A tunnel portal assembling and reinforcing structure facilitating hoisting and assembling of steel corrugated plates

By using the hoisting and grouting technology of modular reinforcement components, the problem of insufficient lateral tilt resistance during tunnel entrance reinforcement was solved, achieving a stable fit and rapid reinforcement effect at the tunnel entrance.

CN225015085UActive Publication Date: 2026-11-24CHINA RAILWAY SEVENTH ENG BUREAU GRP GUANGZHOU ENG CO LTD +2
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202522368066.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-07
Publication Date
2026-11-24
Estimated Expiration
2035-11-07

AI Technical Summary

Technical Problem

Existing technologies cannot effectively improve the lateral tilt resistance of tunnel entrances during the reinforcement and splicing process, nor can they be properly fitted to the outer wall of the tunnel entrance.

Method used

Modular reinforcement components, including a lifting beam mechanism and a base beam mechanism, are used to splice together to form a fan-shaped ring structure through hoisting. Concrete is then poured in using grouting grooves and grouting holes to enhance the splicing strength.

Benefits of technology

It improves the overall structural stability and lateral tilt resistance of the tunnel entrance, ensuring that the assembled modular reinforcement components can fit snugly against the inner wall of the tunnel entrance, thus enhancing the ease of rapid installation and overall strength of the reinforcement structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225015085U_ABST
    Figure CN225015085U_ABST
Patent Text Reader

Abstract

The utility model belongs to tunnel portal construction technical field, especially relates to a kind of tunnel portal assembling reinforcing structure convenient to steel corrugated sheet hoisting combination, including base layer;The top of base layer is provided with tunnel portal, the two side walls of tunnel portal are uniformly attached and connected with modular reinforcing assembly, and the bottom end of two groups modular reinforcing assembly is fixedly connected in the top of base layer, the junction of base layer and tunnel portal is provided with pre-reinforcing pile, and the pre-reinforcing pile is located between two groups modular reinforcing assembly, by the hoisting mode of two groups modular reinforcing assembly, the built-in modular assembly is spliced combination, forms the arch structure for reinforcing the both sides of tunnel portal two side ports, and the modular reinforcing assembly of both sides is horizontally connected with several groups reinforcing crossbeam, forms the reinforcing structure that sticks in the inner wall of different positions of tunnel portal, so that the modular reinforcing assembly after splicing combination is improved to the stable overall structure of tunnel portal.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of tunnel entrance construction technology, and specifically relates to a tunnel entrance assembly and reinforcement structure that facilitates the hoisting and assembly of corrugated steel plates. Background Technology

[0002] In tunnel construction, the portal section, as a crucial transition zone connecting the underground and above-ground areas, has complex geological conditions and undergoes dramatic changes in its stress system, making it a weak link in structural stability. Therefore, reliable reinforcement structures must be employed to ensure the long-term stability of the portal slope and traffic safety.

[0003] As a high-strength, lightweight, and highly flexible prefabricated component, corrugated steel sheet is the core material for such reinforced structures (such as corrugated steel openings or reinforced linings). The precise construction process of "hoisting, positioning, and installation" is the decisive link in achieving the effective combination of corrugated steel sheet and opening reinforcement structure to form the final load-bearing system.

[0004] A search revealed that Chinese Patent Publication No. CN213625007U, authorized on July 6, 2021, discloses a prefabricated assembly structure for tunnel interiors. The structure is characterized by: a cast-in-place base at the bottom of the shield tunnel segments, with prefabricated columns on both sides of the base, and prefabricated support plates installed on the columns; the prefabricated support plate consists of a thick middle plate, a supporting base, and thin cantilevered plates on both sides, with triangular shear reinforcement bars pre-reserved on the plate, the lower part of which is connected to the main reinforcement bars at the bottom of the plate; an upper cast-in-place layer is poured above the support plate, with the reinforcement bars tied to the exposed portions of the triangular shear reinforcement bars; cast-in-place joints are provided at both ends of the upper cast-in-place layer to connect the prefabricated support plate, the upper cast-in-place layer, and the tunnel segments into a whole; anti-collision side stone installation grooves are pre-reserved on both sides of the upper cast-in-place layer, and anti-collision side stones are installed in these grooves. The prefabricated assembly structure inside the tunnel proposed in this application is suitable for the narrow construction space inside shield tunnels, does not affect vehicle traffic inside the tunnel, and is easy to install, firmly connected, quick to construct, and economical.

[0005] However, the equipment still has the following defects: although it can adapt to the narrow construction space inside the shield tunnel, it cannot fit against the outer wall of the tunnel entrance during the reinforcement and splicing process, and cannot improve the strength of the tunnel entrance against lateral tilting after splicing. Utility Model Content

[0006] To address the aforementioned problems, this utility model provides a tunnel entrance assembly and reinforcement structure that facilitates the hoisting and assembly of corrugated steel plates, comprising a base layer; a tunnel entrance is provided on the top of the base layer, and modular reinforcement components are attached to both side walls of the tunnel entrance, with the bottom ends of the two sets of modular reinforcement components fixedly connected to the top of the base layer; pre-reinforcement piles are provided at the connection between the base layer and the tunnel entrance, and the pre-reinforcement piles are located between the two sets of modular reinforcement components; several sets of reinforcement beams for attaching to the inner wall of the tunnel entrance are horizontally arranged between the two sets of modular reinforcement components.

[0007] The modular reinforcement component includes a suspension beam mechanism; both ends of the suspension beam mechanism are fitted with base beam mechanisms, and the two sets of base beam mechanisms and suspension beam mechanisms are spliced ​​together to form a fan-shaped ring structure.

[0008] Furthermore, the lifting beam mechanism includes a lifting beam corrugated steel plate; a plurality of first grouting grooves are provided on the outer side wall of the lifting beam corrugated steel plate, and a first sealing cap is fixedly connected to both sides of the inner wall of the plurality of first grouting grooves; and a first through hole is provided at both ends of the lifting beam corrugated steel plate for communicating with the base beam mechanism on both sides.

[0009] Furthermore, the inner wall of the corrugated steel plate of the hanging beam is provided with several sets of second through holes, and the several sets of second through holes are used to connect several sets of first grouting grooves to each other. The bottom of the corrugated steel plate of the hanging beam is fixedly connected with two sets of first assembly blocks, and the first assembly blocks are provided with first positioning holes for penetrating the reinforcing beam.

[0010] Furthermore, the top of the corrugated steel plate of the lifting beam is provided with an adjustment groove, and the inner walls of the adjustment groove are fixedly connected to both ends of a limiting plate. The outer walls of the limiting plate are fixedly connected to a limiting claw. The top of the corrugated steel plate of the lifting beam is provided with a grouting hole, and the grouting hole is interconnected with the top of a set of first grouting grooves.

[0011] Furthermore, the inner wall of the adjusting groove is slidably connected with two sets of adjusting plates, and fastening blocks are fixedly connected to the top of the two sets of adjusting plates and near the grouting hole. The outer wall of the fastening block is provided with an internal threaded hole for fastening bolts.

[0012] Furthermore, the base beam mechanism includes a base beam corrugated steel plate; the outer wall of the base beam corrugated steel plate is provided with several sets of second grouting grooves, and the inner walls of the second grouting grooves are fixedly connected with second sealing caps on both sides.

[0013] Furthermore, a third through hole is provided at one end of the corrugated steel plate of the base beam, and the third through hole is interconnected with the first through hole. Several sets of fourth through holes are provided on the inner wall of the corrugated steel plate of the base beam, and the several sets of fourth through holes are interconnected with the second grouting grooves.

[0014] Furthermore, a second assembly block is fixedly connected to one side wall of the base beam corrugated steel plate, and a second positioning hole for penetrating the reinforcing beam is provided on the second assembly block. Two sets of positioning plates are fixedly connected to the outer wall of the base beam corrugated steel plate and the side near the third through hole. A limit pin is fixedly connected between the two sets of positioning plates, and the limit pin is movably engaged with the limit gripper.

[0015] The beneficial effects of this utility model are:

[0016] 1. By hoisting two sets of modular reinforcement components, the built-in modular components are spliced ​​together to form an arched structure for reinforcing the two ends of the tunnel entrance. The modular reinforcement components on both sides are horizontally connected with several sets of reinforcement beams to form a reinforcement structure that fits into different positions on the inner wall of the tunnel entrance. This improves the overall stability of the tunnel entrance structure after the modular reinforcement components are spliced ​​together.

[0017] 2. By fixing one end of the two sets of base beam corrugated steel plates to the top of the base layer, the base beam corrugated steel plates on both sides can be installed at the tunnel entrance. When the lifting beam corrugated steel plates are lowered by hoisting, the limiting claws on both sides are engaged with the limiting pins to form a modular reinforcement component with a fan-shaped ring structure. The modular reinforcement component after splicing can meet the fitting requirements at the tunnel entrance, and improve the stability of the spliced ​​structure after rapid reinforcement.

[0018] 3. After concrete is poured into the grouting holes, the diverted concrete flows sequentially through the first grouting groove, the second through hole, the third through hole, the second grouting groove, and the fourth through hole, so that the poured concrete fills the interior of each grouting groove. This is used to strengthen the quality of the assembled modular reinforcement components and improve the overall structural strength of the assembled modular reinforcement components.

[0019] 4. By designing both the hanging beam corrugated steel plate and the base beam corrugated steel plate as arched structures, it is easy to assemble them into a reinforced structure for the tunnel entrance. Furthermore, the several sets of first grouting grooves on the outer wall of the hanging beam corrugated steel plate and the several sets of second grouting grooves on the outer wall of the base beam corrugated steel plate facilitate the insertion of traction ropes through these grooves. A crane can then be used to simultaneously lift the traction ropes and the hanging beam and base beam corrugated steel plates, thus improving the ease of installation.

[0020] Other features and advantages of this invention will be set forth in the description which follows, and will be apparent in part from the description, or may be learned by practicing the invention. The objects and other advantages of this invention can be realized and obtained by means of the structures pointed out in the description, claims, and drawings. Attached Figure Description

[0021] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0022] Figure 1 A schematic diagram of the modular assembly structure of this utility model embodiment is shown. Figure 1 ;

[0023] Figure 2 A schematic diagram of the modular assembly structure of this utility model embodiment is shown. Figure 2 ;

[0024] Figure 3 A schematic diagram of the modular reinforcement component according to an embodiment of the present invention is shown;

[0025] Figure 4 A schematic diagram of the lifting beam mechanism according to an embodiment of this utility model is shown. Figure 1 ;

[0026] Figure 5 A schematic diagram of the lifting beam mechanism according to an embodiment of this utility model is shown. Figure 2 ;

[0027] Figure 6 A schematic diagram of the base beam mechanism according to an embodiment of the present invention is shown.

[0028] In the diagram: 1. Base layer; 2. Tunnel entrance; 3. Modular reinforcement component; 31. Lifting beam mechanism; 311. Lifting beam corrugated steel plate; 312. First grouting groove; 313. First sealing cover; 314. First through hole; 315. Second through hole; 316. First assembly block; 317. Adjustment groove; 318. Limiting plate; 319. Limiting claw; 3110. Grouting hole; 3111. Adjustment plate; 3112. Fastening block; 32. Base beam mechanism; 321. Base beam corrugated steel plate; 322. Second grouting groove; 323. Second sealing cover; 324. Third through hole; 325. Fourth through hole; 326. Second assembly block; 327. Positioning plate; 328. Limiting pin; 4. Pre-reinforced pile; 5. Reinforced crossbeam. Detailed Implementation

[0029] To make the objectives, technical solutions, and advantages of the embodiments of this utility model clearer, the technical solutions of the embodiments of this utility model will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this utility model, not all embodiments. Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of this utility model.

[0030] This utility model embodiment proposes a tunnel entrance assembly and reinforcement structure that facilitates the hoisting and assembly of corrugated steel plates, including a base layer 1; exemplarily, such as... Figure 1 and Figure 2 As shown.

[0031] A tunnel opening 2 is provided at the top of the base layer 1. Modular reinforcement components 3 are attached to both sides of the tunnel opening 2. The bottom ends of the two sets of modular reinforcement components 3 are fixedly connected to the top of the base layer 1. A pre-reinforcement pile 4 is provided at the connection between the base layer 1 and the tunnel opening 2. The pre-reinforcement pile 4 is located between the two sets of modular reinforcement components 3. Several sets of reinforcement beams 5 are horizontally arranged between the two sets of modular reinforcement components 3 for attaching to the inner wall of the tunnel opening 2.

[0032] Specifically, the two sets of modular reinforcement components 3 are spliced ​​together by hoisting to form an arched structure at both ends of the tunnel entrance 2. The modular reinforcement components 3 on both sides are horizontally connected to several sets of reinforcement beams 5 to form reinforcement structures that fit into different positions on the inner wall of the tunnel entrance 2, thereby improving the overall stability of the tunnel entrance 2 after the modular reinforcement components 3 are spliced ​​together.

[0033] The modular reinforcement component 3 includes a lifting beam mechanism 31; for example, such as Figure 3 As shown.

[0034] Both ends of the lifting beam mechanism 31 are fitted with base beam mechanisms 32, and the two sets of base beam mechanisms 32 and lifting beam mechanisms 31 are spliced ​​together to form a fan-shaped ring structure.

[0035] The lifting beam mechanism 31 includes a corrugated steel plate 311 for the lifting beam; for example, such as Figure 4 and Figure 5 As shown.

[0036] The outer wall of the corrugated steel plate 311 of the hanging beam is provided with several sets of first grouting grooves 312. The inner walls of the several sets of first grouting grooves 312 are fixedly connected with first sealing caps 313 on both sides. The two ends of the corrugated steel plate 311 of the hanging beam are provided with first through holes 314 for communicating with the base beam mechanism 32 on both sides. The inner wall of the corrugated steel plate 311 of the hanging beam is also provided with several sets of second through holes 315, and the several sets of second through holes 315 are used to communicate with the several sets of first grouting grooves 312. The bottom of the corrugated steel plate 311 of the hanging beam is fixedly connected with two sets of first assembly blocks 316, and the first assembly blocks 316 are provided with first positioning holes for penetrating the reinforcing crossbeam 5.

[0037] The top of the corrugated steel plate 311 of the lifting beam is provided with an adjustment groove 317. Both ends of the inner wall of the adjustment groove 317 are fixedly connected to a limiting plate 318. The outer wall of the limiting plate 318 is fixedly connected to a limiting claw 319. The top of the corrugated steel plate 311 of the lifting beam is provided with a grouting hole 3110, and the grouting hole 3110 is interconnected with the top of a set of first grouting grooves 312. The inner wall of the adjustment groove 317 is slidably fitted with two sets of adjustment plates 3111. The top of the two sets of adjustment plates 3111 and the position near the grouting hole 3110 are fixedly connected with fastening blocks 3112. The outer wall of the fastening block 3112 is provided with an internal threaded hole for fastening bolts.

[0038] Furthermore, the corrugated steel plate 311 of the lifting beam has an arched structure, and the corrugated steel plate 311 of the lifting beam utilizes several sets of first grouting grooves 312 opened on the outer side wall to facilitate the passage of the traction rope through its interior. Then, the traction rope and the corrugated steel plate 311 of the lifting beam are hoisted and transported simultaneously by a crane, which improves the convenience of the installation process of the corrugated steel plate 311 of the lifting beam.

[0039] The base beam mechanism 32 includes a base beam corrugated steel plate 321; for example, such as Figure 6 As shown.

[0040] The outer wall of the corrugated steel plate 321 of the foundation beam is provided with several sets of second grouting grooves 322, and the inner walls of the second grouting grooves 322 are fixedly connected with second sealing caps 323 on both sides. One end of the corrugated steel plate 321 of the foundation beam is provided with a third through hole 324, and the third through hole 324 is interconnected with the first through hole 314. The inner wall of the corrugated steel plate 321 of the foundation beam is provided with several sets of fourth through holes 325, and the several sets of fourth through holes 325 are provided with second grouting grooves 322. 22 are interconnected. A second assembly block 326 is fixedly connected to one side wall of the base beam corrugated steel plate 321. The second assembly block 326 has a second positioning hole for penetrating the reinforcing beam 5. Two sets of positioning plates 327 are fixedly connected to the outer wall of the base beam corrugated steel plate 321 and the side near the third through hole 324. A limiting pin 328 is fixedly connected between the two sets of positioning plates 327, and the limiting pin 328 is movably engaged with the limiting claw 319.

[0041] Furthermore, the corrugated steel plate 321 of the base beam has an arched structure, and the corrugated steel plate 321 of the base beam utilizes several sets of second grouting grooves 322 opened on the outer side wall to facilitate the passage of the traction rope through its interior. Then, the traction rope and the corrugated steel plate 321 of the base beam are hoisted and transported simultaneously by a crane, which improves the convenience of the installation process of the corrugated steel plate 321 of the base beam.

[0042] Specifically, one end of each of the two sets of base beam corrugated steel plates 321 is fixedly connected to the top of the base layer 1, so that the base beam corrugated steel plates 321 on both sides can be installed at the port of the tunnel entrance 2. When the lifting beam corrugated steel plates 311 are lowered by hoisting, the limiting claws 319 on both sides are engaged with the limiting pins 328 to form a modular reinforcement component 3 with a fan-shaped structure. The assembled modular reinforcement component 3 can meet the fitting requirements at the port of the tunnel entrance 2.

[0043] The grouting hole 3110 is used to inject concrete into its interior, so that the diverted concrete passes sequentially through the first grouting groove 312, the second through hole 315, the first through hole 314, the third through hole 324, the second grouting groove 322, and the fourth through hole 325, so that the poured concrete fills the interior of each grouting groove, thereby strengthening the quality of the assembled modular reinforcement component 3 and improving the overall structural strength of the assembled modular reinforcement component 3.

[0044] The working principle of the tunnel entrance assembly and reinforcement structure that facilitates the hoisting and assembly of corrugated steel plates, as proposed in this embodiment of the invention, is as follows:

[0045] Two sets of base beam corrugated steel plates 321 are fixedly connected at one end to the top of the base layer 1, so that the base beam corrugated steel plates 321 on both sides can be installed at the port of the tunnel entrance 2. When the lifting beam corrugated steel plates 311 are lowered by hoisting, the limiting claws 319 on both sides are engaged with the limiting pins 328 to form a modular reinforcement component 3 with a fan-shaped structure. The assembled modular reinforcement component 3 can meet the fitting requirements at the port of the tunnel entrance 2.

[0046] After concrete is poured into the grouting hole 3110, the diverted concrete flows sequentially through the first grouting groove 312, the second through hole 315, the first through hole 314, the third through hole 324, the second grouting groove 322, and the fourth through hole 325, so that the poured concrete fills the interior of each grouting groove, thereby strengthening the quality of the assembled modular reinforcement component 3 and improving the overall structural strength of the assembled modular reinforcement component 3.

[0047] Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A tunnel entrance assembly and reinforcement structure that facilitates the hoisting and assembly of corrugated steel plates, characterized in that: Includes a base layer (1); a tunnel opening (2) is provided on the top of the base layer (1), and modular reinforcement components (3) are attached to both sides of the tunnel opening (2), and the bottom ends of the two sets of modular reinforcement components (3) are fixedly connected to the top of the base layer (1). A pre-reinforcement pile (4) is provided at the connection between the base layer (1) and the tunnel opening (2), and the pre-reinforcement pile (4) is located between the two sets of modular reinforcement components (3). Several sets of reinforcement beams (5) for attaching to the inner wall of the tunnel opening (2) are horizontally arranged between the two sets of modular reinforcement components (3). The modular reinforcement component (3) includes a hanging beam mechanism (31); both ends of the hanging beam mechanism (31) are connected to a base beam mechanism (32), and the two sets of base beam mechanisms (32) and hanging beam mechanisms (31) are spliced ​​together to form a fan-shaped ring structure.

2. The tunnel entrance assembly and reinforcement structure for easy hoisting and assembly of corrugated steel plates according to claim 1, characterized in that: The lifting beam mechanism (31) includes a lifting beam corrugated steel plate (311); a plurality of first grouting grooves (312) are provided on the outer side wall of the lifting beam corrugated steel plate (311), and a first sealing cap (313) is fixedly connected to both sides of the inner wall of the plurality of first grouting grooves (312), and a first through hole (314) is provided at both ends of the lifting beam corrugated steel plate (311) for communicating with the two side base beam mechanisms (32).

3. The tunnel entrance assembly and reinforcement structure for easy hoisting and assembly of corrugated steel plates according to claim 2, characterized in that: The inner wall of the corrugated steel plate (311) of the hanging beam is also provided with several sets of second through holes (315), and the several sets of second through holes (315) are used to connect several sets of first grouting grooves (312) to each other. The bottom of the corrugated steel plate (311) of the hanging beam is fixedly connected with two sets of first assembly blocks (316), and the first assembly blocks (316) are provided with first positioning holes for penetrating the reinforcing beam (5).

4. The tunnel entrance assembly and reinforcement structure for easy hoisting and assembly of corrugated steel plates according to claim 3, characterized in that: The top of the corrugated steel plate (311) of the lifting beam is provided with an adjustment groove (317). Both ends of the inner wall of the adjustment groove (317) are fixedly connected with limit plates (318). The outer wall of the limit plate (318) is fixedly connected with limit claws (319). The top of the corrugated steel plate (311) of the lifting beam is provided with a grouting hole (3110), and the grouting hole (3110) is interconnected with the top of a set of first grouting grooves (312).

5. The tunnel entrance assembly and reinforcement structure for easy hoisting and assembly of corrugated steel plates according to claim 4, characterized in that: The inner wall of the adjustment groove (317) is slidably connected to two sets of adjustment plates (3111). The top of the two sets of adjustment plates (3111) and the position near the grouting hole (3110) are fixedly connected to fastening blocks (3112). The outer wall of the fastening block (3112) is provided with an internal threaded hole for fastening bolts.

6. The tunnel entrance assembly and reinforcement structure for easy hoisting and assembly of corrugated steel plates according to claim 1, characterized in that: The base beam mechanism (32) includes a base beam corrugated steel plate (321); the outer wall of the base beam corrugated steel plate (321) is provided with a number of second grouting grooves (322), and the inner walls of the second grouting grooves (322) are fixedly connected with second sealing caps (323) on both sides.

7. The tunnel entrance assembly and reinforcement structure for easy hoisting and assembly of corrugated steel plates according to claim 6, characterized in that: One end of the corrugated steel plate (321) of the base beam is provided with a third through hole (324), and the third through hole (324) is connected to the first through hole (314). The inner wall of the corrugated steel plate (321) of the base beam is provided with a number of fourth through holes (325), and the number of fourth through holes (325) are connected to the second grouting groove (322).

8. The tunnel entrance assembly and reinforcement structure for easy hoisting and assembly of corrugated steel plates according to claim 7, characterized in that: A second assembly block (326) is fixedly connected to one side wall of the base beam corrugated steel plate (321), and a second positioning hole for penetrating the reinforcing beam (5) is provided on the second assembly block (326). Two sets of positioning plates (327) are fixedly connected to the outer wall of the base beam corrugated steel plate (321) and the side near the third through hole (324). A limiting pin (328) is fixedly connected between the two sets of positioning plates (327), and the limiting pin (328) is movably engaged with the limiting claw (319).

Citation Information

Patent Citations

  • Prefabricated assembly structure in tunnel

    CN213625007U