A hole wall protecting slurry making pool
By using a slurry mixing tank for borehole wall protection during drilling to separate and mix the solid and liquid mud, the problem of mud generated by drill bit rotation was solved, achieving efficient mud transportation and cost savings.
Patent Information
- Application Number
- CN202620029346.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2026-01-12
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2036-01-12
AI Technical Summary
The mud produced by existing drill bits during drilling does not meet the standards, affecting the effectiveness of subsequent manual mud addition and increasing production costs.
A slurry preparation tank for borehole wall protection is adopted, including components such as frame, tank body, slurry baffle plate, slag baffle plate and mud pump. The mud pump extracts the drilling mud and water for solid-liquid separation, the mud properties are detected and adjusted by the tester, the mud is stirred by the agitator, and the grouting pump delivers it to the borehole.
It achieves efficient separation and blending of drilling mud, solves the problem of drilling mud generated by drill bit rotation, saves the cost of drilling mud production, and reduces the difficulty of handling by workers.
Smart Images

Figure CN225015065U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of bored pile construction technology, and in particular to a slurry-making tank for borehole wall protection. Background Technology
[0002] "Drill wall protection" is a technical means used in the construction of bored piles to prevent the borehole wall from collapsing. This is achieved by injecting mud or installing casings to maintain the stability of the borehole wall. There are two main types of wall protection: mud wall protection and casing wall protection. Mud wall protection uses the static pressure of mud to balance the lateral pressure of the soil in the borehole wall. At the same time, the mud can also form a mud cake on the borehole wall to prevent water flow and soil particle loss. Mud is a mixture of water, bentonite (or clay), and additives. Casing wall protection involves lowering a metal or concrete casing into the borehole to isolate the borehole wall from the external environment and prevent collapse.
[0003] The existing method of preparing mud for borehole wall protection involves workers setting up a mud-making tank at the construction site, preparing the mud in the tank, and then spraying it onto the borehole wall through a conduit. The drill bit itself can produce mud during the drilling process, but the mud produced by the drill bit usually does not meet the standards for use and will affect the effectiveness of subsequent manual mud addition, which has its shortcomings. Utility Model Content
[0004] In order to improve the impact of the drilling mud generated by the drill bit during the drilling process on the subsequent manual addition of drilling mud, this application provides a mud-making tank for borehole wall protection.
[0005] The slurry-making tank for borehole wall protection provided in this application adopts the following technical solution: A slurry preparation tank for borehole wall protection includes a frame, on which a tank body is mounted. A slurry baffle plate and a slag baffle plate are installed within the tank body, sequentially dividing the tank body into a slurry preparation area, a transfer area, and a slag discharge area. A slag discharge screen is installed in the slag discharge area of the tank body. A slag discharge port is opened on the vertical sidewall of the slag discharge area. A sludge pump electrically connected to a control system is mounted on the tank body. A sludge pump inlet is connected to the borehole via a sludge pump pipe. The outlet of the sludge pump is located above the slag discharge screen plate. A filter screen is installed on the sludge separation plate. A slurry transfer device and a stirring device are installed on the pool body. The slurry transfer device is used to transfer the slurry from the transfer zone to the slurry preparation zone. The stirring device is used to stir the slurry in the slurry preparation zone. The slurry preparation zone of the pool body is equipped with an inlet pipe, a detector, and a grouting pump. The detector and the grouting pump are both electrically connected to the control system. The detector is used to detect the slurry properties in the slurry preparation zone. The inlet end of the grouting pump is connected to the slurry preparation zone of the pool body. The outlet end of the grouting pump is connected to the borehole through a grouting pipe.
[0006] By adopting the above technical solution, during the drilling process, the control system starts the mud pump, which pumps the mud and water from deep within the borehole to the slag discharge screen through the mud pumping pipe. Large solid particles in the mud and water are filtered by the slag discharge screen and discharged through the slag discharge port. The filtered mud and water then flows into the transfer zone under the secondary filtration effect of the filter screen. The mud transfer device transfers the mud from the transfer zone to the mud preparation zone. The detector feeds back the performance of the mud in the mud preparation zone to the control system. The workers adjust the performance of the mud by adding materials based on the feedback information. At the same time, the agitator continuously agitates the mud in the mud preparation zone. Finally, the control system starts the grouting pump, which delivers the prepared mud into the borehole through the grouting pipe. This not only solves the mud problem caused by the rotation of the drill bit but also saves on the cost of producing mud.
[0007] Optionally, the slag discharge screen is inclined toward the slag discharge port in a downward direction, and a flow-slowing screen is provided between the lowest point of the slag discharge screen and the slag discharge port.
[0008] By adopting the above technical solution, large solid particles in the mud and water flowing out of the mud pumping pipe will move along the inclined slag discharge screen to the slag discharge port, while the liquid in the mud and water will flow downward through the holes in the slag discharge screen and the slow flow screen, thereby achieving the effect of solid-liquid separation in the mud and water.
[0009] Optionally, the mud suction pipe located inside the borehole is close to the drill bit.
[0010] By adopting the above technical solution, large solid particles drilled by the drill bit can be quickly discharged.
[0011] Optionally, the transfer device includes a transfer pump disposed in the transfer zone of the tank, the transfer pump being electrically connected to the control system, the outlet end of the transfer pump being connected to a transfer pipe, and the end of the transfer pipe facing away from the transfer pump being located at the top of the slurry preparation zone of the tank.
[0012] By adopting the above technical solution, the control system starts the slurry pump, which pumps the slurry filtered by the filter screen to the slurry preparation area through the slurry transfer pipe, thereby achieving the effect of saving materials.
[0013] Optionally, the agitator includes an agitator frame disposed on the tank body, the agitator frame being located in the slurry preparation area, the agitator frame being provided with a plurality of agitator motors electrically connected to the control system, and the output shaft of the agitator motors being provided with agitator blades.
[0014] By adopting the above technical solution, the control system starts the stirring motor, and the output shaft of the stirring motor drives the stirring blades to rotate. The rotating stirring blades will make the mud in the mixing zone of the tank mix quickly and maintain the flow effect, reducing the phenomenon of mud stratification.
[0015] Optionally, a sludge discharge funnel is provided at the bottom of the sludge discharge area of the pool, and a sludge discharge valve is provided at the bottom of the sludge discharge funnel.
[0016] By adopting the above technical solution, some of the larger particles in the mud after being filtered by the slag discharge screen will be deposited in the mud discharge funnel under the action of gravity, while the rest of the mud will enter the transfer zone through the filter screen, thereby further controlling the quality of the mud. After the drilling and grouting are completed, the workers can quickly discharge the mud deposited in the mud discharge funnel through the mud discharge valve, which greatly reduces the difficulty of the workers' handling.
[0017] Optionally, a slurry discharge funnel is provided at the bottom of the slurry preparation area of the pool, and a slurry discharge valve is provided at the bottom of the slurry discharge funnel.
[0018] By adopting the above technical solution, after the drilling and grouting are completed, the mud remaining in the grouting area will be concentrated in the grout discharge funnel. Workers can quickly discharge the mud in the grout discharge funnel through the grout discharge valve, which greatly reduces the difficulty of cleaning up in the later stage.
[0019] Optionally, a hollow slag collection box with an open top is arranged next to the pool body, and an inclined trough plate is provided at the slag discharge port of the pool body. The cross-section of the trough plate is U-shaped, and the lowest point of the inclination of the trough plate is located at the top of the slag collection box.
[0020] By adopting the above technical solution, the trough plate facilitates the flow of large solid particles that slide out from the slag discharge screen to the slag collection box, making it easier for workers to centrally process the solid slag in the mud and reducing the difficulty of processing for workers.
[0021] In summary, this application includes at least one of the following beneficial technical effects: During drill bit operation, the control system activates the mud pump, which pumps the mud and water from deep within the borehole to the slag discharge screen through the mud pumping pipe. Large solid particles in the mud and water are filtered by the slag discharge screen and discharged through the slag discharge port. The filtered mud and water then flows into the transfer zone under the secondary filtration effect of the filter screen. The mud transfer device transfers the mud from the transfer zone to the mud preparation zone. The detector feeds back the performance of the mud in the mud preparation zone to the control system. Based on the feedback information, the workers adjust the mud performance by adding materials. At the same time, the agitator continuously agitates the mud in the mud preparation zone. Finally, the control system activates the grouting pump, which delivers the prepared mud into the borehole through the grouting pipe. This not only solves the mud problem caused by drill bit rotation but also saves on mud production costs. The control system starts the stirring motor, and the output shaft of the stirring motor drives the stirring blades to rotate. The rotating stirring blades will quickly mix the mud in the mixing zone of the tank and maintain its flow, reducing the phenomenon of mud stratification. After being filtered by the slag discharge screen, some of the larger particles in the mud will be deposited in the mud discharge funnel under the action of gravity, while the rest of the mud will pass through the filter screen into the transfer zone, thereby further controlling the quality of the mud. After the drilling and grouting are completed, the workers can quickly discharge the mud deposited in the mud discharge funnel through the mud discharge valve, which greatly reduces the difficulty of the workers' handling. Attached Figure Description
[0022] Figure 1 This is a structural schematic diagram of an embodiment of this application.
[0023] Figure 2 This is a cross-sectional view used in the embodiments of this application to illustrate the positional relationship between the slurry pump, the stirring blades, and the slag discharge screen.
[0024] Explanation of reference numerals in the attached drawings: 1. Frame; 2. Tank body; 3. Baffle plate; 4. Slag plate; 5. Slurry preparation area; 6. Transfer area; 7. Slag discharge area; 8. Slag discharge screen; 9. Slag discharge port; 10. Sludge pump; 11. Sludge pump pipe; 12. Filter screen; 13. Slurry transfer component; 131. Slurry transfer pump; 132. Slurry transfer pipe; 14. Mixing component; 141. Mixing frame; 142. Mixing motor; 143. Mixing blades; 15. Water inlet pipe; 16. Detector; 17. Grouting pump; 18. Grouting pipe; 19. Slow-flow screen; 20. Sludge discharge funnel; 21. Sludge discharge valve; 22. Slurry discharge funnel; 23. Slurry discharge valve; 24. Slag collection box; 25. Trough plate; 26. Mounting hole. Detailed Implementation
[0025] The following is in conjunction with the appendix Figures 1-2 This application will be described in further detail.
[0026] This application discloses a slurry-making tank for hole wall protection.
[0027] Reference Figure 1 and Figure 2 A slurry preparation tank for hole wall protection includes a frame 1, a tank body 2 bolted to the top of the frame 1, and a slurry baffle 3 and a slag baffle 4 welded inside the tank body 2. The slurry baffle 3 and the slag baffle 4 divide the tank body 2 into a slurry preparation area 5, a transfer area 6 and a slag discharge area 7 in sequence.
[0028] Reference Figure 1 and Figure 2 A sludge discharge funnel 20 is welded to the bottom of the slag discharge area 7 of the pool body 2, and a sludge discharge valve 21 is bolted to the bottom of the sludge discharge funnel 20. A slurry discharge funnel 22 is welded to the bottom of the slurry preparation area 5 of the pool body 2, and a slurry discharge valve 23 is bolted to the bottom of the slurry discharge funnel 22.
[0029] Reference Figure 1 and Figure 2The slag discharge area 7 of the pool body 2 is bolted with an inclined slag discharge mesh plate 8. The vertical side wall of the slag discharge area 7 of the pool body 2 has a slag discharge port 9. The slag discharge mesh plate 8 is inclined towards the slag discharge port 9 from top to bottom. A slow flow mesh plate 19 is bolted between the lowest point of the inclination of the slag discharge mesh plate 8 and the slag discharge port 9. Both the slag discharge mesh plate 8 and the slow flow mesh plate 19 can be woven from stainless steel wire in the prior art.
[0030] Reference Figure 1 and Figure 2 A hollow slag collection box 24 with an open top is arranged next to the pool body 2. An inclined trough plate 25 is bolted to the slag discharge port 9 of the pool body 2. The cross-section of the trough plate 25 is U-shaped, and the lowest point of the inclination of the trough plate 25 is located at the top of the slag collection box 24.
[0031] Reference Figure 1 and Figure 2 A sludge pump 10 electrically connected to the control system is arranged on the pool body 2. A sludge pump pipe 11 is connected between the liquid inlet end of the sludge pump 10 and the borehole. The sludge pump pipe 11 located in the borehole is close to the drill bit. The liquid outlet end of the sludge pump 10 is located above the slag discharge screen plate 8. A filter screen plate 12 is bolted on the slag separation plate 4. The slag separation plate 4 has mounting holes 26 for installing the filter screen plate 12.
[0032] During the drilling process, the control system starts the mud pump 10. The mud pump 10 pumps the mud and water from the deep borehole to the slag discharge screen plate 8 through the mud pipe 11. Large solid particles in the mud and water will be filtered out by the slag discharge screen plate 8. The filtered large solid particles will move along the inclined slag discharge screen plate 8 through the slag discharge port 9 from the slot plate 25 to the slag collection box 24.
[0033] The filtered mud flows into the mud discharge funnel 20. At this time, the heavier particles in the mud will settle in the mud discharge funnel 20, while the clearer mud will flow into the transfer zone 6 through the mesh on the filter screen 12, thereby achieving the effect of solid-liquid separation of the drilling mud in the deep borehole.
[0034] Reference Figure 1 and Figure 2 A slurry transfer device 13 is arranged on the tank body 2. The slurry transfer device 13 is used to transfer the slurry in the transfer zone 6 to the slurry preparation zone 5. The slurry transfer device 13 includes a slurry transfer pump 131 bolted to the transfer zone 6 of the tank body 2. The slurry transfer pump 131 is electrically connected to the control system. The outlet end of the slurry transfer pump 131 is connected to a slurry transfer pipe 132. The end of the slurry transfer pipe 132 facing away from the slurry transfer pump 131 is located at the top of the slurry preparation zone 5 of the tank body 2.
[0035] Reference Figure 1 and Figure 2A stirring element 14 is arranged on the tank body 2. The stirring element 14 is used to stir the mud in the mud preparation area 5. The stirring element 14 includes a stirring frame 141 bolted to the tank body 2. The stirring frame 141 is located in the mud preparation area 5. Multiple stirring motors 142 that are electrically connected to the control system are bolted to the stirring frame 141. Stirring blades 143 are bolted to the output shaft of the stirring motors 142.
[0036] Reference Figure 1 and Figure 2 The mixing zone 5 of the pool body 2 is equipped with an inlet pipe 15, a detector 16 and a grouting pump 17. The inlet pipe 15 is welded to the pool body 2 and connected to the mixing zone 5. The detector 16 and the grouting pump 17 are both electrically connected to the control system. The detector 16 is used to detect the mud properties of the mixing zone 5. The inlet end of the grouting pump 17 is connected to the mixing zone 5 of the pool body 2. The outlet end of the grouting pump 17 is connected to the borehole by a grouting pipe 18.
[0037] The control system starts the transfer pump 131, which transfers the mud in the transfer zone 6 to the mixing zone 5 through the transfer pipe 132. At this time, the detector 16 will continuously feed back the mud performance of the mixing zone 5 to the control system. Then, the workers adjust the mud in the mixing zone 5 by adding materials.
[0038] During this process, the control system starts the stirring motor 142. The output shaft of the stirring motor 142 drives the stirring blades 143 to rotate. The rotating stirring blades 143 cause the mud in the mixing zone 5 to flow and mix continuously. When the information fed back by the detector 16 is consistent, the control system starts the grouting pump 17. The grouting pump 17 injects the mud in the mixing zone 5 of the pool 2 into the borehole through the grouting pipe 18.
[0039] The implementation principle of a slurry tank for borehole wall protection in this application embodiment is as follows: During the drilling process, the control system starts the mud pump 10. The mud pump 10 pumps the mud and water from the depth of the borehole to the slag discharge screen plate 8 through the mud pumping pipe 11. Large solid particles in the mud and water will be filtered out by the slag discharge screen plate 8. The filtered large solid particles will move along the inclined slag discharge screen plate 8 through the slag discharge port 9 from the trough plate 25 to the slag collection box 24.
[0040] The filtered mud flows into the mud discharge funnel 20. At this time, the heavier particles in the mud will settle in the mud discharge funnel 20, while the clearer mud will flow into the transfer zone 6 through the mesh on the filter screen 12, thereby achieving the effect of solid-liquid separation of the drilling mud in the deep borehole.
[0041] The control system starts the transfer pump 131, which transfers the mud in the transfer zone 6 to the mixing zone 5 through the transfer pipe 132. At this time, the detector 16 will continuously feed back the mud performance of the mixing zone 5 to the control system. Then, the workers adjust the mud in the mixing zone 5 by adding materials.
[0042] During this process, the control system starts the stirring motor 142. The output shaft of the stirring motor 142 drives the stirring blades 143 to rotate. The rotating stirring blades 143 cause the mud in the mixing zone 5 to flow and mix continuously. When the information fed back by the detector 16 is consistent, the control system starts the grouting pump 17. The grouting pump 17 injects the mud in the mixing zone 5 of the pool 2 into the borehole through the grouting pipe 18.
[0043] The above are all preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made in accordance with the structure, shape and principle of this application should be covered within the scope of protection of this application.
Claims
1. A slurry-making tank for pore wall protection, characterized in that: The system includes a frame (1), on which a pool body (2) is mounted. A slurry baffle (3) and a slag baffle (4) are mounted inside the pool body (2). The slurry baffle (3) and the slag baffle (4) divide the pool body (2) into a slurry preparation area (5), a transfer area (6), and a slag discharge area (7). A slag discharge screen (8) is mounted on the slag discharge area (7) of the pool body (2). A slag discharge port (9) is opened on the vertical side wall of the slag discharge area (7) of the pool body (2). A mud pump (10) electrically connected to the control system is mounted on the pool body (2). A mud pump pipe (11) is connected between the inlet end of the mud pump (10) and the borehole. The outlet end of the mud pump (10) is located above the slag discharge screen (8). A flow meter is mounted on the slag baffle (4). The filter screen (12) is provided with a slurry transfer device (13) and a stirring device (14) on the pool body (2). The slurry transfer device (13) is used to transfer the slurry in the transfer zone (6) to the slurry preparation zone (5). The stirring device (14) is used to stir the slurry in the slurry preparation zone (5). The slurry preparation zone (5) of the pool body (2) is provided with a water inlet pipe (15), a detector (16) and a grouting pump (17). The detector (16) and the grouting pump (17) are electrically connected to the control system. The detector (16) is used to detect the slurry performance of the slurry in the slurry preparation zone (5). The liquid inlet of the grouting pump (17) is connected to the slurry preparation zone (5) of the pool body (2). The liquid outlet of the grouting pump (17) is connected to the borehole by a grouting pipe (18).
2. The slurry-making tank for borehole wall protection according to claim 1, characterized in that: The slag discharge screen (8) is inclined toward the slag discharge port (9) in a downward direction, and a slow-flow screen (19) is provided between the lowest point of the inclination of the slag discharge screen (8) and the slag discharge port (9).
3. A slurry-making tank for borehole wall protection according to claim 1, characterized in that: The mud suction pipe (11) located inside the borehole is close to the drill bit.
4. A slurry-making tank for borehole wall protection according to claim 1, characterized in that: The transfer device (13) includes a transfer pump (131) disposed in the transfer area (6) of the pool body (2). The transfer pump (131) is electrically connected to the control system. The outlet end of the transfer pump (131) is connected to a transfer pipe (132). One end of the transfer pipe (132) facing away from the transfer pump (131) is located at the top of the slurry preparation area (5) of the pool body (2).
5. A slurry-making tank for borehole wall protection according to claim 4, characterized in that: The stirring component (14) includes a stirring frame (141) disposed on the tank body (2). The stirring frame (141) is located in the slurry preparation area (5). The stirring frame (141) is provided with a plurality of stirring motors (142) electrically connected to the control system. The output shaft of the stirring motor (142) is provided with stirring blades (143).
6. A slurry-making tank for borehole wall protection according to claim 3, characterized in that: The bottom of the slag discharge area (7) of the pool body (2) is provided with a sludge discharge funnel (20), and the bottom of the sludge discharge funnel (20) is provided with a sludge discharge valve (21).
7. A slurry-making tank for borehole wall protection according to claim 5, characterized in that: The bottom of the slurry preparation area (5) of the pool body (2) is provided with a slurry discharge funnel (22), and the bottom of the slurry discharge funnel (22) is provided with a slurry discharge valve (23).
8. A slurry-making tank for borehole wall protection according to claim 1, characterized in that: A slag collection box (24) with a hollow interior and an open top is arranged next to the pool body (2). An inclined trough plate (25) is provided at the slag discharge port (9) of the pool body (2). The cross-section of the trough plate (25) is U-shaped, and the lowest point of the inclination of the trough plate (25) is located at the top of the slag collection box (24).