bracket (2), characterized in that: The main body (1) of the cage includes a first support (3), the upper end of the first support (3) is connected to a fixed support (2), the lower end of the first support (3) is rotatably provided with a second support (4), the front end of the second support (4) is rotatably provided with a third support (5), the third support (5) and the first support (3) are arranged vertically relative to each other, and multiple connecting rods (6) are hinged between the third support (5) and the first support (3). The upper sides of the third bracket (5) are respectively equipped with two inclined support rods (7). The ends of the two inclined support rods (7) are respectively hinged to the upper and lower ends of the first bracket (3). When folding, remove the connecting bolts between the upper end of the third bracket (5) and the inclined support rods (7), and lift the third bracket (5) to complete the folding.
2. The foldable hoisting cage for steel structure installation according to claim 1, characterized in that: The upper side of the second bracket (4) is fixedly provided with a bearing panel (8).
3. The foldable hoisting cage for steel structure installation according to claim 1, characterized in that: The first support (3) includes two vertically arranged first vertical beams (31), which are connected by a plurality of first horizontal beams (32).
4. The foldable cage for steel structure installation according to claim 1, characterized in that: The third support (5) includes two vertically arranged second vertical beams (51), which are connected by a plurality of second horizontal beams (52).
5. The foldable cage for steel structure installation according to claim 3, characterized in that: The fixed bracket (2) includes a connecting part (21) fixedly connected to the first vertical beam (31). A screw (23) is fixedly connected to the connecting part (21). A clamp (22) is sleeved on the screw (23). A protrusion extending towards the connecting part (21) is provided at the bottom of the clamp (22). The space between the clamp (22) and the connecting part (21) is used to clamp the support beam (9) on the top of the factory building.
6. The foldable cage for steel structure installation according to claim 5, characterized in that: A nut (24) is threaded onto the screw (23) on the side of the clamp (22), and a drive rod (25) is fixedly connected to the outside of the nut (24).