A sliding mechanism for an assembled operation platform of a steel plate composite beam

By designing a sliding mechanism for the prefabricated operating platform, the sliding and lifting of the operating platform are achieved using support beams, fixed seats, and drive components. This solves the problem of inconvenient movement of traditional operating platforms and improves safety and efficiency during construction and maintenance.

CN225014585UActive Publication Date: 2026-11-24URBAN RAIL TRANSIT PROJECT CO LTD CHINA RAILWAY BEIJING ENG GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522800168.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-30
Publication Date
2026-11-24
Estimated Expiration
2035-12-30

AI Technical Summary

Technical Problem

Traditional operating platforms are inconvenient to move and have low stability during the construction and maintenance of steel plate composite beams, making it difficult to safely and conveniently access various parts of the beam.

Method used

A sliding mechanism for a prefabricated operating platform was designed, including a support beam, a fixed base, traveling wheels, a drive motor, a winch, and an adjustment component. Through the coordinated work of these components, the sliding, lifting, and stability adjustment of the operating platform can be achieved, facilitating hoisting and assembly.

Benefits of technology

It enables convenient movement and improved stability of the operating platform, facilitating safe and convenient access to various parts of the beam during construction and maintenance, simplifying the installation and disassembly process, and improving construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225014585U_ABST
    Figure CN225014585U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of the operating platform of combined beam, especially a sliding mechanism of the fabricated operating platform for steel plate combined beam, including two support beams. The utility model has the advantages that four walking wheels, two limit wheels and drive motors are installed on four fixed seats, the end of two adjacent first square tubes is slidably installed with an adjusting assembly, the walking wheels are slidably installed on the both sides of the external combined beam, the drive motor is electrified to run, the two support beams and the operating platform advance and retreat along the length direction of the external combined beam, two winches are arranged, the steel wire rope in the middle of the winch is fixedly connected with the both ends of the operating platform, the two winches are synchronously operated, the height of the operating platform is adjusted, the segment of the external combined beam is spliced and installed by the operator, the whole structure is simple, and the problems in the prior art are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of operating platform technology for composite beams, and in particular to a sliding mechanism for an assembled operating platform for steel plate composite beams. Background Technology

[0002] Steel plate composite beams are a modern and efficient structural component. They combine steel beams with concrete bridge decks (or floor slabs) through reliable connection methods, allowing them to work together as a unified whole, fully utilizing the tensile strength of steel and the compressive strength of concrete. Without the combination, the steel beams and concrete slabs bend independently. After combination, under load, the neutral axis shifts upward, with the concrete slab primarily bearing compressive stress and the steel beams primarily bearing tensile stress. This significantly improves the flexural capacity, stiffness, and stability of the cross-section, using less steel than pure steel beams and being lighter and capable of larger spans than pure concrete beams.

[0003] During the construction (installation, welding, concrete pouring) and subsequent operation and maintenance (inspection, painting, repair) of steel plate composite beams, safe and convenient access to all parts of the beam is required. The temporary or permanent working facilities set up for this purpose are collectively referred to as operating platforms.

[0004] Steel plate composite beams are either hoisted as a whole or spliced ​​segmentally. When segmental connections are used, traditional operating platform movement methods are complex and inconvenient for installation and disassembly, while also exhibiting low stability during horizontal movement. Therefore, a sliding mechanism for an assembled operating platform for steel plate composite beams is proposed to address these issues. Utility Model Content

[0005] The purpose of this invention is to overcome the shortcomings of the prior art and provide a sliding mechanism for an assembly operation platform for steel plate composite beams, which effectively solves the deficiencies of the prior art.

[0006] To achieve the above objectives, one embodiment of the present invention provides a sliding mechanism for an assembled operating platform for steel plate composite beams, comprising two support beams, one end of which is bent outward in a figure-eight structure; Two first square tubes are fixedly connected to the middle of adjacent sides of the two support beams, and an adjustment component is slidably installed between the ends of two adjacent first square tubes. Fixed seats are installed in the middle and on one side of the top surface of the two support beams. Four traveling wheels and two limiting wheels are rotatably installed on the inner wall of the four fixed seats. A drive motor is fixedly connected to one corner of each of the four fixed seats, and its output end is fixedly connected to the traveling wheel. A winch is installed on the side of each of the two support beams away from the top surface of the fixed seat. Steel wire ropes are wound around the outside of the two winches. Two second square tubes are installed on the side of each of the two support beams away from the bottom surface of the fixed seat. An operating platform is slidably installed on the outer wall of the four second square tubes. Both ends of the operating platform are fixedly connected to the bottom end of the steel wire rope. The operating platform includes two half-frames. Two first limiting tubes are installed on one side of the bottom surface of one half-frame, and a second limiting tube that slides with the first limiting tubes is installed on one side of the bottom surface of the other half-frame.

[0007] Preferably, in any of the above embodiments, each of the four adjustment components includes a limiting block, two support tubes, eight connecting plates, and eight fasteners. The two support tubes are located at both ends of the limiting block. The eight connecting plates are respectively connected to both sides of the top surface of the limiting block, both sides of the bottom surface, and one side of the top and bottom surfaces of the first square tube. The eight fasteners are arranged in pairs, with each pair of fasteners clamping the two connecting plates. The two support tubes are respectively slidably connected to the inside of the first square tube. This embodiment facilitates the adjustment of the end positions of the four adjustment components and the four first square tubes. By loosening the fasteners and cooperating with external hoisting equipment, the distance between the two support beams can be adjusted, and the traveling wheels can be separated from the external combined beam, facilitating the overall hoisting and removal of the prefabricated operating platform using external hoisting equipment.

[0008] Preferably, the bottom ends of the four fixed seats are fixedly connected to the top surfaces of the two support beams by fasteners. Each of the four fixed seats has notches at its two corners. This design facilitates observation for the operator, allowing them to easily observe the installation of the wheels on the external composite beams during the installation of the prefabricated operating platform. The notches also allow for the positioning wheels to abut against the two sides of the bottom of the external composite beams. The fixed seats adopt a modular design, facilitating their processing and manufacturing by the operator, and enabling mass production. After processing, they can be directly fixed to the top surfaces of the support beams using fasteners.

[0009] Preferably, in any of the above solutions, two third-party tubes are installed on both sides of the top surface of the operating platform, and the four third-party tubes are slidably connected to the second square tubes respectively. This solution facilitates the limitation of the vertical sliding of the operating platform. At the same time, the top ends of two adjacent second square tubes are fixedly connected by steel plates and fixedly connected to the bottom surface of the support beam by fasteners. The slidable connection between the third-party tubes and the second square tubes further improves the stability of the operating platform during vertical sliding. In the deflected state of the operating platform, it facilitates the provision of a stable standing position for the operator to splice and install the segments of the external composite beam.

[0010] Preferably, one of the above solutions is that a guardrail is installed at the edge of the half-frame, and the open end of one of the guardrails is bent inward and misaligned. This solution facilitates the formation of a protective structure on three sides of the two half-frames, and also makes it convenient for operators to fasten their safety belts to the guardrails. An opening is designed between the adjacent ends of the two guardrails, and the open end of one of the guardrails is bent inward and misaligned. This avoids movement interference between the open ends of the two guardrails during the relative sliding phase of the two half-frames, ensuring the safety of the installation and disassembly process.

[0011] Preferably, in any of the above embodiments, a support plate is installed on the side of one of the half-frames near the top surface of the first limiting tube. The bottom surface of the support plate is in contact with the bottom surface of the other half-frame. The top surface of the support plate has multiple through slots. In this embodiment, the operating platform adopts a two-section structure. The gap at the contact point is blocked by the support plate, which facilitates the operator to walk on the operating platform. The bottom surface of the operating platform at the contact point is slidably connected by the first limiting tube and the second limiting tube to improve the strength of the contact point. At the same time, it is convenient for the operating platform to be stretched outward together with the adjustment components, which facilitates the operator to install and disassemble the prefabricated operating platform on both sides of the steel plate composite beam.

[0012] This utility model has the following advantages: 1. A sliding mechanism for an assembly operating platform for steel plate composite beams comprises two support beams and four fixed seats, each equipped with four traveling wheels, two limit wheels, and a drive motor. Adjustment components are slidably installed at the ends of two adjacent first square tubes, facilitating the sliding installation of the traveling wheels on both sides of the external composite beam. The drive motor, when energized, drives the two support beams and the operating platform to move forward and backward along the length of the external composite beam. Two winches are installed, with steel wire ropes in the middle of the winches fixedly connected to both ends of the operating platform, allowing for synchronous operation of the two winches. This facilitates height adjustment of the operating platform and allows operators to easily assemble and install segments of the external composite beam. The overall structure is simple and effectively solves the problems existing in the prior art.

[0013] 2. The sliding mechanism of the prefabricated operating platform for steel plate composite beams is provided by setting four first square tubes and four adjusting components. The support tubes in the adjusting components are located at both ends of the limiting block. The support tubes are slidably connected to the inside of the first square tubes. Each set of fasteners clamps two connecting plates. Then, each set of fasteners is loosened in turn, which facilitates the loosening of the connecting plates, so that the support tubes can slide outward along the inside of the first square tubes, so that the traveling wheels are separated from the external composite beam. At the same time, the distance between the two half-frames is increased, which makes it easier to use hoisting equipment to lift the prefabricated operating platform down. The overall structure is simple, the design is reasonable, and it is convenient to disassemble and assemble the prefabricated operating platform. Attached Figure Description

[0014] Figure 1 This is a schematic diagram of the overall installation position structure of this utility model; Figure 2 This is a schematic diagram of the overall structure of this utility model; Figure 3 This is an exploded view of the adjusting component of this utility model; Figure 4 This utility model Figure 3 Enlarged structural diagram at point A; Figure 5 This is a schematic diagram of the fixing base structure of this utility model; Figure 6 This is a schematic diagram of the operating platform structure of this utility model; Figure 7 This is an exploded structural diagram of the operating platform of this utility model.

[0015] In the diagram: 1-Support beam, 2-Fixed seat, 3-First square tube, 5-Adjusting component, 501-Limiting block, 502-Supporting tube, 503-Connecting plate, 504-Fastener, 6-Second square tube, 7-Third square tube, 8-Guardrail, 9-Supporting plate, 10-Operating platform, 11-Winder, 12-Drive motor, 13-Walking wheel, 14-Limiting wheel, 15-Second limiting tube, 16-First limiting tube. Detailed Implementation

[0016] The present invention will be further described below with reference to the accompanying drawings, but the scope of protection of the present invention is not limited to the following description.

[0017] like Figures 1 to 7 As shown, a sliding mechanism for an assembled operating platform for steel plate composite beams includes two support beams 1, one end of which is bent outward in a V-shape. The support beams 1 are welded from I-beams, and multiple stiffening plates are installed on both sides of the web of the two I-beams 1 to improve the mechanical strength of the two support beams 1.

[0018] Two first square tubes 3 are fixedly connected to the middle of adjacent sides of the two support beams 1. An adjustment component 5 is slidably installed between the ends of the two adjacent first square tubes 3. The two first square tubes 3 located on the same side are fixedly connected by steel plates, and the steel plates are fixedly connected to the middle of the two support beams 1 by fasteners, forming a modular design, which facilitates the operator to process and install them later.

[0019] Fixed seats 2 are installed in the middle and on one side of the top surface of the two support beams 1. Four traveling wheels 13 and two limiting wheels 14 are rotatably installed on the inner wall of the four fixed seats 2. A drive motor 12 is fixedly connected to one corner of each of the four fixed seats 2, and its output end is fixedly connected to the traveling wheel 13. The fixed seats 2 are made of steel plate and are formed by bending. In one fixed seat 2, the four traveling wheels 13 are installed vertically and the two limiting wheels 14 are installed horizontally, which facilitates installation on the external composite beam.

[0020] Two winches 11 are installed on the side of the two support beams 1 away from the top surface of the fixed seat 2. Steel wire ropes are wound around the outside of the two winches 11. Two second square tubes 6 are installed on the side of the two support beams 1 away from the bottom surface of the fixed seat 2. An operating platform 10 is slidably installed on the outer wall of the four second square tubes 6. Both ends of the operating platform 10 are fixedly connected to the bottom end of the steel wire rope. The operating platform 10 includes two half-frames. Two first limit tubes 16 are installed on one side of the bottom surface of one half-frame. A second limit tube 15 that slides with the first limit tube 16 is installed on one side of the bottom surface of the other half-frame. The two half-frames adopt a modular design and are welded together using square tube profiles. The middle is hollowed out to reduce the amount of material used and ensure its structural strength.

[0021] Each of the four adjustment components 5 includes a limiting block 501, two support tubes 502, eight connecting plates 503, and eight fasteners 504. The two support tubes 502 are located at both ends of the limiting block 501. The eight connecting plates 503 are respectively connected to both sides of the top surface and both sides of the bottom surface of the limiting block 501, and one side of the top and bottom surfaces of the first square tube 3. The eight fasteners 504 are in pairs, and each pair of fasteners 504 clamps the two connecting plates 503. The two support tubes 502 are respectively slidably connected to the inside of the first square tube 3. As an optional technical solution of this utility model, this makes it easy to adjust the end positions of the four adjustment components 5 and the four first square tubes 3. By loosening the fasteners 504 and cooperating with external hoisting equipment, the distance between the two support beams 1 can be adjusted, and the traveling wheels 13 can be separated from the external combined beam, making it easy to use external hoisting equipment to hoist and remove the prefabricated operating platform as a whole.

[0022] The bottom ends of the four fixed seats 2 are fixedly connected to the top surfaces of the two support beams 1 by fasteners. The two corners of the four fixed seats 2 are left with notches as an optional technical solution of this utility model. This makes it easier to provide an observation position for the operator. During the installation of the prefabricated operating platform 1, the notches make it easy to observe the installation of the traveling wheels 13 on the external combined beam and the limiting wheels 14 abutting against the two sides of the bottom end of the external combined beam. The fixed seats 2 adopt a modular design, which makes it easy for the operator to process and manufacture them and to mass-produce them. After processing, they can be directly fixedly connected to the top surface of the support beams 1 using fasteners.

[0023] Two third-party tubes 7 are installed on both sides of the top surface of the operating platform 10. The four third-party tubes 7 are slidably connected to the second square tubes 6 respectively. As an optional technical solution of this utility model, this facilitates the limitation of the vertical sliding of the operating platform 10. At the same time, the top ends of two adjacent second square tubes 6 are fixedly connected by steel plates and fixedly connected to the bottom surface of the support beam 1 by fasteners. The sliding connection between the third-party tubes 7 and the second square tubes 6 facilitates the improvement of the stability of the operating platform 10 when sliding vertically. At the same time, in the demounted state, the operating platform 10 facilitates the provision of a stable standing position for the operator to splice and install the segments of the external composite beam.

[0024] A guardrail 8 is installed at the edge of the half-frame, and the open end of one guardrail 8 is bent inward and misaligned. As an optional technical solution of this utility model, this facilitates the formation of a protective structure on three sides of the two half-frames, and also makes it convenient for operators to fasten the safety belt buckle to the guardrail 8. An opening is designed between the adjacent ends of the two guardrails 8, and the open end of one guardrail 8 is bent inward and misaligned. In this way, during the relative sliding phase of the two half-frames, the movement interference between the open ends of the two guardrails 8 is avoided, ensuring the safety of the installation and disassembly process.

[0025] A support plate 9 is installed on one half of the frame near the top surface of the first limiting tube 16. The bottom surface of the support plate 9 is in contact with the bottom surface of the other half of the frame. The top surface of the support plate 9 has multiple through slots. As an optional technical solution of this utility model, the operating platform 10 adopts a two-section structure. The gap is blocked by the support plate 9 at the contact position, which facilitates the operator to walk on the operating platform 10. The bottom surface of the contact position of the operating platform 10 is slidably connected by the first limiting tube 16 and the second limiting tube 15 to improve the strength of the contact position. At the same time, it is convenient for the operating platform 10 to be stretched outward together with the adjusting component 5, which facilitates the operator to install and disassemble the prefabricated operating platform on both sides of the steel plate composite beam.

[0026] The sliding mechanism of this prefabricated operating platform for steel plate composite beams requires the following steps when in use: 1) When in use, install the prefabricated operating platform on the external composite beam, tighten the multiple fasteners 504, and make the limit wheels 14 contact the two sides of the bottom end of the external composite beam; 2) The four drive motors 12 operate synchronously, driving the two support beams 1 and the operating platform 10 to move forward along the outer composite beam, and moving the operating platform 10 to the splicing position of the outer composite beam; 3) The two winches 11 are powered on and run to rotate and wind the wire rope, which drives the operating platform 10 to rise vertically along the outer wall of the second square tube 6. The height of the operating platform 10 is adjusted to facilitate the operator to splice the external composite beam on the operating platform 10.

[0027] In summary, during operation, the system utilizes two support beams 1 and four fixed seats 2, each equipped with four traveling wheels 13, two limit wheels 14, and a drive motor 12. Adjustment components 5 are slidably mounted on the ends of adjacent first square tubes 3, facilitating the sliding installation of the traveling wheels 13 on both sides of the external composite beam. The drive motor 12, when energized, drives the two support beams 1 and the operating platform to move forward and backward along the length of the external composite beam. Two winches 11 are installed, with steel cables in the middle of each winch fixedly connected to both ends of the operating platform 10. Synchronous operation of the two winches 11 facilitates height adjustment of the operating platform 10, allowing operators to easily assemble segments of the external composite beam. The assembly is simple in structure and effectively solves the problems existing in the prior art. By setting four first square tubes 3 and four adjusting components 5, the support tubes 502 in the adjusting components 5 are located at both ends of the limiting blocks 501. The support tubes 502 are slidably connected to the inside of the first square tubes 3. Each set of fasteners 504 clamps the two connecting plates 503. Then, each set of fasteners 504 is loosened in turn, which makes it easy to loosen the connecting plates 503, so that the support tubes 502 can slide outward along the inside of the first square tubes 3, so that the traveling wheels 13 are separated from the external combined beam. At the same time, the distance between the two half frames is increased, which makes it easier to use hoisting equipment to lift the prefabricated operating platform down. The overall structure is simple and reasonable in design, and it is convenient to disassemble and assemble the prefabricated operating platform.

[0028] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A skid mechanism for an assembly platform for a steel plate composite beam, characterized by: It includes two supporting beams (1), one end of which is bent outward in a V-shape; Two first square tubes (3) are fixedly connected to the middle of the adjacent sides of the two support beams (1), and an adjustment component (5) is slidably installed between the ends of the two adjacent first square tubes (3). Fixed seats (2) are installed in the middle and on one side of the top surface of the two support beams (1). Four traveling wheels (13) and two limiting wheels (14) are rotatably installed on the inner wall of the four fixed seats (2). A drive motor (12) is fixedly connected to one corner of each of the four fixed seats (2), and its output end is fixedly connected to the traveling wheel (13). Two winches (11) are installed on the side of the two support beams (1) away from the top surface of the fixed seat (2). Steel wire ropes are wound around the outside of the two winches (11). Two second square tubes (6) are installed on the side of the two support beams (1) away from the bottom surface of the fixed seat (2). An operating platform (10) is slidably installed on the outer wall of the four second square tubes (6). Both ends of the operating platform (10) are fixedly connected to the bottom end of the steel wire rope. The operating platform (10) includes two half-frames. Two first limiting tubes (16) are installed on one side of the bottom surface of one half-frame. A second limiting tube (15) that slides with the first limiting tube (16) is installed on one side of the bottom surface of the other half-frame.

2. The sliding mechanism of the fabricated working platform for steel plate composite beam according to claim 1, characterized in that: Each of the four adjustment components (5) includes a limiting block (501), two support tubes (502), eight connecting plates (503), and eight fasteners (504). The two support tubes (502) are located at both ends of the limiting block (501). The eight connecting plates (503) are respectively connected to the two sides of the top surface of the limiting block (501), the two sides of the bottom surface, and one side of the top and bottom surfaces of the first square tube (3). The eight fasteners (504) are in pairs, and each pair of fasteners (504) clamps the two connecting plates (503). The two support tubes (502) are respectively slidably connected to the inside of the first square tube (3).

3. The sliding mechanism of the fabricated working platform for steel plate composite beam according to claim 2, characterized in that: The bottom ends of the four fixed seats (2) are fixedly connected to the top surfaces of the two support beams (1) by fasteners, and notches are left at the two corners of the four fixed seats (2).

4. The sliding mechanism of the fabricated working platform for steel plate composite beam according to claim 3, characterized in that: Two third-party tubes (7) are installed on both sides of the top surface of the operating platform (10), and the four third-party tubes (7) are slidably connected to the second square tube (6) respectively.

5. The sliding mechanism of the fabricated working platform for steel plate composite beam according to claim 4, characterized in that: A guardrail (8) is installed at the edge of the half frame, and the open end of one of the guardrails (8) is bent inward and misaligned.

6. The sliding mechanism of the fabricated working platform for steel plate composite beam according to claim 5, characterized in that: A support plate (9) is installed on one side of the half frame near the top surface of the first limiting tube (16). The bottom surface of the support plate (9) is in contact with the bottom surface of the other half frame. The top surface of the support plate (9) is provided with multiple through slots.