High-altitude steel bar truss floor support plate construction device
By designing a high-altitude steel truss floor decking construction device, the problems of time-consuming, labor-intensive, and dangerous high-rise construction in traditional engineering have been solved, achieving safe and efficient floor decking construction, saving costs and improving safety.
Patent Information
- Application Number
- CN202522760145.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-26
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-26
AI Technical Summary
Traditional scaffolding methods are time-consuming, labor-intensive, and pose significant engineering risks when constructing high-rise buildings, making it difficult to construct floor slabs efficiently and safely.
Design a high-altitude steel truss floor decking construction device, including a support structure and a hoisting structure. The support structure is located on the steel frame, and the hoisting structure is connected to the longitudinal beam of the steel frame through a connecting sleeve. When concrete is poured on the support structure, the tensile force of the floor decking is transferred to the steel frame, ensuring safety and allowing for reuse.
It eliminates the need for scaffolding during high-altitude construction, saving costs and manpower, improving construction safety, and the device is reusable, further reducing expenses.
Smart Images

Figure CN225014609U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of building construction equipment technology, specifically a high-altitude steel truss floor deck construction device. Background Technology
[0002] Steel structure buildings are a common type of building structure. After the steel structure frame is erected, floor slabs need to be constructed on the corresponding floors. When the floors are high, the traditional method of erecting scaffolding is time-consuming and labor-intensive, and high formwork is a dangerous project. In response, the applicant designed a high-altitude steel truss floor slab construction device. Utility Model Content
[0003] To address the technical problems existing in the background art, this utility model provides a high-altitude steel truss floor deck construction device.
[0004] The technical solution of this utility model is as follows: A high-altitude steel truss floor slab construction device includes a support structure and a hoisting structure. The support structure is located on a steel frame, and the hoisting structure is located above the support structure.
[0005] The supporting structure includes a support plate connected to the steel frame, and several rows of steel trusses are set above the support plate, with connecting steel bars passing through the steel trusses.
[0006] The hoisting structure includes support beams, connecting sleeves, and transverse supports. There are multiple connecting sleeves, which are fixed to multiple longitudinal beams of the steel structure frame. The two ends of the support beams are movably inserted into the connecting sleeves. Transverse supports are connected between adjacent support beams. The lower end of the support beams is suspended by suspension components to connect the reinforcing bars.
[0007] In this way, the support structure can be laid directly on the corresponding floor, and the hoisting structure can be directly connected to the longitudinal beams of the steel frame through the connecting sleeves at both ends. When pouring concrete to make the floor decking on the support structure, the tension exerted by the floor decking on the support structure will be transferred to the steel frame, ensuring construction safety. After the floor decking is completed, the suspension components can be cut off, and the support beams can be pulled out of the connecting sleeves for reuse, saving costs.
[0008] As one implementation method, the steel trusses are arranged at equal intervals laterally.
[0009] The connecting steel bars are longitudinally and evenly connected at the top of several steel trusses.
[0010] The support beams are arranged laterally, avoiding the area above the steel truss, to facilitate the suspension and connection of the steel bars.
[0011] In one embodiment, the support beam includes an upper beam and a lower beam, with several vertical beams connected in the middle. The height of the middle of the support beam is greater than the height of both ends, and an inclined beam connects two adjacent vertical beams.
[0012] Inserted posts are provided at the lower ends of both ends of the lower beam, and the size of the inserted posts matches the inner size of the connecting sleeve.
[0013] Preferably, the connecting sleeve is a square sleeve.
[0014] In a preferred embodiment, the height of the insert column is greater than the height of the connecting sleeve, and the height of the connecting sleeve is greater than the height of the steel truss. The bottom of the insert column directly contacts the longitudinal beam of the steel structure frame, and the upper part of the connecting sleeve is cut off after the floor slab is poured, followed by local treatment of the cut-off area.
[0015] Furthermore, the lateral supports are connected between the opposing vertical beams of the adjacent support beams.
[0016] In one embodiment, the lateral support includes a central X-shaped connecting rod and reinforcing rods vertically connected at both ends, with the reinforcing rods connected to the vertical beam.
[0017] In one implementation, the suspension component is a hanger rod, the upper part of which is connected to the lower beam, and the lower part is an arc-shaped hook, the inner diameter of which matches the outer diameter of the connecting steel bar.
[0018] Through the above design, this utility model provides a high-altitude steel truss floor decking construction device, which can directly construct floor decking on the corresponding floor without the need to build scaffolding from below, thus saving costs and labor.
[0019] This device does not involve the operation of high-formwork and dangerous large-scale projects, making construction safer.
[0020] Furthermore, the hoisting structure is directly connected to the longitudinal beams of the steel frame via connecting sleeves at both ends. When pouring concrete to create the floor decking on the supporting structure, the tension exerted by the floor decking on the supporting structure is transferred to the steel frame, ensuring construction safety. After the floor decking is completed, the suspension components can be cut off, and the supporting beams can be pulled out of the connecting sleeves for reuse, saving costs. Attached Figure Description
[0021] In the attached diagram: Figure 1 This is a diagram showing the operational status of the construction equipment. Figure 2 This is a schematic diagram of the construction equipment. Figure 3 for Figure 1 A partial enlarged view of the hoisting structure and suspension support structure corresponding to position X in the middle; The components represented by the various reference numerals in the diagram are: 1. Support plate; 2. Steel truss; 3. Connecting steel bars; 4. Support beam; 41. Upper beam; 42. Lower beam; 43. Vertical beam; 44. Inclined beam; 45. Inserted column; 5. Connecting sleeve; 6. Lateral support; 61. Reinforcing bar; 62. X-shaped connecting bar; 7. Hanging rod. Detailed Implementation
[0022] See Figures 1-3 This embodiment provides a high-altitude steel truss floor slab construction device, including a support structure and a hoisting structure. The support structure is located on the steel frame, and the hoisting structure is located above the support structure.
[0023] The supporting structure includes a support plate 1 connected to the steel frame, and several rows of steel trusses 2 are set above the support plate 1, with connecting steel bars 3 passing through the steel trusses 2.
[0024] See Figure 1 As shown, Figure 1 The left half shows the application of construction equipment on the steel structure frame, while the right half shows the state before construction.
[0025] The steel truss 2 is arranged at equal intervals in the transverse direction.
[0026] The connecting steel bars 3 are tied longitudinally at equal intervals to the top of several steel truss 2.
[0027] Specifically, the connecting steel bar 3 is made of thick steel bar, which passes through all the steel trusses 2. On the one hand, it acts as a spreader beam; on the other hand, it facilitates connection with the hoisting structure to lift the floor slab.
[0028] The hoisting structure of this embodiment includes a support beam 4, a connecting sleeve 5, and a transverse support 6. The connecting sleeve 5 includes multiple sleeves, which are respectively fixed on multiple longitudinal beams of the steel structure frame. The two ends of the support beam 4 are movably inserted into the connecting sleeve 5. The transverse support 6 connects adjacent support beams 4. The lower end of the support beam 4 is suspended and connected to the reinforcing bar 3 through a suspension member.
[0029] In this way, the supporting structure can be laid directly on the corresponding floor, and the hoisting structure can be directly connected to the longitudinal beams of the steel frame through the connecting sleeves 5 at both ends. When pouring concrete to make the floor decking on the supporting structure, the tension exerted by the floor decking on the supporting structure will be transferred to the steel frame, ensuring construction safety. After the floor decking is completed, the suspension components can be cut off, and the supporting beam 4 can be pulled out from the connecting sleeve 5 for reuse, saving costs.
[0030] In this embodiment, the support beam 4 is arranged laterally, avoiding the position above the steel truss 2, so as to facilitate the suspension and connection of the steel bars 3.
[0031] See Figure 2 The support beam 4 includes an upper beam 41 and a lower beam 42, with several vertical beams 43 connected in the middle. The height of the middle of the support beam 4 is greater than the height of both ends, and an inclined beam 44 connects two adjacent vertical beams 43.
[0032] The upper beam 41 is arranged in a herringbone shape, the lower beam 42 is a straight beam parallel to the support plate 1, and the inclined beam 44 is connected to the diagonal position of the two beams 43. The two adjacent inclined beams 44 are arranged symmetrically about the vertical beam 43 between them.
[0033] Rectangular inserts 45 are provided at the lower ends of both ends of the lower beam 42, and the dimensions of the inserts 45 are matched with the inner dimensions of the connecting sleeve 5.
[0034] Preferably, the connecting sleeve 5 is a square sleeve, which is a disposable item. After each use, the exposed upper part is cut off.
[0035] In a preferred embodiment, the height of the insert column 45 is greater than the height of the connecting sleeve 5, and the height of the connecting sleeve 5 is greater than the height of the steel truss 2. The bottom of the insert column 45 directly contacts the longitudinal beam of the steel structure frame, and the intermediate support plate 1 does not affect the transmission of influence. The upper part of the connecting sleeve 5 is cut off after the floor slab is poured, and the cut-off position is then locally treated. Although the construction is carried out at height, this device still emphasizes both safety and efficiency.
[0036] Furthermore, the transverse support 6 is connected between the opposite vertical beams 43 of the adjacent support beams 4.
[0037] In one embodiment, the transverse support 6 includes an X-shaped connecting rod 62 in the middle and reinforcing rods 61 connected vertically at both ends, with the reinforcing rods 61 connected to the vertical beam 43.
[0038] Preferably, the reinforcing rod 61 is longer than the vertical beam 43 and is welded to the opposite surfaces of the vertical beam 43 at two opposite positions.
[0039] The X-shaped connecting rod 62 can be either a fixed or movable structure. When it is a fixed structure, after inserting the support beam 4 into the connecting sleeve 5, a rectangular tube of appropriate length is cut and welded between the two reinforcing rods 61 to form the X-shaped connecting rod 62. (See [link]) Figure 2 After construction is completed, cut off both ends of the X-shaped connecting rod 62 and remove the support beam.
[0040] When it is a movable structure, the X-shaped connecting rod 62 can be made in advance, but the middle position is connected by bolts, so that the length and width of the X-shaped connecting rod 62 can be adjusted. After the support beam 4 is installed, the length of the X-shaped connecting rod 62 is adjusted and it is welded to the reinforcing rod 61.
[0041] In this embodiment, the support beam 4 is not a single plate structure, but is welded together from an upper beam 41, a lower beam 42, a vertical beam 43, and a diagonal beam 44, saving materials. Moreover, the overall structure is high in the middle and low on both sides, and the internal vertical beam 43 and diagonal beam 44 form continuous reinforcing ribs, ensuring its own strength and allowing for safe suspension of the support structure.
[0042] Adjacent support beams 4 are connected by X-shaped transverse supports 6, which can effectively resist bending compared to straight beams.
[0043] See Figure 3In this embodiment, the suspension component is a hanger rod 7, the upper part of which is welded to the lower beam 42, and the lower part is an arc-shaped hook with an inner diameter that matches the outer diameter of the connecting steel bar 3. The hanger rod 7 can be cut off after construction is completed.
Claims
1. A construction device for high-altitude steel truss floor slabs, characterized in that, It includes a supporting structure and a hoisting structure, wherein the supporting structure is located on the steel frame and the hoisting structure is located above the supporting structure; The supporting structure includes a support plate (1) connected to the steel frame, and several rows of steel trusses (2) are arranged above the support plate (1), with connecting steel bars (3) passing through the steel trusses (2). The hoisting structure includes a support beam (4), a connecting sleeve (5), and a transverse support (6). The connecting sleeve (5) includes multiple ones, which are fixed on multiple longitudinal beams of the steel structure frame. The two ends of the support beam (4) are movably inserted into the connecting sleeve (5). The transverse support (6) connects adjacent support beams (4). The lower end of the support beam (4) is suspended and connected to the reinforcing bar (3) through a suspension member.
2. The construction device according to claim 1, characterized in that, The steel truss (2) is arranged at equal intervals in the transverse direction.
3. The construction device according to claim 2, characterized in that, The connecting steel bars (3) are longitudinally and equally spaced on the top of several steel trusses (2).
4. The construction apparatus according to any one of claims 1-3, characterized in that, The support beam (4) is arranged laterally, avoiding the position above the steel truss (2).
5. The construction device according to claim 4, characterized in that, The support beam (4) includes an upper beam (41) and a lower beam (42), with several vertical beams (43) connected in the middle. The height of the middle of the support beam (4) is greater than the height of both ends, and an inclined beam (44) connects two adjacent vertical beams (43). The lower beam (42) has inserts (45) at both ends, and the size of the inserts (45) matches the inner size of the connecting sleeve (5).
6. The construction device according to claim 5, characterized in that, The connecting sleeve (5) is a square sleeve.
7. The construction device according to claim 6, characterized in that, The height of the insert (45) is greater than the height of the connecting sleeve (5), and the height of the connecting sleeve (5) is greater than the height of the steel truss (2).
8. The construction apparatus according to any one of claims 5-7, characterized in that, The transverse support (6) is connected between the vertical beams (43) opposite to the adjacent support beams (4).
9. The construction device according to claim 8, characterized in that, The lateral support (6) includes an X-shaped connecting rod (62) in the middle and a reinforcing rod (61) vertically connected at both ends. The reinforcing rod (61) is connected to the vertical beam (43).
10. The construction apparatus according to any one of claims 5-7, characterized in that, The suspension component is a suspension rod (7), the upper part of which is connected to the lower beam (42), and the lower part is an arc hook with an inner diameter that matches the outer diameter of the connecting steel bar (3).