Cableway foundation pre-embedding structure
By using a modularly designed cableway foundation pre-embedded structure and components such as straightening and positioning ribs and square tube brackets, the cableway foundation can be accurately positioned and quickly installed. This solves the problem of displacement of pre-embedded parts during concrete pouring and improves construction quality and efficiency.
Patent Information
- Application Number
- CN202522609567.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-09
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-09
AI Technical Summary
In existing technologies, the embedded parts of cableway foundations are prone to displacement during concrete pouring, resulting in inaccurate positioning. Furthermore, the disassembly of welded components is cumbersome, affecting construction quality and reusability.
The cableway foundation pre-embedded structure adopts a modular design, including straightening and positioning ribs, transverse and longitudinal square tube brackets, upper and lower positioning plates, and ground anchor tie steel wire ropes. Precise positioning is achieved through bolt connection and position adjustment, simplifying the installation process.
It improves construction quality and efficiency, enhances positioning accuracy and applicability, is easy to operate, conforms to the concept of green and low-carbon construction, and reduces construction costs.
Smart Images

Figure CN225014691U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of auxiliary equipment technology for building construction, and in particular to a pre-embedded structure for cableway foundations. Background Technology
[0002] In the construction of cableway foundations and similar large foundations, the positioning and fixing of embedded parts often adopts traditional methods such as welded steel support positioning system, simple steel bar bracket fixing, or wooden formwork with holes for fixing.
[0003] A search revealed Chinese patent CN204343319U, which discloses a positioning mold for pre-embedded anchor bolts in cableway pipe foundations. The positioning mold includes anchor bolts, an upper annular plate, a lower annular plate, a positioning sleeve, a fixing plate, and elongated holes. The upper and lower annular plates are provided with bolt holes matching the anchor bolts. Annular reinforcing ribs are provided between the upper and lower annular plates. Reinforcing ribs at the positioning points are provided on the center lines of the upper and lower annular plates. These reinforcing ribs are fixedly connected to the fixing plate, which has elongated holes. A positioning sleeve is installed between the anchor bolts and the upper and lower annular plates. The advantages of this patent are: simple structure, easy to manufacture, and low cost; strong practicality, safety and reliability; reduced displacement of the pre-embedded bolts during concrete pouring and vibration, avoiding structural modifications due to anchor bolt pre-stress deviations; and disassembly and reuse, reducing construction costs.
[0004] Based on the above search and existing technology, the findings were as follows: The existing patented ring plate cannot withstand the strong vibration and impact during concrete pouring, and the embedded parts are prone to displacement, which affects the accuracy of the overall structure. Furthermore, the ring plate structure cannot quickly adapt to changes in different engineering requirements. Welded components make the disassembly process cumbersome, damage parts, and reduce the reuse rate, thus having certain limitations. Utility Model Content
[0005] To address the aforementioned technical issues, this utility model proposes a pre-embedded structure for cableway foundations, which employs a modular design and bolted connection, making installation and dismantling extremely convenient and significantly reducing construction costs.
[0006] The technical solution to achieve the purpose of this utility model is: a cableway foundation pre-embedded structure, including straightening and positioning ribs, and also including a transverse square tube bracket and a pre-embedded component system: The transverse square tube bracket is fixedly installed between the straightening and positioning steel bars, and a pair of longitudinal square tube brackets are fixedly installed on the surface of the transverse square tube bracket. The embedded component system includes an upper positioning plate set on the top of the longitudinal square tube bracket, and a lower positioning plate set at the bottom of the upper positioning plate.
[0007] Preferably, ground anchor wire ropes are fixedly installed on the outer side of each of the corrective positioning ribs, and multiple pre-embedded bolts are threaded between the upper positioning plate and the lower positioning plate.
[0008] Preferably, the external thread of the pre-embedded bolt is fitted with a hexagonal nut, which is located on the upper and lower sides of the upper positioning plate and the top of the lower positioning plate. The bottom thread of the pre-embedded bolt is fitted with a bottom anchor plate, which is located at the bottom of the lower positioning plate.
[0009] Compared with existing technologies, the significant advantages of this invention are: Firstly, this utility model, by setting up a positioning system consisting of upper and lower positioning plates, detachable anchor plates, longitudinal and transverse brackets and positioning steel bars, and ground anchoring system, can quickly and accurately position and firmly fix the pre-embedded parts system by simply adjusting the tension of the ground anchoring steel wire rope, the position of the longitudinal and transverse brackets, and the nuts of the upper and lower positioning plates. The operation is simple and significantly improves the quality, efficiency and applicability of cableway foundation construction.
[0010] Secondly, this utility model device is easy to install and dismantle, highly flexible, accurately positioned, stable and reliable, and convenient to construct. Through flexible adjustment and assembly of various components, it can effectively solve the problems of easy displacement of embedded parts and difficulty in ensuring positioning accuracy during concrete construction. Moreover, in the entire construction positioning process, it mainly relies on mechanical structure and manpower for installation and adjustment, without relying on large mechanical equipment to provide continuous power, and without consuming external energy such as electricity and gasoline. It is energy-saving and environmentally friendly, and conforms to the modern construction concept of green and low carbon.
[0011] This invention solves the problems of existing patented ring plates being unable to withstand the strong vibrations and impacts during concrete pouring, the easy displacement of embedded parts affecting the overall structural accuracy, and the inability of the ring plate structure to quickly adapt to changes in different engineering requirements; as well as the cumbersome disassembly process caused by welding components, which damages parts and reduces the reuse rate. Attached Figure Description
[0012] The present invention will be further explained below with reference to the accompanying drawings and embodiments: Figure 1 This is a schematic diagram of the structure of the embedded part positioning system provided by this utility model; Figure 2 This is a schematic diagram of the connection node structure of the embedded part system provided by this utility model.
[0013] Explanation of reference numerals in the attached figures: 101. Correcting and positioning ribs; 102. Ground anchor tie wire ropes; 103. Longitudinal square tube brackets; 104. Transverse square tube brackets; 105. Hexagonal nuts; 106. Upper positioning plate; 107. Embedded bolts; 108. Lower positioning plate; 109. Bottom anchor plate. Detailed Implementation
[0014] The present invention will now be described in detail, and the technical solutions in the embodiments of the present invention will be clearly and completely described. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of the present invention.
[0015] This utility model provides an improved cableway foundation pre-embedded structure. The technical solution of this utility model is as follows: like Figures 1-2 As shown, a cableway foundation pre-embedded structure includes a straightening and positioning rib 101, which significantly improves the quality, efficiency, and applicability of cableway foundation construction. It also includes a transverse square tube bracket 104 and a pre-embedded component system. The transverse square tube bracket 104 is fixedly installed between the straightening and positioning steel bars 101. A pair of longitudinal square tube brackets 103 are fixedly installed on the surface of the transverse square tube bracket 104. The entire system is anchored to the external stable ground or rock mass through the four corner straightening and positioning steel bars 101 and the ground anchor tie steel wire rope 102 to enhance the firmness. The embedded part system includes an upper positioning plate 106 set on the top of the longitudinal square tube bracket 103, and a lower positioning plate 108 set at the bottom of the upper positioning plate 106, which meets the needs of modern, efficient and precise construction and realizes flexible installation and adjustment.
[0016] Furthermore, ground anchor steel wire ropes 102 are fixedly installed on the outer side of the straightening positioning ribs 101, and multiple pre-embedded bolts 107 are threaded between the upper positioning plate 106 and the lower positioning plate 108. Through bolt connection and position adjustment, rapid adaptation and precise fine adjustment to different engineering needs can be achieved.
[0017] Furthermore, the external threads of the pre-embedded bolt 107 are fitted with hexagonal nuts 105, which are located on the upper and lower sides of the upper positioning plate 106 and the top of the lower positioning plate 108. The bottom threads of the pre-embedded bolt 107 are fitted with a bottom anchor plate 109, which is located at the bottom of the lower positioning plate 108. This allows for quick and accurate positioning and secure fixing of the pre-embedded component system, making operation simple.
[0018] The specific working method is as follows: A cableway foundation embedded component positioning system is formed by using the four corner correction and positioning ribs 101 of the reinforcing steel keel, ground anchor wire ropes 102, longitudinal and transverse brackets, and an embedded component system. The embedded component system includes an upper positioning plate 106, a lower positioning plate 108, hexagonal nuts 105, threaded embedded bolts 107, and a detachable anchor plate. Vertical correction and positioning ribs are set at the four corners of the reinforcing steel keel and anchored to the surrounding ground after being wrapped and fixed with ground anchor wire ropes 102. The lower positioning plate 108 is installed, and a detachable anchor plate is set at its bottom, fixed with double nuts. Supporting steel bars are welded to the detachable anchor plate and welded to the longitudinal and transverse positioning ribs. Longitudinal and transverse brackets are installed to form a support system. The upper positioning plate 106 is placed and fixed with the upper and lower nuts and embedded bolts 107. After adjusting the position of the embedded components to ensure positioning accuracy, concrete is poured.
[0019] The technical means disclosed in this utility model are not limited to those described above, but also include technical solutions composed of equivalent substitutions of the above technical features. Matters not covered in this utility model are common knowledge to those skilled in the art.
Claims
1. A cableway foundation pre-embedded structure, including a straightening and positioning rib (101), characterized in that: Also includes: A transverse square tube bracket (104) is fixedly installed between the straightening and positioning ribs (101), and a pair of longitudinal square tube brackets (103) are fixedly installed on the surface of the transverse square tube bracket (104). The embedded part system includes an upper positioning plate (106) set on the top of the longitudinal square tube bracket (103), and a lower positioning plate (108) set at the bottom of the upper positioning plate (106).
2. The cableway foundation pre-embedded structure according to claim 1, characterized in that: The outer side of each of the corrective positioning ribs (101) is fixedly installed with ground anchor tie steel wire ropes (102), and multiple pre-embedded bolts (107) are threaded between the upper positioning plate (106) and the lower positioning plate (108).
3. The cableway foundation pre-embedded structure according to claim 2, characterized in that: The external thread of the pre-embedded bolt (107) is fitted with a hexagonal nut (105), which is located on the upper and lower sides of the upper positioning plate (106) and the top of the lower positioning plate (108). The bottom thread of the pre-embedded bolt (107) is fitted with a bottom anchor plate (109), which is located at the bottom of the lower positioning plate (108).