Hydraulic drilling jumbo for mining
By designing a double-layer propulsion mechanism and a double-arm working device for a mining hydraulic tunneling drill rig, the problem that existing mining hydraulic tunneling drill rigs cannot meet the construction requirements of small-section tunneling holes and anchor bolt holes in roadways has been solved, thus improving construction efficiency and drilling applicability.
Patent Information
- Application Number
- CN202522820750.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-31
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-31
AI Technical Summary
Existing mining hydraulic tunneling rigs, while meeting the construction depth requirements for small-section tunneling holes, cannot meet the construction requirements for anchor bolt holes in roadways, and the drilling efficiency of a single working device is low.
A mining hydraulic tunneling drill rig was designed, which adopts a drill rig body, drill arm and double-layer propulsion mechanism, including lower and upper propulsion components. The rock drill can adjust its posture and move under the action of the double-layer propulsion mechanism, the overall size of the machine is reduced, it can adapt to drill rods of different lengths, and the double-arm working device improves construction efficiency.
It enables the construction of anchor bolt holes in roadways while achieving the construction depth of small-section excavation holes, improves drilling efficiency, adapts to drill rods of different lengths, reduces the overall size of the machine, and meets the construction needs of roadways ranging from 4m×4m to 6m×6m.
Smart Images

Figure CN225015040U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of underground tunneling technology, and in particular to a mining hydraulic tunneling drilling rig. Background Technology
[0002] The mining hydraulic tunneling drilling rig, as a type of rock drilling and hole drilling equipment in the engineering field, is a rock drilling equipment that integrates the construction of tunneling holes and anchor bolt holes in underground non-coal metal mines.
[0003] Currently, mines across China are implementing a strategy of replacing or reducing manpower through mechanization, and are gradually introducing mechanized equipment for widespread adoption. Tunneling rigs have significant advantages over manual drilling, offering absolute superiority in terms of personnel safety, manpower availability, drilling speed, and borehole quality.
[0004] Existing technology discloses a dual-arm rock drilling rig, employing a segmented frame to reduce the turning radius and facilitate operation in confined spaces. The rig also features a cable reel for easy cable laying during operation, simplifying site layout. The operator can adjust the height of the lifting cab to improve visibility and ease of operation. However, due to the dual-arm design, the rig is relatively large, and the single-layer propulsion beam limits its ability to drill pipe holes in tunnels approximately 4 meters high, even when drilling 4 meters deep holes, thus placing certain requirements on the tunnel size.
[0005] Therefore, it is necessary to provide a new hydraulic tunneling rig for mining to solve the above-mentioned technical problems. Utility Model Content
[0006] The main purpose of this utility model is to provide a mining hydraulic tunneling drill rig, which aims to solve the problem that existing mining hydraulic tunneling drill rigs cannot meet the construction depth of small cross-section tunneling holes while also meeting the construction requirements of anchor bolt holes in roadways, and at the same time solve the problem of low drilling efficiency of single working devices.
[0007] To achieve the above objectives, the present invention proposes a mining hydraulic tunneling rig, comprising a rig body, a drill arm, and a double-layer propulsion mechanism. The rig body is capable of moving along the ground. The drill arm is mounted on the rig body. The double-layer propulsion mechanism includes a lower propulsion assembly, an upper propulsion assembly, and a rock drill. The lower propulsion assembly is mounted on the drill arm, and the upper propulsion assembly is mounted on the lower propulsion assembly. The rock drill is mounted on the upper propulsion assembly. The drill arm can adjust the posture of the lower propulsion assembly, the lower propulsion assembly can drive the upper propulsion assembly to move along the drilling direction, and the upper propulsion assembly can drive the rock drill to move along the drilling direction.
[0008] Optionally, the lower propulsion assembly includes a lower propulsion beam and a first propulsion drive, the lower propulsion beam being slidably disposed on the drill arm; the first propulsion drive is connected between the lower propulsion beam and the drill arm, and the first propulsion drive is capable of driving the lower propulsion beam to move along a first direction; the upper propulsion assembly includes an upper propulsion beam and a second propulsion drive, the upper propulsion beam being slidably disposed on the lower propulsion beam; the second propulsion drive is connected between the upper propulsion beam and the lower propulsion beam, and the second propulsion drive is capable of driving the upper propulsion beam to move along the first direction; the rock drill is disposed on the upper propulsion beam.
[0009] Optionally, the rock drill is slidably mounted on the upper propulsion beam along the first direction; the double-layer propulsion mechanism further includes a third propulsion drive component, which is connected between the rock drill and the upper propulsion beam, and the third propulsion drive component can drive the rock drill to move along the first direction.
[0010] Optionally, the double-layer propulsion mechanism further includes a drill string support, a hydraulic hose reel, and a buffer. The drill string support is provided on both the upper propulsion beam and the end of the upper propulsion beam away from the main body of the drilling rig. The drill string support is used to support and limit the drill rod. The hydraulic hose reel is set on the upper propulsion beam, and the water pipe, air pipe, and oil pipe of the rock drill all pass through the hydraulic hose reel. The buffer is set on the lower propulsion beam and is used to abut against the rock wall.
[0011] Optionally, the drill arm includes a mounting base, a telescopic arm, a lifting mechanism, a leveling mechanism, a rotating base, and a support assembly. The mounting base is vertically mounted on the drill rig body. The two ends of the telescopic arm are hinged to the mounting base and the rotating base respectively via cross pins, and the telescopic arm can extend and retract along its length. The two ends of the lifting mechanism are hinged to the mounting base and the telescopic arm respectively via cross pins, and the lifting mechanism can drive the telescopic arm to yaw left and right and pitch up and down. The first end of the leveling mechanism is hinged to the telescopic arm via a horizontal pin, and the second end is connected to the rotating base via a cross pin. The leveling mechanism can drive the rotating base to yaw left and right and pitch up and down, and the leveling mechanism is driven synchronously with the lifting mechanism. The support assembly is mounted on the rotating base.
[0012] Optionally, the lifting mechanism includes at least two lifting cylinders, which are arranged in a gradually decreasing direction toward the mounting base; the leveling mechanism includes at least two leveling cylinders, which are arranged in a gradually decreasing direction toward the rotating base.
[0013] Optionally, the support assembly includes a rotary reducer, a connecting seat, a propulsion beam base, and a sway cylinder. The rotary reducer is mounted on the rotary seat. The connecting seat is perpendicularly connected to the output shaft of the rotary reducer. The propulsion beam base is mounted on the connecting seat, and the lower propulsion beam is slidably mounted on the propulsion beam base. The sway cylinder is hinged between the connecting seat and the propulsion beam base, and the sway cylinder can drive the propulsion beam base to sway up and down.
[0014] Optionally, the number of drill arms is two, and the two drill arms are symmetrically arranged on the main body of the drilling rig. Each drill arm is provided with a corresponding double-layer propulsion mechanism.
[0015] Optionally, the drilling rig body includes an articulated chassis, an engine, a water-air system, a cable reel, and a hydraulic system. The articulated chassis includes a front body and a rear body that are articulated together, both of which travel along the ground via wheels. The engine, the water-air system, the cable reel, and the hydraulic system are all mounted on the rear body. The engine drives the wheels to travel along the ground. The water-air system provides aerosol lubrication and high-pressure air and water for cleaning debris. The cable reel is used to store cables. The hydraulic system drives the drill arm and the double-layer propulsion mechanism to perform rock drilling operations and provides power to the articulated chassis.
[0016] Optionally, the mining hydraulic tunneling rig also includes a cab, which is equipped with an operating position control module and a driving position control module. The driving position control module is used for controlling the machine's movement, raising and lowering the cab canopy, raising and lowering the outriggers, and controlling the driving and work lights. The operating position control module is used to control the hydraulic system to drive the boom and the double-layer propulsion mechanism to perform rock drilling operations.
[0017] In this utility model, the drill arm can flexibly adjust the posture of the double-layer propulsion mechanism to adapt to different operating scenarios. The double-layer propulsion mechanism can adjust its length under the action of the upper and lower propulsion components to accommodate drill rods of different lengths. The overall size of the machine is greatly reduced, which can meet the construction depth of small-section excavation holes while also meeting the construction of anchor bolt holes in the roadway. Attached Figure Description
[0018] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on the structures shown in these drawings without creative effort.
[0019] Figure 1 This is a schematic diagram of the structure of the mining hydraulic tunneling drilling rig in the embodiments of this utility model; Figure 2 This is a schematic diagram of the drill arm and the double-layer propulsion mechanism in an embodiment of this utility model; Figure 3 This is a schematic diagram of the drill arm structure in an embodiment of this utility model; Figure 4 This is a top view of the mining hydraulic tunneling drill rig in this embodiment of the utility model; Figure 5 This is a side view of the drill arm in an embodiment of this utility model.
[0020] Explanation of icon numbers: 1. Drill Rig Body; 1.1 Articulated Chassis; 1.2 Engine; 1.3 Water and Steam System; 1.4 Cable Reel; 1.5 Hydraulic System; 1.6 Cab; 1.7 Electrical Control System; 2. Drill Arm; 2.1 Mounting Base; 2.2 Telescopic Arm; 2.3 Lifting Mechanism; 2.3.1 Lifting Cylinder; 2.4 Leveling Mechanism; 2.4.1 Leveling Cylinder; 2.5 Rotary Seat; 2.6 Support Components, 2.6.1, rotary reducer, 2.6.2, connecting seat, 2.6.3, propulsion beam base, 2.6.4, yaw cylinder, 2.6.5, first propulsion drive component, 2.7, cross pin, 2.8, horizontal pin, 3, double-layer propulsion mechanism, 3.1, lower propulsion beam, 3.2, upper propulsion beam, 3.3, rock drill, 3.4, drill bit holder, 3.5, hydraulic hose reel, 3.6, buffer component.
[0021] The realization of the purpose, functional features and advantages of this utility model will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation
[0022] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0023] It should be noted that all directional indicators (such as up, down, left, right, front, back, etc.) in this utility model embodiment are only used to explain the relative positional relationship and movement of each component in a certain specific posture (as shown in the figure). If the specific posture changes, the directional indicator will also change accordingly.
[0024] Furthermore, in this utility model, the use of terms such as "first," "second," etc., is for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this utility model, "multiple" means at least two, such as two, three, etc., unless otherwise explicitly specified.
[0025] In this utility model, unless otherwise explicitly specified and limited, the terms "connection," "fixing," etc., should be interpreted broadly. For example, "fixing" can mean a fixed connection, a detachable connection, or an integral part; it can mean a mechanical connection or an electrical connection; it can mean a direct connection or an indirect connection through an intermediate medium; it can mean the internal communication of two components or the interaction between two components, unless otherwise explicitly limited. Those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.
[0026] Furthermore, the technical solutions of the various embodiments of this utility model can be combined with each other, but only if they are based on the ability of those skilled in the art to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such combination of technical solutions does not exist and is not within the scope of protection claimed by this utility model.
[0027] This utility model proposes a mining hydraulic tunneling drill rig, which aims to solve the problem that existing mining hydraulic tunneling drill rigs, while meeting the construction depth requirements for small-section tunneling holes, cannot meet the construction requirements for anchor bolt holes in roadways.
[0028] See Figures 1 to 3The mining hydraulic tunneling drill rig includes a drill rig body 1, a drill arm 2, and a double-layer propulsion mechanism 3. The drill rig body 1 can move along the ground. The drill arm 2 is mounted on the drill rig body 1. The double-layer propulsion mechanism 3 includes a lower propulsion component, an upper propulsion component, and a rock drill 3.3. The lower propulsion component is mounted on the drill arm 2, and the upper propulsion component is mounted on the lower propulsion component. The rock drill 3.3 is mounted on the upper propulsion component. The drill arm 2 can adjust the posture of the lower propulsion component, which can drive the upper propulsion component to move along the drilling direction. The upper propulsion component can drive the rock drill 3.3 to move along the drilling direction. During rock drilling operations, the drill arm 2 can flexibly adjust the posture of the double-layer propulsion mechanism 3 to adapt to different operating scenarios. The rock drill 3.3 can adjust the distance between itself and the rock wall under the action of the upper and lower propulsion components to use drill rods of different lengths. The overall size of the machine is significantly reduced, which can meet the construction depth requirements of small-section tunneling holes while also meeting the construction requirements of anchor bolt holes in the roadway. This embodiment solves the problems of low mechanization, high labor intensity, high risk factor, low tunneling efficiency, and inability to meet the construction of anchor bolt holes in roadways when using existing tunnel equipment in non-coal mines. It meets the development trend of mine equipment to achieve mechanized, less-manned, and high-efficiency tunneling and anchor bolt hole construction, and can adapt to the construction of anchor bolt holes in roadways with a minimum size of 4m×4m-6m×6m.
[0029] The lower propulsion assembly includes a lower propulsion beam 3.1 and a first propulsion drive component 2.6.5. The lower propulsion beam 3.1 is slidably mounted on the drill arm 2. The first propulsion drive component 2.6.5 is connected between the lower propulsion beam 3.1 and the drill arm 2, and can drive the lower propulsion beam 3.1 to move along a first direction. The upper propulsion assembly includes an upper propulsion beam 3.2 and a second propulsion drive component. The upper propulsion beam 3.2 is slidably mounted on the lower propulsion beam 3.1. The second propulsion drive component is connected between the upper propulsion beam 3.2 and the lower propulsion beam 3.1, and can drive the upper propulsion beam 3.2 to move along the first direction. The rock drill 3.3 is mounted on the upper propulsion beam 3.2. In this embodiment, both the first propulsion drive component 2.6.5 and the second propulsion drive component are hydraulic cylinders. Under the action of the first propulsion drive component 2.6.5 and the second propulsion drive component, two-stage propulsion of the rock drill 3.3 is achieved, which can reduce the overall size of the machine while adapting to drill rods of different lengths.
[0030] Specifically, the rock drill 3.3 is slidably mounted on the upper propulsion beam 3.2 along the first direction; the double-layer propulsion mechanism 3 also includes a third propulsion drive component, which is connected between the rock drill 3.3 and the upper propulsion beam 3.2. The third propulsion drive component can drive the rock drill 3.3 to move along the first direction. The third propulsion drive component can drive the rock drill 3.3 to move along the first direction on the upper propulsion beam 3.2, thereby realizing the third stage propulsion of the rock drill 3.3, further extending the movement range of the rock drill 3.3, and improving the applicable range of drill rod length.
[0031] Furthermore, the double-layer propulsion mechanism 3 also includes a drill string support 3.4, a hydraulic hose reel 3.5, and a buffer 3.6. Both the upper propulsion beam 3.2 and the end of the upper propulsion beam 3.2 furthest from the main body 1 of the drilling rig are equipped with drill string supports 3.4, which are used to support and limit the drill rod. The hydraulic hose reel 3.5 is located on the upper propulsion beam 3.2, and the water pipes, air pipes, and oil pipes of the rock drill 3.3 all pass through the hydraulic hose reel 3.5. The buffer 3.6 is located on the lower propulsion beam 3.1 and is used to contact the rock wall. The drill string support 3.4 is a product that can be directly purchased on the market. The limiting parts of both drill string supports 3.4 are coaxially arranged with the output shaft of the rock drill 3.3 to ensure the accuracy of the drill rod setting and to facilitate the drilling operation. The water pipe, air pipe, and oil pipe of the rock drill 3.3 are connected to the third propulsion drive component after passing through the hydraulic hose reel 3.5. This reel limits and guides the water pipe, air pipe, and oil pipe of the rock drill 3.3, and can adapt to various working postures of the drill arm 2 and the double-layer propulsion mechanism 3. In this embodiment, the buffer 3.6 is a rubber plate, which is set on the side of the drill bit holder 3.4 on the lower propulsion beam 3.1 near the rock wall. It is used to abut against the rock wall and plays a buffering role in rock drilling operations.
[0032] Furthermore, the drill arm 2 includes a mounting base 2.1, a telescopic arm 2.2, a lifting mechanism 2.3, a leveling mechanism 2.4, a rotating base 2.5, and a support assembly 2.6. The mounting base 2.1 is vertically mounted on the drill rig body 1. The two ends of the telescopic arm 2.2 are respectively hinged to the mounting base 2.1 and the rotating base 2.5 via cross pins 2.7, and the telescopic arm 2.2 can extend and retract along its length. The two ends of the lifting mechanism 2.3 are respectively connected to the mounting base 2 via cross pins 2.7. The lifting mechanism 23 is hinged to the telescopic arm 2.2 and can drive the telescopic arm 2.2 to swing left and right and tilt up and down; the first end of the leveling mechanism 2.4 is hinged to the telescopic arm 2.2 through the horizontal pin 2.8, and the second end is connected to the rotating seat 2.5 through the cross pin 2.7; the leveling mechanism 2.4 can drive the rotating seat 2.5 to swing left and right and tilt up and down, and the leveling mechanism 2.4 is driven synchronously with the lifting mechanism 2.3; the support assembly 2.6 is set on the rotating seat 2.5. The lifting mechanism 2.3 drives the telescopic arm 2.2 to swing left and right in the horizontal plane and pitch up and down in the vertical plane via the cross pin 2.7. Simultaneously, both ends of the lifting mechanism 2.3 rotate relative to the mounting base 2.1 and the telescopic arm 2.2 via the cross pin 2.7 to accommodate the movement of the telescopic arm 2.2. The second end of the telescopic arm 2.2 is hinged to the rotating base 2.5 via the cross pin 2.7. The leveling mechanism 2.4 drives the rotating base 2.5 to swing left and right or pitch up and down via the cross pin 2.7. The leveling mechanism 2.4 is driven synchronously with the lifting mechanism 2.3. When adjusting the sway and pitch angles of the telescopic arm 2.2, the leveling mechanism 2.4 synchronously adjusts to ensure the level of the support assembly 2.6 and that the sway angles of the support assembly 2.6 and the telescopic arm 2.2 are the same. This allows for accurate adjustment of the working posture of the rock drill 3.3 on the support assembly 2.6 according to operational requirements. Furthermore, the telescopic arm 2.2 is equipped with a hydraulic cylinder, enabling its extension and retraction, achieving multi-degree-of-freedom adjustment.
[0033] See also Figure 4 The lifting mechanism 2.3 includes at least two lifting cylinders 2.3.1, which are arranged in a gradually retracting manner along the direction closer to and farther from the mounting base 2.1. The leveling mechanism 2.4 includes at least two leveling cylinders 2.4.1, which are arranged in a gradually retracting manner along the direction closer to the rotating base 2.5. When the two lifting cylinders 2.3.1 extend and retract synchronously, the telescopic arm 2.2 pitches up and down. When the two lifting cylinders 2.3.1 are arranged in a gradually retracting manner, when one lifting cylinder 2.3.1 extends, the other lifting cylinder 2.3.1 shortens. At this time, the telescopic arm 2.2 sways towards the shortened lifting cylinder 2.3.1. The lifting cylinders 2.3.1 and leveling cylinders 2.4.1 located on the same side of the telescopic arm 2.2 are driven synchronously to ensure the synchronous swinging or pitching of the rotating base 2.5 and the telescopic arm 2.2, meeting the self-leveling requirements during drilling operations.
[0034] See also Figure 3 and Figure 4 The support assembly 2.6 includes a rotary reducer 2.6.1, a connecting seat 2.6.2, a propulsion beam base 2.6.3, and a yaw cylinder 2.6.4. The rotary reducer 2.6.1 is mounted on the rotary seat 2.5; the connecting seat 2.6.2 is perpendicularly connected to the output shaft of the rotary reducer 2.6.1; the propulsion beam base 2.6.3 is mounted on the connecting seat 2.6.2, and the lower propulsion beam 3.1 is slidably mounted on the propulsion beam base 2.6.3; the yaw cylinder 2.6.4 is hinged between the connecting seat 2.6.2 and the propulsion beam base 2.6.3, and the yaw cylinder 2.6.4 can drive the propulsion beam base 2.6.3 to yaw left and right. The rotary reducer 2.6.1 can drive the connecting seat 2.6.2 to rotate ±180° around the output shaft of the rotary reducer 2.6.1, thereby increasing the working range of the rock drill 3.3 while minimizing the movement of the telescopic boom 2.2 and the rotating seat 2.5. The yaw cylinder 2.6.4 can drive the propulsion beam base 2.6.3 to drive the lower propulsion beam 3.1 to yaw left and right, thereby causing the rock drill 3.3 to yaw, further increasing the working range of the rock drill 3.3 and reducing the number of posture adjustments required for the telescopic boom 2.2 and the rotating seat 2.5, which is beneficial to improving work efficiency.
[0035] In this embodiment, there are two drill arms 2, which are symmetrically arranged on the main body 1 of the drilling rig. Each drill arm 2 is equipped with a double-layer propulsion mechanism 3. The use of a double-arm working device results in higher construction efficiency compared to a single-working-device tunneling drilling rig.
[0036] In addition, the main body 1 of the drilling rig includes an articulated chassis 1.1, an engine 1.2, a water-air system 1.3, a cable reel 1.4, and a hydraulic system 1.5. The articulated chassis 1.1 includes a front body and a rear body that are articulated together, and both the front body and the rear body travel along the ground via wheels. The engine 1.2, the water-air system 1.3, the cable reel 1.4, and the hydraulic system 1.5 are all located on the rear body. The engine 1.2 can drive the wheels to travel along the ground. The water-air system 1.3 is used to provide aerosol lubrication and high-pressure air and high-pressure water for cleaning debris. The cable reel 1.4 is used to store cables. The hydraulic system 1.5 can drive the drill arm 2 and the double-layer propulsion mechanism 3 to perform rock drilling operations and provide power to the articulated chassis. The articulated chassis 1.1 adopts the structure commonly used in existing drilling rigs. The axle transmission system of the articulated chassis 1.1 adopts hydraulic transmission and four-wheel drive. The drive axle adopts spring braking, hydraulic release, and fully enclosed wet drive axle. The hydraulic transmission has been matched and optimized, with stable performance and strong power, making it more suitable for flexible passage in narrow and complex underground roadways, meeting the needs of the whole machine for walking, climbing, and relocation. The hydraulic system 1.5 is installed on the rear body of the chassis and includes hydraulic components such as a hydraulic oil tank, a motor pump group, and a control valve group. In this embodiment, the drilling rig body 1 also includes an electrical control system 1.7, which is installed on the left rear side of the chassis. The electrical control components of the electrical control system 1.7 are mainly installed in the electrical control cabinet. The water and air system 1.3 mainly includes an air compressor, a water pump, valve group pipelines, etc. The air compressor and water pump are arranged on the right rear side of the trolley, and the valve group pipelines are arranged on the right side of the rear frame. The engine 1.2 includes a fuel tank, a radiator, an exhaust gas treatment system, and an intake system, and is arranged in the middle of the rear frame. The cable reel 1.4 is installed on the left rear side of the chassis and can be controlled for cable winding and unwinding from the cab 1.6 driving position and the rear of the frame. The cable reel is hinged to the left rear side of the chassis and can be flipped outward for easy operator maintenance of the equipment.
[0037] In this embodiment, the cross pin 2.7, the horizontal pin 2.8, the swivel seat 2.5, the rotary motor, and the connecting seat 2.6.2 are all equipped with lubrication mechanisms.
[0038] In this embodiment, the mining hydraulic tunneling rig also includes a cab 1.6. The cab 1.6 is equipped with an operating position control module and a driving position control module. The driving position control module is used for overall machine operation, including machine movement, cab canopy raising and lowering, outrigger raising and lowering, and driving and work lighting. The operating position control module is used to control the hydraulic system 1.5 to drive the boom and the double-layer propulsion mechanism 3 for rock drilling operations. In this embodiment, an open-type cab 1.6 is adopted, featuring a double-column cab design, and the canopy is adjustable and certified by FOPS. In this embodiment, the operation control module consists of a hydraulic control handle and a related parameter display for controlling the movement of the drill arm 2 and drilling operations. By operating the hydraulic control handle, the raising and lowering of the outriggers, the swing of the boom, and rock drilling operations can be controlled. The operation is simple, reliable, and easy to learn. It also features functions such as anti-dry drilling, anti-jamming, and automatic retraction, and adjusts parameters in real time according to the construction conditions to reduce the consumption of drilling tools such as the shank and drill bit, improving drilling efficiency and making it economical and efficient. The cab 1.6 is also equipped with a display showing the working time of the water pump, motor, air compressor, and rock drill 3.3, as well as displaying fault information, which can assist on-site personnel in quickly handling faults. The above description is only a preferred embodiment of this utility model and does not limit the patent scope of this utility model. Any equivalent structural transformations made based on the inventive concept of this utility model, using the content of this utility model's specification and drawings, or direct / indirect applications in other related technical fields are included within the patent protection scope of this utility model.
Claims
1. A hydraulic tunneling rig for mining, characterized in that, The system includes a drilling rig body (1), a drill arm (2), and a double-layer propulsion mechanism (3). The drilling rig body (1) can move along the ground. The drill arm (2) is mounted on the drilling rig body (1). The double-layer propulsion mechanism (3) includes a lower propulsion component, an upper propulsion component, and a rock drill (3.3). The lower propulsion component is mounted on the drill arm (2), and the upper propulsion component is mounted on the lower propulsion component. The rock drill (3.3) is mounted on the upper propulsion component. The drill arm (2) can adjust the posture of the lower propulsion component. The lower propulsion component can drive the upper propulsion component to move along the drilling direction, and the upper propulsion component can drive the rock drill (3.3) to move along the drilling direction.
2. The mining hydraulic tunneling rig as described in claim 1, characterized in that, The lower propulsion assembly includes a lower propulsion beam (3.1) and a first propulsion drive (2.6.5). The lower propulsion beam (3.1) is slidably disposed on the drill arm (2). The first propulsion drive (2.6.5) is connected between the lower propulsion beam (3.1) and the drill arm (2), and the first propulsion drive (2.6.5) can drive the lower propulsion beam (3.1) to move along a first direction. The upper propulsion assembly includes an upper propulsion beam (3.2) and a second propulsion drive. The upper propulsion beam (3.2) is slidably disposed on the lower propulsion beam (3.1). The second propulsion drive is connected between the upper propulsion beam (3.2) and the lower propulsion beam (3.1), and the second propulsion drive can drive the upper propulsion beam (3.2) to move along a first direction. The rock drill (3.3) is disposed on the upper propulsion beam (3.2).
3. The mining hydraulic tunneling rig as described in claim 2, characterized in that, The rock drill (3.3) is slidably mounted on the upper propulsion beam (3.2) along the first direction; the double-layer propulsion mechanism (3) further includes a third propulsion drive component, which is connected between the rock drill (3.3) and the upper propulsion beam (3.2), and the third propulsion drive component can drive the rock drill (3.3) to move along the first direction.
4. The mining hydraulic tunneling rig as described in claim 3, characterized in that, The double-layer propulsion mechanism (3) further includes a drill bit holder (3.4), a hydraulic hose reel (3.5), and a buffer (3.6). The drill bit holder (3.4) is provided at the end of the upper propulsion beam (3.2) away from the main body (1) of the drilling rig. The drill bit holder (3.4) is used to support and limit the drill rod. The hydraulic hose reel (3.5) is set on the upper propulsion beam (3.2). The water pipe, air pipe, and oil pipe of the rock drill (3.3) all pass through the hydraulic hose reel (3.5). The buffer (3.6) is set on the lower propulsion beam (3.1) and is used to abut against the rock wall.
5. The mining hydraulic tunneling rig as described in claim 4, characterized in that, The drill arm (2) includes a mounting base (2.1), a telescopic arm (2.2), a lifting mechanism (2.3), a leveling mechanism (2.4), a rotating base (2.5), and a support assembly (2.6). The mounting base (2.1) is vertically mounted on the drill rig body (1). The two ends of the telescopic arm (2.2) are respectively hinged to the mounting base (2.1) and the rotating base (2.5) via cross pins (2.7), and the telescopic arm (2.2) can extend and retract along its length. The two ends of the lifting mechanism (2.3) are respectively hinged to the mounting base (2.1) and the rotating base (2.6) via cross pins (2.7). The telescopic arm (2.2) is hinged, and the lifting mechanism (2.3) can drive the telescopic arm (2.2) to swing left and right and pitch up and down; the first end of the leveling mechanism (2.4) is hinged to the telescopic arm (2.2) through a horizontal pin (2.8), and the second end is connected to the rotating seat (2.5) through a cross pin (2.7); the leveling mechanism (2.4) can drive the rotating seat (2.5) to swing left and right and pitch up and down, and the leveling mechanism (2.4) is driven synchronously with the lifting mechanism (2.3); the support assembly (2.6) is disposed on the rotating seat (2.5).
6. The mining hydraulic tunneling rig as described in claim 5, characterized in that, The lifting mechanism (2.3) includes at least two lifting cylinders (2.3.1), which are gradually reduced in the direction of approaching and moving away from the mounting base (2.1); the leveling mechanism (2.4) includes at least two leveling cylinders (2.4.1), which are gradually reduced in the direction of approaching the rotating base (2.5).
7. The mining hydraulic tunneling rig as described in claim 6, characterized in that, The support assembly (2.6) includes a rotary reducer (2.6.1), a connecting seat (2.6.2), a propulsion beam base (2.6.3), and a sway cylinder (2.6.4). The rotary reducer (2.6.1) is mounted on the rotating seat (2.5). The connecting seat (2.6.2) is perpendicularly connected to the output shaft of the rotary reducer (2.6.1). The propulsion beam base (2.6.3) is mounted on the connecting seat (2.6.2), and the lower propulsion beam (3.1) is slidably mounted on the propulsion beam base (2.6.3). The sway cylinder (2.6.4) is hinged between the connecting seat (2.6.2) and the propulsion beam base (2.6.3), and the sway cylinder (2.6.4) can drive the propulsion beam base (2.6.3) to sway up and down.
8. The mining hydraulic tunneling rig as described in any one of claims 1 to 7, characterized in that, The number of drill arms (2) is two, and the two drill arms (2) are symmetrically arranged on the main body (1) of the drilling vehicle. Each drill arm (2) is provided with a corresponding double-layer propulsion mechanism (3).
9. The mining hydraulic tunneling rig as described in claim 8, characterized in that, The drilling rig body (1) includes an articulated chassis (1.1), an engine (1.2), a water-air system (1.3), a cable reel (1.4), and a hydraulic system (1.5). The articulated chassis (1.1) includes a front body and a rear body that are articulated together. Both the front body and the rear body travel along the ground via wheels. The engine (1.2), the water-air system (1.3), the cable reel (1.4), and the hydraulic system (1.5) are all mounted on the rear body. The engine (1.2) can drive the wheels to travel along the ground. The water-air system (1.3) is used to provide high-pressure air and high-pressure water for aerosol lubrication and slag removal. The cable reel (1.4) is used to store cables. The hydraulic system (1.5) can drive the drill arm (2) and the double-layer propulsion mechanism (3) to perform rock drilling operations and provide power to the articulated chassis.
10. The mining hydraulic tunneling rig as described in claim 9, characterized in that, The mining hydraulic tunneling drilling rig also includes a cab (1.6), which is equipped with an operation position control module and a travel position control module. The travel position control module is used for controlling the machine to move, raise and lower the cab canopy, raise and lower the outriggers, and control the travel and work lights. The operation position control module is used to control the hydraulic system (1.5) to drive the drill arm (2) and the double-layer propulsion mechanism (3) to perform rock drilling operations.
