A form reinforcing device for a laminated slab
By combining pre-embedded T-nuts with support and reinforcement components, the problem of grout leakage during the construction of composite slab strips was solved, achieving material savings, improved construction efficiency, and enhanced construction quality.
Patent Information
- Application Number
- CN202522454337.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-19
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-11-19
AI Technical Summary
Existing composite slab strips are prone to grout leakage during construction, resulting in poor appearance quality and material waste. Existing reinforcement methods are costly and inconvenient to construct.
The system employs a combination of pre-embedded T-nuts, support components, and reinforcement components. The reinforcement components are connected to the composite slab via T-nuts, while the support components provide stable support. Tie rods and steel pipes are used to create a tensile force, which is combined with rubber plugs for sealing to prevent grout leakage.
It effectively prevents grout leakage, reduces material waste, lowers costs, improves construction efficiency, facilitates construction, and enhances the quality of one-time molding.
Smart Images

Figure CN225014608U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of building equipment technology, and in particular to a formwork reinforcement device for composite slab strips. Background Technology
[0002] In recent years, with the increasing national requirements for the prefabrication rate of new buildings, the application of composite slabs in engineering has become increasingly widespread. Composite slabs are a common precast component, composed of a bottom precast concrete slab and an upper cast-in-place concrete layer. Compared with traditional cast-in-place slabs, composite slabs offer better quality reinforcement at the bottom, and the precast slabs can be used as formwork, reducing the need for formwork and shortening the construction period. In actual engineering projects, improper treatment of the joints of the post-cast slab strips in composite slabs can easily lead to grout leakage, resulting in poor appearance quality and increased costs for secondary finishing. The main causes of grout leakage include: inadequate adhesion of the sponge strips at the slab strip location; insufficient reinforcement of the formwork support at the slab strip location; and deformation of the formwork due to concrete pouring. To effectively prevent grout leakage, construction units currently commonly use the following methods for slab strip reinforcement:
[0003] One end of the scrap steel bar is bent at a certain angle (about 120 degrees) to form a hook, and the other end is welded to the tie rod to make a tie member for the strip formwork. Small sections of steel bars (referred to as hanger bars, with a diameter of not less than 14mm) are placed on the surface of two adjacent composite slabs. The tie member is passed through the strip formwork, and the hooked end is hung on the hanger bar. The tie force between the upper and lower parts is formed by the tie rods on the supporting steel pipe and the U-shaped clamps on the tie rod. With the addition of the attached sponge strip, the gap between the strip formwork and the composite slab can be greatly eliminated, thereby effectively avoiding the phenomenon of grout leakage at the bottom of the strip and further improving the one-time forming quality of the composite slab strip.
[0004] In the above scheme, there are many small steel bars placed on the strip, and they will remain in the concrete slab after pouring, resulting in some material waste and increased costs. Utility Model Content
[0005] An embodiment of this application provides a template reinforcement device for the strip of a composite slab.
[0006] To achieve the above objectives, embodiments of this application provide a formwork reinforcement device for the joint of composite slabs, comprising:
[0007] Support components are installed at the bottom of the cast-in-place slab strip, which is reserved between adjacent composite slabs;
[0008] T-shaped nuts are pre-embedded inside the composite slab; and the opening of the T-shaped nut faces the bottom of the composite slab.
[0009] The reinforcing components are screwed to the T-nuts on both sides of the cast-in-place slab strip.
[0010] In one embodiment, the support component includes:
[0011] The template is connected to the composite slabs on both sides of the cast-in-place slab strip;
[0012] Square timber is attached to the side of the formwork away from the composite slab.
[0013] The support pole is fixedly connected to the center of the side of the template away from the composite slab.
[0014] In one embodiment, two square timbers are included, which are symmetrically arranged on the same side of the template and are arranged along the length of the cast-in-place slab strip.
[0015] In one embodiment, the template and the composite plate are bonded together with double-sided adhesive.
[0016] In one embodiment, the reinforcement component includes:
[0017] A tie rod, one end of which is connected to a T-nut;
[0018] The other end of the tie rod passes through the connector and is screwed into the nut.
[0019] The steel pipes are installed above the two connectors on both sides of the cast-in-place slab strip.
[0020] In one embodiment, the connector is a U-shaped clip, with the tie rod passing through the center of the U-shaped clip; two arc-shaped grooves are symmetrically opened on the top of the U-shaped clip to hold two steel pipes.
[0021] In one embodiment, the template reinforcement device at the composite plate strip further includes: a rubber plug for sealing the T-nut.
[0022] In one embodiment, the bottom surface of the rubber cap is flush with the bottom surface of the composite plate.
[0023] This application has the following advantages over the prior art:
[0024] The formwork reinforcement device for the composite slab strip provided in this embodiment pre-embeds T-nuts within the composite slab, reducing the number of holes created by the reinforcement components passing through the composite slab strip, avoiding damage during perforation, and preventing leakage risks due to poor sealing later. Furthermore, the support and reinforcement components are reusable, saving materials and reducing costs. Simultaneously, this device facilitates construction and improves construction efficiency. Attached Figure Description
[0025] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0026] Figure 1 This is an axial sectional view of the template reinforcement device at the composite slab strip in an embodiment of this application;
[0027] Figure 2 This is a front view of the template reinforcement device at the composite slab strip of this application embodiment;
[0028] Figure 3 This is a plan view of the template reinforcement device at the composite slab strip in an embodiment of this application;
[0029] Figure 4 This is a left view of the template reinforcement device at the composite slab strip of this application embodiment;
[0030] Figure 5 for Figure 2 Enlarged view at point B in the middle;
[0031] Figure 6 This is a schematic diagram of the structure of the rubber cap of the template reinforcement device at the composite plate strip in an embodiment of this application. Detailed Implementation
[0032] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.
[0033] In the description of this application, it should be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this application.
[0034] In the description of this application, it should be noted that, unless otherwise expressly specified and limited, the terms "installation", "connection" and "joining" should be interpreted broadly, for example, they can refer to fixed connection, detachable connection, or integral connection; for those skilled in the art, the specific meaning of the above terms in this application can be understood according to the specific circumstances.
[0035] The terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this application, unless otherwise stated, "a plurality of" means two or more.
[0036] like Figures 1-5 The diagram shows a structural schematic of the template reinforcement device at the plate strip of the composite plate provided in the embodiment of this application.
[0037] Reference Figures 1-5 An embodiment of this application provides a formwork reinforcement device for the strip of a composite slab, comprising:
[0038] Support components are provided at the bottom of the cast-in-place slab strip, which is reserved between adjacent composite slabs 1;
[0039] T-shaped nut 2 is embedded inside the composite plate 1; and the opening of T-shaped nut 2 faces the bottom of composite plate 1;
[0040] The reinforcing components are screwed to the T-nuts 2 on both sides of the cast-in-place slab strip.
[0041] Specifically, the support components are used to bear the weight of the cast-in-place concrete strip, construction personnel and equipment, and provide a reliable support surface for the formwork 4 at the bottom of the cast-in-place concrete strip. They are the load-bearing foundation of the entire strip support system and ensure construction safety.
[0042] The reinforcing component connects to the T-nuts 2 embedded in the composite slab 1, generating a downward tensile force from above, tightly bonding the support component of the middle cast-in-place slab strip to the composite slabs 1 on both sides. This tensile force also compresses the composite slab 1 and the support component, effectively sealing the horizontal joint and preventing grout leakage.
[0043] In this embodiment, pre-embedding the T-shaped nut within the composite plate reduces the number of holes created by the reinforcing components passing through the composite plate strips, avoiding damage during perforation and preventing leakage risks due to poor sealing later. Furthermore, the support and reinforcing components are reusable, saving materials and reducing costs. Simultaneously, this device facilitates construction and improves construction efficiency.
[0044] In one embodiment, such as Figure 6As shown, the template reinforcement device at the composite plate strip also includes: a rubber plug 11, used to seal the T-shaped nut 2.
[0045] Specifically, the custom T-nut 2 is sealed with a rubber plug 11 to prevent cement slurry from flowing into the threaded hole of the T-nut 2 during concrete pouring. The T-nut 2 is pre-embedded symmetrically and evenly at a distance of 150-350mm from the long side of the composite plate 1. After pre-embedding, the bottom surface of the rubber plug 11 is flush with the bottom surface of the composite plate 1.
[0046] In one embodiment, the support component includes:
[0047] Template 4 is connected to the composite slabs 1 on both sides of the cast-in-place slab strip; optionally, template 4 and composite slab 1 are bonded together with double-sided adhesive tape 10.
[0048] Square timber 5 is connected to the side of template 4 away from composite board 1;
[0049] The support pole 9 is fixedly connected to the center of the side of the template 4 away from the composite plate 1.
[0050] This includes two square timbers 5, which are symmetrically arranged on the same side of the template 4, and the square timbers 5 are arranged along the length of the cast-in-place slab strip.
[0051] Specifically, template 4 is laid directly on the bottom of the cast-in-place slab strip, and the left and right sides of template 4 are respectively connected to the bottom surface of the adjacent composite slab 1.
[0052] Square timber 5 is fixedly connected to the bottom of formwork 4. Generally, two square timbers 5 are set, which are symmetrically set at the bottom of formwork 4 and laid along the length of the cast-in-place slab strip, so as to provide continuous and uniform support for formwork 4.
[0053] The support pole 9 is vertically fixed to the center position below the template 4, providing the main vertical support force for the entire support system.
[0054] The template 4 and the composite slab 1 are bonded together with double-sided adhesive tape 10. Combined with the T-shaped nuts 2 symmetrically arranged on both sides of the cast-in-place slab strip, the reinforcement components are connected to ensure that the template 4 and the composite slab 1 are tightly bonded, which can prevent grout leakage and improve the quality of one-time construction.
[0055] In one embodiment, the reinforcement component includes:
[0056] Pull screw 3, one end of which is connected to T-nut 2;
[0057] Connector 7, the other end of the tie rod 3 passes through connector 7 and is screwed to nut 8;
[0058] Steel pipe 6 is installed above two connectors 7 on both sides of the cast-in-place slab strip.
[0059] Among them, the connector 7 is a mountain-shaped clip, and the tie rod 3 passes through the center of the mountain-shaped clip; two arc-shaped grooves are symmetrically opened on the top of the mountain-shaped clip to place two steel pipes 6.
[0060] Specifically, steel pipe 6 serves as the main keel of the entire reinforcement device, erected above two connectors 7 on both sides of the cast-in-place slab strip. It connects the tie rods 3 on both sides into a whole, converting the tension force of the tie rods 3 into overall constraint on the entire cast-in-place slab strip area. Tightening the nuts 8 secures the formwork system 4. Furthermore, the tightness can be easily adjusted by turning the nuts 8 to adapt to different construction requirements.
[0061] Compared to a single steel pipe, the double steel pipe main keel has significantly improved rigidity and bending resistance, and can more effectively distribute the load and prevent deformation of the main keel.
[0062] The application process of the formwork reinforcement device for the composite slab strip provided in this application is as follows:
[0063] Step 1: Embed the T-nut 2 in the composite slab 1. Before embedding, seal the exposed opening of the T-nut 2 with a rubber plug 11 to prevent grout from entering and contaminating the T-nut 2 during prefabrication. The T-nut 2 can be made by welding on-site scrap steel bars and water-stop bolt nuts. Pre-embedding it in the composite slab 1 increases the adhesion and stability with the concrete. It should be placed 150-350mm away from the long side of the composite slab 1. It can only be shipped for use after the prefabrication is completed, the strength meets the standards, and the acceptance is qualified.
[0064] Step 2: Transport the pre-embedded T-nuts 2 of the composite slab 1 to the site. Installation can only proceed after on-site inspection and approval. During installation, the support components at the bottom of the cast-in-place slab strip must be pre-erected and approved before installing the composite slab 1. Before placing the composite slab 1, 3M double-sided tape 10 should be applied to the joint between the formwork 4 and the composite slab 1. The application position should be accurate and continuous, and repeated displacement is strictly prohibited to ensure a good seal. The double-sided tape 10 prevents grout leakage from the slab strip gaps.
[0065] Step 3: Secure one end of the tie rod 3 to the T-nut 2. Before connecting, remove the rubber plug 11 to ensure that the hole of the T-nut 2 is clean and free of debris. The bottom of the formwork 4 at the cast-in-place slab strip is a support system composed of square timber 5 and support poles 9. The bottom sides of the formwork 4 are reinforced by a system composed of tie rods 3, steel pipes 6, U-shaped clips and nuts 8, forming an upper and lower tension. Together with the double-sided tape 10, it can effectively eliminate the gap between the composite slab 1 and the formwork 4, preventing grout leakage from affecting the pouring quality.
[0066] Step 4: After the slab strip is poured and cured to the design strength (generally 75% or more), the tie rods 3 and the bottom steel pipes 6, U-shaped clips, nuts 8, and other supporting reinforcement components can be removed. These reinforcement components can be reused, saving costs. The T-shaped nut 2 pre-reserved at the bottom of the composite slab 1 is sealed and compacted with 1:2 dry-hard micro-expansion cement mortar. After the outer cement mortar dries, multiple coats of JS or polyurethane waterproof coating are applied to the holes and surrounding area, covering a range of 100×100mm. The process is complete after the waterproof coating dries.
[0067] The above are merely specific embodiments of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions within the technical scope disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.
Claims
1. A formwork reinforcement device for composite slab strips, characterized in that, include: Support components are provided at the bottom of the cast-in-place slab strip, which is reserved between adjacent composite slabs (1); T-shaped nuts (2) are embedded inside the composite plate (1); and the opening of the T-shaped nuts (2) faces the bottom of the composite plate (1); The reinforcing components are screwed to the T-nuts (2) on both sides of the cast-in-place slab strip.
2. The formwork reinforcement device at the joint of the composite slab strip according to claim 1, characterized in that, The support components include: The template (4) is connected to the composite slabs (1) on both sides of the cast-in-place slab strip; Square timber (5) is connected to the side of the template (4) away from the composite board (1); The support pole (9) is fixedly connected to the center of the template (4) on the side away from the composite plate (1).
3. The formwork reinforcement device at the joint of the composite slab strip according to claim 2, characterized in that, It includes two square timbers (5), which are symmetrically arranged on the same side of the template (4) and are arranged along the length of the cast-in-place slab strip.
4. The formwork reinforcement device at the joint of the composite slab strip according to claim 2, characterized in that, The template (4) and the composite plate (1) are bonded together by double-sided adhesive (10).
5. The formwork reinforcement device at the joint of the composite slab strip according to claim 1, characterized in that, The reinforcement components include: A pull screw (3), one end of which is connected to the T-nut (2); The other end of the tie rod (3) passes through the connector (7) and is screwed to the nut (8); The steel pipe (6) is erected above the two connectors (7) on both sides of the cast-in-place slab strip.
6. The formwork reinforcement device at the joint of the composite slab strip according to claim 5, characterized in that, The connector (7) is a mountain-shaped clip, and the tie rod (3) passes through the center of the mountain-shaped clip; two arc-shaped grooves are symmetrically opened on the top of the mountain-shaped clip for placing the two steel pipes (6).
7. The formwork reinforcement device at the joint of the composite slab strip according to claim 1, characterized in that, Also includes: A rubber plug (11) is used to seal the T-nut (2).
8. The formwork reinforcement device at the joint of the composite slab strip according to claim 7, characterized in that, The bottom surface of the rubber cap (11) is flush with the bottom surface of the composite plate (1).