A curing structure for a concrete pier wall
By pre-embedding climbing cones within the concrete pier wall to set up a platform and water storage tank, combined with a booster pump and sprinkler heads, automated concrete pier wall curing was achieved, solving the problems of high labor intensity and water waste caused by manual watering and improving construction efficiency.
Patent Information
- Application Number
- CN202522580084.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-04
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-04
AI Technical Summary
In the existing technology, the maintenance of concrete pier walls cast by cantilever formwork requires manual watering at regular intervals, which results in high labor intensity and serious waste of water resources.
The system uses a pre-embedded climbing cone to set up a platform and a water storage tank. Multiple spray heads are connected to the system via a booster pump and water pipes to automatically spray curing water onto the top surface of the newly poured concrete pier wall. Excess water is collected in a water collection tank to reduce manual intervention.
It reduced labor intensity, decreased water waste, enabled automated maintenance of concrete piers and walls, and improved construction efficiency.
Smart Images

Figure CN225014700U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of concrete curing technology, specifically to a curing structure for concrete pier walls. Background Technology
[0002] Cantilever formwork is a single-sided formwork system that relies on the cantilever action of the support system to maintain structural stability. It is mainly used for the construction of large-volume concrete structures (such as concrete piers and walls). Cantilever formwork achieves single-sided cantilevering of the formwork through support structures such as cantilever beams or trusses. It relies on its own weight and embedded parts to bear the lateral pressure of the concrete without the need for additional reinforcement.
[0003] After concrete piers are cast using cantilever formwork, they typically require moisturizing and curing. Timely and adequate moisturizing and curing are crucial for ensuring concrete strength development and preventing surface cracking. The cantilever casting process involves first pouring the lower layer of concrete pier. Once the newly poured concrete has initially set and reached sufficient strength, it becomes a completed concrete pier. Using this completed pier as a foundation, the cantilever formwork is raised a certain distance before another layer is poured. Therefore, the top elevation of the concrete pier is constantly rising, making fixed-structure curing devices unsuitable for cantilever casting. Current technology still relies on manual, periodic watering of the newly poured concrete pier. Each watering requires moving the cantilever formwork up and down, resulting in high labor intensity. Due to the difficulty of moving the cantilever formwork up and down, workers often resort to spraying large amounts of curing water at once to prolong the water's retention time on the concrete surface, thus reducing the frequency of moving the cantilever formwork up and down. This leads to significant water waste. Utility Model Content
[0004] This utility model provides a curing structure for concrete pier walls to solve the problems of the curing process of concrete pier walls cast using cantilever formwork, which requires manual watering at regular intervals and frequent up-and-down movement of the cantilever formwork; and the problem of water waste caused by workers usually spraying a large amount of curing water at once to extend the retention time of the curing water on the concrete surface in order to reduce the number of up-and-down movement of the cantilever formwork.
[0005] To solve the above-mentioned technical problems, the technical solution adopted by this utility model is as follows: a curing structure for a concrete pier wall, wherein the concrete pier wall is cast using a cantilever formwork and the concrete pier wall is provided with a pre-embedded climbing cone, including a placement platform, a water storage tank and multiple first spray heads; The placement platform is set on the surface of the poured concrete pier wall by pre-embedded climbing cones; The water storage tank is placed on the platform; Multiple first spray heads are installed on the top of the cantilever formwork; each first spray head is connected to a booster pump through a water supply pipe, and the booster pump is connected to a water storage tank; the multiple first spray heads are used to spray curing water onto the top surface of the newly poured concrete pier wall.
[0006] Specifically, it also includes a water collection trough; the water collection trough has an upward-facing opening and is located on the top of the side of the cantilever formwork facing the newly poured concrete pier wall; the water collection trough is connected to a water storage tank through a return water pipe.
[0007] Furthermore, the bottom surface of the water collection tank is an inclined surface, and the lowest point of the bottom surface of the water collection tank is connected to the water storage tank through a return water pipe.
[0008] Furthermore, the opening of the water collection tank is also covered with a filter screen.
[0009] Furthermore, it also includes multiple second spray heads, which are also connected to the booster pump via water supply pipes; the second spray heads are located below the placement platform, facing the poured concrete pier wall, and are used to spray curing water onto the surface of the poured concrete pier wall.
[0010] Furthermore, it also includes a PLC controller connected to the booster pump, which is used to control the booster pump to supply water to the first and second spray heads in a timely and quantitative manner.
[0011] Specifically, the lower surface of the placement platform near the side of the already poured concrete pier wall is also provided with multiple uprights, each upright having a support foot for supporting the already poured concrete pier wall.
[0012] Specifically, it also includes diagonal bracing, with one end of the diagonal bracing connected to the placement platform and the other end connected to the cantilever formwork.
[0013] Specifically, the bottom of the cantilever formwork facing the already poured concrete pier wall is provided with a horizontal strip groove, and a "U"-shaped installation groove is fixed in the strip groove, with the opening of the installation groove facing the already poured concrete pier wall; a polyethylene grout-stopping strip is embedded in the installation groove.
[0014] Compared with the prior art, this utility model has the following advantages and beneficial effects: A platform is set up by pre-embedded climbing cones in the concrete pier wall to place the water storage tank; multiple first spray heads are set on the top of the cantilever formwork. The curing water in the water storage tank is pumped to the multiple first spray heads through a booster pump and water supply pipe, so that the newly poured concrete pier wall is cured from the top. This replaces the manual curing process in the existing technology. There is no need for workers to climb up and down the cantilever formwork, thereby reducing labor intensity and eliminating the need for excessive spraying of curing water, thus reducing water waste. Attached Figure Description
[0015] Figure 1This is a schematic diagram of the main structure for maintenance.
[0016] Figure 2 for Figure 1 Enlarged structural diagram at point A in the middle.
[0017] The meanings of the labels in the diagram are as follows: Placement platform—1; Water storage tank—101; Return water pipe—102; Water supply pipe—103; Diagonal brace—104; Vertical pole—105; Support leg—106; Cantilever formwork—2; Water collection trough—201; First spray head—202; Second spray head—203; Polyethylene grout stop strip—204; Strip groove—205; Installation groove—206; Concrete pier wall already poured - 3; Newly poured concrete pier wall—4; Pre-embedded climbing cone - 5. Detailed Implementation
[0018] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model, so as to provide a better understanding of the concept of the present utility model, the technical problem solved, the technical features constituting the technical solution and the technical effects brought about.
[0019] like Figure 1 As shown, a curing structure for a concrete pier wall is provided. The concrete pier wall is cast using a cantilever formwork and has a pre-embedded climbing cone 5 inside. It includes a placement platform 1, a water storage tank 101 and multiple first spray heads 202. The placement platform 1 is set on the surface of the already poured concrete pier wall 3 by pre-embedded climbing cones 5; Water storage tank 101 is installed on placement platform 1; Multiple first spray heads 202 are installed on the top of the cantilever formwork 2; each first spray head 202 is connected to a booster pump through a water supply pipe 103, and the booster pump is connected to a water storage tank 101; the multiple first spray heads 202 are used to spray curing water onto the top surface of the newly poured concrete pier wall 4.
[0020] In this utility model, the concrete pier wall cast by cantilever formwork is divided into newly cast concrete pier wall 4 (concrete pier wall that has just been cast and is waiting for curing) and already cast concrete pier wall 3 (concrete pier wall that has completed initial setting and has a certain initial strength). The pre-embedded climbing cone 5 inside the already cast concrete pier wall 3 is used as the installation point. The placement platform 1 is set on the surface of the already cast concrete pier wall 3 by connecting bolts. Specifically, a fixing plate extending downward can be set on the lower surface of the placement platform 1. The connecting bolts are screwed into the transverse threaded hole of the pre-embedded climbing cone 5 after passing through the fixing plate, thereby installing the placement platform 1 on the concrete pier wall. The placement platform 1 is used to place the water storage tank 101, and the water storage tank 101 is used to store curing water. The first spray head 202 is connected to the booster pump via the water supply pipe 103, thereby connecting to the water storage tank 101. When curing water needs to be sprayed, the booster pump is started, and water is supplied to multiple first spray heads 202 on the top of the cantilever formwork 2. Multiple first spray heads 202 spray curing water together to achieve curing of the top surface of the newly poured concrete pier wall 4, thereby replacing the manual watering curing process in the prior art, effectively reducing labor intensity, and eliminating the need for excessive spraying of curing water, thus effectively reducing water waste. Preferably, multiple first spray heads 202 are evenly distributed on the top of the cantilever formwork 2 to ensure uniform spraying of curing water, thereby achieving uniform curing of the top surface of the newly poured concrete pier wall 4. Once the newly poured concrete pier wall 4 has initially gained a certain strength (usually 4 to 7 days), the cantilever formwork 2 is moved upwards, and the first spray head 202 also rises along with it, so that the next batch of concrete pier wall can be poured and cured without the need for construction personnel to adjust the position of the first spray head 202.
[0021] As a preferred embodiment, such as Figure 1 As shown, it also includes a water collection trough; the water collection trough 201 is set with its opening facing upward and is set on the top of the side of the cantilever formwork 2 facing the newly poured concrete pier wall 4; the water collection trough 201 is connected to the water storage tank 101 through the return water pipe 102.
[0022] In this embodiment, the curing structure also includes a water collection trough 201. The water collection trough 201 is positioned with its opening facing upwards, and is also located on the top of the cantilever formwork 2 facing the newly poured concrete pier wall 4. This upward-opening water collection trough 201 is used to collect excess curing water from the top of the newly poured concrete pier wall 4 and recovers it to the water storage tank 101 via the return pipe 102, thereby further reducing water waste. After the concrete is poured, the surface is not perfectly level, but usually has a slight angle with a higher center and lower sides. Therefore, excess curing water sprayed can flow into the water collection trough 201. The excess curing water collected on the top of the newly poured concrete pier wall 4 will also naturally spread and flow into the water collection trough 201, thus achieving the recycling of the sprayed water. Furthermore, after the cantilever formwork 2 moves upward, causing the water collection trough 201 to move upward as well, the space occupied by the water collection trough 201 can be filled by supplementing with concrete, and subsequent concrete pier wall pouring can proceed after it has achieved initial strength; alternatively, it can be filled by directly pouring the next batch of concrete. This also creates a mortise-and-tenon-like interlocking structure between the newly poured concrete pier wall 4 and the already poured concrete pier wall 3, thereby increasing the bonding force between the newly poured concrete pier wall 4 and the already poured concrete pier wall 3. It should be noted that the water collection trough 201 cannot recover all the excess curing water on the top of the newly poured concrete pier wall 4, but only a portion. Moreover, some of the curing water will be absorbed by the concrete after spraying. Therefore, the water storage tank 101 will still decrease as construction progresses, and it is necessary to check the remaining water storage tank 101 regularly and replenish it in a timely manner.
[0023] In a preferred embodiment, the bottom surface of the water collection tank 201 is an inclined surface, and the lowest point of the bottom surface of the water collection tank 201 is connected to the water storage tank through the return water pipe 102.
[0024] In this embodiment, by setting the bottom surface of the water collection tank 201 as an inclined surface, the bottom surface of the water collection tank 201 is ensured to have an inclination. By connecting the return water pipe 102 to the lowest point of the bottom surface of the water collection tank 201, excess curing water is ensured to converge towards the lower end after entering the water collection tank 201, and is guided by the return water pipe 102 to the water storage tank 101 placed on the platform 1 below, thereby realizing the recycling of excess spray water. Preferably, the side of the water collection tank 201 near the cantilever formwork 2 is lower, which facilitates the return water pipe 102 to pass through the cantilever formwork 2. Specifically, a horizontal hole can be opened on the cantilever formwork 2, through which the return water pipe 102 passes and is connected to the water collection tank 201, and the gap between the horizontal hole and the return water pipe 102 is sealed to prevent grout leakage.
[0025] As a further embodiment, such as Figure 1 As shown, the opening of the water collection tank 201 is also covered with a filter screen.
[0026] In this embodiment, the filter screen essentially functions as a filter mesh to prevent debris from falling into the water collection tank 201 during construction and causing blockage of the return water pipe 102. The size of the filter screen is larger than the opening of the water collection tank 201, so that the filter screen can cover the opening of the water collection tank 201 to complete the installation of the filter screen and ensure its filtering effect.
[0027] As a preferred embodiment, such as Figure 1 As shown, it also includes multiple second spray heads 203, which are also connected to the booster pump through the water supply pipe 103; the second spray heads 203 are set below the placement platform 1 and face the poured concrete pier wall 3, and are used to spray curing water onto the surface of the poured concrete pier wall 3.
[0028] In this embodiment, the curing structure also includes multiple second spray heads 203 arranged towards the poured concrete pier wall 3. When the newly poured concrete pier wall 4 initially has a certain strength and the cantilever formwork 2 moves upward, the newly poured concrete pier wall 4 becomes the poured concrete pier wall 3. The wall surface of the poured concrete pier wall 3 is cured by the second spray heads 203 to ensure the curing effect of the poured concrete pier wall 3. Preferably, the multiple second spray heads 203 need to be evenly distributed along the wall surface of the poured concrete pier wall 3 to ensure the uniformity of the curing process of the wall surface of the poured concrete pier wall 3 and to ensure the overall curing effect of the poured concrete pier wall 3.
[0029] It should be noted that the first spray head 202 is actually used to cure the top surface of the newly poured concrete pier wall 4, and its curing process follows the conventional procedure. The second spray head 203 is used to cure the wall surface of the newly poured concrete pier wall 4, which has already partially hardened and possesses a certain degree of initial strength. Its curing process is somewhat delayed compared to the conventional curing process. "Possessing a certain degree of initial strength" means that the concrete has achieved early strength, that is, after 4-14 days of pouring, once the strength is sufficient (usually reaching 75% of the design value within 7 days), the formwork can be removed ahead of schedule. Conventional concrete curing requires approximately 28 days; therefore, removing the formwork early and delaying the curing of the sides of the newly poured concrete pier wall 4 will not significantly affect the overall strength of the concrete pier wall.
[0030] In a preferred embodiment, the system also includes a PLC controller connected to the booster pump, the PLC controller being used to control the booster pump to supply water to the first spray head 202 and the second spray head 203 at regular intervals and in quantitative amounts.
[0031] In this embodiment, the maintenance structure also includes a PLC controller for controlling the booster pump to start at regular intervals, thereby supplying water to the first spray head 202 and the second spray head 203. The PLC controller can also control the start-up duration of the booster pump; that is, it can control the booster pump to start for a certain duration at regular intervals to achieve timed and quantitative maintenance. Specifically, the start-up time of the booster pump can be set by turning on the delay timer (TON), and the duration after the booster pump starts can be set by turning off the delay timer (TOF). Since the timer-related technology in the PLC controller is a very mature existing technology, its specific circuit relationships will not be described in detail here.
[0032] As a preferred embodiment, such as Figure 1 As shown, the lower surface of the placement platform 1 near the side of the poured concrete pier wall 3 is also provided with multiple uprights 105, and the uprights 105 are provided with support legs 106, which are used to support the poured concrete pier wall 3.
[0033] In this embodiment, the placement platform 1 is fixedly connected to multiple uprights 105. The middle or bottom of the uprights 105 are provided with support feet 106 for supporting the surface of the poured concrete pier wall 3. Thus, the uprights 105 and the placement platform 1 form an "L" shaped structure. The support feet 106 share part of the downward bending moment caused by the self-weight and load of the placement platform 1, so that the placement platform 1 can be set more stably on the pre-embedded climbing cone 5. It can also avoid the load on the placement platform 1 from generating an excessive bending moment on the pre-embedded climbing cone 5.
[0034] As a preferred embodiment, such as Figure 1 As shown, it also includes a diagonal brace 104, one end of which is connected to the placement platform 1 and the other end is connected to the cantilever template 2.
[0035] In this embodiment, the placement platform 1 and the outer wall of the cantilever formwork 2 are connected by a diagonal brace 104. This allows the placement platform 1 to both assist in supporting the cantilever formwork 2, improving its stability, and connect to it. When the cantilever formwork 2 rises, the placement platform 1 rises along with it (the placement platform 1 needs to be removed from the pre-embedded climbing cone 5), avoiding separate installation, removal, and lifting of the placement platform 1, thus simplifying the construction process. Preferably, the diagonal brace 104 can be a telescopic rod. Adjusting the length of the diagonal brace 104 facilitates its installation. After installation, the diagonal brace 104 is extended again, applying a diagonal pressure towards the poured concrete pier wall 3 to keep the cantilever formwork 2 in close contact with the poured concrete pier wall 3, thus reducing grout leakage.
[0036] As a preferred embodiment, such as Figure 2 As shown, the bottom of the cantilever template 2 facing the already poured concrete pier wall 3 has a horizontal strip groove 205. A "U"-shaped installation groove 206 is fixed in the strip groove 205. The opening of the installation groove 206 faces the already poured concrete pier wall 3. A polyethylene grout-stopping strip 204 is embedded in the installation groove 206.
[0037] In the actual concrete pouring process, since the cantilever formwork pouring is a continuation of the pouring on top of the already poured concrete pier wall 3, it is essentially a bonding between the old and new concrete layers. Therefore, special attention needs to be paid to avoid grout leakage, that is, to prevent concrete grout from leaking out from the gap between the already poured concrete pier wall 3 and the cantilever formwork 2. Therefore, in this embodiment, a transverse strip groove 205 is opened at the bottom of the cantilever formwork 2 facing the already poured concrete pier wall 3, and a "U"-shaped installation groove 206 is set in the strip groove 205, so that the opening direction of the installation groove 206 also faces the already poured concrete pier wall 3. This makes it easy to insert a polyethylene grout-stopping strip 204, preferably a polyethylene closed-cell foam strip, into the opening of the installation groove 206, thereby filling the gap between the cantilever formwork 2 and the already poured concrete pier wall 3 and preventing grout leakage.
[0038] The terms "connection" and "fixing" appearing in this utility model description can refer to fixed connection, processing and forming, welding, or mechanical connection. The specific meaning of the above terms in this utility model should be understood according to the specific circumstances.
[0039] In the description of this utility model, the terms "center", "upper", "lower", "horizontal", "inner", "outer", etc., are used only to indicate the orientation or positional relationship for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or component referred to must have a specific orientation, and therefore should not be construed as a limitation of this utility model.
[0040] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this utility model, and not to limit it; although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of this utility model.
Claims
1. A curing structure for a concrete pier wall, wherein the concrete pier wall is cast using a cantilever formwork, and a pre-embedded climbing cone (5) is provided inside the concrete pier wall, characterized in that, It includes a placement platform (1), a water storage tank (101), and multiple first spray heads (202); The placement platform (1) is set on the surface of the already poured concrete pier wall (3) by pre-embedded climbing cones (5); The water storage tank (101) is set on the placement platform (1); Multiple first spray heads (202) are installed on the top of the cantilever formwork (2); each first spray head (202) is connected to a booster pump through a water supply pipe (103), and the booster pump is connected to a water storage tank (101); the multiple first spray heads (202) are used to spray curing water onto the top surface of the newly poured concrete pier wall (4).
2. The curing structure for a concrete pier wall as described in claim 1, characterized in that, It also includes a water collection trough (201); the water collection trough (201) is set with its opening facing upward and is set on the top of the side of the cantilever formwork (2) facing the newly poured concrete pier wall (4); the water collection trough (201) is connected to the water storage tank (101) through the return water pipe (102).
3. The curing structure for a concrete pier wall as described in claim 2, characterized in that, The bottom surface of the water collection tank (201) is an inclined surface, and the lowest point of the bottom surface of the water collection tank (201) is connected to the water storage tank (101) through the return water pipe (102).
4. The curing structure for a concrete pier wall as described in claim 2, characterized in that, The opening of the water collection tank (201) is also covered with a filter screen.
5. The curing structure for a concrete pier wall as described in claim 1, characterized in that, It also includes multiple second spray heads (203), which are also connected to the booster pump via water supply pipe (103); the second spray heads (203) are located below the placement platform (1) and face the poured concrete pier wall (3) to spray curing water onto the surface of the poured concrete pier wall (3).
6. The curing structure for a concrete pier wall as described in claim 5, characterized in that, It also includes a PLC controller connected to the booster pump, which is used to control the booster pump to supply water to the first spray head (202) and the second spray head (203) in a timed and quantitative manner.
7. The curing structure for a concrete pier wall as described in claim 1, characterized in that, The lower surface of the placement platform (1) near the side of the poured concrete pier wall (3) is also provided with multiple uprights (105), the uprights (105) are provided with support feet (106), and the support feet (106) are used to support the poured concrete pier wall (3).
8. The curing structure for a concrete pier wall as described in claim 1, characterized in that, It also includes a diagonal brace (104), one end of which is connected to the placement platform (1) and the other end is connected to the cantilever template (2).
9. The curing structure for a concrete pier wall as described in claim 1, characterized in that, The bottom of the cantilever template (2) facing the side of the cast-in-place concrete pier (3) is also provided with a horizontal strip groove (205), and a "U"-shaped installation groove (206) is fixed in the strip groove (205). The opening of the installation groove (206) faces the cast-in-place concrete pier (3); a polyethylene grout-stopping strip (204) is embedded in the installation groove (206).