Prefabricated steel-concrete structure monument

By designing a monument using a prefabricated steel-concrete structure, employing a prefabricated steel frame and prefabricated base, and utilizing splicing technology with internal threaded sleeves and grouting materials, the problem of low construction efficiency of traditional monuments in extreme geological environments was solved, achieving simple and efficient construction and excellent economic results.

CN225014788UActive Publication Date: 2026-11-24XINJIANG ZHONGJING YIYUAN BUILDING MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522362584.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-07
Publication Date
2026-11-24
Estimated Expiration
2035-11-07

AI Technical Summary

Technical Problem

Traditional monument structures are inefficient to construct in extremely complex geological environments, have high material costs, long construction periods, and are difficult to control in terms of quality. They also rely heavily on human resources and are difficult to meet the needs of future engineering development.

Method used

The prefabricated steel-concrete structure is adopted. The prefabricated steel frame of the monument and the prefabricated base are efficiently spliced ​​using internal threaded sleeves, connectors and grouting materials to form a layered prefabricated base. The marble slabs are then installed using dry-hanging construction technology.

Benefits of technology

It achieves a simple structure, convenient construction, short cycle and excellent economy, reduces the difficulty of production, transportation and construction, and improves construction efficiency and quality stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225014788U_ABST
    Figure CN225014788U_ABST
Patent Text Reader

Abstract

The utility model belongs to the basic construction technical field provides an assembly type steel -concrete structure monument, including monument steel skeleton and assembly type base, assembly type base includes the bearing platform and the pillar, the bearing platform includes at least two layers spliced subassembly, and the pillar is connected in the top surface of bearing platform through a plurality of connecting pieces, the top surface fixedly connected with the internal thread sleeve of pillar, the bottom of monument steel skeleton is fixed through internal thread sleeve and mounting hole connecting bolt, and the surface of monument steel skeleton is installed with marble board. The utility model adopts the laminated assembly type base, and the bearing platform of base can be respectively hoisted and assembled after each layer, is connected with the connecting piece of reserved connecting port and metal bellows hole during assembling, is closed after filling in mortar and grouting material after connection, guarantees structural strength and durability. The monument steel skeleton reserves the mounting hole and internally -threaded sleeve is prebored in the top surface of pillar, realizes the efficient connection of both.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of basic construction technology, and in particular relates to a prefabricated steel-concrete structure monument. Background Technology

[0002] As public buildings that carry historical memory, cultural symbols and spiritual sustenance, the permanence of the structure, the timeliness of construction, and the adaptability to complex environments have always been the core concerns of the design and engineering fields. Traditional monument structures are mostly made of cast-in-place reinforced concrete or all-stone masonry.

[0003] Traditional precast foundation engineering has demonstrated good construction efficiency and economy under normal geological conditions. However, in extremely complex geological environments, such as deserts, plateau regions, and high-altitude areas, traditional precast foundations face significant challenges in terms of construction efficiency, material costs, schedule control, and quality assurance. Specifically, these challenges manifest as decreased construction efficiency, increased material costs, extended project durations, and difficulty in consistently controlling quality. Furthermore, such projects are highly dependent on human resources, and in complex geological areas, they often face constraints such as scarce raw materials, poor living conditions, and insufficient water and electricity supply, making it difficult to meet the needs of future engineering development.

[0004] Therefore, it is necessary to develop a prefabricated steel-concrete structure monument that is simple in structure, easy to construct, has a short construction period, and is economical. Utility Model Content

[0005] This utility model provides a prefabricated steel-concrete structure monument, aiming to solve the above-mentioned technical problems.

[0006] This utility model is implemented as follows: a prefabricated steel-concrete structure monument includes a monument steel frame and a prefabricated base. The prefabricated base includes a platform and a support column. The platform includes at least two layers of splicing components, each splicing component including a first splicing plate and a second splicing plate. The first splicing plate and the second splicing plate are connected by multiple connectors. The support column is connected to the top surface of the platform by multiple connectors. An internally threaded sleeve is fixedly connected to the top surface of the support column. The bottom of the monument steel frame has mounting holes corresponding to the internally threaded sleeve. The bottom of the monument steel frame is fixed by bolts connecting the internally threaded sleeve and the mounting holes. A marble slab is installed on the surface of the monument steel frame.

[0007] Furthermore, multiple connection ports are respectively provided on the side of the first splicing plate and the bottom of the support column, and the connector is installed in the connection port.

[0008] Furthermore, the connector includes a threaded steel bar and a connecting box that mates with the threaded steel bar. The connecting box is fixedly installed inside the connecting port. The threaded steel bar is connected to the side of the second splicing plate at the position corresponding to the connecting port of the first splicing plate. The threaded steel bar is connected to the top surface of the support platform at the position corresponding to the connecting port of the support column.

[0009] Furthermore, a corrugated metal pipe hole is provided on the top surface of the foundation corresponding to the connection port of the support column, and the threaded steel bar is fixedly embedded in the corrugated metal pipe hole using grouting material.

[0010] Furthermore, the top surfaces of the first splicing plate, the second splicing plate, and the support column are connected with multiple hanging nails.

[0011] Furthermore, the connection is sealed with mortar.

[0012] Furthermore, the bottom end of the threaded steel bar on the top surface of the foundation extends into the splicing assembly at the bottom layer.

[0013] This utility model provides a prefabricated steel-concrete structure monument with a layered prefabricated base. Each layer of the base platform can be hoisted and assembled separately. During assembly, pre-reserved connection ports and corrugated metal pipe holes are used for connection. After connection, mortar and grouting material are poured in to seal the structure, ensuring structural strength and durability. The monument's steel frame has pre-reserved installation holes and pre-embedded internal threaded sleeves on the top surface of the supports, achieving efficient connection between the two. This utility model uses prefabricated foundation materials for splicing and fixing, featuring a simple structure, convenient construction, short cycle, and excellent economy. It can reduce production, transportation, and construction difficulties and improve construction efficiency. Attached Figure Description

[0014] Figure 1 This is a structural schematic diagram of the prefabricated steel-concrete structure monument provided in this embodiment of the utility model.

[0015] Figure 2 yes Figure 2 Exploded view.

[0016] Figure 3 This is a structural diagram of the monument's steel frame.

[0017] Figure 4 This is a structural diagram of the base.

[0018] Figure 5 This is a structural diagram of the first splicing panel.

[0019] Figure 6 This is a partial view of the first splicing panel at the connection port and connection box.

[0020] Figure 7This is a structural diagram of the second splicing panel.

[0021] Figure 8 This is a structural diagram of a two-layer splicing component.

[0022] Figure 9 This is a structural diagram of the support column.

[0023] The numbers in the diagram represent: 1-foundation, 2-splicing component, 3-first splicing plate, 4-second splicing plate, 5-support column, 6-connection port, 7-threaded steel bar, 8-connecting box, 9-metal corrugated pipe hole, 10-hanging nail, 11-monument steel frame, 12-marble slab. Detailed Implementation

[0024] To make the objectives, technical solutions, and advantages of this utility model clearer, the present utility model will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the present utility model and are not intended to limit the present utility model.

[0025] See Figures 1-9 This utility model provides a prefabricated steel-concrete structure monument, including a monument steel frame and a prefabricated base. The prefabricated base includes a platform and a support column. The platform includes at least two layers of splicing components, each including a first splicing plate and a second splicing plate. The first splicing plate and the second splicing plate are connected by multiple connectors. The support column is connected to the top surface of the platform by multiple connectors. An internally threaded sleeve is fixedly connected to the top surface of the support column. The bottom of the monument steel frame has mounting holes corresponding to the internally threaded sleeve. The bottom of the monument steel frame is fixed by bolts connecting the internally threaded sleeve and the mounting holes. A marble slab is installed on the surface of the monument steel frame.

[0026] The connector includes threaded steel bars and a connecting box that mates with the threaded steel bars. The connecting box is fixedly installed inside the connecting port. Threaded steel bars are connected to the side of the second splicing plate at the position corresponding to the connecting port of the first splicing plate. Threaded steel bars are connected to the top surface of the foundation at the position corresponding to the connecting port of the support column.

[0027] In this embodiment of the present invention, the splicing component 2 is provided with two layers, and the area of ​​the top layer is smaller than that of the bottom layer, forming a support platform 1 with steps on all sides.

[0028] The first splicing plate 3 and the second splicing plate 4 are spliced ​​together at the middle of the splicing assembly 2. Three connection ports 6 are opened on the side of the first splicing plate 3, and a connection box 8 is fixedly installed in each connection port 6. Three threaded steel bars 7 are pre-embedded on the side of the second splicing plate 4. The connection box 8 has an elongated hole. After the front end of the threaded steel bar 7 passes through the elongated hole of the connection box 8, a nut is connected to the threaded steel bar to clamp and fix the connection box 8. After fixing, mortar is poured into the connection port 6 to seal it.

[0029] Four lifting nails 10 are connected to the top surfaces of the first splicing plate 3 and the second splicing plate 4 respectively, and the first splicing plate 3 and the second splicing plate 4 are hoisted to the designated position using the lifting nails 10.

[0030] The top-layer splicing component 2 is horizontally rotated 90 degrees relative to the bottom-layer splicing component 2 and stacked. Eight corrugated metal pipe holes 9 are formed around the center point of the top-layer splicing component 2. Corrugated metal pipes are installed inside each of the holes 9, and a threaded steel bar 7 is inserted into each hole. Grout is filled into the holes 9 to secure the threaded steel bar 7. The bottom end of the threaded steel bar extends into the bottom-layer splicing component 2 to prevent relative horizontal displacement between the two layers of splicing components 2.

[0031] The top surface of the support column 5 is connected with four hanging nails 10. The bottom surface of the support column 5 has eight connection ports 6 arranged in a circular array. Each connection port 6 is fixedly installed with a connection box 8. The position of the connection box 8 is aligned with the metal corrugated pipe hole 9 on the top splicing component 2 and the threaded steel bar 7 inside it. During installation, the four hanging nails 10 on the top surface of the support column 5 are connected to the top surface of the splicing component 2 on the top layer of the foundation 1 using a crane. The eight connection boxes 8 on the bottom surface of the support column 5 are respectively fitted with the screws of the eight threaded steel bars 7 on the splicing component 2 and then fixed with nuts. After fixing, the connection ports 6 are filled with mortar to seal them.

[0032] In summary, during the construction of the prefabricated steel-concrete structure monument provided by this utility model embodiment, the first splicing plate 3, the second splicing plate 4, and the column 5 are all prefabricated in the factory. During prefabrication, connection ports 6, corrugated metal pipe holes 9, and insertion holes for threaded steel bars 7 are left, and connection boxes 8, corrugated metal pipes, and hanging nails 10 are installed.

[0033] Transport vehicles transport the prefabricated components to the monument's construction site. First, a crane lifts the first splicing plate 3 and the second splicing plate 4 to the designated location, aligning and assembling them to form the bottom layer of splicing components 2. During assembly, the threaded steel bars 7 on the side of the second splicing plate 4 are inserted into the connecting boxes 8 on the side of the first splicing plate 3, and then the nuts are tightened. Mortar is poured into the connection joint 6 to seal it. This process is repeated to build another layer of splicing components 2. A long threaded steel bar 7 is threaded through the corrugated metal pipe hole 9 in the upper layer of splicing components 2 and inserted into the lower layer of splicing components 2. The support column 5 is hoisted above the upper layer of splicing components 2, and then lowered so that the connecting box 8 of the support column 5 fits onto the threaded steel bars 7 of the upper layer of splicing components 2. The nuts are then tightened, and mortar is poured into the connection joint 6 to seal it. Finally, the monument's steel frame 11 is hoisted. The mounting holes at the bottom of the monument's steel frame 11 are aligned with the internal threaded sleeves at the top of the support column 5 and inserted for fixing with bolts. Finally, marble slabs 12 were installed on the surface of the monument's steel frame 11 and pillars 5 using a dry-hanging construction technique.

[0034] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.

Claims

1. A fabricated steel-concrete structure monument, characterized by, The monument includes a steel frame and a prefabricated base. The prefabricated base includes a platform and a support column. The platform includes at least two layers of splicing components. The splicing components include a first splicing plate and a second splicing plate. The first splicing plate and the second splicing plate are connected by multiple connectors. The support column is connected to the top surface of the platform by multiple connectors. The top surface of the support column is fixedly connected with an internal threaded sleeve, and the bottom of the monument steel frame is provided with a mounting hole corresponding to the internal threaded sleeve. The bottom of the monument steel frame is fixed by the internal threaded sleeve and the mounting hole connecting bolts, and the surface of the monument steel frame is covered with marble slabs.

2. The assembled steel-concrete structure monument according to claim 1, wherein The first splicing plate has multiple connection ports on its side and the bottom of the support column, and the connector is installed in the connection ports.

3. The assembled steel-concrete structure monument according to claim 2, characterized in that, The connector includes a threaded steel bar and a connecting box that mates with the threaded steel bar. The connecting box is fixedly installed inside the connecting port. The threaded steel bar is connected to the side of the second splicing plate at the position corresponding to the connecting port of the first splicing plate. The threaded steel bar is connected to the top surface of the support platform at the position corresponding to the connecting port of the support column.

4. The assembled steel-concrete structure monument according to claim 3, wherein The top surface of the foundation is provided with a corrugated metal pipe hole at the position corresponding to the connection port of the support column, and the threaded steel bar is fixedly embedded in the corrugated metal pipe hole using grouting material.

5. The assembled steel-concrete structure monument according to claim 1, wherein The top surfaces of the first splicing plate, the second splicing plate, and the support column are connected with multiple hanging nails.

6. The assembled steel-concrete structure monument according to claim 2, wherein The connection is sealed with mortar.

7. The assembled steel-concrete structure monument according to claim 3, wherein The bottom end of the threaded steel bar on the top surface of the foundation extends into the splicing assembly at the bottom layer.