Building basket for house building project
By introducing a sliding entrance fence, adjustable rods, and a safety net insert structure into the building scaffold, the problems of inconvenient height adjustment of the enclosure structure and lack of safety nets are solved, thereby improving the flexibility and safety of the scaffold.
Patent Information
- Application Number
- CN202522527829.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-28
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-11-28
AI Technical Summary
Existing suspended platforms in building construction projects suffer from problems such as inconvenience in adjusting the height of the enclosure structure, lack of personnel access points and safety nets, resulting in insufficient operational convenience and low safety.
A construction suspended platform was designed, which adopts a sliding entrance fence, an adjustable adjustment rod and a safety net insertion structure to achieve flexible height adjustment and convenient assembly and disassembly, thereby enhancing safety and stability.
It improves the flexibility and safety of suspended platforms, simplifies the assembly and disassembly process, and enhances construction efficiency and safety.
Smart Images

Figure CN225014580U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of suspended platform technology, and in particular to a building suspended platform for building construction projects. Background Technology
[0002] In high-altitude operations during building construction, suspended scaffolds are crucial equipment for ensuring the safety of construction workers and maximizing work efficiency. However, existing products suffer from numerous technical shortcomings: the protective structure is mostly a fixed design, unable to be flexibly adjusted according to personnel access and material transportation needs, resulting in insufficient operational convenience; the height adjustment mechanism has poor locking stability, insufficient accuracy when adapting to different floor heights, and the stability of the frame is easily affected after adjustment; the installation of the protective net relies on complex methods such as bolts and binding, resulting in low disassembly and assembly efficiency, and the large gap between the net and the crossbar makes it difficult to prevent small parts from falling; the entrance fence mostly uses simple pin locking, which is prone to loosening and accidental unlocking under high-altitude vibration, posing a significant safety risk. These defects not only restrict construction efficiency but also threaten the lives of workers. Therefore, there is an urgent need to develop a construction suspended scaffold with flexible protection, adjustable height, reliable locking, and comprehensive protection to meet the high-quality construction needs of building construction projects.
[0003] The existing patent document CN219826073U discloses a construction scaffold for building construction projects, including a scaffold body. A connecting rod is fixedly connected to one side of the scaffold body. A placement mechanism is movably connected inside the connecting rod. The placement mechanism includes a placement box. A fixing rod is fixedly connected to the rear side of the placement box. A retaining plate is movably connected inside the fixing rod. A movable groove is opened inside the connecting rod. The movable groove is used in conjunction with the fixing rod and the retaining plate.
[0004] However, due to the lack of flexible height control measures and convenient access points in actual use, workers need to repeatedly climb over railings to enter and exit the suspended platform, which is not only inconvenient but also unsafe. Furthermore, the platform lacks protective netting and enclosure panels, increasing the risk of construction equipment falling from a height and posing unforeseen dangers. Therefore, we propose a construction suspended platform for building engineering, which solves the problems of inconvenient height control of the enclosure structure, lack of personnel access points and protective netting, and improves the ease of use and safety of the suspended platform. Utility Model Content
[0005] The purpose of this utility model is to provide a construction scaffold for building construction projects, which solves the problems of inconvenient height adjustment of the enclosure structure, lack of personnel entrances and exits, and lack of protective netting in existing devices.
[0006] To achieve the above objectives, this utility model provides a building scaffold for building construction, including a support plate. Four uprights are fixedly welded to the four corners of the top surface of the support plate. Four adjusting rods are installed vertically inside the four uprights. Surrounding rods are fixedly welded to the adjacent sides of the four adjusting rods. It also includes an entrance fence, which is installed between two uprights on the top surface of one end of the support plate and is slidably connected to the two uprights.
[0007] It also includes two sets of enclosure components, each set of enclosure components including three horizontal bars, which are fixedly welded between four vertical bars and form an enclosure structure with the entrance fence.
[0008] Two sets of enclosure components are evenly fixed vertically to the side wall of the upright, and a triangular reinforcing rod is fixedly welded between the two sets of enclosure components. A strip-shaped installation groove is opened inside the crossbar, and a protective net is inserted inside the strip-shaped installation groove.
[0009] The entrance fence includes a top rod, a bottom rod, and several connecting rods. The connecting rods are fixedly welded between the top rod and the bottom rod. Sliding blocks are fixedly installed at both ends of the bottom rod. A sliding groove is opened on the side of the upright that connects to the entrance fence. The sliding blocks slide up and down along the sliding groove.
[0010] Among them, the upper ends of the two uprights connected by the entrance fence are welded with limit rods on adjacent sides, and the limit rods have limit grooves inside. The upper end of the entrance fence passes through the limit grooves and slides up and down along the limit grooves. There are two sliding blocks, one of which has a threaded hole. The upper and lower ends of the upright connected to the sliding block have fixing holes with the same specifications as the threaded hole, and fixing bolts are provided in the fixing holes.
[0011] The adjusting rod has an adjusting hole on one side, the upper end of the upright is equipped with an adjusting bolt matching the adjusting hole, and the top edge of the support plate is surrounded by a surrounding plate welded on.
[0012] This utility model discloses a construction scaffold for building construction projects. By installing an entrance fence that can be slidably opened and closed at one end of the scaffold, and equipping it with fixing bolts, limit rods and sliding blocks, it facilitates workers to enter and exit the scaffold while ensuring the safety of the scaffold's enclosure structure.
[0013] By installing four adjustable rods in the four columns, welding a retaining rod between the rods, and opening an adjustment hole on one side of the rod, and installing an adjustment bolt at the top of the column, the height of the enclosure structure can be flexibly adjusted according to the height of the workers or construction tools, thereby improving the flexibility and safety of the use of the suspended platform.
[0014] The strip-shaped installation slots on the crossbars provide a convenient installation channel for the protective netting. The netting is directly inserted into the slots without the need for additional fasteners. Combined with the enclosure, this not only ensures the protective integrity of the suspended platform and effectively prevents small tools and parts from falling, but also simplifies the assembly and disassembly process and improves work efficiency. Attached Figure Description
[0015] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the accompanying drawings used in the description of the embodiments or the prior art will be briefly introduced below.
[0016] Figure 1 This is a schematic diagram of the overall structure of this utility model; Figure 2 This is a partial structural diagram of the present invention. Figure 1 ; Figure 3 This is a partial structural diagram of the present invention. Figure 2 ; Figure 4 This is a schematic diagram of the entrance fence structure of this utility model.
[0017] In the diagram: 1. Support plate; 2. Upright pole; 3. Adjusting rod; 4. Enclosure bar; 5. Entrance fence; 6. Enclosure assembly; 7. Horizontal bar; 8. Triangular reinforcing bar; 9. Strip mounting groove; 10. Protective net; 11. Top rod; 12. Bottom rod; 13. Connecting rod; 14. Sliding block; 15. Sliding groove; 16. Limiting rod; 17. Limiting groove; 18. Threaded hole; 19. Fixing hole; 20. Fixing bolt; 21. Adjusting hole; 22. Adjusting bolt; 23. Enclosure panel. Detailed Implementation
[0018] The embodiments of the present invention are described in detail below. Examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain the present invention, but should not be construed as limiting the present invention.
[0019] The first embodiment of this application is as follows: Please see Figure 1 - Figure 3This embodiment of a building construction scaffold includes a support plate 1. Four uprights 2 are fixedly welded to the four corners of the top surface of the support plate 1. Four adjusting rods 3 are movably installed inside the four uprights 2. Enclosure rods 4 are fixedly welded to the adjacent sides of the four adjusting rods 3. Two sets of enclosure components 6 are included, each set including three horizontal bars 7. The three horizontal bars 7 are fixedly welded between the four uprights 2 and form an enclosure structure with the entrance fence 5. The two sets of enclosure components 6 are evenly fixed vertically to the side walls of the uprights 2. Triangular reinforcing rods 8 are fixedly welded between the two sets of enclosure components 6. A strip-shaped installation groove 9 is opened inside the horizontal bar 7. A protective net 10 is inserted into the strip-shaped installation groove 9. An adjusting hole 21 is opened on one side of the adjusting rod 3. An adjusting bolt 22 matching the adjusting hole 21 is installed at the upper end of the upright 2. Enclosure plates 23 are welded to the top edge of the support plate 1.
[0020] Through the above scheme, the support plate 1 serves as the core load-bearing foundation, and the enclosure 23 prevents materials from sliding down from the bottom. The upright 2 and the adjusting rod 3 cooperate through the adjusting hole 21 and the adjusting bolt 22. Loosening the bolt allows the height of the adjusting rod 3 to be adjusted up and down. After adjusting to the operational needs, tightening it to fix it is also possible. The enclosure 4 simultaneously forms a protective height, thus facilitating the use of workers of different heights. The horizontal bars 7 of the two sets of enclosure components 6 are combined with the entrance fence 5 to form a safe maintenance structure. Among them, the triangular reinforcing bar 8 enhances the structural stability of the suspended platform, and the protective net 10 inserted into the strip mounting groove 9 inside the horizontal bar 7 can prevent personnel or small parts from falling. The whole system achieves safe high-altitude operations through the coordinated operation of all components.
[0021] The second embodiment of this application is as follows: Please see Figure 1 - Figure 4 Based on the first embodiment, this embodiment of a building construction scaffold also includes an entrance fence 5. The entrance fence 5 is installed between two uprights 2 on the top surface of one end of the support plate 1 and is slidably connected to the two uprights 2. The entrance fence 5 includes a top rod 11, a bottom rod 12 and several connecting rods 13. The connecting rods 13 are fixedly welded between the top rod 11 and the bottom rod 12. Sliding blocks 14 are fixedly provided at both ends of the bottom rod 12. A sliding groove 15 is provided on the side of the upright 2 that is connected to the entrance fence 5, and the sliding blocks 14 are slidably connected up and down along the sliding groove 15. Limiting rods 16 are welded to the upper adjacent sides of the two uprights 2 connected to the entrance fence 5. Limiting rods 16 have limiting grooves 17 inside. The upper end of the entrance fence 5 passes through the limiting grooves 17 and slides up and down along the limiting grooves 17. There are two sliding blocks 14. One of the sliding blocks 14 has a threaded hole 18. The upper and lower ends of the upright connected to the sliding block 14 have fixing holes 19 with the same specifications as the threaded hole 18. Fixing bolts 20 are provided in the fixing holes 19.
[0022] Through the above scheme, with the support plate 1 as the core load-bearing foundation, the enclosure 23 can effectively prevent the work materials from slipping. The upright 2 and the adjusting rod 3 cooperate through the adjusting hole 21 and the adjusting bolt 22. Loosening the bolt allows the height of the adjusting rod 3 to be adjusted up and down. After adapting to the work requirements, tightening it to fix it, and the enclosure 4 simultaneously forms the corresponding protective height. The entrance fence 5 slides up and down along the sliding groove 15 of the upright 2 through the sliding blocks 14 at both ends of the bottom rod 12. The top rod 11 passes through the limiting groove 17 of the limiting rod 16 to maintain sliding stability. The opening and closing state is fixed by the threaded hole 18, the fixing hole 19 and the fixing bolt 20. This structure allows workers to easily open and close the entrance fence 5 to enter and exit the suspended basket. In addition, the horizontal bar 7 of the enclosure component 6 encloses the entrance fence 5, the triangular reinforcing rod 8 enhances the overall stability of the structure, and the protective net 10 is inserted through the strip installation groove 9 to prevent fall. It is not only easy to install and remove, but also further ensures the safety of high-altitude operations.
[0023] Working principle: In use, the support plate 1 serves as the main support for personnel and materials, while the top edge of the enclosure 23 prevents materials from slipping. The four welded uprights 2 at the four corners and the two sets of enclosure components 6 form the core support structure of the overall frame. Through the vertical connection between the adjusting rod 3 and the upright 2, workers can loosen the adjusting bolt 22 at the upper end of the upright 2 and slide the adjusting rod 3 vertically along the upright 2 to the required height. Then, the adjusting bolt 22 is screwed into the adjusting hole 21 at the corresponding position of the adjusting rod 3 to lock the adjusting rod 3, ensuring that the protection height matches the construction floor height. At the same time, the enclosure 4 on the adjacent side of the adjusting rod 3 further enhances the lateral protection strength. Two sets of enclosure components 6 are evenly distributed vertically along the uprights 2. Each set has three horizontal bars 7 welded between the four uprights 2, forming a closed protective space together with the entrance fence 5. The strip-shaped mounting grooves 9 inside the horizontal bars 7 provide a convenient installation channel for the protective net 10. The protective net 10 is directly inserted into the groove without additional fasteners, ensuring the integrity of the protection, effectively preventing small tools and parts from falling, and simplifying the disassembly and assembly process, thus improving work efficiency. In addition, the triangular reinforcing bars 8 between the two sets of enclosure components 6 utilize the principle of triangular stability to enhance the overall frame's resistance to deformation, preventing structural loosening caused by vibrations during high-altitude operations. The entrance fence 5 serves as a passage for personnel and material transport. It slides up and down via the cooperation of sliding blocks 14 at both ends of the base rod 12 and sliding grooves 15 on the upright rod 2. To open, unscrew the fixing bolts 20 corresponding to the threaded holes 18 and sliding blocks 14, push the entrance fence 5 upwards. The sliding blocks 14 move upwards along the sliding grooves 15, and the top rod 11 slides synchronously along the limiting grooves 17 of the limiting rod 16 until fully open. To close, move the entrance fence 5 downwards so that the threaded holes 18 of the sliding blocks 14 align with the fixing holes 19 at the lower end of the upright rod 2. Tighten the fixing bolts 20 to lock it in place. If temporary locking of the open state is required, the sliding blocks 14 can be moved upwards to the position of the fixing holes 19 at the upper end of the upright rod 2. The cooperation between the limiting rod 16 and the limiting grooves 17 ensures the stability of the entrance fence 5 during sliding, preventing it from shifting or falling off. Throughout the entire operation, all components work together to meet the safety and flexibility requirements of high-altitude operations in building construction projects.
[0024] The above-disclosed embodiments are merely one or more preferred embodiments of this application and should not be construed as limiting the scope of this application. Those skilled in the art can understand that all or part of the processes for implementing the above embodiments and equivalent changes made in accordance with the claims of this application still fall within the scope of this application.
Claims
1. A construction scaffold for building construction, comprising a support plate (1), characterized in that: The support plate (1) has four uprights (2) fixedly welded to the four corners of its top surface. The four uprights (2) have four adjusting rods (3) installed inside them, which move up and down. The four adjusting rods (3) have surrounding rods (4) fixedly welded to adjacent sides. It also includes an entrance fence (5), which is installed between two uprights (2) on the top surface of one end of the support plate (1) and is slidably connected to the two uprights (2) in a vertical manner.
2. A construction scaffold for building construction as described in claim 1, characterized in that: It also includes two sets of enclosure components (6), each set of enclosure components (6) includes three crossbars (7), the three crossbars (7) are fixedly welded between four uprights (2) and form an enclosure structure with the entrance fence (5).
3. A construction scaffold for building construction as described in claim 2, characterized in that: The two sets of enclosure components (6) are evenly fixed vertically on the side wall of the upright (2). A triangular reinforcing rod (8) is fixedly welded between the two sets of enclosure components (6). A strip-shaped installation groove (9) is opened inside the crossbar (7). A protective net (10) is inserted inside the strip-shaped installation groove (9).
4. A construction scaffold for building construction as described in claim 1, characterized in that: The entrance fence (5) includes a top rod (11), a bottom rod (12) and several connecting rods (13). The connecting rods (13) are fixedly welded between the top rod (11) and the bottom rod (12). Sliding blocks (14) are fixedly provided at both ends of the bottom rod (12). A sliding groove (15) is provided on the side of the upright (2) that is connected to the entrance fence (5). The sliding blocks (14) slide up and down along the sliding groove (15).
5. A construction scaffold for building construction as described in claim 4, characterized in that: The upper ends of the two uprights (2) connected to the entrance fence (5) are welded with limit rods (16) on adjacent sides. The limit rods (16) have limit grooves (17) inside. The upper end of the entrance fence (5) passes through the limit grooves (17) and slides up and down along the limit grooves (17). There are two sliding blocks (14). One of the sliding blocks (14) has a threaded hole (18). The upper and lower ends of the upright connected to the sliding block (14) have fixing holes (19) with the same specifications as the threaded hole (18). The fixing holes (19) are equipped with fixing bolts (20).
6. A construction scaffold for building construction as described in claim 1, characterized in that: An adjustment hole (21) is provided on one side of the adjustment rod (3), and an adjustment bolt (22) matching the adjustment hole (21) is installed on the upper end of the upright (2). A surrounding plate (23) is welded around the top edge of the support plate (1).
Citation Information
Patent Citations
Building hanging basket for house building project
CN219826073U