A construction engineering building climbing frame convenient to disassemble
By using a quick-release unit design, combined with the sliding cooperation of the mobile safety net and the chute, the building climbing formwork can efficiently avoid obstacles in the fire corridor, simplifying the operation steps and reducing safety risks.
Patent Information
- Application Number
- CN202522734528.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-24
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-24
AI Technical Summary
When the existing building climbing scaffold ascends to the fire-fighting corridor, the protective netting and walkway panels need to be disassembled and installed separately, which increases the operation steps and safety risks.
The quick-release unit design, combined with the sliding cooperation between the movable protective net and the chute, and the linkage structure between the movable walkway and the fixed walkway, enables the dismantling and installation of the avoidance section frame without the need for separate dismantling and assembly of the protective net and walkway.
It simplifies the operation steps, improves the efficiency of obstacle avoidance construction, and reduces the safety risks of high-altitude dismantling and assembly operations.
Smart Images

Figure CN225014582U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of climbing formwork technology, specifically relating to a construction climbing formwork that is easy to assemble and disassemble. Background Technology
[0002] Climbing scaffolding is a commonly used safety device in high-rise building construction. It can rise synchronously with the construction progress of the main building, providing a safe working platform for construction workers. In actual construction, some buildings will have fire escape corridors. When the climbing scaffolding reaches the location of the fire escape corridor, it needs to avoid the corridor before it can continue to climb. In existing technologies, the protective netting and walkway panels of existing climbing scaffolding are mostly fixedly connected to the scaffolding structure. When dismantling the section of the scaffolding that needs to be avoided, the protective netting and walkway panels need to be dismantled and installed separately, which further increases the operation steps and safety risks. Therefore, there is an urgent need for a building climbing scaffolding that is simple in structure, efficient in dismantling and assembly, highly safe, and adaptable to avoidance requirements. Utility Model Content
[0003] In view of the above-mentioned shortcomings in the existing technology, the present invention provides a construction climbing formwork that is easy to assemble and disassemble, so as to solve the problems in the background technology.
[0004] To solve the above-mentioned technical problems, the present invention adopts the following technical solution: A construction climbing scaffold that is easy to assemble and disassemble includes a quick-release unit. The quick-release unit includes a first column, the front end of which is connected to the bottom end of a horizontal column. The top end of the horizontal column is connected to one side of a second column. The other side of the second column is connected to a fixed protective net. A support rod is hinged to one side of the horizontal column. A sliding groove is provided on the inner side of the second column. The sliding groove is connected to a movable protective net. The horizontal column is connected to a fixed guide plate. The fixed guide plate is connected to a movable guide plate.
[0005] Furthermore, a first pin hole is provided at the other end of the support rod, and the support rod includes a first support rod and a second support rod, with one side of the upper surface of the first support rod connected to the guide rail.
[0006] Furthermore, the quick-release unit includes a main unit and a sub-unit, the first pin hole is connected to the sub-unit, and the sub-unit is provided with a second slide groove corresponding to the slide groove.
[0007] Furthermore, the bottom left end of the mobile protective net is connected to a U-shaped pin, the inner side of the U-shaped pin is hinged to a guide wheel, and the guide wheel is rotatably connected to the guide rail.
[0008] Furthermore, the second column includes a left column and a right column. The left column has a first sliding groove running through its upper and lower ends, and the first sliding groove is symmetrically arranged on the right column along the center of the fixed protective net.
[0009] Furthermore, the upper and lower ends of the movable protective net are connected to the slider, the slider is slidably connected to the slide groove, and the left side of the slider is connected to the second pin hole.
[0010] Furthermore, the sub-unit is provided with a socket corresponding to the second pin hole.
[0011] Furthermore, the lower surface of the first support rod is in contact with the upper surface of the second support rod, and the movable track plate is snapped together with the top of the support rod at the hinge position.
[0012] Compared with the prior art, this utility model has the following advantages: This utility model, through the design of quick-release units, combined with the sliding cooperation of the movable protective net and the chute, and the linkage structure of the movable walkway and the fixed walkway, can complete the dismantling and installation of the avoidance section frame without separately dismantling and installing the protective net and the walkway, simplifying the operation steps and improving the avoidance construction efficiency of the climbing frame in locations such as fire corridors. The mobile safety net uses a precise combination of sliders and grooves, along with U-shaped pins and guide wheels for positioning. The mobile walkway and support rods are connected by snap-fit, ensuring the stability of the connection between the safety net and the walkway during disassembly and assembly. This effectively reduces the risk of parts falling off and lowers the safety risks for construction workers during high-altitude disassembly and assembly operations. Attached Figure Description
[0013] Figure 1 This is a three-dimensional structural diagram of an embodiment of a building climbing scaffold that is easy to assemble and disassemble (viewpoint 1). Figure 2 This is a three-dimensional structural diagram (view 2) of an embodiment of a building climbing scaffold that is easy to assemble and disassemble in a building engineering project according to the present invention. Figure 3 This is a three-dimensional structural diagram of the folded state of an embodiment of a building climbing scaffold that is easy to assemble and disassemble in a building engineering project according to the present invention; Figure 4 for Figure 2 A magnified view of a section at point A in the middle; The reference numerals in the accompanying drawings include: Quick-release unit (1), support rod (3), slide groove (4), movable guard net (5), movable walkway (6), first pin hole (7), guide rail (8), slider (9), U-shaped pin (10), guide wheel (11), second pin hole (12), socket (13), first column (101), horizontal column (102), second column (103), fixed guard net (104), fixed walkway (105), left column (113), right column (123), main unit (201), sub-unit (202), first support rod (301), second support rod (302), first slide groove (401), second slide groove (402). Detailed Implementation
[0014] To enable those skilled in the art to better understand this utility model, the technical solution of this utility model will be further described below in conjunction with the accompanying drawings and embodiments.
[0015] The accompanying drawings are for illustrative purposes only and are schematic diagrams, not actual images. They should not be construed as limiting the scope of this application. To better illustrate the embodiments of this utility model, some components in the drawings may be omitted, enlarged, or reduced, and do not represent the actual product dimensions. It is understandable to those skilled in the art that some well-known structures and their descriptions may be omitted in the drawings.
[0016] In the accompanying drawings of this utility model, the same or similar reference numerals correspond to the same or similar components. In the description of this utility model, it should be understood that if terms such as "upper," "lower," "left," "right," "inner," and "outer" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, they are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, the terms used to describe positional relationships in the drawings are only for illustrative purposes and should not be construed as limiting this application. For those skilled in the art, the specific meaning of the above terms can be understood according to the specific circumstances.
[0017] In the description of this utility model, unless otherwise explicitly specified and limited, the term "connection" or similar designation indicating the connection relationship between components should be interpreted broadly. For example, it can refer to a fixed connection, a detachable connection, or an integral part; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances. Example 1:
[0018] like Figure 1-4 As shown, this utility model discloses a construction climbing scaffold that is easy to assemble and disassemble. Specifically, it includes a quick-release unit 1, which includes a first column 101. The front end of the first column 101 is connected to the bottom end of a horizontal column 102, and the top end of the horizontal column 102 is connected to one side of a second column 103. The other side of the second column 103 is connected to a fixed protective net 104. The first column 101 is used to fix and move the entire climbing scaffold, and the horizontal column 102 is used to support the load of the climbing scaffold.
[0019] The horizontal column 102 on one side is hinged to the support rod 3. A sliding groove 4 is provided on the inner side of the second column 103, and the sliding groove 4 connects to the movable safety net 5. The support rod 3 is a support structure that enables connection and deployment between units. The cooperation between the sliding groove 4 and the movable safety net 5 allows for rapid deployment and retraction of the safety net. The horizontal column 102 is connected to the fixed walkway 105, and the fixed walkway 105 is connected to the movable walkway 6. The fixed walkway 105 and the movable walkway 6 form an expandable working platform to meet different span requirements.
[0020] The other end of the support rod 3 is provided with a pin hole 7. The support rod 3 includes a first support rod 301 and a second support rod 302. One side of the upper surface of the first support rod 301 is connected to the guide rail 8. The pin hole 7 is an interface for fixed connection, and the guide rail 8 provides a sliding track for the movable protective net 5. The quick-release unit 1 includes a main unit 201 and a sub-unit 202. The first pin hole 7 is connected to the sub-unit 202, and the sub-unit 202 is provided with a second sliding groove 402 corresponding to the sliding groove 4. The design of the main unit 201 and the sub-unit 202 facilitates combination according to different avoidance requirements. The bottom left side of the movable protective net 5 is connected to a U-shaped pin 10. The inner side of the U-shaped pin 10 is hinged to a guide wheel 11, and the guide wheel 11 is rolledly connected to the guide rail 8. The U-shaped pin 10 and the guide wheel 11 constitute the guiding and limiting mechanism of the movable protective net 5, ensuring smooth sliding. The second column 103 includes a left column 113 and a right column 123. The left column 113 has a first sliding groove 401 extending through its upper and lower ends. The first sliding groove 401 is symmetrically arranged on the right column 123 along the center of the fixed protective net 104. This symmetrical sliding groove design ensures balanced force distribution on the movable protective net 5. The upper and lower ends of the movable protective net 5 are connected to a slider 9, which is slidably connected to the sliding groove 401. The left side of the slider 9 is connected to a second pin hole 12. The slider 9 and the guide wheel 11 enable precise sliding of the movable protective net 5. The sub-unit 202 has a socket 13 corresponding to the second pin hole 12. The socket 13 enables quick docking between units. The lower surface of the first support rod 301 is in contact with the upper surface of the second support rod 302. The movable guide plate 6 is snap-fitted to the top of the hinged position of the support rod 3. This in-place design ensures support stability, and the snap-fit connection enables quick fixing of the guide plate.
[0021] When using this utility model: During installation, the main unit 201 is fixed to the building structure via the first column 101. The support rod 3 is unfolded and connected to the secondary unit 202 via the pin hole 7. The movable protective net 5 is slidably moved along the sliding groove 4 via the slider 9, and the guide wheel 11 of the U-shaped pin 10 is engaged with the guide rail 8. The movable protective net 5 is pushed along the sliding groove 4 to a predetermined position, aligning the second pin hole 12 with the socket 13 and securing it with the pin. The movable guide plate 6 is unfolded, aligning with the fixed guide plate 105 and locking it with a snap-fit mechanism.
[0022] During the dismantling process, when the climbing scaffold needs to avoid the fire escape corridor, open the buckle of the movable walkway 6 and fold it. Pull out the pin of the movable safety net 5, push the movable safety net 5 to slide and retract along the slide groove 4 towards the fixed safety net 104, remove the connecting pin between the support rod 3 and the sub-unit 202, and the entire avoidance section unit can be quickly dismantled.
[0023] After the obstacle avoidance is completed, reinstall the support rod 3, push out the movable safety net 5 and fix it with the pin, unfold the movable walkway 6 and lock it in place, and the full climbing frame function can be restored.
[0024] The above are merely embodiments of this utility model. The circuits, electronic components, and modules involved are all prior art, fully achievable by those skilled in the art, and require no further explanation. The content protected by this application does not involve improvements to the software and methods. Commonly known structures and characteristics in the solution are not described in detail here. Those skilled in the art are aware of all common technical knowledge in the field prior to the application date or priority date, are able to access all existing technologies in that field, and possess the ability to apply conventional experimental methods prior to that date. Those skilled in the art can, under the guidance of this application, improve and implement this solution in conjunction with their own capabilities. Some typical known structures or methods should not be obstacles for those skilled in the art to implement this application. It should be noted that those skilled in the art can make several modifications and improvements without departing from the structure of this utility model. These should also be considered within the scope of protection of this utility model, and will not affect the effectiveness of the implementation of this utility model or the practicality of the application.
Claims
1. A climbing formwork for building construction that is easy to assemble and disassemble, characterized in that: The system includes a quick-release unit (1), which includes a first column (101). The front end of the first column (101) is connected to the bottom end of a horizontal column (102). The top end of the horizontal column (102) is connected to one side of a second column (103). The other side of the second column (103) is connected to a fixed protective net (104). The horizontal column (102) on one side is hinged to a support rod (3). A sliding groove (4) is provided on the inner side of the second column (103). The sliding groove (4) is connected to a movable protective net (5). The horizontal column (102) is connected to a fixed walkway (105). The fixed walkway (105) is connected to a movable walkway (6).
2. The easily assembled and disassembled climbing formwork for building construction as described in claim 1, characterized in that: The other end of the support rod (3) is provided with a first pin hole (7). The support rod (3) includes a first support rod (301) and a second support rod (302). One side of the upper surface of the first support rod (301) is connected to the guide rail (8).
3. The easily assembled and disassembled climbing formwork for building construction as described in claim 2, characterized in that: The quick-release unit (1) includes a main unit (201) and a sub-unit (202). The first pin hole (7) is connected to the sub-unit (202). The sub-unit (202) is provided with a second slide groove (402) corresponding to the slide groove (4).
4. The easily assembled and disassembled climbing formwork for building construction as described in claim 2, characterized in that: The bottom left end of the mobile protective net (5) is connected to the U-shaped pin (10), the inner side of the U-shaped pin (10) is hinged to the guide wheel (11), and the guide wheel (11) is rolledly connected to the guide rail (8).
5. The easily assembled and disassembled climbing formwork for building construction as described in claim 3, characterized in that: The second column (103) includes a left column (113) and a right column (123). The left column (113) has a first sliding groove (401) running through its upper and lower ends. The first sliding groove (401) is symmetrically arranged on the right column (123) along the center of the fixed protective net (104).
6. The easily assembled and disassembled climbing formwork for building construction as described in claim 3, characterized in that: The upper and lower ends of the mobile protective net (5) are connected to the slider (9), the slider (9) is slidably connected to the slide groove (4), and the left side of the slider (9) is connected to the second pin hole (12).
7. The easily assembled and disassembled climbing formwork for building construction as described in claim 6, characterized in that: The sub-unit (202) is provided with a socket (13) corresponding to the second pin hole (12).
8. The easily assembled and disassembled climbing formwork for building construction as described in claim 5, characterized in that: The lower surface of the first support rod (301) is in contact with the upper surface of the second support rod (302), and the movable track plate (6) is snapped to the top of the hinge position of the support rod (3).