A device for jointly detecting water content and seepage water pressure of surrounding rock in front of a TBM tunnel in a water-rich stratum

By installing a combined detection device of electromagnetic waves and a piezometer in front of the TBM tunnel, the problem of detecting water content and seepage pressure in water-rich strata was solved, enabling rapid and accurate risk warning, reducing the risk of water inrush and mudslide disasters, and ensuring construction safety and efficiency.

CN225015078UActive Publication Date: 2026-11-24STATE KEY LAB OF SHIELD & TUNNELING TECH +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522643321.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-12
Publication Date
2026-11-24
Estimated Expiration
2035-12-12

AI Technical Summary

Technical Problem

Existing technologies are insufficient to accurately detect the water content and seepage pressure in front of TBM tunnels in water-rich strata, resulting in a high risk of water inrush and mudslide disasters, which affects construction safety and efficiency.

Method used

Design a device for jointly detecting the water content and seepage pressure of the surrounding rock in front of a TBM tunnel in water-rich strata. The device uses a rock bolt drilling rig to drill holes at specific locations to install electromagnetic wave transmitting and receiving antennas and a piezometer. Combined with a multi-parameter fusion sensing mechanism, it can achieve comprehensive detection of water volume and water pressure.

Benefits of technology

It enables rapid and accurate positioning of the water content and seepage pressure of the surrounding rock in front of the TBM tunnel in water-rich strata, provides dynamic risk warning, reduces the risk of water inrush and mudslide disasters, and ensures construction safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225015078U_ABST
    Figure CN225015078U_ABST
Patent Text Reader

Abstract

This invention discloses a device for jointly detecting the water content and seepage pressure of the surrounding rock in front of a TBM tunnel in water-rich strata, aiming to solve the related measurement difficulties in the current technology. It includes a lateral measuring device for calculating the water content at the boundary of the water-bearing body in front of the TBM, a front measuring device for calculating the seepage pressure of the surrounding rock in the tunnel, and a back-end control device. The input end of the back-end control device is connected to the electromagnetic wave transmitting antenna, the electromagnetic wave receiving antenna, and the piezometer; the output end is connected to the power source, power mechanism, and movement control power source of the anchor drilling rig, as well as the power source of the tunneling device, forming a system that receives information to control the output of the tunneling device and receives water content information to install the pre-drilling borehole. This invention can detect both the water content and seepage pressure of the surrounding rock in front of the TBM tunnel, providing a decision-making basis for TBM construction in response to water inrush and mudslides.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of rock tunnel boring machine (TBM) construction, and in particular to a device for jointly detecting the water content and seepage pressure of the surrounding rock in front of a TBM tunnel in water-rich strata. Background Technology

[0002] When TBMs are constructed in high-pressure, water-rich strata, it is crucial to accurately grasp the geological and hydrological conditions ahead. Among them, the water content and seepage pressure of the surrounding rock (10) are two key risk warning indicators. If the existence of high-pressure water-bearing bodies ahead of the TBM (tunnel boring machine) is not identified in a timely and accurate manner through advanced geological forecasting, borehole detection and other means, it will bring extremely destructive chain risks.

[0003] When the TBM cutterhead unknowingly tunnels and penetrates such a high-pressure aquifer barrier, the high-pressure water trapped in the rock strata, along with any accompanying mud, sand, and gravel, will erupt instantly under the enormous pressure difference, forming a water inrush and mudslide disaster. The high-speed gushing water and mud mixture will not only quickly flood the tunnel working face, but may also destroy equipment, damage the support structure, and even cause instability of the surrounding rock (10) on a larger scale. More seriously, if the TBM main system located at the front end of the tunnel—including its core drive, electrical, hydraulic, and other precision components—is not protected in time, it may be flooded in a very short period of time. Once the equipment is flooded, it will lead to system paralysis, damage to key components, and shutdown for maintenance for weeks or even months.

[0004] The direct consequence of such disasters is a complete interruption of tunnel construction. The construction period will be forced to be significantly delayed, and huge costs will be required for emergency rescue, equipment repair or replacement, and environmental remediation. In addition, sudden disasters pose a serious threat to the lives of construction workers and may trigger secondary environmental and social risks. Therefore, accurate detection and early warning of the water-bearing conditions of the surrounding rock (10) ahead are the lifeline to ensure the safe and efficient excavation of the TBM and to control the success or failure and safety of the entire tunnel project.

[0005] Therefore, developing a method and equipment for joint detection of water content and seepage pressure in front of TBM tunnels in water-rich strata is a technical problem that urgently needs to be solved by those skilled in the art. Utility Model Content

[0006] The purpose of this invention is to solve the problem of difficulty in detecting water content and permeability pressure in water-rich strata in the prior art.

[0007] The specific solution of this utility model is as follows: Design a device for jointly detecting the water content and seepage pressure of the surrounding rock in front of a TBM tunnel in water-rich strata. The device includes a transverse measuring device for estimating the water content at the boundary of the water-bearing body in front of the TBM, a forward measuring device for estimating the seepage pressure of the surrounding rock, and a central control unit. The transverse measuring device comprises two sets of transverse boreholes drilled symmetrically at the three o'clock and nine o'clock positions on both sides of the tunnel behind the TBM shield using a bolt drilling rig. A pair of electromagnetic wave transmitting antennas and a pair of electromagnetic wave receiving antennas are installed in each of the transverse boreholes. The forward measuring device comprises two piezometers installed at the bottom of two forward boreholes drilled at the 11:30 and 12:30 positions on the top of the TBM shield. The forward boreholes are filled with sand and sealed with cement mortar. The central control unit's input end is connected to the electromagnetic wave transmitting antenna, electromagnetic wave receiving antenna, and piezometers. Its output end is connected to the power source, power mechanism, and movement control power source of the bolt drilling rig, as well as the power source of the tunneling device. This forms a system that receives information, controls the output of the tunneling device, and receives water content information before installing the forward boreholes.

[0008] In specific implementation, the pre-drill hole is inclined at an angle of 15-30 degrees relative to the drilling direction to form a divergent detection space.

[0009] In specific implementation, the pre-drilling hole also includes multiple pre-drilling holes installed in a radiating pattern with the center of the working face as the center.

[0010] In specific implementation, it also includes an auxiliary platform to assist at least one of the anchor drilling rigs in advancing to the work position. The auxiliary platform includes an arc-shaped rack coaxial with the excavation hole. A bracket is provided on the rack, and a power mechanism is installed on the bracket. The output end of the power mechanism is installed on the other end of the transmission gear bracket that cooperates with the arc-shaped rack, and a transition platform is installed. The transition platform includes a fixed block and a movable block. A movement control power source is provided on the movable block to control its displacement relative to the fixed block. The anchor drilling rig is installed on the movable block, and an angular degree of freedom connection is provided between the transition platform and the bracket.

[0011] In practice, the auxiliary platform is mounted on the trolley via a fixed rod, or the auxiliary platform is mounted on a traveling trolley.

[0012] The beneficial effects of this utility model are as follows: Existing technologies can only estimate the location and water content of water-bearing bodies in front of TBM tunnels, but it is difficult to detect the seepage water pressure in the surrounding rock. This utility model can detect both water volume and water pressure, providing a more comprehensive decision-making basis for TBM construction in water-rich strata.

[0013] A system was designed that can quickly and accurately locate borehole positions based on construction and measurement conditions, saving positioning time in each step of the process. The breakthrough advantage of this invention lies in its integrated detection of two key hydrological parameters: "water volume" and "water pressure." Its core lies in the adoption of an innovative joint inversion algorithm or multi-parameter fusion sensing mechanism. This allows for the quantitative or semi-quantitative inversion of the water pressure value in the target area by analyzing the coupling relationship between specific physical fields (such as stress wave propagation characteristics and differences in multi-frequency electromagnetic responses) and pore water pressure while detecting water-bearing bodies. This capability upgrades forecasting results from static to dynamic risk warnings. Attached Figure Description

[0014] Figure 1 This is a front view schematic diagram of the sensor arrangement for the equipment provided by this utility model for jointly detecting the water content and seepage pressure of the surrounding rock in front of a TBM tunnel in water-rich strata. Figure 2 This is a top view schematic diagram of the sensor arrangement for the equipment provided by this utility model for jointly detecting the water content and seepage pressure of the surrounding rock in front of a TBM tunnel in water-rich strata. Figure 3 This is a side view schematic diagram of the sensor arrangement for the equipment provided by this utility model for jointly detecting the water content and seepage pressure of the surrounding rock in front of a TBM tunnel in water-rich strata. Figure 4 This is a schematic diagram of the auxiliary platform structure; Figure 5 yes Figure 5 The front view of the structure shown; Figure 6 yes Figure 5 Rear view of the structure shown; Figure 7 This is a structural diagram of another state of the auxiliary platform; Figure 8 yes Figure 8 Mid-section view; Figure 9 This is a structural diagram of the auxiliary platform in another state; Figure 10 This is a structural diagram of the auxiliary platform from another angle in another state; Figure 11 yes Figure 9 A cross-sectional view of the structure shown; The correspondence between the accompanying illustrations and component names is as follows: 1. Piezometer; 2. Pre-drilling borehole; 3. TBM shield; 4. Electromagnetic wave receiving antenna; 5. Lateral borehole; 6. Electromagnetic wave transmitting antenna; 10. Surrounding rock; 11. Arc-shaped rack; 12. Hanger; 13. Transmission gear; 14. Power mechanism; 15. Fixed block; 16. Moving block; 17. Movement control power source; 18. Rotating hinge; 19. Turntable; 20. Anchor bolt drilling rig. Detailed Implementation

[0015] The preferred embodiments of the present invention will be described below with reference to the accompanying drawings. It should be understood that the preferred embodiments described herein are for illustration and explanation only and are not intended to limit the present invention. Example 1

[0016] A device for jointly detecting the water content and seepage pressure of the surrounding rock in front of a TBM tunnel in water-rich strata, see [link / reference]. Figures 1 to 3 The system includes a lateral measuring device for estimating the water content at the boundary of the water-bearing body in front of the TBM, a forward measuring device for estimating the seepage pressure of the surrounding rock 10 of the tunnel, and a back-end central control device. The lateral measuring device includes two sets of lateral boreholes 5 drilled symmetrically at the three o'clock and nine o'clock positions on both sides of the tunnel behind the TBM shield 3 using a bolt drilling rig 20. A pair of electromagnetic wave transmitting antennas 6 and a pair of electromagnetic wave receiving antennas 4 are installed in the lateral boreholes 5 respectively. The forward measuring device includes two permeameters 1 installed at the bottom of two forward boreholes 2 drilled at the 11:30 and 12:30 positions on the top of the TBM shield 3. At the same time, the forward boreholes 2 are filled with sand and sealed with cement mortar. The input end of the back-end central control device is connected to the electromagnetic wave transmitting antenna 6, the electromagnetic wave receiving antenna 4, and the permeameter 1. The output end is connected to the power source, power mechanism 14, and movement control power source 17 of the bolt drilling rig 20 and the power source of the tunneling device, so as to form a system that controls the output of the tunneling device after receiving information and installs the forward boreholes 2 after receiving water content information.

[0017] It also includes an auxiliary platform to assist at least one of the anchor drilling rigs 20 in advancing to the working position. The auxiliary platform includes an arc-shaped rack 11 coaxial with the drilling hole. A bracket 12 is provided on the rack. A power mechanism 14 is installed on the bracket 12. The output end of the power mechanism 14 is installed on the transmission gear 13 that meshes with the arc-shaped rack 11. A transition platform is installed at the other end of the bracket 12. The transition platform includes a fixed block 15 and a movable block 16. A movement control power source 17 is provided on the movable block 16 to control its displacement relative to the fixed block 15. The anchor drilling rig 20 is installed on the movable block 16. An angular degree of freedom connection is provided between the transition platform and the bracket 12. The angular degree of freedom connection includes rotation in at least two standard coordinate directions. An arc-shaped limiting slide rail is also provided between the bracket 12 and the arc-shaped rack 11.

[0018] The work process includes the following steps: (1) Calculate the water content of the water-bearing body boundary in front of the TBM: Using the anchor drilling rig 20, two sets of transverse boreholes 5 are opened at the symmetrical positions of the three o'clock and nine o'clock positions on both sides of the tunnel behind the TBM shield 3. A pair of electromagnetic wave transmitting antennas 6 and a pair of electromagnetic wave receiving antennas 4 are installed in the transverse boreholes 5 respectively. The position of the water-bearing body boundary in front of the TBM is detected by wave impedance, and the water content is calculated by three-dimensional imaging. (2) Use the water content at the boundary of the water-bearing body in front of the TBM to deduce whether it has entered the water-rich area; when the resistivity displayed by the electromagnetic wave system is ≤750, it is determined that the area ahead is about to enter the water-rich area. (3) Calculate the seepage water pressure of the surrounding rock 10 of the tunnel: Near the water-rich area detected by electromagnetic waves, two pre-drilling holes 2 are opened at the 11:30 and 12:30 positions on the top of the TBM shield 3 using an advanced drilling rig. Two piezometers 1 are installed at the bottom of each pre-drilling hole 2. The holes are filled with sand and sealed with cement mortar. The seepage water pressure of the surrounding rock 10 of the tunnel is monitored using a vibrating wire data acquisition instrument. (4) Adjust the working conditions according to the seepage water pressure of the surrounding rock 10 in the tunnel: When the seepage water pressure of the surrounding rock 10 is ≥0.3MPa, use pressurized tunneling or use advanced high-pressure grouting water plugging protection equipment to prevent sudden water surge. (5) Post-drilling treatment: After all tests are completed, the boreholes are subsequently filled with the building mortar used in the current construction.

[0019] The pre-drill hole 2 has an inclination angle of 15-30 degrees relative to the drilling direction to form a divergent detection space.

[0020] The method for detecting the water content of the surrounding rock 10 in front of the TBM is as follows: Using the anchor drilling rig 20, two sets of boreholes 5 are drilled at the symmetrical positions of the three o'clock and nine o'clock positions on both sides of the tunnel behind the TBM shield 3. The diameter of the boreholes 5 is Φ40mm and the depth of the boreholes 5 is 2m. A pair of electromagnetic wave transmitting antennas 6 and a pair of electromagnetic wave receiving antennas 4 are installed in the boreholes 5 respectively. The boundary of the water-bearing body in front of the TBM is detected by wave impedance, and the water content is estimated by three-dimensional imaging.

[0021] The method for detecting water pressure in the surrounding rock (10) in front of the TBM is as follows: Near the water-rich area detected by electromagnetic waves, two boreholes 2 are drilled at 11:30 and 12:30 on the top of the TBM shield 3 using an advanced drilling rig. The boreholes 2 have a diameter of Φ50mm, a depth of 10m, and an angle of 12° with the tunnel axis. Two piezometers 1 are installed at the bottom of each borehole 2. The monitoring results of the two piezometers 1 in the same borehole 2 are cross-validated, and the monitoring results of the piezometers 1 in different boreholes 2 are cross-validated to ensure the accuracy of water pressure monitoring in the surrounding rock (10). The boreholes 2 are filled with fine sand and sealed with cement mortar. A vibrating wire data acquisition instrument is used to monitor the water pressure in the surrounding rock (10) of the tunnel.

[0022] Therefore, when carrying out TBM construction in a high-risk geological environment of water-rich strata, this utility model not only indicates "where water may be," but also warns "how much pressure the water may gush out." Example 2

[0023] The basic principle of this embodiment is the same as that of embodiment 1. The difference is that the pre-drilled hole 2 also includes a plurality of pre-drilled holes 2 installed in a radiating pattern with the center of the working face as the center.

[0024] In this embodiment, four, six, or eight boreholes may be included to achieve multi-directional sensing of the water pressure ahead. Example 3

[0025] The basic principle of this embodiment is the same as that of Embodiment 1, except that, as Figure 4-11 The system also includes an auxiliary platform to assist at least one of the anchor drilling rigs 20 in advancing to the working position. The auxiliary platform includes an arc-shaped rack 11 coaxial with the drilling hole. A bracket 12 is mounted on the rack, and a power mechanism 14 is installed on the bracket 12. The output end of the power mechanism 14 is mounted on a transmission gear 13 that meshes with the arc-shaped rack 11. A transition platform is mounted on the other end of the bracket 12. The transition platform includes a fixed block 15 and a movable block 16. A movement control power source 17 is provided on the movable block 16 to control its displacement relative to the fixed block 15. The anchor drilling rig 20 is mounted on the movable block 16. A connection is provided between the transition platform and the bracket 12. The angular degree of freedom connection includes rotation in at least two standard coordinate directions. An arc-shaped limiting slide rail is also provided between the bracket 12 and the arc-shaped rack 11. The angular degree of freedom connection includes rotation in at least two standard coordinate directions. An arc-shaped limiting slide rail is also provided between the bracket 12 and the arc-shaped rack 11. The design purpose is to ensure that the bracket 12 can rotate along the arc-shaped rack 11 under the action of power drive, and always remain perpendicular to the arc-shaped rack 11 rather than perpendicular to the ground during the rotation, while ensuring that there is no excessive constraint. The arc-shaped limiting slide rail is similar to a track and is a common technology, so it is not shown in the attached figure.

[0026] The bracket 12 is mounted on the arc-shaped rack 11. The power mechanism 14 drives the transmission gear 13 to rotate, which in turn drives the bracket 12 to move along the arc-shaped rack 11. Subsequently, various adjustment devices are used to move the anchor drilling rig 20 and further realize the planned drilling.

[0027] The auxiliary platform is mounted on the trolley by means of a fixed rod, or the auxiliary platform is mounted on a traveling trolley.

[0028] It also includes a back-end central control mechanism. The input end of the back-end central control mechanism is connected to the electromagnetic wave transmitting antenna 6, the electromagnetic wave receiving antenna 4, and the piezometer 1. The output end is connected to the power source of the anchor drilling rig 20, the power mechanism 14, the mobile control power source 17, and the tunneling device power source, so as to form a system that controls the output of the tunneling device after receiving information control, and installs the pre-drilling hole 2 after receiving water content information.

[0029] In this embodiment, after the arc-shaped rack 11 is fixed, the drilling of the transverse hole 5 can be achieved by adjusting the position of the anchor drill 20. Then, based on measurements, when it is determined that the pre-drilled hole 2 needs to be drilled, the angle between the transition platform and the bracket 12, and the relative displacement between the fixed block 15 and the moving block 16, can be adjusted to achieve hole drilling. In this embodiment, the arc-shaped rack 11 is limited by space and fixed at a suitable position on the trolley. When there is sufficient space, it can also be fixed on the matching traveling trolley.

[0030] It should be noted that, due to length limitations, when drilling the pre-drill hole 2, the main drilling is the pilot hole, which can effectively provide the hole position and direction for subsequent formal drilling.

[0031] In this embodiment, the angular degree of freedom connection is selected from the hinge shape connection, and further, the hinge shape is provided with a power device to control its opening and closing angle.

[0032] Finally, it should be noted that the above description is merely a preferred embodiment of this utility model and is not intended to limit the utility model. Although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this utility model should be included within the protection scope of this utility model.

Claims

1. A device for jointly detecting the water content and seepage pressure of the surrounding rock in front of a TBM tunnel in water-rich strata, characterized in that: The system includes a transverse measuring device for estimating the water content at the boundary of the water-bearing body in front of the TBM, a forward measuring device for estimating the seepage water pressure in the surrounding rock (10) of the tunnel, and a back-end central control device. The transverse measuring device includes two sets of transverse boreholes (5) drilled symmetrically at the three o'clock and nine o'clock positions on both sides of the tunnel behind the TBM shield (3) using a bolt drilling rig (20). A pair of electromagnetic wave transmitting antennas (6) and a pair of electromagnetic wave receiving antennas (4) are installed in the transverse boreholes (5). The forward measuring device includes the devices located at the 11:30 and 12:30 positions on the top of the TBM shield (3). Two piezometers (1) are installed at the bottom of the two pre-drill holes (2) at the location. At the same time, the pre-drill holes (2) are filled with sand and sealed with cement mortar. The input end of the background central control mechanism is connected to the electromagnetic wave transmitting antenna (6), the electromagnetic wave receiving antenna (4), and the piezometer (1). The output end is connected to the power source, power mechanism (14), and mobile control power source (17) of the anchor drilling machine (20) and the power source of the tunneling device, so as to form a system that controls the output of the tunneling device after receiving information control and installs the pre-drill holes (2) after receiving water content information.

2. The device for jointly detecting the water content and seepage pressure of the surrounding rock in front of a TBM tunnel in water-rich strata as described in claim 1, characterized in that: The pre-drill hole (2) has an inclination angle of 15-30 degrees relative to the drilling direction to form a divergent detection space.

3. The device for jointly detecting the water content and seepage pressure of the surrounding rock in front of a TBM tunnel in water-rich strata as described in claim 2, characterized in that: The pre-drilled hole (2) also includes multiple pre-drilled holes (2) installed in a radiating pattern with the center of the working face as the center.

4. The device for jointly detecting the water content and seepage pressure of the surrounding rock in front of a TBM tunnel in water-rich strata as described in claim 1, characterized in that: It also includes an auxiliary platform to assist at least one of the anchor drilling rigs (20) in advancing to the work position. The auxiliary platform includes an arc-shaped rack (11) coaxial with the excavation hole. A bracket (12) is provided on the rack. A power mechanism (14) is installed on the bracket (12). The output end of the power mechanism (14) is installed on the transmission gear (13) that meshes with the arc-shaped rack (11). A transition platform is installed at the other end of the bracket (12). The transition platform includes a fixed block (15) and a moving block (16). A movement control power source (17) is provided on the moving block (16) to control its displacement relative to the fixed block (15). The anchor drilling rig (20) is installed on the moving block (16). An angular degree of freedom connection is provided between the transition platform and the bracket (12). The angular degree of freedom connection includes rotation in at least two standard coordinate directions. An arc-shaped limiting slide rail is also provided between the bracket (12) and the arc-shaped rack (11).

5. The device for jointly detecting the water content and seepage pressure of the surrounding rock in front of a TBM tunnel in water-rich strata as described in claim 4, characterized in that: The auxiliary platform is mounted on the trolley by means of a fixed rod, or the auxiliary platform is mounted on a traveling trolley.